[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-57":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":595},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,57,50,2973,[13,34,46,58,70,82,94,102,113,125,137,149,161,173,185,197,209,217,229,241,253,265,277,289,301,313,325,337,346,358,370,380,392,404,416,428,438,450,459,467,479,491,503,515,527,539,548,559,571,583],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1119886,1,"单选题","不属于施工平行承发包模式中进度控制内容的是( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","某一部分施工图完成后，即可开始这部分工程的招标，开工日期提前，可以边设计边施工，缩短建设周期",false,{"key":24,"text":25,"correct":26},"B","一般要等施工图设计全部结束后，才能进行施工总承包单位的招标，开工日期较迟，建设周期势必较长，对进度控制不利",true,{"key":28,"text":29,"correct":22},"C","工程总进度计划和控制由业主负责",{"key":31,"text":32,"correct":22},"D","由于要进行多次招标，业主用于招标的时间较多","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1119887,"下列情景中，可以考虑采用施工平行承发包模式的情况是()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"项目规模较小，具备施工能力的承包商较多",{"key":24,"text":41,"correct":22},"项目施工图已全部出齐，项目建设工期较长",{"key":28,"text":43,"correct":26},"业主有足够的经验和能力应对多家施工单位",{"key":31,"text":45,"correct":22},"业主希望管理风险较小，管理成本较低",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1119888,"关于施工总承包模式的说法，正确的是()",[50,52,54,56],{"key":20,"text":51,"correct":22},"工程质量的好坏取决于业主的管理水平",{"key":24,"text":53,"correct":22},"施工总承包模式适用于建设周期紧迫的项目",{"key":28,"text":55,"correct":26},"施工总承包模式下业主对施工总承包单位的依赖较大",{"key":31,"text":57,"correct":22},"施工总承包合同一般采用单价合同",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1119889,"某开发公司在工程建设方面经验不足，目前拟建项目的施工图设计尚未完成，在此情况下，为早日开工，该公司可采用的较为适宜的承发包模式是（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"平行承发包",{"key":24,"text":65,"correct":22},"施工总承包",{"key":28,"text":67,"correct":26},"施工总承包管理",{"key":31,"text":69,"correct":22},"分别承发包",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1119890,"某建设工程业主将项目的全部施工任务发包给甲施工单位，对于这种发承包方式，下列表述中正确的是（）",[74,76,78,80],{"key":20,"text":75,"correct":22},"项目质量的好坏很大程度上取决于业主的管理水平",{"key":24,"text":77,"correct":22},"施工总承包合同一般实行单价合同",{"key":28,"text":79,"correct":22},"业主需要进行多次招标，合同管理量较大",{"key":31,"text":81,"correct":26},"业主只负责对施工总承包单位的管理及组织协调",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1119891,"某建设项目采用施工总承包管理模式，现拟将项目中的安装工程分包给某安装单位，则该分包单位的选择应由()决策。",[86,88,90,92],{"key":20,"text":87,"correct":22},"工程师",{"key":24,"text":89,"correct":22},"施工总承包管理单位",{"key":28,"text":91,"correct":26},"业主",{"key":31,"text":93,"correct":22},"施工总承包单位",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1119892,"为保证项目早日开工，而且对施工总承包单位的招标不依赖施工图设计，工程业主可采用的较为适宜的模式是()",[98,99,100,101],{"key":20,"text":63,"correct":22},{"key":24,"text":65,"correct":22},{"key":28,"text":67,"correct":26},{"key":31,"text":69,"correct":22},{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":20,"analysis":33},1119893,"下列有关施工总承包模式的表述中正确的是()。",[106,108,110,112],{"key":20,"text":107,"correct":26},"业主只与一个施工总承包单位签约，合同管理量较小",{"key":24,"text":109,"correct":22},"业主要负责所有施工单位的管理及组织协调，对业主不利",{"key":28,"text":111,"correct":22},"施工总承包合同一般实行单价合同，对业主有利",{"key":31,"text":75,"correct":22},{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":24,"analysis":33},1119894,"根据专业工程分包合同示范文本规定，分包合同约定的工程变更调整的合同价款，应()。",[117,119,121,123],{"key":20,"text":118,"correct":22},"与工程结算款同期支付",{"key":24,"text":120,"correct":26},"与工程进度款同期调整支付",{"key":28,"text":122,"correct":22},"单独支付",{"key":31,"text":124,"correct":22},"以上三种方式均可",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":31,"analysis":33},1119895,"根据《建设工程施工专业分包合同（示范文本）》规定，承包人应当向分包人提供（）。",[129,131,133,135],{"key":20,"text":130,"correct":22},"全套总包合同供分包人查阅",{"key":24,"text":132,"correct":22},"合同专用条款中约定的设备和设施，费用由分包人承担",{"key":28,"text":134,"correct":22},"与监理公司签订的合同",{"key":31,"text":136,"correct":26},"与分包工程相关的各种证件、批件和各种相关资料",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":31,"analysis":33},1119896,"根据《建设工程施工劳务分包合同（示范文本）》（GF-2003-0214），劳务分包项目的施工组织设计应由()负责编制",[141,143,145,147],{"key":20,"text":142,"correct":22},"发包人",{"key":24,"text":144,"correct":22},"监理人",{"key":28,"text":146,"correct":22},"劳务分包人",{"key":31,"text":148,"correct":26},"承包人",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":24,"analysis":33},1119897,"索赔报告的关键部分是（）部分。",[153,155,157,159],{"key":20,"text":154,"correct":22},"总述部分",{"key":24,"text":156,"correct":26},"论证部分",{"key":28,"text":158,"correct":22},"索赔款项（或工期）计算部分",{"key":31,"text":160,"correct":22},"证据部分",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":31,"analysis":33},1119898,"承包人必须在发出索赔意向通知后的( )天内，提交一份详细的索赔文件和有关资料。",[165,167,169,171],{"key":20,"text":166,"correct":22},"7天",{"key":24,"text":168,"correct":22},"14天",{"key":28,"text":170,"correct":22},"21天",{"key":31,"text":172,"correct":26},"28天",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":31,"analysis":33},1119899,"根据《标准施工招标文件》，承包人按合同约定提交的最终结清申请单中，只能够提出（）发生的索赔。",[177,179,181,183],{"key":20,"text":178,"correct":22},"缺陷责任期终止证书颁发前",{"key":24,"text":180,"correct":22},"竣工付款证书接收前",{"key":28,"text":182,"correct":22},"工程接收证书颁发前",{"key":31,"text":184,"correct":26},"工程接收证书颁发后",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":28,"analysis":33},1119900,"承包人应在知道或应当知道索赔事件发生后( )d内，向监理人递交索赔意向通知书，并说明发生索赔事件的事由。",[189,191,193,195],{"key":20,"text":190,"correct":22},"7",{"key":24,"text":192,"correct":22},"14",{"key":28,"text":194,"correct":26},"28",{"key":31,"text":196,"correct":22},"56",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":24,"analysis":33},1119901,"施工承包合同索赔成立的条件之一是：造成承包人费用增加或工期损失的原因，按合同约定()。",[201,203,205,207],{"key":20,"text":202,"correct":22},"不属于发包人的合同责任或风险责任",{"key":24,"text":204,"correct":26},"不属于承包人的行为责任或风险责任",{"key":28,"text":206,"correct":22},"属于承包人的可预见的不利外界条件",{"key":31,"text":208,"correct":22},"属于分包人的风险",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":24,"analysis":33},1119902,"索赔报告中，旨在解决索赔权能否成立的关键部分是()。",[213,214,215,216],{"key":20,"text":154,"correct":22},{"key":24,"text":156,"correct":26},{"key":28,"text":158,"correct":22},{"key":31,"text":160,"correct":22},{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":28,"analysis":33},1119903,"对于设计变更引起的工程价格调整，监理公司可按照()的原则，商定或确定变更工作的单价。",[221,223,225,227],{"key":20,"text":222,"correct":22},"最低利润",{"key":24,"text":224,"correct":22},"市场价格",{"key":28,"text":226,"correct":26},"成本加利润",{"key":31,"text":228,"correct":22},"最低成本",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":20,"analysis":33},1119904,"发包人或者工程师的签证可以作为索赔的()。",[233,235,237,239],{"key":20,"text":234,"correct":26},"证据",{"key":24,"text":236,"correct":22},"法律依据",{"key":28,"text":238,"correct":22},"旁证",{"key":31,"text":240,"correct":22},"参考",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":31,"analysis":33},1119905,"不属于索赔证据的有( )。",[245,247,249,251],{"key":20,"text":246,"correct":22},"各种合同文件",{"key":24,"text":248,"correct":22},"施工日记、备忘录",{"key":28,"text":250,"correct":22},"工程有关照片和录像",{"key":31,"text":252,"correct":26},"法律法规",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":28,"analysis":33},1119906,"施工合同履行过程中发生工程变更时，应由（）向承包人发出变更指令。",[257,259,261,263],{"key":20,"text":258,"correct":22},"项目业主",{"key":24,"text":260,"correct":22},"设计单位",{"key":28,"text":262,"correct":26},"监理方",{"key":31,"text":264,"correct":22},"变更提出方",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":20,"analysis":33},1119907,"某施工合同实施过程中出现了偏差，经过偏差分析后，承包人采取了夜间加班、增加劳动力投入等措施。这种调整措施属于()。",[269,271,273,275],{"key":20,"text":270,"correct":26},"组织措施",{"key":24,"text":272,"correct":22},"技术措施",{"key":28,"text":274,"correct":22},"经济措施",{"key":31,"text":276,"correct":22},"合同措施",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":24,"analysis":33},1119908,"根据《标准施工招标文件》,下列不属于工程变更范围的是(",[281,283,285,287],{"key":20,"text":282,"correct":22},"改变合同中任何一项工作的质量或其他特性",{"key":24,"text":284,"correct":26},"取消合同中任何一项工作,被取消的工作转由其他人实施",{"key":28,"text":286,"correct":22},"改变合同工程的基线、标高、位置或尺寸",{"key":31,"text":288,"correct":22},"为完成工程需要追加的额外工作",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":31,"analysis":33},1119909,"从风险角度而言，以下合同中业主方承担风险程度最大的合同是( )。",[293,295,297,299],{"key":20,"text":294,"correct":22},"固定单价合同",{"key":24,"text":296,"correct":22},"变动单价合同",{"key":28,"text":298,"correct":22},"总价合同",{"key":31,"text":300,"correct":26},"成本加酬金合同",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":28,"analysis":33},1119910,"在招标时，当图纸、规范准备不充分，不能据以确定合同价格，而仅能制订一个估算指标时，宜采用（）合同。",[305,307,309,311],{"key":20,"text":306,"correct":22},"成本加固定费用",{"key":24,"text":308,"correct":22},"成本加固定比例费用",{"key":28,"text":310,"correct":26},"成本加奖金",{"key":31,"text":312,"correct":22},"最大成本加费用",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":20,"analysis":33},1119911,"施工合同跟踪主要是为了()。",[317,319,321,323],{"key":20,"text":318,"correct":26},"确保合同义务的完全履行",{"key":24,"text":320,"correct":22},"跟踪和监控业主及监理人的工作",{"key":28,"text":322,"correct":22},"及时进行合同变更",{"key":31,"text":324,"correct":22},"发现施工计划是否偏离了工程目标",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":24,"analysis":33},1119912,"施工合同跟踪的重要依据不包括()。",[329,331,333,335],{"key":20,"text":330,"correct":22},"管理人员对现场巡视了解的情况",{"key":24,"text":332,"correct":26},"合同实施中出现的偏差情况",{"key":28,"text":334,"correct":22},"各种实际工程文件",{"key":31,"text":336,"correct":22},"依据合同而编制的各种计划文件",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":31,"analysis":33},1119913,"当工程项目实行施工总承包管理模式时，业主与施工总承包管理单位的合同一般采用( )。",[341,342,344,345],{"key":20,"text":294,"correct":22},{"key":24,"text":343,"correct":22},"固定总价合同",{"key":28,"text":296,"correct":22},{"key":31,"text":300,"correct":26},{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},1119914,"下列不属于总价合同的特点的是()。",[350,352,354,356],{"key":20,"text":351,"correct":26},"可以减少承包商的对立情绪",{"key":24,"text":353,"correct":22},"承包人将承担较多的风险",{"key":28,"text":355,"correct":22},"在施工进度上能极大地调动承包人的积极性",{"key":31,"text":357,"correct":22},"发包单位能更容易、更有把握地对项目进行控制",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},1119915,"以成本加酬金形式发包的建设工程项目，其施工图纸可能不能事先完成。因此，在不增加成本的前提下，承包商可以通过()缩短工期。",[362,364,366,368],{"key":20,"text":363,"correct":26},"分段施工",{"key":24,"text":365,"correct":22},"加快进度",{"key":28,"text":367,"correct":22},"增加人工",{"key":31,"text":369,"correct":22},"增加设备",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},1119916,"下列施工承包合同形式中，承包商承担全部工作量和价格风险的是()。",[374,376,377,379],{"key":20,"text":375,"correct":22},"单价合同",{"key":24,"text":343,"correct":26},{"key":28,"text":378,"correct":22},"变动总价合同",{"key":31,"text":300,"correct":22},{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":28,"analysis":33},1119917,"某建设工程项目承包合同的计价方式是单价合同，地基与基础分部工程完成后，其钢筋混凝土工程实际完成的工程量是2007立方米，而投标时工程量清单中该分项的工程量是1995立方米。在这种情况下，业主应根据()算该分项应付的工程款。",[384,386,388,390],{"key":20,"text":385,"correct":22},"1995立方米乘以合同单价",{"key":24,"text":387,"correct":22},"1995立方米乘以调整后的单价",{"key":28,"text":389,"correct":26},"2007立方米乘以合同单价",{"key":31,"text":391,"correct":22},"2007立方米乘以调整后的单价",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":28,"analysis":33},1119918,"对于业主而言，采用固定总价合同形式发包工程，比较有利于业主控制()。",[396,398,400,402],{"key":20,"text":397,"correct":22},"质量",{"key":24,"text":399,"correct":22},"进度",{"key":28,"text":401,"correct":26},"投资",{"key":31,"text":403,"correct":22},"纠纷",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":24,"analysis":33},1119919,"某施工工程发包时工程量不明确，因此采用单价合同，并根据估算的总工程量约一个合同总价。在实际结算时，上述合同总价与合同各项单价乘以实际完成工程量之和不一致，则应付工程款应以（）为准。",[408,410,412,414],{"key":20,"text":409,"correct":22},"签订的合同总价",{"key":24,"text":411,"correct":26},"合同中各项单位乘以实际完成的工程量之和：成的工程量之和",{"key":28,"text":413,"correct":22},"实际完成的工程量乘以重新协商的各项单价之和",{"key":31,"text":415,"correct":22},"双方重新协商确定的单价和工程量",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":20,"analysis":33},1119920,"施工单价合同“单价优先”原则在结算中主要体现在应支付价款按（）。",[420,422,424,426],{"key":20,"text":421,"correct":26},"实际完成并经工程师认可的工程量和合同单价",{"key":24,"text":423,"correct":22},"清单工程量和合同单价",{"key":28,"text":425,"correct":22},"清单工程量和结算时市场单价",{"key":31,"text":427,"correct":22},"实际工程量和结算时市场单价",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":24,"analysis":33},1119921,"设备采购合同通常采用()。",[432,434,435,437],{"key":20,"text":433,"correct":22},"可调单价合同",{"key":24,"text":343,"correct":26},{"key":28,"text":436,"correct":22},"可调总价合同",{"key":31,"text":300,"correct":22},{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":31,"analysis":33},1119922,"某物资采购合同履行中，由于供货方的错误，实际交付的钢材型号与合同约定不符。对这一问题，正确的处理方式是()。",[442,444,446,448],{"key":20,"text":443,"correct":22},"采购方同意利用，仍按原合同价格计价",{"key":24,"text":445,"correct":22},"采购方同意利用，应当按质论价，且供货方应按合同约定向采购方支付违约金",{"key":28,"text":447,"correct":22},"采购方不同意使用，应由供货方负责更换，采购方承担相关运费",{"key":31,"text":449,"correct":26},"采购方不同意使用，应由供货方负责更换，并承担相关费用",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":28,"analysis":33},1119923,"( )又称为可调总价合同，合同的价格计算是以图纸及规定、规范为基础的。",[454,455,456,457],{"key":20,"text":298,"correct":22},{"key":24,"text":343,"correct":22},{"key":28,"text":378,"correct":26},{"key":31,"text":458,"correct":22},"浮动总价合同",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":20,"analysis":33},1119924,"在国际上，（）被广泛接受和采用，因为有比较成熟的法规和先进的经验，业主的要求和条件清楚，在合同签订时就可以基本确定项目的总投资额，在这类合同中承包商承担了全部的工作量和价格的风险，因此承包商在报价时对一切费用的价格变动因素以及不可预见因素都作了充分估计。",[463,464,465,466],{"key":20,"text":343,"correct":26},{"key":24,"text":378,"correct":22},{"key":28,"text":294,"correct":22},{"key":31,"text":296,"correct":22},{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":24,"analysis":33},1119925,"采用固定总价合同形式发包工程，承包商为了降低自己在工程量和价格上承担的风险，通常会在合同报价中报较高的( )。",[471,473,475,477],{"key":20,"text":472,"correct":22},"措施费",{"key":24,"text":474,"correct":26},"不可预见风险费",{"key":28,"text":476,"correct":22},"单价",{"key":31,"text":478,"correct":22},"管理费",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":31,"analysis":33},1119926,"建设工程合同按承包工程计价方式可分为（）。",[483,485,487,489],{"key":20,"text":484,"correct":22},"总价合同、单价合同、成本加奖金合同、有偿合同",{"key":24,"text":486,"correct":22},"固定总价合同、纯单价合同、成本加固定金额酬金合同、买卖合同",{"key":28,"text":488,"correct":22},"固定总价合同、可调总价合同、单价与包干混合式合同、总承包合同",{"key":31,"text":490,"correct":26},"总价合同、单价合同、成本补偿合同",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":24,"analysis":33},1119927,"根据《建设工程施工专业分包合同（示范文本）》（GF-2003-0213），关于分包人，承包人和分包人关系的说法，正确的是()",[495,497,499,501],{"key":20,"text":496,"correct":22},"发包人向分包人提供具备施工条件的施工场地",{"key":24,"text":498,"correct":26},"就分包范围内的有关工作，承包人随时可以向分包人发出指令",{"key":28,"text":500,"correct":22},"分包人可直接致电发包人或工程师",{"key":31,"text":502,"correct":22},"分包合同价款与总承包合同相应部分价款存在连带关系",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":28,"analysis":33},1119928,"关于缺陷责任，下列说法正确的是（）。",[507,509,511,513],{"key":20,"text":508,"correct":22},"缺陷责任期自竣工验收合格之日起计算",{"key":24,"text":510,"correct":22},"经查验属发包人原因造成的，发包人应承担修复和查验的费用和工期，并支付承包人合理利润",{"key":28,"text":512,"correct":26},"缺陷责任期最长不超过2年",{"key":31,"text":514,"correct":22},"在缺陷责任期，由监理人向承包人出具经监理人签认的缺陷责任期终止证书，并退还剩余的质量保证金",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":28,"analysis":33},1119929,"根据《建设工程施工专业分包合同(示范文本)》(GF-2003-0213)不属于承包人责任与义务的是()。",[519,521,523,525],{"key":20,"text":520,"correct":22},"组织分包人参加发包人组织的图纸会审,向分包人进行设计图纸交底",{"key":24,"text":522,"correct":22},"负责整个施工场地的管理工作,协调分包人与统一施工场地的其他分包人之间的配合",{"key":28,"text":524,"correct":26},"负责提供专业分包合同专用条款中约定的保修与试车,并承担由此发生的费用",{"key":31,"text":526,"correct":22},"随时为分包人提供确保分包工程施工所要求的施工场地和通告,满足施工运输需要",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":24,"analysis":33},1119930,"某承包人承揽一房屋建筑项目，现已按合同约定通过竣工验收。承包人的缺陷责任期应自()起计算。",[531,533,535,537],{"key":20,"text":532,"correct":22},"承包人提交竣工验收申请报告之日后5天",{"key":24,"text":534,"correct":26},"工程接收证书中写明的实际竣工日期",{"key":28,"text":536,"correct":22},"发包人签认工程接收证书之日",{"key":31,"text":538,"correct":22},"监理向承包人出具经发包人签认的工程接收证书之日",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":28,"analysis":33},1119931,"在缺陷责任期，包括根据合同规定延长的期限终止后（）d内，由监理人向承包人出具经发包人签认的缺陷责任期终止证书，并退还剩余的质量保证金。",[543,545,546,547],{"key":20,"text":544,"correct":22},"2",{"key":24,"text":190,"correct":22},{"key":28,"text":192,"correct":26},{"key":31,"text":194,"correct":22},{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":24,"analysis":33},1119932,"承包人按照专用合同条款的规定份数和期限向监理人提交竣工付款申请单的时间是( )。",[552,554,556,557],{"key":20,"text":553,"correct":22},"工程接受证书颁发前",{"key":24,"text":555,"correct":26},"工程接受证书颁发后",{"key":28,"text":178,"correct":22},{"key":31,"text":558,"correct":22},"缺陷责任期终止证书颁发后",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":31,"analysis":33},1119933,"根据《标准施工招标文件》中“通用合同条款”的规定，监理人出具进度付款证书，则()。",[563,565,567,569],{"key":20,"text":564,"correct":22},"视为监理人已同意承包人完成的该部分工作",{"key":24,"text":566,"correct":22},"视为发包人已接受承包人完成的该部分工作",{"key":28,"text":568,"correct":22},"发包人应在收到该证书后28天内，将进度款支付给承包人",{"key":31,"text":570,"correct":26},"不应视为监理人已批准了承包人完成的该部分工作",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":31,"analysis":33},1119934,"根据《建设工程施工合同（示范文本）》(GF-1999-0201)规定，缺陷责任期自()日期起开始计算。",[575,577,579,581],{"key":20,"text":576,"correct":22},"主体工程结束",{"key":24,"text":578,"correct":22},"工程开工",{"key":28,"text":580,"correct":22},"提交竣工验收报告",{"key":31,"text":582,"correct":26},"实际竣工",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":31,"analysis":33},1119935,"根据《标准施工招标文件》，除专用合同条款另有约定外，经验收合格工程的实际竣工日期，以()的日期为准，并在工程接收证书中写明。",[587,589,591,593],{"key":20,"text":588,"correct":22},"承包人实际完成工程的日期",{"key":24,"text":590,"correct":22},"工程竣工验收后，发包人给予认可意见的日期",{"key":28,"text":592,"correct":22},"组织工程竣工验收的日期",{"key":31,"text":594,"correct":26},"提交竣工验收申请报告的日期",[596,599,602,605,608,611],{"id":15,"name":597,"category":7,"favorite":598},"领导干部任职前廉政法规知识测试题",92,{"id":600,"name":601,"category":7,"favorite":15},595,"建筑结构与设备",{"id":603,"name":604,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":606,"name":607,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":609,"name":610,"category":7,"favorite":8},534,"BIM工程师",{"id":612,"name":610,"category":7,"favorite":8},535]