[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-56":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":597},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,56,50,2973,[13,34,46,58,70,82,94,106,118,129,141,153,165,176,187,199,211,222,234,246,254,266,278,288,300,312,324,336,344,356,368,377,386,394,406,418,430,442,454,466,478,489,501,513,525,537,549,561,573,585],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1119835,1,"单选题","下列工程资料中，可以作为承包人向业主索赔依据的是()。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","承包人安全交底会议纪要",false,{"key":24,"text":25,"correct":22},"B","承包人技术交底纪要",{"key":27,"text":28,"correct":22},"C","承包人与分包人签订的分包合同",{"key":30,"text":31,"correct":32},"D","承包人和发包人签订的合同文件",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},1119836,"关于索赔，下列说法不正确的是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"合同的双方都可以向对方提出索赔要求",{"key":24,"text":41,"correct":22},"索赔是一种正当的权利要求",{"key":27,"text":43,"correct":22},"与索赔相对应的活动是反索赔",{"key":30,"text":45,"correct":32},"索赔的依据法律、法规和工程建设惯例",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1119837,"不属于施工合同文件组成的是( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"合同协议书",{"key":24,"text":53,"correct":32},"投标须知",{"key":27,"text":55,"correct":22},"合同通用条款",{"key":30,"text":57,"correct":22},"工程报价单",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1119838,"施工合同的索赔是一种()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"弥补报价失误的手段",{"key":24,"text":65,"correct":22},"应对苛刻合同条件的策略",{"key":27,"text":67,"correct":32},"正当的权利要求",{"key":30,"text":69,"correct":22},"获得额外收入的途径",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1119839,"根据九部委《标准施工招标文件》，承包人提交了索赔文件后，干扰事件对施工造成持续影响，这种情况下承包人的正确做法位（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"只需在干扰事件影响结束后28d内提交最终索赔报告",{"key":24,"text":77,"correct":32},"按工程师要求的间隔提交延续索赔通知，干扰事件影响结束后28d内提交最终索赔报告",{"key":27,"text":79,"correct":22},"按工程师要求的间隔提交延续索赔通知，干扰事件影响结束后36d内提交最终索赔报告",{"key":30,"text":81,"correct":22},"按工程师要求的间隔提交中间索赔报告，干扰事件影响结束后28d内提交最终索赔报告",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1119840,"根据《标准施工招标文件》，在索赔事件影响结束后的28天内，承包人应向监理人递交()。",[86,88,90,92],{"key":20,"text":87,"correct":22},"索赔意向通知",{"key":24,"text":89,"correct":22},"中间索赔报告",{"key":27,"text":91,"correct":32},"最终索赔报告",{"key":30,"text":93,"correct":22},"索赔证据",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1119841,"承包商在施工过程中，由于设计变更的个别施工图纸变更拖延，造成工程局部施工拖延约3个月，在这种情况下，承包商向发包人提出工期和费用索赔，其工作程序应该是( )。",[98,100,102,104],{"key":20,"text":99,"correct":32},"索赔意向通知书--------索赔通知书--------延续索赔通知书--------最终索赔通知书",{"key":24,"text":101,"correct":22},"索赔意向通知书--------延续索赔通知书--------最终索赔通知书",{"key":27,"text":103,"correct":22},"索赔意向通知书--------延续索赔通知书",{"key":30,"text":105,"correct":22},"索赔意向通知书--------索赔通知书",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1119842,"根据《标准施工招标文件》，发生发包人索赔事件后，监理人应及时书面通知承包人，详细说明索赔金额和（或）延长缺陷责任期的细节和依据，发包人提出索赔的期限和要求应（）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"视工程具体情况而不同",{"key":24,"text":113,"correct":22},"在《标准施工招标文件》中没有规定",{"key":27,"text":115,"correct":32},"与承包人提出索赔的期限和要求相同",{"key":30,"text":117,"correct":22},"与承包人协商以后确定",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1119843,"某承包商承揽的写字楼工程，由于场地中间有几户居民不搬迁，工程不能按期开工。承包商向业主（监理工程师）发出索赔意向书后，依然迟迟不能开工情况下，承包商应该按照工程师要求的合理间隔期，提交（）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"新的索赔意向书",{"key":24,"text":125,"correct":32},"延续索赔通知",{"key":27,"text":127,"correct":22},"新的索赔证据和依据",{"key":30,"text":91,"correct":22},{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":30,"analysis":33},1119845,"下列材料属于索赔意向通知内容的是（）",[133,135,137,139],{"key":20,"text":134,"correct":22},"索赔金额",{"key":24,"text":136,"correct":22},"承包人为该索赔事项付出的附加开支",{"key":27,"text":138,"correct":22},"索赔工期的计算",{"key":30,"text":140,"correct":32},"索赔依据",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":24,"analysis":33},1119846,"建设工程实施过程中承包人向发包人提出索赔第一步是（）",[145,147,149,151],{"key":20,"text":146,"correct":22},"报告索赔事件",{"key":24,"text":148,"correct":32},"提出索赔意向",{"key":27,"text":150,"correct":22},"计算索赔金额",{"key":30,"text":152,"correct":22},"提交索赔证据",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":30,"analysis":33},1119847,"施工合同索赔程序的第一步是（）。",[157,159,161,163],{"key":20,"text":158,"correct":22},"承包人收集证据",{"key":24,"text":160,"correct":22},"承包人提交索赔报告",{"key":27,"text":162,"correct":22},"监理人审核索赔报告",{"key":30,"text":164,"correct":32},"承包人向监理人提交索赔意向通知书",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":24,"analysis":33},1119848,"一般索赔意向通知仅仅表明索赔的意向，应该尽量简明扼要，涉及索赔内容，但不涉及（）。",[169,171,172,174],{"key":20,"text":170,"correct":22},"索赔时间",{"key":24,"text":134,"correct":32},{"key":27,"text":173,"correct":22},"索赔方式",{"key":30,"text":175,"correct":22},"以上都不对",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":20,"analysis":33},1119849,"在工程实施过程中发生索赔事件以后,或者承包人发现索赔机会,索赔工作程序的第一步是要()。",[180,181,183,185],{"key":20,"text":148,"correct":32},{"key":24,"text":182,"correct":22},"提出索赔金额",{"key":27,"text":184,"correct":22},"提出索赔时间",{"key":30,"text":186,"correct":22},"提出索赔报告",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":24,"analysis":33},1119850,"根据《标准施工招标文件》规定，对于承包人向发包人的索赔请求，索赔文件首先应该交由()审核。",[191,193,195,197],{"key":20,"text":192,"correct":22},"业主",{"key":24,"text":194,"correct":32},"监理人",{"key":27,"text":196,"correct":22},"项目经理",{"key":30,"text":198,"correct":22},"承包人",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":24,"analysis":33},1119851,"工程施工过程中发生索赔事件以后，承包人首先要做的工作是()。",[203,205,207,209],{"key":20,"text":204,"correct":22},"向监理工程师提交索赔证据",{"key":24,"text":206,"correct":32},"提出索赔意向通知",{"key":27,"text":208,"correct":22},"提交索赔报告",{"key":30,"text":210,"correct":22},"与业主就索赔事项进行谈判",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":27,"analysis":33},1119852,"根据九部委《标准施工招标文件》承包人应在索赔事件影响结束后的28d内向监理人递交（）",[215,216,218,220],{"key":20,"text":87,"correct":22},{"key":24,"text":217,"correct":22},"中间索赔依据",{"key":27,"text":219,"correct":32},"最终索赔通知书",{"key":30,"text":221,"correct":22},"索赔声明",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":30,"analysis":33},1119853,"索赔资料准备阶段的主要工作，不包括（）。",[226,228,230,232],{"key":20,"text":227,"correct":22},"跟踪和调查干扰事件，掌握事件产生的详细经过",{"key":24,"text":229,"correct":22},"分析干扰事件产生的原因，划清各方责任，确定索赔根据",{"key":27,"text":231,"correct":22},"损失或损害调查分析与计算，确定工期索赔和费用索赔值",{"key":30,"text":233,"correct":32},"提交索赔意向通知和索赔报告",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":27,"analysis":33},1119854,"承包人必须在发出索赔意向通知后的( )天内或经过工程师（监理人）同意的其他合理时间内向工程师（监理人）提交一份详细的索赔文件和有关资料。",[238,240,242,244],{"key":20,"text":239,"correct":22},"7",{"key":24,"text":241,"correct":22},"14",{"key":27,"text":243,"correct":32},"28",{"key":30,"text":245,"correct":22},"56",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":20,"analysis":33},1119855,"承包商拟向业主提出工期索赔，索赔工作程序的第一步是要( )。",[250,251,252,253],{"key":20,"text":148,"correct":32},{"key":24,"text":182,"correct":22},{"key":27,"text":184,"correct":22},{"key":30,"text":186,"correct":22},{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":20,"analysis":33},1119856,"索赔报告的关键部分是()，其目的是说明自己具有索赔权，是索赔能否成立的关键。",[258,260,262,264],{"key":20,"text":259,"correct":32},"论证部分",{"key":24,"text":261,"correct":22},"总述部分",{"key":27,"text":263,"correct":22},"索赔款项（或工期）计算部分",{"key":30,"text":265,"correct":22},"证据部分",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":20,"analysis":33},1119857,"索赔文件的主要内容包括总述部分、论证部分、工期计算部分和证据部分。其论证部分是()。",[270,272,274,276],{"key":20,"text":271,"correct":32},"索赔报告的关键部分，其目的是说明自己有索赔权，是索赔能否成立的关键",{"key":24,"text":273,"correct":22},"论述索赔事项发生的日期和过程；承包人为该索赔事项付出的努力和附加开支；承包人的具体索赔要求",{"key":27,"text":275,"correct":22},"解决索赔权能否成立，则款项计算是为解决能得多少款项",{"key":30,"text":277,"correct":22},"对重要的证据资料附以文字说明，或附以确认件",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":24,"analysis":33},1119858,"对于承包人向发包人的索赔请求，索赔文件首先应该交由()审核。",[282,283,285,286],{"key":20,"text":192,"correct":22},{"key":24,"text":284,"correct":32},"工程师",{"key":27,"text":196,"correct":22},{"key":30,"text":287,"correct":22},"律师",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":24,"analysis":33},1119859,"某新校区抗震模拟实验室工程，模拟振动台设备基础采用钢筋混凝土大块基础，混凝土施工要求使用商品混凝土。但在模拟振动台设备基础施工中，由于业主要求从使用商品混凝土变更为现场搅拌，致使工程延期3天。则承包商可索赔材料费的情况是（）。",[292,294,296,298],{"key":20,"text":293,"correct":22},"人工价格上涨",{"key":24,"text":295,"correct":32},"材料超期储存",{"key":27,"text":297,"correct":22},"材料被盗和损坏",{"key":30,"text":299,"correct":22},"材料进货日期变化",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":20,"analysis":33},1119860,"造成承包人费用增加或工期损失的原因，按合同约定（）是承包人对此费用索赔成立的必要条件之一。",[304,306,308,310],{"key":20,"text":305,"correct":32},"不属于承包人的行为责任或风险责任",{"key":24,"text":307,"correct":22},"不属于发包人的合同责任或风险责任",{"key":27,"text":309,"correct":22},"属于承包人可预见的不利外界条件",{"key":30,"text":311,"correct":22},"属于分包人的风险",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":27,"analysis":33},1119861,"关于建设工程索赔成立条件的说法，正确的是()。",[316,318,320,322],{"key":20,"text":317,"correct":22},"导致索赔的事件必须是对方的过错，索赔才能成立",{"key":24,"text":319,"correct":22},"只要对方存在过错，不管是否造成损失，索赔都能成立",{"key":27,"text":321,"correct":32},"不按照合同规定的程序提交索赔报告，索赔不能成立",{"key":30,"text":323,"correct":22},"只要索赔事件的事实存在，在合同有效期内任何时候提出索赔都能成立",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":27,"analysis":33},1119862,"索赔事件是指那些使实际情况与合同规定不符合的各类事件，其在施工过程中最终引起的应是()的变化。",[328,330,332,334],{"key":20,"text":329,"correct":22},"规范和标准",{"key":24,"text":331,"correct":22},"方案和部署",{"key":27,"text":333,"correct":32},"工期和费用",{"key":30,"text":335,"correct":22},"合同条件",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":30,"analysis":33},1119863,"索赔事件（又称为干扰事件）使实际情况与合同规定不符合，其在施工过程中最终引起的应是()的变化。",[340,341,342,343],{"key":20,"text":329,"correct":22},{"key":24,"text":331,"correct":22},{"key":27,"text":335,"correct":22},{"key":30,"text":333,"correct":32},{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":30,"analysis":33},1119864,"索赔证据应该具有()、及时性、全面性、关联性和有效性。",[348,350,352,354],{"key":20,"text":349,"correct":22},"合理性",{"key":24,"text":351,"correct":22},"科学性",{"key":27,"text":353,"correct":22},"明确性",{"key":30,"text":355,"correct":32},"真实性",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":20,"analysis":33},1119865,"下列情形中，承包人不可以提起索赔的事件是()。",[360,362,364,366],{"key":20,"text":361,"correct":32},"不可抗力导致承包人的设备损坏",{"key":24,"text":363,"correct":22},"合同规定以外的项目进行检验，且检验合格",{"key":27,"text":365,"correct":22},"物价上涨，法规变化",{"key":30,"text":367,"correct":22},"发包人提出提前完成项目",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":20,"analysis":33},1119866,"工程施工中发生了索赔事件，承包人应按规定的程序和时间提交索赔文件，其中说明自己有索赔权，决定索赔能否成立的关健是()",[372,373,374,376],{"key":20,"text":259,"correct":32},{"key":24,"text":265,"correct":22},{"key":27,"text":375,"correct":22},"索赔款项",{"key":30,"text":261,"correct":22},{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":30,"analysis":33},1119867,"为了不失去索赔权利，承包人应在干扰事件影响结束后的()天内，提交最终索赔报告。",[381,382,383,385],{"key":20,"text":239,"correct":22},{"key":24,"text":241,"correct":22},{"key":27,"text":384,"correct":22},"21",{"key":30,"text":243,"correct":32},{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":30,"analysis":33},1119868,"根据FIDIC合同条件，为了不让索赔权利失效，承包人应在干扰事件结束后的()天内，提交最终索赔报告。",[390,391,392,393],{"key":20,"text":239,"correct":22},{"key":24,"text":241,"correct":22},{"key":27,"text":384,"correct":22},{"key":30,"text":243,"correct":32},{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":27,"analysis":33},1119869,"根据《标准施工招标文件》，承包人按合同约定提交的最终结清申请单中，只限于提出工程接收证书颁发后发生的索赔。提出索赔的期限自接受()时终止。",[398,400,402,404],{"key":20,"text":399,"correct":22},"竣工付款证书",{"key":24,"text":401,"correct":22},"工程验收证书",{"key":27,"text":403,"correct":32},"最终结清证书",{"key":30,"text":405,"correct":22},"临时付款证书",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":27,"analysis":33},1119870,"监理人在收到承包人索赔通知书或有关索赔的进一步证明资料后的()内，将索赔处理结果答复给承包人",[410,412,414,416],{"key":20,"text":411,"correct":22},"28天",{"key":24,"text":413,"correct":22},"14天",{"key":27,"text":415,"correct":32},"42天",{"key":30,"text":417,"correct":22},"56天",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":20,"analysis":33},1119871,"根据《标准施工招标文件》中的通用合同条款，承包人按合同约定接受了竣工付款证书后，应被认为()",[422,424,426,428],{"key":20,"text":423,"correct":32},"已无权再提出在合同工程接收证书颁发前所发生的任何索赔",{"key":24,"text":425,"correct":22},"有权提出在合同工程接收证书颁发前所发生的任何索赔",{"key":27,"text":427,"correct":22},"有权提出在合同工程接收证书颁发后所发生的任何索赔",{"key":30,"text":429,"correct":22},"已无权再提出在合同工程接收证书颁发后所发生的任何索赔",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":24,"analysis":33},1119872,"如果对方提出了索赔要求，则应采取各种措施来反击或反驳对方的索赔要求。通常采取的措施是()。",[434,436,438,440],{"key":20,"text":435,"correct":22},"分析合同错误，提出不同意见",{"key":24,"text":437,"correct":32},"抓对方的失误，向对方提出索赔",{"key":27,"text":439,"correct":22},"说明自身难处，赢得对方理解",{"key":30,"text":441,"correct":22},"抓住客观原因，说明双方有责",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},1119873,"根据《标准施工招标文件》中的通用条款，承包人按合同约定提交的最终结清申请单中，只限于提出（）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"工程接收证书颁发前发生的索赔",{"key":24,"text":449,"correct":32},"工程接收证书颁发后发生的索赔",{"key":27,"text":451,"correct":22},"竣工付款证书接收前发生的索赔",{"key":30,"text":453,"correct":22},"缺陷责任期终止证书颁发后发生的索赔",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":20,"analysis":33},1119874,"下列选项中，属于反索赔工作内容的是()。",[458,460,462,464],{"key":20,"text":459,"correct":32},"防止对方提出索赔，反击或反驳对方的索赔要求",{"key":24,"text":461,"correct":22},"反对对方提出索赔，拖延答复对方的索赔要求",{"key":27,"text":463,"correct":22},"向索赔方提出索赔，对抗和平衡对方的索赔要求",{"key":30,"text":465,"correct":22},"反驳对方提出索赔，指出索赔项目在合同中无约定",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":20,"analysis":33},1119875,"审查对方是否在干扰事件发生后的索赔时限内及时提出索赔要求或报告，这是从（）方面对对方索赔报告的反击或反驳。",[470,472,474,476],{"key":20,"text":471,"correct":32},"索赔要求或报告的时限性",{"key":24,"text":473,"correct":22},"索赔值审核",{"key":27,"text":475,"correct":22},"干扰事件的原因、责任分析",{"key":30,"text":477,"correct":22},"索赔事件的真实性",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":27,"analysis":33},1119876,"下列选项中，不属于索赔资料准备阶段的主要工作的是()。",[482,484,485,487],{"key":20,"text":483,"correct":22},"跟踪和调查干扰事件",{"key":24,"text":229,"correct":22},{"key":27,"text":486,"correct":32},"确定索赔对象，明确索赔的项目",{"key":30,"text":488,"correct":22},"收集证据，获得充分而有效的各种证据",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":27,"analysis":33},1119877,"对环境调查和预测的风险属于施工合同风险的（）。",[493,495,497,499],{"key":20,"text":494,"correct":22},"项目外界环境风险",{"key":24,"text":496,"correct":22},"项目组织成员风险",{"key":27,"text":498,"correct":32},"管理风险",{"key":30,"text":500,"correct":22},"经济风险",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":27,"analysis":33},1119878,"根据我国保险制度，关于建设工程第三者责任险的说法，正确的是（）。",[505,507,509,511],{"key":20,"text":506,"correct":22},"被保险人是项目法人和承包人以外的第三人",{"key":24,"text":508,"correct":22},"赔偿范围包括承包商在工地的财产损失",{"key":27,"text":510,"correct":32},"被保险人是项目法人和承包人",{"key":30,"text":512,"correct":22},"赔偿范围包括承包商在现场从事与工作有关的职工伤亡",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":24,"analysis":33},1119879,"在一份保险合同中，保险人承担或给付保险金责任的最高额度是该份保险合同的（ ）",[517,519,521,523],{"key":20,"text":518,"correct":22},"标的价值",{"key":24,"text":520,"correct":32},"保险金额",{"key":27,"text":522,"correct":22},"保险费",{"key":30,"text":524,"correct":22},"实际赔付额",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":27,"analysis":33},1119880,"债务人不转移对拥有财产的占有，将该财产作为债权的担保，债务人不履行债务时，债权人有权依法将该财产折价或者拍卖，变卖该财产的价款中优先受偿，这种担保方式是（）担保",[529,531,533,535],{"key":20,"text":530,"correct":22},"保证",{"key":24,"text":532,"correct":22},"质押",{"key":27,"text":534,"correct":32},"抵押",{"key":30,"text":536,"correct":22},"留置",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":30,"analysis":33},1119881,"根据《招标投标法的实施条例》，对某 3000 万元投资概算的工程项目进行招标时，施工投标保证金额度符合规定的是（ ）万元人民币 。",[541,543,545,547],{"key":20,"text":542,"correct":22},"70",{"key":24,"text":544,"correct":22},"100",{"key":27,"text":546,"correct":22},"120",{"key":30,"text":548,"correct":32},"50",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":24,"analysis":33},1119882,"以下关于施工平行发承包模式的特点，说法错误的是（）。",[553,555,557,559],{"key":20,"text":554,"correct":22},"对某些工作而言，符合质量控制上的“他人控制”原则",{"key":24,"text":556,"correct":32},"需全部施工图完成后才进行招标，对进度控制不利",{"key":27,"text":558,"correct":22},"业主要负责所有施工承包合同的招标、合同谈判、签约，招标工作量大，对业主不利",{"key":30,"text":560,"correct":22},"业主直接控制所有工程的发包，可决定所有工程的承包商的选择",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":30,"analysis":33},1119883,"关于施工平行承发包特点的说法,正确的是()。",[565,567,569,571],{"key":20,"text":566,"correct":22},"签订的合同越多,业主的责任与义务就越少",{"key":24,"text":568,"correct":22},"业主直接管理所有的施工合同,管理风险小",{"key":27,"text":570,"correct":22},"业主可以分次招标,每次招标工作量较小,业主用于招标的时间较少",{"key":30,"text":572,"correct":32},"业主直接控制所有工程的发包,可决定所有工程的承包商的选择",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":24,"analysis":33},1119884,"施工平行承发包的一般工作程序为()。",[577,579,581,583],{"key":20,"text":578,"correct":22},"施工→施工招投标→施工图设计完成→完工验收",{"key":24,"text":580,"correct":32},"施工图设计完成→施工招投标→施工→完工验收",{"key":27,"text":582,"correct":22},"施工招投标→施工图设计完成→施工→完工验收",{"key":30,"text":584,"correct":22},"施工招投标→施工→施工图设计完成→完工验收",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":30,"analysis":33},1119885,"建设工程施工施工总承包模式的最大缺点是（）。",[589,591,593,595],{"key":20,"text":590,"correct":22},"建设周期较短",{"key":24,"text":592,"correct":22},"合同管理工作量大",{"key":27,"text":594,"correct":22},"业主对总承包施工单位的依赖较大",{"key":30,"text":596,"correct":32},"对进度控制不利",[598,601,604,607,610,613],{"id":15,"name":599,"category":7,"favorite":600},"领导干部任职前廉政法规知识测试题",92,{"id":602,"name":603,"category":7,"favorite":15},595,"建筑结构与设备",{"id":605,"name":606,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":608,"name":609,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":611,"name":612,"category":7,"favorite":8},534,"BIM工程师",{"id":614,"name":612,"category":7,"favorite":8},535]