[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-55":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":584},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,55,50,2973,[13,34,46,58,66,74,86,98,110,122,134,146,156,168,179,191,203,215,227,239,251,263,275,284,294,305,317,329,341,352,364,376,388,399,408,416,426,434,443,455,467,479,491,503,514,524,536,548,560,572],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1119785,1,"单选题","某建设工程项目以最大成本加费用合同形式发包，合同中规定的工程成本总价是1600万元，固定酬金是350万元。施工完成后实际的成本是1650万元。则根据合同，承包商可以获得的支付是()万元。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","1600",false,{"key":24,"text":25,"correct":22},"B","1650",{"key":27,"text":28,"correct":29},"C","1950",true,{"key":31,"text":32,"correct":22},"D","2000","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1119786,"关于成本加酬金合同的说法，正确的是()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"在工程总成本一开始估计不准，可能变化不大的情况下宜采用成本加奖金合同",{"key":24,"text":41,"correct":29},"报酬总额随工程成本的加大而增加采用成本加固定比例费用合同",{"key":27,"text":43,"correct":22},"成本加固定费用合同，由于酬金金额固定，承包商在缩短工期方面没有积极性",{"key":31,"text":45,"correct":22},"通常在非代理型CM模式的合同中采用成本加固定费用合同",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1119787,"一般在工程初期很难描述工作范围和性质，或工期紧迫，无法按常规编制招标文件招标时采用的成本加酬金合同形式是()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"成本加奖金合同",{"key":24,"text":53,"correct":29},"成本加固定比例费用合同",{"key":27,"text":55,"correct":22},"最大成本加费用合同",{"key":31,"text":57,"correct":22},"成本加固定费用合同",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1119788,"某工程由于图纸、规范等准备不充分，招标方仅能制订一个估算指标，则在招标时宜采用成本加酬金合同形式中的()。",[62,63,64,65],{"key":20,"text":51,"correct":29},{"key":24,"text":57,"correct":22},{"key":27,"text":53,"correct":22},{"key":31,"text":55,"correct":22},{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":27,"analysis":33},1119789,"在招标时，当图纸、规范等准备不充分，不能据以确定合同价格，而仅能制定一个估算指标时可采用的成本加酬金合同的形式是（）。",[70,71,72,73],{"key":20,"text":57,"correct":22},{"key":24,"text":53,"correct":22},{"key":27,"text":51,"correct":29},{"key":31,"text":55,"correct":22},{"id":75,"libraryId":5,"type":15,"typeLabel":16,"stem":76,"options":77,"answer":20,"analysis":33},1119790,"以成本加酬金形式发包的建设工项目，其施工图纸可能不能事先完成。承包商可以通过（）缩短工期，不必等到所有施工图完成才开始招标和施工。",[78,80,82,84],{"key":20,"text":79,"correct":29},"分段施工",{"key":24,"text":81,"correct":22},"加快进度",{"key":27,"text":83,"correct":22},"增加人工",{"key":31,"text":85,"correct":22},"增加设备",{"id":87,"libraryId":5,"type":15,"typeLabel":16,"stem":88,"options":89,"answer":24,"analysis":33},1119791,"通常用于紧急工程施工的是()计价方式的施工合同。",[90,92,94,96],{"key":20,"text":91,"correct":22},"固定单价",{"key":24,"text":93,"correct":29},"成本加酬金",{"key":27,"text":95,"correct":22},"可调价格",{"key":31,"text":97,"correct":22},"固定总价",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":24,"analysis":33},1119792,"适用于工期较短、工程量变化幅度不会太大的项目的合同方式是()。",[102,104,106,108],{"key":20,"text":103,"correct":22},"变动单价合同",{"key":24,"text":105,"correct":29},"固定单价合同",{"key":27,"text":107,"correct":22},"成本加酬金合同",{"key":31,"text":109,"correct":22},"固定总价合同",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":27,"analysis":33},1119793,"成本加奖金合同中的奖金是根据报价书中的成本估算指标制定的，在合同中对这个估算指标规定一个底点和顶点，分别为工程成本估算的( )。",[114,116,118,120],{"key":20,"text":115,"correct":22},"65%-75%、100%-135%",{"key":24,"text":117,"correct":22},"70%-85%、110%-155%",{"key":27,"text":119,"correct":29},"60%-75%、110%~135%",{"key":31,"text":121,"correct":22},"50%-65%、110%-125%",{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":31,"analysis":33},1119794,"承包合同计价形式的不同，工程招标时对设计深度要求也不一样，成本加酬金合同( )进行招标。",[126,128,130,132],{"key":20,"text":127,"correct":22},"必须在完成方案设计后",{"key":24,"text":129,"correct":22},"必须在完成初步设计后",{"key":27,"text":131,"correct":22},"必须在完成施工图设计后",{"key":31,"text":133,"correct":29},"可以在设计各个阶段",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":20,"analysis":33},1119795,"对于承包人而言，承担风险由大到小的依次是（）。",[138,140,142,144],{"key":20,"text":139,"correct":29},"总价合同，单价合同，成本加酬金合同",{"key":24,"text":141,"correct":22},"成本加酬金合同，单价合同，总价合同",{"key":27,"text":143,"correct":22},"单价合同，总价合同，成本加酬金合同",{"key":31,"text":145,"correct":22},"成本加酬金合同，总价合同，单价合同",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":31,"analysis":33},1119796,"从风险角度而言，以下合同中承包商不承担风险的合同是( )。",[150,152,154,155],{"key":20,"text":151,"correct":22},"单价合同",{"key":24,"text":153,"correct":22},"总价合同",{"key":27,"text":103,"correct":22},{"key":31,"text":107,"correct":29},{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":31,"analysis":33},1119797,"对于不同的承包合同计价形式，工程招标时对设计深度要求也不一样，成本加酬金合同()进行招标。",[160,162,164,166],{"key":20,"text":161,"correct":22},"只能在方案设计阶段",{"key":24,"text":163,"correct":22},"只能在初步设计阶段",{"key":27,"text":165,"correct":22},"只能在施工图设计阶段",{"key":31,"text":167,"correct":29},"可以在设计的各个阶段",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":27,"analysis":33},1119798,"对于承包商来说，采用()合同，不存在风险。",[172,174,176,177],{"key":20,"text":173,"correct":22},"总价",{"key":24,"text":175,"correct":22},"单价",{"key":27,"text":93,"correct":29},{"key":31,"text":178,"correct":22},"可调价",{"id":180,"libraryId":5,"type":15,"typeLabel":16,"stem":181,"options":182,"answer":31,"analysis":33},1119799,"下列不属于施工合同执行者进行合同跟踪的依据的是（）。",[183,185,187,189],{"key":20,"text":184,"correct":22},"管理人员对现场巡视、质量检查了解的情况",{"key":24,"text":186,"correct":22},"原始记录、报表、验收报告等各种实际工程文件",{"key":27,"text":188,"correct":22},"合同以及依据合同而编制的各种计划文件",{"key":31,"text":190,"correct":29},"合同订立前签署的意向书",{"id":192,"libraryId":5,"type":15,"typeLabel":16,"stem":193,"options":194,"answer":27,"analysis":33},1119800,"根据合同实施偏差分析的结果，承包商应采取相应的调整措施，其中变更技术方案，采用新的高效率的施工方案属于()。",[195,197,199,201],{"key":20,"text":196,"correct":22},"经济措施",{"key":24,"text":198,"correct":22},"组织措施",{"key":27,"text":200,"correct":29},"技术措施",{"key":31,"text":202,"correct":22},"管理措施",{"id":204,"libraryId":5,"type":15,"typeLabel":16,"stem":205,"options":206,"answer":24,"analysis":33},1119801,"按照合同约定的变更程序，监理公司向建筑公司作出变更指示，须经( )同意。",[207,209,211,213],{"key":20,"text":208,"correct":22},"企业经理",{"key":24,"text":210,"correct":29},"发包人",{"key":27,"text":212,"correct":22},"设计单位",{"key":31,"text":214,"correct":22},"工程师",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":27,"analysis":33},1119802,"合同变更，即双方当事人依法对合同的内容进行修改的时段应是在()。",[219,221,223,225],{"key":20,"text":220,"correct":22},"工程开工以后合同履行完毕以前",{"key":24,"text":222,"correct":22},"合同成立以后和工程竣工以前",{"key":27,"text":224,"correct":29},"合同成立以后和履行完毕以前",{"key":31,"text":226,"correct":22},"合同成立以前和履行完毕以后",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":24,"analysis":33},1119803,"施工合同实施偏差的责任分析，必须以()为依据。",[231,233,235,237],{"key":20,"text":232,"correct":22},"施工计划",{"key":24,"text":234,"correct":29},"合同",{"key":27,"text":236,"correct":22},"材料量差、价差、效率差",{"key":31,"text":238,"correct":22},"成本量差、价差、效率差",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":24,"analysis":33},1119804,"承包单位对施工合同实施偏差进行分析，其内容包括：产生合同偏差的原因，合同实施偏差的责任及( )。",[243,245,247,249],{"key":20,"text":244,"correct":22},"不同项目合同偏差的对比",{"key":24,"text":246,"correct":29},"合同实施趋势分析",{"key":27,"text":248,"correct":22},"偏差的跟踪情况",{"key":31,"text":250,"correct":22},"业主对合同偏差的态度",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":20,"analysis":33},1119805,"针对承包的工程任务，合同跟踪以()等方面为对象。",[255,257,259,261],{"key":20,"text":256,"correct":29},"工程施工的质量、工程进度、工程数量、成本的增加和减少",{"key":24,"text":258,"correct":22},"工程施工的质量、工程进度、成本的增加或减少",{"key":27,"text":260,"correct":22},"工程施工的质量、工程数量、成本的增加或减少",{"key":31,"text":262,"correct":22},"工程施工的质量、工程进度、工程环境、成本的增加或减少",{"id":264,"libraryId":5,"type":15,"typeLabel":16,"stem":265,"options":266,"answer":20,"analysis":33},1119806,"根据合同实施偏差分析处理中，承包商应该采取相应的调整措施，其中属于经济措施的是()。",[267,269,271,273],{"key":20,"text":268,"correct":29},"增加投入",{"key":24,"text":270,"correct":22},"调整工作流程",{"key":27,"text":272,"correct":22},"增加人员投入",{"key":31,"text":274,"correct":22},"采取索赔方案",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":27,"analysis":33},1119807,"施工合同实施偏差处理中，根据合同实施偏差分析的结果，承包商应该采取相应的调整措施，其中变更技术方案、采用新的高效率的施工方案属于（）。",[279,280,282,283],{"key":20,"text":198,"correct":22},{"key":24,"text":281,"correct":22},"合同措施",{"key":27,"text":200,"correct":29},{"key":31,"text":196,"correct":22},{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":24,"analysis":33},1119808,"下列合同实施偏差的调整措施中，属于经济措施的是()。",[288,289,290,292],{"key":20,"text":272,"correct":22},{"key":24,"text":268,"correct":29},{"key":27,"text":291,"correct":22},"变更技术方案",{"key":31,"text":293,"correct":22},"变更合同条款",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":27,"analysis":33},1119809,"根据《标准施工招标文件》，承包人在进行工程变更时，必须由（）做出变更指示。",[298,299,301,303],{"key":20,"text":210,"correct":22},{"key":24,"text":300,"correct":22},"设计人",{"key":27,"text":302,"correct":29},"监理人",{"key":31,"text":304,"correct":22},"政府建设主管部门",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":20,"analysis":33},1119810,"关于工程变更原因的说法，错误的是()。",[309,311,313,315],{"key":20,"text":310,"correct":29},"设计单位新的变更指令，对建筑的新要求",{"key":24,"text":312,"correct":22},"工程环境的变化，要求实施方案或实施计划变更",{"key":27,"text":314,"correct":22},"政府部门对工程新的要求",{"key":31,"text":316,"correct":22},"由于合同实施出现问题，必须调整合同目标或修改合同条款",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":24,"analysis":33},1119811,"根据九部委《标准施工招标文件》中通用合同条款的规定，在履行合同过程中，经发包人同意，()可按合同约定的变更程序向承包人作出变更指示，承包人应遵照执行。没有()的变更指示，承包人不得擅自变更。",[321,323,325,327],{"key":20,"text":322,"correct":22},"监理人；发包人",{"key":24,"text":324,"correct":29},"监理人；监理人",{"key":27,"text":326,"correct":22},"规划主管部门；设计人",{"key":31,"text":328,"correct":22},"设计人；规划主管部门",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":27,"analysis":33},1119812,"根据《标准施工招标文件》中通用合同条款的规定，除专用合同条款对期限另有约定外，承包应在收到变更指示或变更意向书后的()内，向监理人提交变更报价书",[333,335,337,339],{"key":20,"text":334,"correct":22},"7天",{"key":24,"text":336,"correct":22},"28天",{"key":27,"text":338,"correct":29},"14天",{"key":31,"text":340,"correct":22},"42天",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":27,"analysis":33},1119813,"施工合同履行过程中发生工程变更时，应由()向承包人发出变更指令。",[345,347,348,350],{"key":20,"text":346,"correct":22},"项目业主",{"key":24,"text":212,"correct":22},{"key":27,"text":349,"correct":29},"监理方",{"key":31,"text":351,"correct":22},"变更提出方",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":24,"analysis":33},1119814,"按照《标准施工招标文件》通用合同条款规定，承包人提出的合理化建议降低了合同价格、缩短了工期或者提高了工程经济效益的，发包人( )给予承包人奖励。",[356,358,360,362],{"key":20,"text":357,"correct":22},"可在通用合同条款中确定",{"key":24,"text":359,"correct":29},"可在专用合同条款中约定",{"key":27,"text":361,"correct":22},"可按承包人提出的有关方案",{"key":31,"text":363,"correct":22},"可按发包人提出的有关方案",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":27,"analysis":33},1119815,"在合同履行过程中，如若发生有关工程变更情形，按合同约定的变更程序，正确的做法是（）。",[368,370,372,374],{"key":20,"text":369,"correct":22},"承包人发出变更意向书，监理人提出书面变更建议",{"key":24,"text":371,"correct":22},"书面变更建议应该在收到变更意向书28天内提出",{"key":27,"text":373,"correct":29},"变更与否，监理人要与发包人共同研究确认",{"key":31,"text":375,"correct":22},"变更指示应在收到变更书面建议的28天做出",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":27,"analysis":33},1119816,"某项目实施过程中，承包人收到监理人的变更意向书，承包人认为实施该变更有困难，就立即书面通知监理人，说明变更可能对于工程价款和工期带来较大影响，并提交了相关说明和详细依据。后经监理人与承包商协商，确定撤销了原变更意向书，对此，下列表述中正确的是（）。",[380,382,384,386],{"key":20,"text":381,"correct":22},"承包人不应对变更提出困难和异议",{"key":24,"text":383,"correct":22},"经承包人和监理人协商后可以撤销原变更意向书",{"key":27,"text":385,"correct":29},"撤销、改变或不改变原变更意向书都应有发包人参与协商",{"key":31,"text":387,"correct":22},"承包人对于变更提出的异议不能附加价款或工期要求",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":24,"analysis":33},1119817,"某施工合同实施过程中出现了偏差，经过偏差分析后，承包人采用新的高效率的施工方案。这种调整措施属于()措施。",[392,394,396,398],{"key":20,"text":393,"correct":22},"组织",{"key":24,"text":395,"correct":29},"技术",{"key":27,"text":397,"correct":22},"经济",{"key":31,"text":234,"correct":22},{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":27,"analysis":33},1119818,"下列合同实施偏差的调整措施中，属于组织措施的是（）。",[403,405,406,407],{"key":20,"text":404,"correct":22},"增加资金投入",{"key":24,"text":291,"correct":22},{"key":27,"text":272,"correct":29},{"key":31,"text":293,"correct":22},{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":24,"analysis":33},1119819,"“调整工作计划”属于合同实施偏差处理措施中的( )措施。",[412,413,414,415],{"key":20,"text":395,"correct":22},{"key":24,"text":393,"correct":29},{"key":27,"text":397,"correct":22},{"key":31,"text":234,"correct":22},{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":31,"analysis":33},1119820,"根据《标准施工招标文件》中的通用合同条款,在合同履行过程中,没有()的变更指示,承包人不得擅自变更。",[420,422,423,425],{"key":20,"text":421,"correct":22},"业主",{"key":24,"text":300,"correct":22},{"key":27,"text":424,"correct":22},"规划主管部门",{"key":31,"text":302,"correct":29},{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":27,"analysis":33},1119821,"根据《标准施工招标文件》中的通用合同条款，没有()的变更指示，承包人不得擅自进行工程变更。",[430,431,432,433],{"key":20,"text":210,"correct":22},{"key":24,"text":300,"correct":22},{"key":27,"text":302,"correct":29},{"key":31,"text":214,"correct":22},{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":20,"analysis":33},1119822,"根据《标准施工招标文件》中通用条款规定，变更指示由()签发。",[438,439,440,442],{"key":20,"text":302,"correct":29},{"key":24,"text":210,"correct":22},{"key":27,"text":441,"correct":22},"监理人或发包人",{"key":31,"text":212,"correct":22},{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":24,"analysis":33},1119823,"某项目承包人，在收到变更指示的8天后，向监理人提出变更报价书。而总监理工程师在收到承包人变更报价书的第20天，约请承包人商量确定了变更价格，则在此事件中()。",[447,449,451,453],{"key":20,"text":448,"correct":22},"承包人提交“变更报价书”超过时效",{"key":24,"text":450,"correct":29},"总监理工程师约请承包人商定变更价格超过时效",{"key":27,"text":452,"correct":22},"承包人提交“变更报价书”没有时间要求",{"key":31,"text":454,"correct":22},"总监理工程师约请承包人商定变更价格没有时间要求",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":24,"analysis":33},1119824,"根据《标准施工招标文件》的规定，监理人在收到承包人工程变更的书面建议后，确认存在变更的，应在收到书面建议后的()天内做出变更指示。",[459,461,463,465],{"key":20,"text":460,"correct":22},"7",{"key":24,"text":462,"correct":29},"14",{"key":27,"text":464,"correct":22},"21",{"key":31,"text":466,"correct":22},"28",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":31,"analysis":33},1119825,"在履行合同过程中，因设计原因发生了工程变更，监理人根据合同约定情形的范围和内容，向承包人发出变更意向书。承包人则按照变更意向书要求，提交工程变更实施方案，其内容应包括拟实施变更工作的（）等内容。",[471,473,475,477],{"key":20,"text":472,"correct":22},"发包人的指令",{"key":24,"text":474,"correct":22},"材料、设备等技术条件",{"key":27,"text":476,"correct":22},"设计部门的意见",{"key":31,"text":478,"correct":29},"计划、措施和竣工时间",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":20,"analysis":33},1119826,"合同的履行是工程建设项目的发包方与承包方根据合同规定的( )等要求，各自完成合同义务的行为.",[483,485,487,489],{"key":20,"text":484,"correct":29},"时间、地点、方式、内容和标准",{"key":24,"text":486,"correct":22},"时间、地点、方法、内容和标准",{"key":27,"text":488,"correct":22},"时间、地点、方式、成本和标准",{"key":31,"text":490,"correct":22},"时间、地点、方式、内容和质量",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":31,"analysis":33},1119827,"下列工作属于承包单位针对合同实施偏差情况，对施工合同实施趋势进行分析的是()。",[495,497,499,501],{"key":20,"text":496,"correct":22},"分析业主对合同偏差的态度",{"key":24,"text":498,"correct":22},"分析组织结构的变化",{"key":27,"text":500,"correct":22},"分析建设监理管理的严格程度",{"key":31,"text":502,"correct":29},"分析最终工程经济效益水平",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":27,"analysis":33},1119828,"某施工总承包合同下的工程项目由于组织协调不当，某专业分包商未能按时进入施工现场而导致工程延误，由此造成的损失由（）承担",[507,508,510,512],{"key":20,"text":212,"correct":22},{"key":24,"text":509,"correct":22},"建设单位",{"key":27,"text":511,"correct":29},"施工总承包企业",{"key":31,"text":513,"correct":22},"监理单位",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":27,"analysis":33},1119829,"施工合同实施偏差分析的内容包括:产生合同偏差的原因分析,合同实施偏差的责任分析以及()。",[518,519,521,522],{"key":20,"text":244,"correct":22},{"key":24,"text":520,"correct":22},"偏差的跟踪情况分析",{"key":27,"text":246,"correct":29},{"key":31,"text":523,"correct":22},"业主对合同偏差的态度分析",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":27,"analysis":33},1119830,"对于设计变更引起的工程价格调整，监理公司可按照（）的原则，商定或确定变更工作的单价。",[528,530,532,534],{"key":20,"text":529,"correct":22},"最低利润",{"key":24,"text":531,"correct":22},"市场价格",{"key":27,"text":533,"correct":29},"成本加利润",{"key":31,"text":535,"correct":22},"最低成本",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":31,"analysis":33},1119831,"关于变更估价的原则，下列说法不正确的是()。",[540,542,544,546],{"key":20,"text":541,"correct":22},"已标价工程量清单中有适用于变更工作的子目的，采用该子目的单价",{"key":24,"text":543,"correct":22},"已标价工程量清单中无适用于变更工作的子目，但有类似子目的，可在合理范围内参照类似子目的单价",{"key":27,"text":545,"correct":22},"已标价工程量清单中无适用或类似子目的单价，可按照成本加利润的原则确定",{"key":31,"text":547,"correct":29},"变更工作的单价应由承包人确定",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":27,"analysis":33},1119832,"某承包商承揽的住宅工程项目，由于业主对于相关设计修改迟迟拿不定主意，致使一项工作拖期3天完工，由于该工作有3天的自由时差，根据索赔成立应该具备的前提条件，承包商()。",[552,554,556,558],{"key":20,"text":553,"correct":22},"不应向业主提出超过3天的工期索赔",{"key":24,"text":555,"correct":22},"应向业主提出费用索赔",{"key":27,"text":557,"correct":29},"不应向业主提出工期索赔",{"key":31,"text":559,"correct":22},"应向业主提出工期索赔",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":27,"analysis":33},1119833,"索赔事件（又称为干扰事件）是指那些使实际情况与合同规定不符合的各类事件，其在施工过程中最终引起的应是()的变化。",[564,566,568,570],{"key":20,"text":565,"correct":22},"规范和标准",{"key":24,"text":567,"correct":22},"方案和部署",{"key":27,"text":569,"correct":29},"工期和费用",{"key":31,"text":571,"correct":22},"合同条件",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":24,"analysis":33},1119834,"下列内容中，可以作为施工索赔依据的是()。",[576,578,580,582],{"key":20,"text":577,"correct":22},"工程会议纪要",{"key":24,"text":579,"correct":29},"工程建设惯例",{"key":27,"text":581,"correct":22},"施工现场记录",{"key":31,"text":583,"correct":22},"工程有关照片和录像",[585,588,591,594,597,600],{"id":15,"name":586,"category":7,"favorite":587},"领导干部任职前廉政法规知识测试题",92,{"id":589,"name":590,"category":7,"favorite":15},595,"建筑结构与设备",{"id":592,"name":593,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":595,"name":596,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":598,"name":599,"category":7,"favorite":8},534,"BIM工程师",{"id":601,"name":599,"category":7,"favorite":8},535]