[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-54":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":557},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,54,50,2973,[13,34,46,58,70,82,94,106,118,127,136,148,158,170,182,190,202,210,222,234,246,256,266,278,287,297,305,317,326,338,348,356,368,380,389,401,413,425,435,447,459,471,483,495,503,511,519,529,541,549],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1119735,1,"单选题","设备制造前，业主应支付设备价格的（）作为预付款。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","20%",false,{"key":24,"text":25,"correct":22},"B","15%",{"key":27,"text":28,"correct":29},"C","10%",true,{"key":31,"text":32,"correct":22},"D","8%","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1119736,"某设备采购合同中，约定由采购方负责安装，供货方应向采购方提供必要的技术服务和现场服务。下述事项中属于技术服务和现场服务内容的是()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"负责组织设备的调试",{"key":24,"text":41,"correct":22},"向采购方提供所需的配件",{"key":27,"text":43,"correct":29},"处理设备的质量问题",{"key":31,"text":45,"correct":22},"组织试车和验收试验",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1119737,"设备采购合同通常采用的合同形式为()。",[50,52,54,56],{"key":20,"text":51,"correct":29},"固定总价合同",{"key":24,"text":53,"correct":22},"可调单价合同",{"key":27,"text":55,"correct":22},"固定单价合同",{"key":31,"text":57,"correct":22},"成本加酬金合同",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1119738,"成套设备安装后的试车检验不合格，下列说法正确的是( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"若属于设备质量的原因，由供货方负责修理、更换，由安装方承担全部费用",{"key":24,"text":65,"correct":29},"若属于设备质量的原因，由供货方负责修理、更换，并承担全部费用",{"key":27,"text":67,"correct":22},"若由于工程施工质量问题，由供货方负责拆除后纠正缺陷",{"key":31,"text":69,"correct":22},"若由于工程施工质量问题，由施工方负责拆除后纠正缺陷",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1119739,"某按单价合同计价的招标工程，在评标过程中，发现某投标人的总价与单价的计算结果不一致，究其原因是投标人在计算时，将混凝土单价300元／m3误作为30元／m3的结果。对此，业主有权（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"以总价为准调整单价",{"key":24,"text":77,"correct":29},"以单价为准调整总价",{"key":27,"text":79,"correct":22},"将该投标文件作废标处理",{"key":31,"text":81,"correct":22},"要求投标者重新提报混凝土单价",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1119740,"某建设工程采用单价合同，其投标报价单中，钢筋混凝土数量为1000m3，合同价应该是30万元，而实际只写了3万元。实际施工时，实际工程量为1500m3，则钢筋混凝土工程的价款金额应该是（）万元",[86,88,90,92],{"key":20,"text":87,"correct":22},"30",{"key":24,"text":89,"correct":22},"3",{"key":27,"text":91,"correct":29},"45",{"key":31,"text":93,"correct":22},"4.5",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1119741,"下列关于固定总价合同适用性说法不正确的是()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"工程量小、工期短，施工过程中环境因素变化小，工程条件稳定并合理",{"key":24,"text":101,"correct":22},"工程设计详细，图纸完整、清楚，工程任务和范围明确",{"key":27,"text":103,"correct":22},"工程结构和技术简单，风险小",{"key":31,"text":105,"correct":29},"合同条件中有对承包商单方面保护的条款",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1119742,"某建设工程承包采用固定单价合同，地基与基础分部工程施工历时1年，通货膨胀率8%，完成后，其钢筋混凝土工程实际完成的工程量是2016m3，而投标时工程量清单中该分项的工程量是2000m3。在这种情况下，业主应根据（）计算该分项应付的工程款。",[110,112,114,116],{"key":20,"text":111,"correct":22},"2000m3乘以合同单价",{"key":24,"text":113,"correct":22},"2000m3乘以调整后的单价",{"key":27,"text":115,"correct":29},"2016m3乘以合同单价",{"key":31,"text":117,"correct":22},"2016m3乘以调整后的单价",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1119743,"对于工期较短、工程量变化幅度不会太大的项目，适于采用（）。",[122,124,125,126],{"key":20,"text":123,"correct":22},"变动总价合同",{"key":24,"text":51,"correct":22},{"key":27,"text":55,"correct":29},{"key":31,"text":57,"correct":22},{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":20,"analysis":33},1119744,"按照国际通行做法，采用工程项目总承包模式的项目在合同计价方式上应当采用( )。",[131,132,133,134],{"key":20,"text":51,"correct":29},{"key":24,"text":123,"correct":22},{"key":27,"text":55,"correct":22},{"key":31,"text":135,"correct":22},"变动单价合同",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":27,"analysis":33},1119745,"在固定总价合同形式下,承包人一般应承担的风险是()。",[140,142,144,146],{"key":20,"text":141,"correct":22},"全部工程量的风险,不包括通货膨胀的风险",{"key":24,"text":143,"correct":22},"工程变更的风险,不包括工程量和通货膨胀的危险",{"key":27,"text":145,"correct":29},"全部工程量和通货膨胀的危险",{"key":31,"text":147,"correct":22},"通货膨胀的风险,不包括工程量的风险",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":20,"analysis":33},1119746,"在下列合同形式中，承包人承担风险最大的合同类型是()。",[152,153,154,156],{"key":20,"text":51,"correct":29},{"key":24,"text":55,"correct":22},{"key":27,"text":155,"correct":22},"成本加固定费用合同",{"key":31,"text":157,"correct":22},"最大成本加费用合同",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":24,"analysis":33},1119747,"对于固定总价合同的计价方式，承包商为了降低自己在工程量和价格上承担的风险，通常会在合同报价中报较高的（）。",[162,164,166,168],{"key":20,"text":163,"correct":22},"措施费",{"key":24,"text":165,"correct":29},"不可预计风险费",{"key":27,"text":167,"correct":22},"单价",{"key":31,"text":169,"correct":22},"管理费",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":24,"analysis":33},1119748,"某建设工程采用单价合同，双方根据估算工程量约定了一个合同总价，而在实际结算时原合同总价与合同各项单价乘以实际完成工程量之和不一致，则该工程价款结算以()为准。",[174,176,178,180],{"key":20,"text":175,"correct":22},"签订的合同总价",{"key":24,"text":177,"correct":29},"合同中各项单价乘以实际完成的工程量之和",{"key":27,"text":179,"correct":22},"实际完成的工程量乘以重新协商的各项单价之和",{"key":31,"text":181,"correct":22},"双方重新协商确定的单价和工程量",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":24,"analysis":33},1119749,"某施工工程发包时工程量不明确，因此采用单价合同，并根据估算的总工程量约定了一个合同总价。在实际结算时，上述合同总价与合同各项单价乘以实际完成工程量之和不一致，则应付工程款应以（）为准。",[186,187,188,189],{"key":20,"text":175,"correct":22},{"key":24,"text":177,"correct":29},{"key":27,"text":179,"correct":22},{"key":31,"text":181,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1119750,"某建设工程项目采用固定单价合同。工程完工后，实际完成的工程量乘以各项单价之和与合同总价不一致。在此情况下，工程款的结算应以()为准。",[194,196,198,200],{"key":20,"text":195,"correct":22},"合同总价",{"key":24,"text":197,"correct":29},"实际完成工程量乘以各项单价之和",{"key":27,"text":199,"correct":22},"双方重新协商合同总价",{"key":31,"text":201,"correct":22},"实际完成工程量乘以重新协商的单价之和",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},1119751,"在国际上，()合同被广泛接受和采用。",[206,207,208,209],{"key":20,"text":51,"correct":29},{"key":24,"text":123,"correct":22},{"key":27,"text":55,"correct":22},{"key":31,"text":135,"correct":22},{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":24,"analysis":33},1119752,"某工程以固定总价合同形式发包给承包商，在夏季施工中，雨天较往年多，许多费用较投标时预计的高。为此，承包商()。",[214,216,218,220],{"key":20,"text":215,"correct":22},"有权要求将增加的费用加到合同总价中",{"key":24,"text":217,"correct":29},"无权要求将增加的费用加到合同总价中",{"key":27,"text":219,"correct":22},"增加的费用需通过业主的审核后才能加到合同总价中",{"key":31,"text":221,"correct":22},"可以与业主协商解决费用增加的补偿问题",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":20,"analysis":33},1119753,"对于变动总价合同的计价方式，在合同执行过程中，可以按照（）原则对合同总价进行相应的调整。",[226,228,230,232],{"key":20,"text":227,"correct":29},"合同约定",{"key":24,"text":229,"correct":22},"承包商实际增加的费用",{"key":27,"text":231,"correct":22},"市场行情",{"key":31,"text":233,"correct":22},"监理工程师出具的承包商费用增加证明",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":31,"analysis":33},1119754,"承包商的风险主要有两个方面，下列属于“工作量风险”的是( )。",[238,240,242,244],{"key":20,"text":239,"correct":22},"报价计算错误",{"key":24,"text":241,"correct":22},"漏报项目",{"key":27,"text":243,"correct":22},"物价和人工费上涨",{"key":31,"text":245,"correct":29},"工程变更",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":24,"analysis":33},1119755,"下列施工承包合同形式中，由承包商承担全部的价格风险的是（）",[250,252,253,254],{"key":20,"text":251,"correct":22},"单价合同",{"key":24,"text":51,"correct":29},{"key":27,"text":123,"correct":22},{"key":31,"text":255,"correct":22},"成本加固定比例费用合同",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":27,"analysis":33},1119756,"在固定总价合同形式下，下列应当由业主承担的风险是（）",[260,261,262,264],{"key":20,"text":243,"correct":22},{"key":24,"text":239,"correct":22},{"key":27,"text":263,"correct":29},"工程任务增加",{"key":31,"text":265,"correct":22},"工程量计算错误",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":24,"analysis":33},1119757,"招标人和中标人在签订合同的谈判中，为了防范货币贬值或者通货膨胀的风险，一般通过()约定风险承担方式。",[270,272,274,276],{"key":20,"text":271,"correct":22},"调整投标价格",{"key":24,"text":273,"correct":29},"价格调整条款",{"key":27,"text":275,"correct":22},"调整中标价格",{"key":31,"text":277,"correct":22},"调整工作范围",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":31,"analysis":33},1119758,"某工程施工承包合同采用单价合同，在签订合同时双方根据估算的工程量约定了一个合同总价。在实际结算时，上述的合同总价与合同各项单价乘以实际完成工程量之和不一致，则价款结算应以()为准。",[282,283,284,285],{"key":20,"text":175,"correct":22},{"key":24,"text":181,"correct":22},{"key":27,"text":179,"correct":22},{"key":31,"text":286,"correct":29},"合同中的各项单价乘以实际完成的工程量之和",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":31,"analysis":33},1119759,"单价合同中，当总价与单价发生矛盾时以( )为准。",[291,293,294,296],{"key":20,"text":292,"correct":22},"总价合同",{"key":24,"text":251,"correct":22},{"key":27,"text":295,"correct":22},"总价",{"key":31,"text":167,"correct":29},{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":27,"analysis":33},1119760,"某单价合同的投标报价单中，钢筋混凝土的单价为300元／m3，数量为1000m3，而合同价应该为300000元，而投标人实际上只写了30000元。则业主方在评标时应采取的正确做法是()。",[301,302,303,304],{"key":20,"text":75,"correct":22},{"key":24,"text":81,"correct":22},{"key":27,"text":77,"correct":29},{"key":31,"text":79,"correct":22},{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":27,"analysis":33},1119761,"采用单价合同指标时，对于投标书中明显的数字计算错误，业主有权力先作修改再评标，当总价和单价的计算结果不一致时，以单价为准调整总价，则这体现了单价合同( )的特点。",[309,311,313,315],{"key":20,"text":310,"correct":22},"工程量优先",{"key":24,"text":312,"correct":22},"总价优先",{"key":27,"text":314,"correct":29},"单价优先",{"key":31,"text":316,"correct":22},"风险均摊",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":20,"analysis":33},1119762,"按照计价方式选择合同类型，当发包工程的内容和工程量一时尚不能明确、具体地予以规定时则可以采取的合同模式为( )。",[321,322,324,325],{"key":20,"text":251,"correct":29},{"key":24,"text":323,"correct":22},"可调总价合同",{"key":27,"text":51,"correct":22},{"key":31,"text":57,"correct":22},{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":27,"analysis":33},1119763,"对于单价合同计价方式，确定结算工程款的依据是()。",[330,332,334,336],{"key":20,"text":331,"correct":22},"实际工程量和实际单价",{"key":24,"text":333,"correct":22},"合同工程量和合同单价",{"key":27,"text":335,"correct":29},"实际工程量和合同单价",{"key":31,"text":337,"correct":22},"合同工程量和实际单价",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":31,"analysis":33},1119764,"对于采用单价合同的招标工程，如投标书中有明显的数字计算错误，业主有权先做修改再评标。当总价和单价的计算结果不一致时，正确做法是()。",[342,344,346,347],{"key":20,"text":343,"correct":22},"分别调整单价和总价",{"key":24,"text":345,"correct":22},"按市场价调整单价",{"key":27,"text":75,"correct":22},{"key":31,"text":77,"correct":29},{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":24,"analysis":33},1119765,"从风险角度而言，以下合同中承包商承担风险程度最大的合同是( )。",[352,353,354,355],{"key":20,"text":251,"correct":22},{"key":24,"text":292,"correct":29},{"key":27,"text":135,"correct":22},{"key":31,"text":57,"correct":22},{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":24,"analysis":33},1119766,"“单价优先”原则指：在工程实践中，采用单价合同时，当单价乘以工程量表中估算的工程量得出的初步合同总价与单价乘以实际完成的工程量之和发生矛盾时，应以( )为准。",[360,362,364,366],{"key":20,"text":361,"correct":22},"单价乘以工程量表中估算的工程量得出的初步合同总价",{"key":24,"text":363,"correct":29},"单价乘以实际完成的工程量之和",{"key":27,"text":365,"correct":22},"二者均可",{"key":31,"text":367,"correct":22},"视具体情况而定",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":20,"analysis":33},1119767,"某建设工程项目以固定单价合同形式发包，在施工过程中主要建筑材料的价格上涨了，承包商提出了调整合同单价的要求。根据此类合同的规定业主将()。",[372,374,376,378],{"key":20,"text":373,"correct":29},"不调整合同单价",{"key":24,"text":375,"correct":22},"可以调整合同单价",{"key":27,"text":377,"correct":22},"调整涉及材料上涨的单价",{"key":31,"text":379,"correct":22},"调整涉及材料涨幅较大的单价",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":24,"analysis":33},1119768,"某建设工程项目以单价合同形式发包，在签订合同时根据估算的工程量和单价确定了一个合同总价。工程完成后，实际完成的工程量乘以各项单价之和小于合同总价。根据单价合同的规定，工程款的支付应以()。",[384,386,387,388],{"key":20,"text":385,"correct":22},"签订合同时确定的合同总价",{"key":24,"text":197,"correct":29},{"key":27,"text":199,"correct":22},{"key":31,"text":201,"correct":22},{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":33},1119769,"关于单价合同，下列选项中不正确的是()",[393,395,397,399],{"key":20,"text":394,"correct":29},"单价合同实际工程款的支付以实际完成工程量乘以实际单价进行计算",{"key":24,"text":396,"correct":22},"单价合同对业主而言投资控制不利",{"key":27,"text":398,"correct":22},"单价合同的特点是单价优先",{"key":31,"text":400,"correct":22},"固定单价合同适用于工期短，工程量变化幅度不会太大的项目",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":31,"analysis":33},1119770,"如果采用单价合同，业主的工作量将会增加，主要表现在（）工作量加大。",[405,407,409,411],{"key":20,"text":406,"correct":22},"风险管理",{"key":24,"text":408,"correct":22},"合同管理",{"key":27,"text":410,"correct":22},"施工管理",{"key":31,"text":412,"correct":29},"核实已完成工程量",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":27,"analysis":33},1119771,"某工程以固定总价合同形式发包给承包商，在工程款支付中，承包商发现因自身失误导致某项工作投标报价大大低于其合理价格。对此，承包商()。",[417,419,421,423],{"key":20,"text":418,"correct":22},"有权以合理价格为依据要求业主补差",{"key":24,"text":420,"correct":22},"有权要求对此项工作进行重新定价",{"key":27,"text":422,"correct":29},"无权获得任何补偿",{"key":31,"text":424,"correct":22},"可以与业主协商降低此项工作的质量标准",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":20,"analysis":33},1119772,"某建设工程项目承包合同的计价方式是单价合同,在评标过程中,发现某一个投标者其总价和单价的计算结果不一致,究其原因是投标者在计算时,将混凝土300元\u002Fm3误作为30元\u002Fm3的结果。为此,业主有权()。",[429,430,431,433],{"key":20,"text":77,"correct":29},{"key":24,"text":75,"correct":22},{"key":27,"text":432,"correct":22},"要求投标者重新报混凝土単价",{"key":31,"text":434,"correct":22},"将该标做废标处理",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":27,"analysis":33},1119773,"采用固定总价合同，在业主和承包商都无法预测风险的条件下和可能有工程变更的情况下，( )。",[439,441,443,445],{"key":20,"text":440,"correct":22},"承包商承担了较少的风险，业主的风险较大",{"key":24,"text":442,"correct":22},"业主承担了全部风险",{"key":27,"text":444,"correct":29},"承包商承担了较大的风险，业主的风险较小",{"key":31,"text":446,"correct":22},"承包商承担了全部风险",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":20,"analysis":33},1119774,"根据《建设工程施工合同（示范文本）》(GF-1999-0201)规定，合同双方可约定，在()条件下不可以对合同价款进行调整。",[451,453,455,457],{"key":20,"text":452,"correct":29},"一周内非承包人原因停水、停电、停气造成的停工累计6h",{"key":24,"text":454,"correct":22},"工程造价管理部门公布的价格调整",{"key":27,"text":456,"correct":22},"国家有关政策变化影响合同价款",{"key":31,"text":458,"correct":22},"法律、行政法规变化影响合同价款",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":27,"analysis":33},1119775,"相对于其他合同计价形式而言，成本加酬金合同增加了业主的()难度。",[463,465,467,469],{"key":20,"text":464,"correct":22},"质量控制",{"key":24,"text":466,"correct":22},"进度控制",{"key":27,"text":468,"correct":29},"投资控制",{"key":31,"text":470,"correct":22},"安全管理",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":31,"analysis":33},1119776,"采用( )合同，承包商不承担任何价格变化或工程量变化的风险，这些风险主要由业主承担，对业主的投资控制很不利。",[475,477,479,481],{"key":20,"text":476,"correct":22},"固定总价",{"key":24,"text":478,"correct":22},"可调单价",{"key":27,"text":480,"correct":22},"固定单价",{"key":31,"text":482,"correct":29},"成本加酬金",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":20,"analysis":33},1119777,"关于成本加酬金合同的说明,正确的是()。",[487,489,491,493],{"key":20,"text":488,"correct":29},"采用该计价方式对业主的投资控制不利",{"key":24,"text":490,"correct":22},"成本加酬金合同不适用于抢险、救灾工程",{"key":27,"text":492,"correct":22},"成本加酬金合同不宜用于项目管理合同",{"key":31,"text":494,"correct":22},"对承包商来说,成本加酬金合同比固定总价合同的风险高",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":31,"analysis":33},1119778,"抢险、救灾工程一般采用()合同。",[499,500,501,502],{"key":20,"text":292,"correct":22},{"key":24,"text":55,"correct":22},{"key":27,"text":135,"correct":22},{"key":31,"text":57,"correct":29},{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":31,"analysis":33},1119779,"对于时间要求特别紧迫的抢险救灾工程建设，其工程承包合同计价形式较适合采用()。",[507,508,509,510],{"key":20,"text":292,"correct":22},{"key":24,"text":55,"correct":22},{"key":27,"text":135,"correct":22},{"key":31,"text":57,"correct":29},{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":31,"analysis":33},1119780,"对于应急的工程的建设，其工程承包合同的计价形式较适合采用()。",[515,516,517,518],{"key":20,"text":292,"correct":22},{"key":24,"text":55,"correct":22},{"key":27,"text":135,"correct":22},{"key":31,"text":57,"correct":29},{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":31,"analysis":33},1119781,"( )合同与固定总价合同正好相反的合同。",[523,524,526,528],{"key":20,"text":480,"correct":22},{"key":24,"text":525,"correct":22},"变动总价",{"key":27,"text":527,"correct":22},"变动单价",{"key":31,"text":482,"correct":29},{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":20,"analysis":33},1119782,"以下对总价合同特点表述有误的是()。",[533,535,537,539],{"key":20,"text":534,"correct":29},"业主的风险较大，承包人承担的风险较少",{"key":24,"text":536,"correct":22},"评标时易于迅速确定最低报价的投标人",{"key":27,"text":538,"correct":22},"发包单位能更容易、更有把握地对项目进行控制",{"key":31,"text":540,"correct":22},"必须将设计和施工方面的变化控制在最小限度内",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":20,"analysis":33},1119783,"以下对施工合同中总价合同的特点的表述，不正确的是（）。",[545,546,547,548],{"key":20,"text":534,"correct":29},{"key":24,"text":536,"correct":22},{"key":27,"text":538,"correct":22},{"key":31,"text":540,"correct":22},{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":31,"analysis":33},1119784,"实行施工总承包管理模式时，业主与总承包管理方的合同一般采用（）。",[553,554,555,556],{"key":20,"text":123,"correct":22},{"key":24,"text":55,"correct":22},{"key":27,"text":135,"correct":22},{"key":31,"text":57,"correct":29},[558,561,564,567,570,573],{"id":15,"name":559,"category":7,"favorite":560},"领导干部任职前廉政法规知识测试题",92,{"id":562,"name":563,"category":7,"favorite":15},595,"建筑结构与设备",{"id":565,"name":566,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":568,"name":569,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":571,"name":572,"category":7,"favorite":8},534,"BIM工程师",{"id":574,"name":572,"category":7,"favorite":8},535]