[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-53":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":571},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,53,50,2973,[13,34,46,58,70,82,94,106,114,125,136,148,160,172,184,196,208,217,229,241,249,261,273,283,291,303,313,321,333,345,353,365,377,389,399,411,421,429,441,453,461,470,482,494,504,516,528,536,548,560],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1119684,1,"单选题","根据《建设工程施工专业分包合同(示范文本)》GF2003-0213的规定,承包人应当向分包人提供()。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","全套总包合同供分包人査阅",false,{"key":24,"text":25,"correct":22},"B","合同专用条款中约定的设备和设施,费用由分包人承担",{"key":27,"text":28,"correct":22},"C","与监理公司签订的合同",{"key":30,"text":31,"correct":32},"D","与分包工程相关的各种证件、批件和各种相关资料",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1119685,"工程质量保修期限，应自()起计算。",[38,40,42,44],{"key":20,"text":39,"correct":22},"当事人双方具体约定日期",{"key":24,"text":41,"correct":22},"法规规定标准日期",{"key":27,"text":43,"correct":32},"实际竣工日期",{"key":30,"text":45,"correct":22},"参照行业通常习惯起算日",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1119686,"某承包人承揽一房屋建筑项目，现已按合同约定通过竣工验收。在缺陷责任期内，发包人发现部分卫生间存在漏水现象。对这一缺陷，()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"应由承包人承担修复和查验的费用",{"key":24,"text":53,"correct":22},"应由发包人承担修复和查验的费用",{"key":27,"text":55,"correct":32},"监理人和承包人应共同查清缺陷和损坏的原因，所需费用根据缺陷和损坏原因处理",{"key":30,"text":57,"correct":22},"发包人有权要求承包人相应延长缺陷责任期，但缺陷责任期延长最长不超过1年",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1119687,"根据《建设工程施工专业分包合同（示范文本）》GF-2003-0213，下列说法正确的是()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"发包人向分包人提供具备施工条件的施工场地",{"key":24,"text":65,"correct":22},"分包人可直接致函发包人或工程师",{"key":27,"text":67,"correct":32},"就分包范围内的有关工作，承包人随时可以向分包人发出指令",{"key":30,"text":69,"correct":22},"分包合同价款与总承包合同相应部分的价款存在连带关系",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1119688,"某工程项目发包人与承包人签订了施工合同，承包人与分包人签订了专业工程分包合同，在分包合同履行过程中，分包人的正确做法是（）。",[74,76,78,80],{"key":20,"text":75,"correct":32},"未经承包人允许，分包人不得以任何理由与发包人或工程师发生直接工作联系",{"key":24,"text":77,"correct":22},"分包人可以直接致函发包人或工程师",{"key":27,"text":79,"correct":22},"分包人可以直接接受发包人或工程师的指令",{"key":30,"text":81,"correct":22},"分包人无须接受承包人转发的发包人或工程师与分包工程有关的指令",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1119689,"根据《建设工程施工专业分包合同》（GF2003-0213），下列关于专业工程分包人的主要责任和义务的说法，正确的是（）",[86,88,90,92],{"key":20,"text":87,"correct":32},"分包人应向承包人提交详细的施工组织设计",{"key":24,"text":89,"correct":22},"与承包人产生矛盾时，分包人应直接致函发包人或工程师",{"key":27,"text":91,"correct":22},"承包人随时可以向分包人发出工程相关指令，分包人应执行所有指令",{"key":30,"text":93,"correct":22},"分包人应按照有关部门对施工噪声的规定办理有关手续，并承担由此发生的费用",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},1119690,"建设工程施工劳务分包合同中，劳务分包人在施工现场内使用的安全保护设施，由劳务分包人提供使用计划，经工程承包人批准后，由()负责供应。",[98,100,102,104],{"key":20,"text":99,"correct":22},"发包人",{"key":24,"text":101,"correct":22},"工程师",{"key":27,"text":103,"correct":22},"劳务分包人",{"key":30,"text":105,"correct":32},"工程承包人",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},1119691,"劳务分包合同中，编制施工组织设计、年、季、月施工计划由（）负责。",[110,111,112,113],{"key":20,"text":99,"correct":22},{"key":24,"text":101,"correct":22},{"key":27,"text":103,"correct":22},{"key":30,"text":105,"correct":32},{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":27,"analysis":33},1119692,"组建与工程相适应的项目管理班子，全面履行总（分）包合同，组织实施施工管理的各项工作，对工程的工期和质量向()负责。",[118,120,122,123],{"key":20,"text":119,"correct":22},"分包人",{"key":24,"text":121,"correct":22},"总承包人",{"key":27,"text":99,"correct":32},{"key":30,"text":124,"correct":22},"监理人",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":24,"analysis":33},1119693,"根据《建设工程施工专业分包合同(示范文本)》(GF-2003-0213),关于发包人、承包人和分包人关系的说法,,正确的是()。",[129,130,132,134],{"key":20,"text":63,"correct":22},{"key":24,"text":131,"correct":32},"就分包范围内的有关工作,承包人可以随时向分包人发出指令",{"key":27,"text":133,"correct":22},"分包人可直接致电发包人或工程师",{"key":30,"text":135,"correct":22},"分包合同价款与总承包合同相应部分价款存在连带关系",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":24,"analysis":33},1119694,"根据《建设工程施工专业分包合同（示范文本）》规定，分包合同价款与总包合同相应部分价款之间应当()。",[140,142,144,146],{"key":20,"text":141,"correct":22},"一致",{"key":24,"text":143,"correct":32},"没有连带关系",{"key":27,"text":145,"correct":22},"分包价款低于总包价款",{"key":30,"text":147,"correct":22},"分包价款高于总包价款",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":24,"analysis":33},1119695,"根据《建设工程施工劳务分包合同（示范文本）》(GF-20030214)规定，采用()的，由劳务分包人每日将提供劳务人数报工程承包人，由工程承包人确认。",[152,154,156,158],{"key":20,"text":153,"correct":22},"固定劳务报酬方式",{"key":24,"text":155,"correct":32},"按确定的工时计算劳务报酬",{"key":27,"text":157,"correct":22},"按确定的工程量或工时计算劳务报酬",{"key":30,"text":159,"correct":22},"按确定的工程量计算劳务报酬",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":30,"analysis":33},1119696,"某工程施工承包单位将其承包工程中的劳务作业发包给某劳务分包单位，双方约定劳务报酬采用固定劳务报酬。该劳务分包合同在履行过程中应()。",[164,166,168,170],{"key":20,"text":165,"correct":22},"由工程师确认劳务分包人的工时和工程量",{"key":24,"text":167,"correct":22},"由劳务分包人每日提供劳务人数给工程承包人，由工程承包人确认",{"key":27,"text":169,"correct":22},"由劳务分包人按月将完成的工程量报工程承包人，由工程承包人确认",{"key":30,"text":171,"correct":32},"不计算劳务分包人的工时和工程量",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":24,"analysis":33},1119697,"某建筑材料采购合同中约定由需方负责提货，则交货日期应是()。",[176,178,180,182],{"key":20,"text":177,"correct":22},"以需方收货戳记的日期为准",{"key":24,"text":179,"correct":32},"以供方按合同规定通知的提货日期为准",{"key":27,"text":181,"correct":22},"以承运单位签发的日期为准",{"key":30,"text":183,"correct":22},"以供方向承运单位提出申请的日期为准",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":24,"analysis":33},1119698,"建筑材料采购合同中约定供货方负责送货的,交货日期应以()为准。",[188,190,192,194],{"key":20,"text":189,"correct":22},"供货方发货截记的日期",{"key":24,"text":191,"correct":32},"采购方收货截记的日期",{"key":27,"text":193,"correct":22},"合同约定的提货日期",{"key":30,"text":195,"correct":22},"承运单位签发的日期",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":27,"analysis":33},1119699,"某项目业主作为采购方与钢材生产厂家签订了物资采购合同，合同中规定供货方负责将钢材送达采购方制定地点，由采购方人员对到达的钢材进行检查，发现问题当场作出记录。本合同中，双方约定的验收方式是（）。",[200,202,204,206],{"key":20,"text":201,"correct":22},"驻厂验收",{"key":24,"text":203,"correct":22},"提运验收",{"key":27,"text":205,"correct":32},"接运验收",{"key":30,"text":207,"correct":22},"入库验收",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":30,"analysis":33},1119700,"物资采购合同中，验收方式不包括（）。",[212,213,214,215],{"key":20,"text":201,"correct":22},{"key":24,"text":203,"correct":22},{"key":27,"text":207,"correct":22},{"key":30,"text":216,"correct":32},"现场验收",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":24,"analysis":33},1119701,"某建设工程项目施工合同约定，由承包人负责采购项目所需的防火门，防火门设计要求的质量标准高于国家标准，则在材料采购合同中对该材料的质量标准的约定应是()。",[221,223,225,227],{"key":20,"text":222,"correct":22},"按国家标准执行",{"key":24,"text":224,"correct":32},"按设计要求执行",{"key":27,"text":226,"correct":22},"按国家标准与设计要求折中执行",{"key":30,"text":228,"correct":22},"由承包人视情况而定",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":24,"analysis":33},1119702,"建筑施工企业与物资供应企业就某建筑材料的供应签订合同，如该建筑材料不属于国家定价的产品，则其价格应()。",[233,235,237,239],{"key":20,"text":234,"correct":22},"报请物价主管部门确定",{"key":24,"text":236,"correct":32},"由供需双方协商确定",{"key":27,"text":238,"correct":22},"参考国家定价确定",{"key":30,"text":240,"correct":22},"按当地工程造价管理部门公布的指导价确定",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":20,"analysis":33},1119703,"在制造时期，由采购方派人在供应的生产厂家进行材质检验。该验收方式属于()。",[245,246,247,248],{"key":20,"text":201,"correct":32},{"key":24,"text":203,"correct":22},{"key":27,"text":205,"correct":22},{"key":30,"text":207,"correct":22},{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":30,"analysis":33},1119704,"建筑材料采购合同中，关于价格的表述中，不正确的是()。",[253,255,257,259],{"key":20,"text":254,"correct":22},"有国家定价的材料，应按国家定价执行",{"key":24,"text":256,"correct":22},"不属于国家定价的产品，可由供需双方协商确定价格",{"key":27,"text":258,"correct":22},"按规定应由国家定价的但国家尚无定价的材料，其价格应报请物价主管部门的批准",{"key":30,"text":260,"correct":32},"不属于国家定价的产品，可由任何一方确定价格",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":27,"analysis":33},1119705,"某建筑材料采购合同中约定，委托运输部门送货，则交货日期应()",[265,267,269,271],{"key":20,"text":266,"correct":22},"以采购方收货戳记的日期为准",{"key":24,"text":268,"correct":22},"以供货方按合同规定通知的提货日期为准",{"key":27,"text":270,"correct":32},"以供货方发运产品时，承运单位签发的日期为准",{"key":30,"text":272,"correct":22},"以供货方向承运单位提出申请的日期为准",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":30,"analysis":33},1119706,"建筑材料采购合同中约定委托运输单位代运的产品，交货日期一般以（）为准。",[277,279,281,282],{"key":20,"text":278,"correct":22},"供货方发货戳记的日期",{"key":24,"text":280,"correct":22},"采购方收货戳记的日期",{"key":27,"text":193,"correct":22},{"key":30,"text":195,"correct":32},{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":30,"analysis":33},1119707,"按验收方式划分，由建设工程采购方仓库管理人员对所购物资的数量和外观进行检验的验收方式，属于( )。",[287,288,289,290],{"key":20,"text":201,"correct":22},{"key":24,"text":203,"correct":22},{"key":27,"text":205,"correct":22},{"key":30,"text":207,"correct":32},{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":24,"analysis":33},1119708,"供货方不能全部或部分交货，应按合同约定的违约金比例乘以（）来计算违约金。",[295,297,299,301],{"key":20,"text":296,"correct":22},"全部货物的货款",{"key":24,"text":298,"correct":32},"不能交货部分货款",{"key":27,"text":300,"correct":22},"已经交货部分货款",{"key":30,"text":302,"correct":22},"供需双方商定的货款",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":27,"analysis":33},1119709,"物资采购合同规定，委托运输部门送货的产品，一般交货日期以()为准。",[307,308,310,311],{"key":20,"text":280,"correct":22},{"key":24,"text":309,"correct":22},"供货方通知的提货日期",{"key":27,"text":195,"correct":32},{"key":30,"text":312,"correct":22},"承运单位提出申请的日期",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":24,"analysis":33},1119710,"根据《建设工程专业工程分包合同（示范文本）》规定，分包合同价款与总包合同相应部分款之间应当（）。",[317,318,319,320],{"key":20,"text":141,"correct":22},{"key":24,"text":143,"correct":32},{"key":27,"text":145,"correct":22},{"key":30,"text":147,"correct":22},{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":27,"analysis":33},1119711,"根据《建设工程施工专业分包合同（示范文本）》（GF-2003-0213）规定，对专业分包企业的工作和负责的工程负有协调和管理责任并承担由此造成损失的单位是()。",[325,327,329,331],{"key":20,"text":326,"correct":22},"设计单位",{"key":24,"text":328,"correct":22},"建设单位",{"key":27,"text":330,"correct":32},"施工总承包企业",{"key":30,"text":332,"correct":22},"监理单位",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":20,"analysis":33},1119712,"根据《建设工程施工劳务分包合同》（示范文本）(GF2013-0214)，下列有关劳务分包人应办理的保险的说法，正确的是（）。",[337,339,341,343],{"key":20,"text":338,"correct":32},"劳务分包人应为施工场地内的自有人员生命财产办理保险，并支付保险费用",{"key":24,"text":340,"correct":22},"劳务分包人应为运至施工场地用于劳务施工的材料办理保险，并支付保险费用",{"key":27,"text":342,"correct":22},"劳务分包人应为承包人提供的施工机械办理保险，并支付保险费用",{"key":30,"text":344,"correct":22},"劳务分包人应为租赁的承包人的施工机械办理保险，并支付保险费用",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":30,"analysis":33},1119713,"根据《建设工程施工劳务分包合同（示范文本）》GF 2003-0214，()应为从事危险作业的职工办理意外伤害保险。",[349,350,351,352],{"key":20,"text":105,"correct":22},{"key":24,"text":99,"correct":22},{"key":27,"text":124,"correct":22},{"key":30,"text":103,"correct":32},{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":27,"analysis":33},1119714,"建设工程施工劳务合同中，由劳务分包人负责办理并支付保险费用的是()。",[357,359,361,363],{"key":20,"text":358,"correct":22},"工程承包人租赁或提供给劳务分包人使用的施工机械设备",{"key":24,"text":360,"correct":22},"运至施工场地用于劳务施工的材料和待安装设备",{"key":27,"text":362,"correct":32},"施工场地内劳务分包人自有人员生命财产和施工机械设备",{"key":30,"text":364,"correct":22},"第三方人员生命财产",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":20,"analysis":33},1119715,"根据《建设工程施工劳务分包合同（示范文本）》(GF-2003-0214)，某工程承包人租赁一台起重机提供给劳务分包人使用，则该起重机的保险应由()。",[369,371,373,375],{"key":20,"text":370,"correct":32},"工程承包人办理并支付保险费用",{"key":24,"text":372,"correct":22},"劳务分包人办理并支付保险费用",{"key":27,"text":374,"correct":22},"工程承包人办理，但由劳务分包人支付保险费用",{"key":30,"text":376,"correct":22},"劳务分包人办理，但由承包人支付保险费用",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":27,"analysis":33},1119716,"根据施工劳务分包合同示范文件的规定，采用固定价格的劳务分包合同，可以调整劳务报酬的情况是()。",[381,383,385,387],{"key":20,"text":382,"correct":22},"由于劳务分包人原因造成的返工",{"key":24,"text":384,"correct":22},"通货膨胀导致劳务价格变化",{"key":27,"text":386,"correct":32},"法律政策变化导致劳务价格变化",{"key":30,"text":388,"correct":22},"由于劳务分包人原因造成的安全事故",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":30,"analysis":33},1119718,"根据《建设工程施工劳务分包合同（示范文本）》(GF-2003-0214)，从事危险作业职工的意外伤害保险应由()办理。",[393,394,396,398],{"key":20,"text":99,"correct":22},{"key":24,"text":395,"correct":22},"施工承包人",{"key":27,"text":397,"correct":22},"专业分包人",{"key":30,"text":103,"correct":32},{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":20,"analysis":33},1119719,"根据《建设工程施工劳务分包合同（示范文本）》（GF2013—0214），下列有关劳务分包人应办理的保险的说法，正确的是（）",[403,405,407,409],{"key":20,"text":404,"correct":32},"劳务分包人应为施工场地内的自有人员生命财产办理保险，并支付保险费用。",{"key":24,"text":406,"correct":22},"劳务分包人应为运至施工场地用于劳务施工的材料办理保险，并支付保险费用。",{"key":27,"text":408,"correct":22},"劳务分包人应为承包人提供的施工机械办理保险，并支付保险费用。",{"key":30,"text":410,"correct":22},"劳务分包人应为租赁的承包人的施工机械办理保险，并支付保险费用。",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":20,"analysis":33},1119720,"运至施工场地用于劳务施工的材料和待安装设备，应由（）办理或获得保险。",[415,416,418,419],{"key":20,"text":105,"correct":32},{"key":24,"text":417,"correct":22},"工程承包人和分包人共同",{"key":27,"text":103,"correct":22},{"key":30,"text":420,"correct":22},"保险人",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":20,"analysis":33},1119721,"根据《建设工程施工劳务分包合同（示范文本）》（GF2003—0214），运至施工场地用于劳务施工的材料和待安装设备应由（）",[425,426,427,428],{"key":20,"text":370,"correct":32},{"key":24,"text":372,"correct":22},{"key":27,"text":374,"correct":22},{"key":30,"text":376,"correct":22},{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":30,"analysis":33},1119722,"按照《建筑工程施工劳务分包合同（示范文本）》，下列由劳务报酬最终支付程序规定的表述中，正确的是( )",[433,435,437,439],{"key":20,"text":434,"correct":22},"全部工作完成，经工程承包人确认后7天内，劳务分包人向工程承包人递交完整的结算资料",{"key":24,"text":436,"correct":22},"全部工作完成，经承包人认可后28天内，劳务分包人向工程承包人递交完整的结算资料",{"key":27,"text":438,"correct":22},"工程承包人收到劳务分包人递交的结算资料后28天内进行核实，给予确认或者提出修改意见",{"key":30,"text":440,"correct":32},"工程承包人确认结算资料后14天内向劳务分包人支付劳务报酬尾款",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":27,"analysis":33},1119723,"《建筑工程施工劳务分包合同（示范文本）》（GF-2003-0214）中规定，从工程承包人收到劳务分包人递交的结算资料到工程承包人向劳务分包人支付劳务报酬尾款，最长不得超过( )。",[445,447,449,451],{"key":20,"text":446,"correct":22},"7天",{"key":24,"text":448,"correct":22},"14天",{"key":27,"text":450,"correct":32},"28天",{"key":30,"text":452,"correct":22},"30天",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":27,"analysis":33},1119724,"《建筑工程施工劳务分包合同(示范文本)》中规定，从工程承包人收到劳务发包人递交的结算资料到工程承包人向劳务分包人支付劳务报酬尾款，最长不得超过( )。",[457,458,459,460],{"key":20,"text":446,"correct":22},{"key":24,"text":448,"correct":22},{"key":27,"text":450,"correct":32},{"key":30,"text":452,"correct":22},{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":20,"analysis":33},1119725,"《建筑工程施工劳务合同示范文本》中规定，从工程承包人收到劳务分包人递交的结算资料并确认后的( )内向劳务分包人支付劳务报酬尾款。",[465,466,467,468],{"key":20,"text":448,"correct":32},{"key":24,"text":446,"correct":22},{"key":27,"text":450,"correct":22},{"key":30,"text":469,"correct":22},"21天",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":24,"analysis":33},1119726,"某建设项目施工合同约定，由承包人负责采购项目所需的装饰材料。现设计要求的质量标准高于国家标准与部颁标准，则在材料采购合同中，对该质量标准约定应按（）执行。",[474,476,478,480],{"key":20,"text":475,"correct":22},"相应的企业标准",{"key":24,"text":477,"correct":32},"设计要求",{"key":27,"text":479,"correct":22},"颁布的国家标准",{"key":30,"text":481,"correct":22},"相应的部颁标准",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":24,"analysis":33},1119727,"劳务分包工作全部完成后，劳务分包公司应在工程承包人认可后（）天内，向工程承包人递交完整的结算资料，申请办理最终结算。",[486,488,490,492],{"key":20,"text":487,"correct":22},"7",{"key":24,"text":489,"correct":32},"14",{"key":27,"text":491,"correct":22},"21",{"key":30,"text":493,"correct":22},"28",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":27,"analysis":33},1119728,"某工程建设工程施工劳务合同中，全部工作完成，经()认可14天内，劳务分包人向工程承包人递交完整的结算资料。",[498,499,501,502],{"key":20,"text":99,"correct":22},{"key":24,"text":500,"correct":22},"设计人",{"key":27,"text":105,"correct":32},{"key":30,"text":503,"correct":22},"监理工程师",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":27,"analysis":33},1119729,"建筑材料采购合同中对于材料包装物的约定，通常情况下是()。",[508,510,512,514],{"key":20,"text":509,"correct":22},"由建筑材料的采购方负责提供，不另计包装费",{"key":24,"text":511,"correct":22},"由建筑材料的采购方负责提供，另计包装费",{"key":27,"text":513,"correct":32},"由建筑材料的供应方负责供应，不另计包装费",{"key":30,"text":515,"correct":22},"由建筑材料的供应方负责供应，另计包装费",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":30,"analysis":33},1119730,"物资采购合同中应该明确所采用的计量方法与计量单位，对于没有国家、行业或地方规定的计量标准的产品，计量单位应采用()的计量标准。",[520,522,524,526],{"key":20,"text":521,"correct":22},"供货单位",{"key":24,"text":523,"correct":22},"采购单位",{"key":27,"text":525,"correct":22},"行业惯例",{"key":30,"text":527,"correct":32},"当事人协商",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":20,"analysis":33},1119731,"按验收方式划分,建设工程采购方在所购物资制造时就派人在供应厂家进行检验的验收方式,属于( )。",[532,533,534,535],{"key":20,"text":201,"correct":32},{"key":24,"text":203,"correct":22},{"key":27,"text":205,"correct":22},{"key":30,"text":207,"correct":22},{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":24,"analysis":33},1119732,"设备采购合同价款的支付一般分三次，其中设备制造前，采购方支付设备价格的()%作为预付款。",[540,542,544,546],{"key":20,"text":541,"correct":22},"5",{"key":24,"text":543,"correct":32},"10",{"key":27,"text":545,"correct":22},"15",{"key":30,"text":547,"correct":22},"20",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":30,"analysis":33},1119733,"设备采购合同规定，供货方按照交货顺序在规定的时间内将货物送达交货地点，采购方支付该批设备价的()。",[552,554,556,558],{"key":20,"text":553,"correct":22},"20%",{"key":24,"text":555,"correct":22},"40%",{"key":27,"text":557,"correct":22},"60%",{"key":30,"text":559,"correct":32},"80%",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":24,"analysis":33},1119734,"合同价款的支付一般分三次，设备制造前，采购方支付设备价格的()作为预付款。",[564,566,568,570],{"key":20,"text":565,"correct":22},"5%",{"key":24,"text":567,"correct":32},"10%",{"key":27,"text":569,"correct":22},"15%",{"key":30,"text":553,"correct":22},[572,575,578,581,584,587],{"id":15,"name":573,"category":7,"favorite":574},"领导干部任职前廉政法规知识测试题",92,{"id":576,"name":577,"category":7,"favorite":15},595,"建筑结构与设备",{"id":579,"name":580,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":582,"name":583,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":585,"name":586,"category":7,"favorite":8},534,"BIM工程师",{"id":588,"name":586,"category":7,"favorite":8},535]