[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-52":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":564},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,52,50,2973,[13,34,46,58,70,82,94,105,115,127,139,148,160,172,184,193,205,213,223,231,240,249,261,273,282,292,300,312,322,334,346,358,370,378,390,399,411,419,431,443,455,464,476,488,500,510,522,532,540,552],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1119633,1,"单选题","由于出现专用合同条款规定的异常恶劣气候的条件导致工期延误的，承包人有权要求发包人()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","延长工期",true,{"key":24,"text":25,"correct":26},"B","支付合理利润",false,{"key":28,"text":29,"correct":26},"C","支付违约金",{"key":31,"text":32,"correct":26},"D","增加费用","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1119634,"承包人应按合同约定对材料、工程设备以及工程的所有部位及其施工工艺进行全过程的质量检查和检验，并作详细记录，编制( )，报送监理人审查。",[38,40,42,44],{"key":20,"text":39,"correct":26},"质量检查人员组成名单",{"key":24,"text":41,"correct":26},"质量检查实施细则",{"key":28,"text":43,"correct":26},"质量检查流程表",{"key":31,"text":45,"correct":22},"工程质量报表",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1119635,"施工期间，承包人按监理人的指示提供试验样品并检验合格，之后该部分出现了质量问题，则责任应由（）承担。",[50,52,54,56],{"key":20,"text":51,"correct":26},"发包人",{"key":24,"text":53,"correct":22},"承包人",{"key":28,"text":55,"correct":26},"监理人",{"key":31,"text":57,"correct":26},"检验人",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1119636,"某工程项目施工过程中，由于恶劣的天气原因，工程师发出了暂停施工的指示。该指示发出56天后，工程师仍未发出复工指令，在这种情况下，承包人可以()。",[62,64,66,68],{"key":20,"text":63,"correct":26},"立即自行复工",{"key":24,"text":65,"correct":26},"向监理人提交书面通知后自行复工",{"key":28,"text":67,"correct":26},"取消该工作",{"key":31,"text":69,"correct":22},"向监理人提交书面通知，要求监理人在收到书面通知后28天内准许已暂停施工的工程或其中一部分工程继续施工",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1119637,"隐蔽工程在隐蔽前应通知（）及有关方面进行验收，并形成验收文件。",[74,76,78,80],{"key":20,"text":75,"correct":26},"施工单位质量部门",{"key":24,"text":77,"correct":26},"设计单位",{"key":28,"text":79,"correct":22},"监理单位",{"key":31,"text":81,"correct":26},"政府质量监督部门",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1119638,"由于承包人已完工程出现质量问题，监理人要求进行质量整改，导致暂停施工。如果承包人在收到监理人暂停施工指示后()天内不认真采取有效的复工措施，造成工期延误，可视为承包人违约。",[86,88,90,92],{"key":20,"text":87,"correct":26},"28",{"key":24,"text":89,"correct":26},"35",{"key":28,"text":91,"correct":26},"42",{"key":31,"text":93,"correct":22},"56",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1119639,"发包人应委托（）按合同约定向承包人发出开工通知。",[98,100,102,103],{"key":20,"text":99,"correct":26},"项目负责人",{"key":24,"text":101,"correct":26},"项目总工程师",{"key":28,"text":55,"correct":22},{"key":31,"text":104,"correct":26},"发包人代表",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":20,"analysis":33},1119640,"工程施工过程中发生事故的，承包人应立即通知()。",[109,110,111,113],{"key":20,"text":55,"correct":22},{"key":24,"text":51,"correct":26},{"key":28,"text":112,"correct":26},"政府部门",{"key":31,"text":114,"correct":26},"设计人",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":28,"analysis":33},1119641,"某工程在施工过程中，由于承包人的原因发生事故，根据《标准施工招标文件》中“通用合同条款”的规定，事故发生后的通知程序是()。",[119,121,123,125],{"key":20,"text":120,"correct":26},"承包人应立即通知发包人",{"key":24,"text":122,"correct":26},"承包人应立即通知新闻媒体",{"key":28,"text":124,"correct":22},"承包人应立即通知监理人，监理人应立即通知发包人",{"key":31,"text":126,"correct":26},"如没有造成人员伤亡，承包人可自行处理",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":28,"analysis":33},1119642,"发包人应将其持有的现场地质勘探资料、水文气象资料提供给承包人，并对其()负责。",[131,133,135,137],{"key":20,"text":132,"correct":26},"真实性",{"key":24,"text":134,"correct":26},"完整性",{"key":28,"text":136,"correct":22},"准确性",{"key":31,"text":138,"correct":26},"简洁性",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":24,"analysis":33},1119643,"根据《标准施工招标文件》，现场地质勘探资料、水文气象资料的准确性应由()负责。",[143,145,146,147],{"key":20,"text":144,"correct":26},"地质勘察单位",{"key":24,"text":51,"correct":22},{"key":28,"text":53,"correct":26},{"key":31,"text":55,"correct":26},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":24,"analysis":33},1119644,"根据《标准施工招标文件》中“通用合同条款”的规定，取得为工程建设所需修建场外设施的权利应（）。",[152,154,156,158],{"key":20,"text":153,"correct":26},"由发包人负责办理，承包人协助并承担有关费用",{"key":24,"text":155,"correct":22},"由发包人负责办理，并承担有关费用，承包人协助",{"key":28,"text":157,"correct":26},"由承包人负责办理，发包人协助并承担有关费用",{"key":31,"text":159,"correct":26},"由于承包人负责办理，并承担有关费用，发包人协助",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":28,"analysis":33},1119645,"某工程因施工需要，需取得出入施工场地的某条临时道路的通行权，根据《标准施工招标文件》中“通用合同条款”的规定，该通行权应当由()。",[164,166,168,170],{"key":20,"text":165,"correct":26},"承包人负责办理，并承担有关费用",{"key":24,"text":167,"correct":26},"承包人负责办理，发包人承担有关费用",{"key":28,"text":169,"correct":22},"发包人负责办理，并承担有关费用",{"key":31,"text":171,"correct":26},"发包人负责办理，承包人承担有关费用",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":31,"analysis":33},1119646,"根据《建设工程施工合同（示范文本）》（GF1999-0201）规定，由于发包人提供的材料或工程设备不合格造成的工程不合格，需要承包人采取措施补救的，发包人()。",[176,178,180,182],{"key":20,"text":177,"correct":26},"不承担由此增加的费用和（或）工期延误",{"key":24,"text":179,"correct":26},"只承担由此增加的费用和（或）工期延误，不支付承包人合理利润",{"key":28,"text":181,"correct":26},"应承担由此增加的费用，但不顺延工期",{"key":31,"text":183,"correct":22},"应承担由此增加的费用和（或）工期延误，并支付承包人合理利润",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":24,"analysis":33},1119647,"覆盖工程隐蔽部位后，监理人对质量有疑问的，可要求承包人对已覆盖的部位进行钻孔探测或揭开重新检验，承包人应遵照执行，并在检验后重新覆盖恢复原状。经检验证明工程质量不符合合同要求的，由此增加的费用和工期延误由()承担。",[188,189,190,191],{"key":20,"text":55,"correct":26},{"key":24,"text":53,"correct":22},{"key":28,"text":51,"correct":26},{"key":31,"text":192,"correct":26},"分包人",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":20,"analysis":33},1119648,"根据《标准施工招标文件》中“通用合同条款”的规定，如承包人未通知监理人到场检查，私自将工程隐蔽部位覆盖的，对于监理人提出的重新检验要求，重新检验的费用()。",[197,199,201,203],{"key":20,"text":198,"correct":22},"应由承包人承担",{"key":24,"text":200,"correct":26},"应由发包人承担",{"key":28,"text":202,"correct":26},"应视重新检验结果，确定由哪方承担",{"key":31,"text":204,"correct":26},"由承包人和发包人各承担50%",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":20,"analysis":33},1119650,"根据《建设工程施工合同（示范文本）》（GF1999-0201）规定，承包人根据合同约定或监理人指示进行的现场材料试验，应由()提供试验场所、试验人员、试验设备器材以及其他必要的试验条件。",[209,210,211,212],{"key":20,"text":53,"correct":22},{"key":24,"text":51,"correct":26},{"key":28,"text":114,"correct":26},{"key":31,"text":55,"correct":26},{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":20,"analysis":33},1119651,"承包人未通知监理人到场检验，承包人就自行将施工中隐蔽部位覆盖。此后，经剥开重新检验证明其质量是符合合同要求的，由此增加的费用和延误的工期应由( )",[217,218,219,221],{"key":20,"text":53,"correct":22},{"key":24,"text":51,"correct":26},{"key":28,"text":220,"correct":26},"发包人和承包人共同",{"key":31,"text":222,"correct":26},"监理人和承包人共同",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":20,"analysis":33},1119652,"根据《标准施工招标文件》，承包人按照合同规定将隐蔽工程覆盖后，监理人又要求承包人对已覆盖部位揭开重新检验，经检验证明工程质量符合要求，由此增加的费用和延误的工期应由()承担。",[227,228,229,230],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":26},{"key":28,"text":55,"correct":26},{"key":31,"text":77,"correct":26},{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":20,"analysis":33},1119653,"监理人为验证承包人对材料的检验成果的可靠性而要求承包人重新检验，结果证明材料质量符合要求，由此增加的费用和延误的工期应由（）承担。",[235,236,237,238],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":26},{"key":28,"text":55,"correct":26},{"key":31,"text":239,"correct":26},"供货商",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":28,"analysis":33},1119654,"根据《标准施工招标文件》中“通用合同条款”的规定，承包人在自检确认隐蔽部位具备覆盖条件后，通知监理人在约定的期限内进行检查。该部分隐蔽工程施工完成后，监理人有权提出对已经隐蔽的工程进行重新检验的要求，则重新检验的费用()。",[244,245,246,247],{"key":20,"text":198,"correct":26},{"key":24,"text":200,"correct":26},{"key":28,"text":202,"correct":22},{"key":31,"text":248,"correct":26},"因监理人未对隐蔽工程进行验收，应由监理人承担",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":20,"analysis":33},1119655,"根据《标准施工招标文件》中“通用合同条款”的规定，出现合同专用条款规定的异常恶劣气候条件导致工期延误，则()。",[253,255,257,259],{"key":20,"text":254,"correct":22},"承包人有权要求发包人延长工期",{"key":24,"text":256,"correct":26},"承包人无权要求发包人延长工期",{"key":28,"text":258,"correct":26},"承包人有权要求发包人延长工期，并承担有关费用",{"key":31,"text":260,"correct":26},"承包人无权要求发包人延长工期，并承担有关费用和合理利润",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":31,"analysis":33},1119656,"由于发包人的原因发生暂停施工的紧急情况，且监理人未及时下达暂停施工指示的，承包人可先暂停施工并及时向监理人提出暂停施工的书面请求。监理人应在接到书面请求后的（）h内予以答复，未答复的，视为同意承包人的暂停施工请求。",[265,267,269,271],{"key":20,"text":266,"correct":26},"6",{"key":24,"text":268,"correct":26},"8",{"key":28,"text":270,"correct":26},"12",{"key":31,"text":272,"correct":22},"24",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":20,"analysis":33},1119657,"承包人提出提前竣工的建议能够给发包人带来效益，监理人与承包人共同协商采取加快工程进度的措施和修订合同进度计划，由此增加费用应由( )承担。",[277,278,279,280],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":26},{"key":28,"text":55,"correct":26},{"key":31,"text":281,"correct":26},"政府主管部门",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":31,"analysis":33},1119658,"发包人要求承包人提前竣工，或承包人提出提前竣工的建议能够给发包人带来效益的，应由（）采取加快工程进度的措施和修订合同进度计划。",[286,287,288,290],{"key":20,"text":53,"correct":26},{"key":24,"text":51,"correct":26},{"key":28,"text":289,"correct":26},"发包人与承包人共同协商",{"key":31,"text":291,"correct":22},"监理人与承包人共同协商",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":24,"analysis":33},1119659,"承包人按照监理人批准的计划组织施工，但由于进度计划本身存在缺陷造成工期延误，则责任应由( )承担。",[296,297,298,299],{"key":20,"text":51,"correct":26},{"key":24,"text":53,"correct":22},{"key":28,"text":55,"correct":26},{"key":31,"text":192,"correct":26},{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":24,"analysis":33},1119660,"根据《标准施工招标文件》中“通用合同条款”的规定，质量保证金的计算额度应包括()。",[304,306,308,310],{"key":20,"text":305,"correct":26},"预付款的支付",{"key":24,"text":307,"correct":22},"承包人完成的安装工程款",{"key":28,"text":309,"correct":26},"价格调整的金额",{"key":31,"text":311,"correct":26},"预付款的扣回",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":24,"analysis":33},1119661,"监理人在收到承包人进度付款申请单以及相应的支持性证明文件后的()d内完成核查，提出发包人到期应支付给承包人的金额以及相应的支付性材料，经发包人审查同意后，由监理人向承包人出具经发包人签认的进度付款证书。",[316,318,320,321],{"key":20,"text":317,"correct":26},"7",{"key":24,"text":319,"correct":22},"14",{"key":28,"text":87,"correct":26},{"key":31,"text":93,"correct":26},{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":28,"analysis":33},1119662,"根据《标准施工招标文件》中“通用合同条款”的规定，监理人出具进度付款证书，则（）。",[326,328,330,332],{"key":20,"text":327,"correct":26},"视为监理人已同意承包人完成的该部分工作",{"key":24,"text":329,"correct":26},"视为发包人已接受承包人完成的该部分工作",{"key":28,"text":331,"correct":22},"发包人应在监理人收到进度付款申请单后的28天内，将进度款支付给承包人",{"key":31,"text":333,"correct":26},"视为监理人已批准了承包人完成的该部分工作",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},1119663,"某工程监理人在审核当月承包人提交的进度付款申请单时，发现前二个月已签发的进度付款证书中存在错误，多支付了承包人约50万元的进度款，根据《标准施工招标文件》中“通用合同条款”的规定该笔款()。",[338,340,342,344],{"key":20,"text":339,"correct":26},"工程师无权扣除",{"key":24,"text":341,"correct":22},"应在本次进度付款中扣除",{"key":28,"text":343,"correct":26},"应在本次进度付款中扣除一半",{"key":31,"text":345,"correct":26},"应在竣工付款中扣除",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},1119664,"根据《建设工程施工合同（示范文本）》(GF-19990201)规定，()签发后，承包人可按专用合同条款约定的人数和期限向监理人提交最终结清申请单，并提供相关证明材料。",[350,352,354,356],{"key":20,"text":351,"correct":26},"竣工付款证书",{"key":24,"text":353,"correct":22},"缺陷责任期终止证书",{"key":28,"text":355,"correct":26},"工程进度款证书",{"key":31,"text":357,"correct":26},"工程接收证书",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},1119665,"根据《标准施工招标文件》中“通用合同条款”的规定，承包人提交竣工付款申请单和最终结清申请单的时间条件分别是()。",[362,364,366,368],{"key":20,"text":363,"correct":22},"工程接收证书颁发后、缺陷责任期终止证书签发后",{"key":24,"text":365,"correct":26},"工程接收证书颁发后、履约证书签发后",{"key":28,"text":367,"correct":26},"工程竣工证书颁发后、履约证书签发后",{"key":31,"text":369,"correct":26},"工程竣工证书颁发后、缺陷责任期终止证书签发后",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},1119666,"根据《建设工程施工合同（示范文本）》(GF2013-0201)，在监理人出具竣工付款证书后的（）日内，发包人需将应支付款支付给承包人。",[374,375,376,377],{"key":20,"text":317,"correct":26},{"key":24,"text":319,"correct":22},{"key":28,"text":87,"correct":26},{"key":31,"text":91,"correct":26},{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":28,"analysis":33},1119667,"根据《标准施工招标文件》中“通用合同条款”的规定，如监理人未能在14天内核查承包人提交的竣工付款申请单，又未提出具体意见，则()。",[382,384,386,388],{"key":20,"text":383,"correct":26},"监理人可要求延长核查时间",{"key":24,"text":385,"correct":26},"监理人应向承包人出具经发包人签认的竣工付款证书",{"key":28,"text":387,"correct":22},"视为承包人提交的竣工付款申请已经监理人核查同意",{"key":31,"text":389,"correct":26},"视为承包人提交的竣工付款申请已经发包人核查同意",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":24,"analysis":33},1119668,"监理人收到承包人提交的最终结清申请单后的（）d内，提出发包人应支付给承包人的价款送发包人审核并抄送承包人。",[394,395,396,398],{"key":20,"text":317,"correct":26},{"key":24,"text":319,"correct":22},{"key":28,"text":397,"correct":26},"21",{"key":31,"text":87,"correct":26},{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":24,"analysis":33},1119669,"根据《建设工程施工合同（示范文本）》（G-JF-19990201)规定，关于竣工付款证书及支付时间的表述，不正确的是()。",[403,405,407,409],{"key":20,"text":404,"correct":26},"承包人对发包人签认的竣工付款证书有异议的，发包人可出具竣工付款申请单中承包人已同意部分的临时付款证书",{"key":24,"text":406,"correct":22},"发包人应在监理人出具竣工付款证书后的28d内，将应支付款支付给承包人",{"key":28,"text":408,"correct":26},"监理人在收到承包人提交的竣工付款申请单后的14d内完成核查，提出发包人到期应支付给承包人的价款送发包人审核并抄送承包人",{"key":31,"text":410,"correct":26},"发包人应在收到后14d内审核完毕，由监理人向承包人出具经发包人签认的竣工付款证书",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":20,"analysis":33},1119670,"根据《建设工程施工合同（示范文本）》（GF-1999-0201）规定，监理人审查后认为已具备竣工验收条件的，应在收到竣工验收申请报告后的()d内提请发包人进行工程验收。",[415,416,417,418],{"key":20,"text":87,"correct":22},{"key":24,"text":397,"correct":26},{"key":28,"text":319,"correct":26},{"key":31,"text":317,"correct":26},{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":20,"analysis":33},1119671,"除专用合同条款另有约定外，经验收合格工程的实际竣工日期，以( )的日期为准，并在工程接收证书中写明。",[423,425,427,429],{"key":20,"text":424,"correct":22},"提交竣工验收申请报告",{"key":24,"text":426,"correct":26},"竣工验收合格",{"key":28,"text":428,"correct":26},"颁发竣工验收合格证书",{"key":31,"text":430,"correct":26},"主体结构结束",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":28,"analysis":33},1119672,"一般情况下，验收合格工程的实际竣工日期是（）。",[435,437,439,441],{"key":20,"text":436,"correct":26},"组织工程竣工验收的日期",{"key":24,"text":438,"correct":26},"承包人实际完成工程的日期",{"key":28,"text":440,"correct":22},"承包人提交竣工验收申请报告的日期",{"key":31,"text":442,"correct":26},"工程竣工验收后，发包人给予认可意见的日期",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":20,"analysis":33},1119673,"某工程项目承包人于2009年7月12日向发包人提交了竣工验收报告，发包人收到报告后，于2009年8月5日组织竣工验收，参加验收各方于2009年8月10日签署有关竣工验收合格的文件，发包人于2009年8月20日按有关规定办理了竣工验收备案手续。本项目的实际竣工日期为()。",[447,449,451,453],{"key":20,"text":448,"correct":22},"2009年7月12日",{"key":24,"text":450,"correct":26},"2009年8月5日",{"key":28,"text":452,"correct":26},"2009年8月10日",{"key":31,"text":454,"correct":26},"2009年8月20日",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":31,"analysis":33},1119674,"根据《建设工程施工合同（示范文本）)(GF-19990201)规定，发包人经过验收后同意接受工程的，应在监理人收到竣工验收申请报告后的56d内，由监理人向承包人出具经发包人签认的()。",[459,460,462,463],{"key":20,"text":353,"correct":26},{"key":24,"text":461,"correct":26},"最终结清证书",{"key":28,"text":351,"correct":26},{"key":31,"text":357,"correct":22},{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":31,"analysis":33},1119675,"某工程项目承包人于2006年5月1日按合同规定向监理人报送竣工验收申请报告，但直到2006年7月中旬，发包人无故一直没有组织竣工验收，则根据《标准施工招标文件》中“通用合同条款”的规定应()。",[468,470,472,474],{"key":20,"text":469,"correct":26},"由承包人继续承担工程保管责任",{"key":24,"text":471,"correct":26},"由承包人自行组织竣工验收",{"key":28,"text":473,"correct":26},"视为验收合格，实际竣工日期以收到承包人竣工验收申请报告后的第56天为准",{"key":31,"text":475,"correct":22},"视为验收合格，实际竣工日期以承包人提交竣工验收申请报告的日期为准",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":28,"analysis":33},1119676,"某工程，施工单位于5月10日提交了竣工验收申请报告，监理单位收到承包人的竣工验收申请报告后，经审查认为已具备竣工验收条件，经预验收并签署了工程质量评估意见，于5月25日提请发包人进行工程竣工验收，发包人于6月2日进行了正式验收，直到6月12日才对竣工验收申请报告做出答复，并于7月21日颁发了工程接收证书，除专用合同条款另有约定外，根据《标准招标施工合同》“通用条款”该工程的缺陷责任期应从()起计算",[480,482,484,486],{"key":20,"text":481,"correct":26},"6月12日",{"key":24,"text":483,"correct":26},"6月2日",{"key":28,"text":485,"correct":22},"5月10日",{"key":31,"text":487,"correct":26},"7月21日",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":20,"analysis":33},1119677,"发包人应在监理人收到()后的28d内，将进度应付款支付给承包人。",[492,494,496,498],{"key":20,"text":493,"correct":22},"进度付款申请单",{"key":24,"text":495,"correct":26},"预付款保函",{"key":28,"text":497,"correct":26},"责任保修单",{"key":31,"text":499,"correct":26},"竣工付款申请单",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":28,"analysis":33},1119678,"发包人应在监理人收到进度付款申请单后的()天内，将进度应付款支付给承包人。",[504,506,507,508],{"key":20,"text":505,"correct":26},"30",{"key":24,"text":317,"correct":26},{"key":28,"text":87,"correct":22},{"key":31,"text":509,"correct":26},"15",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":24,"analysis":33},1119679,"根据《标准施工招标文件》，发包人应在收到承包人提交竣工结算款支付申请后()天内予以核实，向承包人签发竣工结算支付证书；发包人签发竣工结算支付证书后的()天内，按照竣工结算支付证书列明的金额向承包人支付结算款。",[514,516,518,520],{"key":20,"text":515,"correct":26},"7，14",{"key":24,"text":517,"correct":22},"14,14",{"key":28,"text":519,"correct":26},"28,28",{"key":31,"text":521,"correct":26},"56，28",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":24,"analysis":33},1119680,"根据《标准施工招标文件》的规定，合同工程尚未全部竣工，其中某项或某几项单位工程或工程设备安装已竣工，根据专用条款约定，需要投入施工期运行的，经()约定验收合格，证明能确保安全后，才能在施工期投入运行。",[526,527,528,530],{"key":20,"text":55,"correct":26},{"key":24,"text":51,"correct":22},{"key":28,"text":529,"correct":26},"监理人与承包人",{"key":31,"text":531,"correct":26},"发包人与承包人",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":24,"analysis":33},1119681,"合同工程尚未全部竣工，其中某项或某几项单位工程或工程设备安装已竣工，根据专用条款约定，需要投入施工期运行的，经（）约定验收合格，证明能确保安全后，才能在施工期投入运行。",[536,537,538,539],{"key":20,"text":55,"correct":26},{"key":24,"text":51,"correct":22},{"key":28,"text":529,"correct":26},{"key":31,"text":531,"correct":26},{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":28,"analysis":33},1119682,"缺陷责任期自()日期起计算。",[544,546,548,550],{"key":20,"text":545,"correct":26},"计划开工",{"key":24,"text":547,"correct":26},"实际开工",{"key":28,"text":549,"correct":22},"实际竣工",{"key":31,"text":551,"correct":26},"计划竣工",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":24,"analysis":33},1119683,"根据《标准施工招标文件》中“通用合同条款的规定”，承包人的缺陷责任期应自()起计算。",[556,558,560,562],{"key":20,"text":557,"correct":26},"承包人提交竣工验收申请报告之日",{"key":24,"text":559,"correct":22},"工程接收证书中写明的实际竣工日期",{"key":28,"text":561,"correct":26},"发包人签认工程接收证书之日",{"key":31,"text":563,"correct":26},"监理人向承包人出具经发包人签认的工程接收证书之日",[565,568,571,574,577,580],{"id":15,"name":566,"category":7,"favorite":567},"领导干部任职前廉政法规知识测试题",92,{"id":569,"name":570,"category":7,"favorite":15},595,"建筑结构与设备",{"id":572,"name":573,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":575,"name":576,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":578,"name":579,"category":7,"favorite":8},534,"BIM工程师",{"id":581,"name":579,"category":7,"favorite":8},535]