[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-51":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":604},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,51,50,2973,[13,34,46,58,70,82,94,106,118,130,142,152,164,176,184,196,208,220,232,244,256,266,278,290,302,314,326,338,350,362,374,386,398,410,422,434,446,458,469,481,490,502,514,523,535,547,559,568,580,592],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1119583,1,"单选题","关于施工总承包管理模式的说法，下列选项错误的是()。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","建设单位可与多个单位组成的联合体签订施工总承包管理协议",false,{"key":24,"text":25,"correct":22},"B","施工总承包管理企业负责整个项目的施工组织与管理",{"key":27,"text":28,"correct":22},"C","施工总承包管理模式的招标可在设计阶段进行",{"key":30,"text":31,"correct":32},"D","施工总承包管理企业可不经过投标，直接承担部分工程的施工",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1119584,"施工总承包管理模式的招标在（）进行。",[38,40,42,44],{"key":20,"text":39,"correct":22},"决策阶段",{"key":24,"text":41,"correct":22},"招投标阶段",{"key":27,"text":43,"correct":32},"设计阶段",{"key":30,"text":45,"correct":22},"施工阶段",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1119585,"某工程项目采用施工总承包管理模式，如施工总承包管理单位想承接该工程部分具体工程的施工任务，则其可通过()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"监理单位委托取得任务",{"key":24,"text":53,"correct":32},"投标竞争取得任务",{"key":27,"text":55,"correct":22},"施工总承包人委托取得任务",{"key":30,"text":57,"correct":22},"自行分配取得任务",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},1119586,"某工程采用施工总承包管理模式，施工总承包管理单位认为业主选定的某个分包人确实没有能力完成分包任务，而业主又执意不肯更换该分包人，则()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"施工总承包管理单位应认可该分包合同",{"key":24,"text":65,"correct":22},"施工总承包管理单位应认可该分包合同，但不承担对该分包人所负责工程的管理责任",{"key":27,"text":67,"correct":22},"施工总承包管理单位可以拒绝认可该分包合同，但应承担对该分包人所负责工程的管理责任",{"key":30,"text":69,"correct":32},"施工总承包管理单位可以拒绝认可该分包合同，并且不承担对该分包人所负责工程的管理责任",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1119587,"关于施工总承包管理模式，下列表述正确的是（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"施工总承包管理单位只负责对现场施工的总体管理和协调，不负责向分包人提供相应的服务",{"key":24,"text":77,"correct":22},"施工总承包管理模式的招标依赖于设计图纸出齐",{"key":27,"text":79,"correct":32},"施工总承包管理单位只收取总包管理费，不赚总包与分包之间的价差",{"key":30,"text":81,"correct":22},"施工总承包管理单位只负责管理与协调，对项目目标控制不承担责任",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1119588,"关于施工总承包管理模式特点的说法，不正确的是()。",[86,88,90,92],{"key":20,"text":87,"correct":32},"对施工总承包管理单位的招标依赖于完整的施工图设计",{"key":24,"text":89,"correct":22},"多数情况下，由业主方与分包人直接签约，这样有可能增加业主方的风险",{"key":27,"text":91,"correct":22},"一般以施工图设计为投标报价的基础，投标人的投标报价较有依据",{"key":30,"text":93,"correct":22},"业主需要进行多次招标",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},1119589,"采用施工总承包管理模式时，对各分包单位的质量控制由( )进行。",[98,100,102,104],{"key":20,"text":99,"correct":22},"业主方",{"key":24,"text":101,"correct":22},"监理方",{"key":27,"text":103,"correct":22},"施工总承包单位",{"key":30,"text":105,"correct":32},"施工总承包管理单位",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1119590,"下列关于施工总承包管理模式的特点的说明错误的是()。",[110,112,114,116],{"key":20,"text":111,"correct":22},"对质量控制有利",{"key":24,"text":113,"correct":32},"开工日期较迟，建设周期势必较长",{"key":27,"text":115,"correct":22},"业主对组织与协调的工作大大减轻",{"key":30,"text":117,"correct":22},"招标及合同管理的工作量较大，对业主不利",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1119591,"关于施工总承包管理模式与施工总承包模式相比具有的优点，表述不正确的是()。",[122,124,126,128],{"key":20,"text":123,"correct":22},"所有分包合同和分供货合同的发包，都通过招标获得有竞争力的投标报价，对业主方节约投资有利",{"key":24,"text":125,"correct":32},"施工总承包管理单位只赚取总包与分包之间的差价",{"key":27,"text":127,"correct":22},"可以提前开工，缩短建设周期，有利于进度控制",{"key":30,"text":129,"correct":22},"合同总价不是一次确定，某一部分施工图设计完成以后，再进行该部分工程的施工招标，确定该部分工程的合同价，因此整个项目的合同总额的确定较有依据",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1119592,"下列各项中，属于施工总承包管理模式在质量控制方面的特点的是（）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"对分包人的质量控制主要由发包人进行",{"key":24,"text":137,"correct":22},"各分包合同交叉界面的定义由发包人负责",{"key":27,"text":139,"correct":32},"对分包人来说，符合质量控制上的“他人控制”原则，对质量控制有利",{"key":30,"text":141,"correct":22},"施工总承包管理的招标不依赖于施工图设计，对质量控制不利",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1119593,"在施工总承包管理模式下，项目总进度计划的编制、控制和协调，以及设计、施工、供货之间的进度计划协调由()负责。",[146,148,149,151],{"key":20,"text":147,"correct":22},"监理工程师",{"key":24,"text":103,"correct":22},{"key":27,"text":150,"correct":32},"业主",{"key":30,"text":105,"correct":22},{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":20,"analysis":33},1119594,"下面有关施工总承包管理模式的基本特点的叙述中，错误的是()。",[156,158,160,162],{"key":20,"text":157,"correct":32},"一般来说，施工总承包管理单位负责所有分包合同的招投标、合同谈判及签约",{"key":24,"text":159,"correct":22},"施工总承包管理单位负责对所有分包人的管理及组织协调",{"key":27,"text":161,"correct":22},"施工总承包管理模式有利于缩短建设周期",{"key":30,"text":163,"correct":22},"所有分包合同都通过招标获得有竞争力的投标报价，对业主方节约投资有利",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":27,"analysis":33},1119595,"关于施工总承包模式和施工总承包管理模式比较的说法,正确的是()。",[168,170,172,174],{"key":20,"text":169,"correct":22},"采用费率招标的施工总承包模式,对投资控制有利",{"key":24,"text":171,"correct":22},"施工总承包管理模式下,发包方招标和合同管理的工作量较小",{"key":27,"text":173,"correct":32},"施工总承包管理模式可以提前开工,缩短建设周期",{"key":30,"text":175,"correct":22},"施工总承包管理模式下发包方管理和组织协调的工作量增大",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":30,"analysis":33},1119596,"在施工总承包管理模式下，施工总进度计划的设计、施工、供货等分包单位之间的管理与组织协调应由（）负责。",[180,181,182,183],{"key":20,"text":147,"correct":22},{"key":24,"text":150,"correct":22},{"key":27,"text":103,"correct":22},{"key":30,"text":105,"correct":32},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":30,"analysis":33},1119597,"属于《招标投标法》规定的招标方式有（）。",[188,190,192,194],{"key":20,"text":189,"correct":22},"直接签订合同",{"key":24,"text":191,"correct":22},"询价采购",{"key":27,"text":193,"correct":22},"自营工程",{"key":30,"text":195,"correct":32},"邀请招标",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":27,"analysis":33},1119598,"建设工程施工招标应具备的条件有（）。",[200,202,204,206],{"key":20,"text":201,"correct":22},"已委托招标代理机构",{"key":24,"text":203,"correct":22},"招标文件已编制完成",{"key":27,"text":205,"correct":32},"初步设计及概算应当履行审批手续的，已经批准",{"key":30,"text":207,"correct":22},"施工图设计及预算应当履行审批手续的，已经批准",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":30,"analysis":33},1119599,"施工总承包管理方要负责对所有分包施工单位的（），大大减轻了业主的工作。这是施工总承包管理模式的基本出发点。",[212,214,216,218],{"key":20,"text":213,"correct":22},"仅管理",{"key":24,"text":215,"correct":22},"仅协调",{"key":27,"text":217,"correct":22},"仅组织",{"key":30,"text":219,"correct":32},"管理及组织协调",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":27,"analysis":33},1119600,"实施总承包管理模式的基本出发点是()",[224,226,228,230],{"key":20,"text":225,"correct":22},"有利于项目的质量控制",{"key":24,"text":227,"correct":22},"有利于项目的进度控制",{"key":27,"text":229,"correct":32},"大大减轻业主组织协调的工作量",{"key":30,"text":231,"correct":22},"有利于合同管理",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":24,"analysis":33},1119601,"按照我国的招投标法，( )项目宜采用招标方式确定承包人。",[236,238,240,242],{"key":20,"text":237,"correct":22},"所有基础设施",{"key":24,"text":239,"correct":32},"部分使用国有资金",{"key":27,"text":241,"correct":22},"总投资超过3000万元",{"key":30,"text":243,"correct":22},"使用国外资金",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":30,"analysis":33},1119602,"招标人对已发出的招标文件进行必要的澄清或者修改，应当在招标文件要求提交投标文件截止时间至少（）日前发出。",[248,250,252,254],{"key":20,"text":249,"correct":22},"5",{"key":24,"text":251,"correct":22},"7",{"key":27,"text":253,"correct":22},"10",{"key":30,"text":255,"correct":32},"15",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":27,"analysis":33},1119603,"根据《招标投标法》，招标人对已发出的招标文件进行必要的澄清或修改的，应当在招标文件要求提交投标文件截止时间至少（）日前书面通知。",[260,261,263,264],{"key":20,"text":251,"correct":22},{"key":24,"text":262,"correct":22},"14",{"key":27,"text":255,"correct":32},{"key":30,"text":265,"correct":22},"21",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":20,"analysis":33},1119604,"招标信息的修正要遵循的原则中不包括（）。",[270,272,274,276],{"key":20,"text":271,"correct":32},"完整",{"key":24,"text":273,"correct":22},"时限",{"key":27,"text":275,"correct":22},"形式",{"key":30,"text":277,"correct":22},"全面",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":27,"analysis":33},1119605,"初步评审中发现投标报价的单价与数量的乘积之和与所报的总价不一致时，应( )。",[282,284,286,288],{"key":20,"text":283,"correct":22},"以总价为准",{"key":24,"text":285,"correct":22},"以大写为准",{"key":27,"text":287,"correct":32},"以单价为准，并应由投标人代表签字确认",{"key":30,"text":289,"correct":22},"以单价为准，无需由投标人代表签字确认",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":27,"analysis":33},1119606,"某按单价合同计价的招标工程，在评标过程中，发现某投标人的总价与单价的计算结果不一致，究其原因是投标人在计算时，将混凝土单价300元\u002Fm3误作为30元\u002Fm3的结果。对此，业主有权()。",[294,296,298,300],{"key":20,"text":295,"correct":22},"以总价为准调整单价",{"key":24,"text":297,"correct":22},"要求投标者重新提报混凝土单价",{"key":27,"text":299,"correct":32},"以单价为准调整总价",{"key":30,"text":301,"correct":22},"将该投标文件作废标处理",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":30,"analysis":33},1119607,"建设工程施工招标，评标过程中如果报价计算有误，下列处理方法正确的是()。",[306,308,310,312],{"key":20,"text":307,"correct":22},"大小写不一致的以小写为准",{"key":24,"text":309,"correct":22},"标书正本和副本不一致的，则以副本为准",{"key":27,"text":311,"correct":22},"修改内容一般应由招标人代表签字确认",{"key":30,"text":313,"correct":32},"单价与数量的乘积之和与所报的总价不一致的应以单价为准",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":24,"analysis":33},1119608,"关于评标，正确的有（）。",[318,320,322,324],{"key":20,"text":319,"correct":22},"初步评审主要是进行技术审查",{"key":24,"text":321,"correct":32},"初步评审中对报价计算的修改，一般应由投标人代表签字确认",{"key":27,"text":323,"correct":22},"详细评审是评标的核心，包括符合性审查与实质性审查",{"key":30,"text":325,"correct":22},"评标委员会推荐的中标候选人应当限定在1-5人，并标明排列顺序",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":30,"analysis":33},1119609,"建设工程施工评标过程中，初步审查的内容不包括()。",[330,332,334,336],{"key":20,"text":331,"correct":22},"投标资格审查",{"key":24,"text":333,"correct":22},"投标担保的有效性审查",{"key":27,"text":335,"correct":22},"投标文件完整性审查",{"key":30,"text":337,"correct":32},"投标书的技术方案先进性审查",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":30,"analysis":33},1119610,"建设工程施工平行发包模式在进度控制方面的特点是（）。",[342,344,346,348],{"key":20,"text":343,"correct":22},"需全部施工图完成后，才能进行招标，对进度控制不利",{"key":24,"text":345,"correct":22},"招标次数较少，对进度控制有利",{"key":27,"text":347,"correct":22},"无法做到边设计边施工.对进度控制不利",{"key":30,"text":349,"correct":32},"某部分施工图完成后即可开始这部分工程招标，有利于缩短建设周期",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":20,"analysis":33},1119611,"施工总承包管理模式在进度控制方面的特点有（）。",[354,356,358,360],{"key":20,"text":355,"correct":32},"对施工总承包管理单位的招标不依赖于施工图设计，可以提前到初步设计阶段进行",{"key":24,"text":357,"correct":22},"设计、施工、供货之间的进度计划协调由施工总承包管理单位负责",{"key":27,"text":359,"correct":22},"项目总进度计划的编制由施工总承包管理单位负责",{"key":30,"text":361,"correct":22},"施工总承包管理模式对缩短建设周期不利",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":27,"analysis":33},1119612,"某建设工程项目以单价合同形式发包，在签订合同时根据估算的工程量和单价确定一个合同总价。工程完成后，实际完成的工程量乘以各项单价之和小于合同总价。根据单价合同的规定，工程款的支付应以()。",[366,368,370,372],{"key":20,"text":367,"correct":22},"双方重新协商",{"key":24,"text":369,"correct":22},"实际完成的工程量乘以合同总价",{"key":27,"text":371,"correct":32},"实际完成的工程量乘以合同单价",{"key":30,"text":373,"correct":22},"实际完成的工程量乘以重新协商单价",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":20,"analysis":33},1119613,"在建设工程施工投标过程中，施工方案应由投标人的（）主持制定。",[378,380,382,384],{"key":20,"text":379,"correct":32},"技术负责人",{"key":24,"text":381,"correct":22},"项目经理",{"key":27,"text":383,"correct":22},"法人代表",{"key":30,"text":385,"correct":22},"分管投标的负责人",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":30,"analysis":33},1119614,"目前国内普遍实行的（）模式决定了劳务分包的普遍性。",[390,392,394,396],{"key":20,"text":391,"correct":22},"施工平行发承包",{"key":24,"text":393,"correct":22},"施工总承包",{"key":27,"text":395,"correct":22},"施工总承包管理",{"key":30,"text":397,"correct":32},"两层分离",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":27,"analysis":33},1119615,"施工总承包管理模式下，一般均由发包人直接招标并与分包人签订合同，以下施工总承包管理单位对此分包合同几种情况，说法不正确的是()",[402,404,406,408],{"key":20,"text":403,"correct":22},"经审查后表态认可此合同",{"key":24,"text":405,"correct":22},"经认真审查后，如认为某个分包人无力完成分包任务可要求发包人另换一个分包人",{"key":27,"text":407,"correct":32},"如发包人不同意换分包人，施工总承包管理单位则应接受此分包人",{"key":30,"text":409,"correct":22},"如发包人不同意换分包人，施工总承包管理单位可拒绝该分包合同，并且不承担对该分包人所负责的工程的管理工作",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":30,"analysis":33},1119616,"根据《标准施工招标文件》中“通用合同条款”的规定，除测量基准点、水准点及书面资料，以及施工场地内地下管线和地下设施的相关资料外，发包人还应向承包人提供()。",[414,416,418,420],{"key":20,"text":415,"correct":22},"当地有关工程材料的市场信息资料",{"key":24,"text":417,"correct":22},"有关项目所在地的风俗习惯资料",{"key":27,"text":419,"correct":22},"有关项目所在地的法律法规资料",{"key":30,"text":421,"correct":32},"其持有的现场地质勘探资料、水文气象资料",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":27,"analysis":33},1119617,"根据《标准施工招标文件》中“通用合同条款”的规定，项目参与各方中应对发包人提供的测量基准点、水准点及书面资料，以及施工场地内地下管线和地下设施的相关资料的真实性、准确性和完整性负责的是()。",[426,428,430,432],{"key":20,"text":427,"correct":22},"承包人",{"key":24,"text":429,"correct":22},"监理人",{"key":27,"text":431,"correct":32},"发包人",{"key":30,"text":433,"correct":22},"有关勘测单位",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":27,"analysis":33},1119618,"某工程因施工需要,需取得出入施工场地的某条临时道路的通行权,根据《标准施工招标文件》中“通用合同条款”的规定,正确的说法是()。",[438,440,442,444],{"key":20,"text":439,"correct":22},"承包人负责办理,并承担有关费用",{"key":24,"text":441,"correct":22},"承包人负责办理,发包人承担有关费用",{"key":27,"text":443,"correct":32},"发包人负责办理,并承担有关费用",{"key":30,"text":445,"correct":22},"发包人负责办理,承包人承担有关费用",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":30,"analysis":33},1119619,"某工程在施工过程中发生事故，并造成毗邻财产受损，承包人随即组织人员清理现场，判断这一行为的合理性，关键在于它是否已经()。",[450,452,454,456],{"key":20,"text":451,"correct":22},"得到了行政主管部门的批准",{"key":24,"text":453,"correct":22},"得到了毗邻财产损失者的同意",{"key":27,"text":455,"correct":22},"根据发包人的指令处理",{"key":30,"text":457,"correct":32},"按规定保护了事故现场",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":27,"analysis":33},1119620,"根据《建设工程施工合同（示范文本）》(GF-19990201)规定，发包人应委托()按合同约定向承包人发出开工通知。",[462,464,466,467],{"key":20,"text":463,"correct":22},"项目负责人",{"key":24,"text":465,"correct":22},"项目总工程师",{"key":27,"text":429,"correct":32},{"key":30,"text":468,"correct":22},"发包人代表",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":20,"analysis":33},1119621,"某工程施工现场狭窄，施工过程中，由于承包人塔吊安装中存在缺陷，导致使用过程中发生塔吊倒塌事故，砸坏项目周边一幢建筑物的屋面。该事故造成的损失，应由()。",[473,475,477,479],{"key":20,"text":474,"correct":32},"承包人承担由此增加的费用和工期延误，以及第三者的财产损失",{"key":24,"text":476,"correct":22},"承包人承担由此增加的费用和工期延误，发包人承担第三者的财产损失",{"key":27,"text":478,"correct":22},"发包人承担由此增加的费用和工期延误，以及第三者的财产损失",{"key":30,"text":480,"correct":22},"发包人承担由此增加的费用和工期延误，承包人承担第三者的财产损失",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":30,"analysis":33},1119622,"根据《建设工程施工劳务分包合同(示范文本)》(GF-2003-0214),劳务合同项目的施工组织设计应由()负责编制。",[485,486,487,489],{"key":20,"text":431,"correct":22},{"key":24,"text":429,"correct":22},{"key":27,"text":488,"correct":22},"劳务分包人",{"key":30,"text":427,"correct":32},{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},1119623,"某工程项目开工前，发包人向承包人提供了有关施工现场的地下管线资料，承包商按合同要求对管线予以了保护。由于发包人提供的资料不准确，导致承包人在正常施工过程中对地下管线造成了破坏，根据施工合同示范文本规定，对该情况的处理应是（）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"保护费用由发包人承担，事故损失由承包人承担",{"key":24,"text":497,"correct":32},"保护费用与事故损失均由发包人承担",{"key":27,"text":499,"correct":22},"保护费用由承包人承担，事故损失由发包人承担",{"key":30,"text":501,"correct":22},"保护费用与事故损失均由承包人承担",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":30,"analysis":33},1119624,"承包人应在接到开工通知后( )d内，向监理人提交承包人在施工场地的管理机构以及人员安排的报告。",[506,508,510,512],{"key":20,"text":507,"correct":22},"8",{"key":24,"text":509,"correct":22},"12",{"key":27,"text":511,"correct":22},"20",{"key":30,"text":513,"correct":32},"28",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},1119625,"监理人在发出开工通知前应获得（）同意，工期自监理人发出的开工通知中载明的开工日期起计算。",[518,519,520,521],{"key":20,"text":427,"correct":22},{"key":24,"text":431,"correct":32},{"key":27,"text":429,"correct":22},{"key":30,"text":522,"correct":22},"设计人",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":24,"analysis":33},1119626,"承包人不得将工程( )和关键性工作分包给第三人。",[527,529,531,533],{"key":20,"text":528,"correct":22},"涉及桥梁的部分",{"key":24,"text":530,"correct":32},"主体",{"key":27,"text":532,"correct":22},"涉及爆破作业的部分",{"key":30,"text":534,"correct":22},"涉及高空作业的部分",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":30,"analysis":33},1119627,"根据《标准施工招标文件》中“通用合同条款”的规定，承包人应在（）,向监理人提交承包人在施工场地的管理机构以及人员安排的报告。",[539,541,543,545],{"key":20,"text":540,"correct":22},"收到中标通知书后28天内",{"key":24,"text":542,"correct":22},"工程开工前14天内",{"key":27,"text":544,"correct":22},"接到开工通知后7天内",{"key":30,"text":546,"correct":32},"接到开工通知后28天内",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":20,"analysis":33},1119628,"根据《建设工程施工专业分包合同（示范文本）》（GF-2003-0213），监理人应在开工日期()前向承包人发出开工通知",[551,553,555,557],{"key":20,"text":552,"correct":32},"7天",{"key":24,"text":554,"correct":22},"3天",{"key":27,"text":556,"correct":22},"14天",{"key":30,"text":558,"correct":22},"5天",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":20,"analysis":33},1119629,"监理人应在开工日期()天前向承包人发出开工通知。",[563,564,565,566],{"key":20,"text":251,"correct":32},{"key":24,"text":262,"correct":22},{"key":27,"text":513,"correct":22},{"key":30,"text":567,"correct":22},"32",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":27,"analysis":33},1119630,"根据《标准施工招标文件》中“通用合同条款”的规定，控制合同工程进度的依据是（）。",[572,574,576,578],{"key":20,"text":573,"correct":22},"承包人编制的施工进度计划",{"key":24,"text":575,"correct":22},"承包人的实际的工程进度",{"key":27,"text":577,"correct":32},"监理人批准的施工进度计划",{"key":30,"text":579,"correct":22},"承包人编制的分阶段计划",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":30,"analysis":33},1119631,"属于施工承包合同中承包人的义务是()。",[584,586,588,590],{"key":20,"text":585,"correct":22},"组织竣工验收",{"key":24,"text":587,"correct":22},"组织设计交底",{"key":27,"text":589,"correct":22},"提供施工场地",{"key":30,"text":591,"correct":32},"工程的维护和照管",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":20,"analysis":33},1119632,"由于承包人原因，未能按合同进度计划完成工作，造成工期延误。对于该事件，下列说法中正确的是（）。",[596,598,600,602],{"key":20,"text":597,"correct":32},"承包人应采取措施加快进度，并支付逾期竣工违约金",{"key":24,"text":599,"correct":22},"承包人应采取措施加快进度，并由发包人承担费用",{"key":27,"text":601,"correct":22},"监理人与承包人共同协商修订合同进度计划，并由发承担费用",{"key":30,"text":603,"correct":22},"承包人有权要求发包人延长工期",[605,608,611,614,617,620],{"id":15,"name":606,"category":7,"favorite":607},"领导干部任职前廉政法规知识测试题",92,{"id":609,"name":610,"category":7,"favorite":15},595,"建筑结构与设备",{"id":612,"name":613,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":615,"name":616,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":618,"name":619,"category":7,"favorite":8},534,"BIM工程师",{"id":621,"name":619,"category":7,"favorite":8},535]