[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":517},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,5,50,2973,[13,34,46,58,70,82,94,105,117,129,141,153,163,172,181,193,202,211,220,229,238,247,256,265,274,283,292,301,310,319,328,337,349,361,370,379,388,397,406,415,427,436,445,454,463,472,481,490,499,508],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1117266,1,"单选题","某工人在施工作业过程中脚部被落物砸伤，休养了21 周。根据《企业职工伤亡事故分类》 （GB6441-1986），该工人的伤害程度为（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","轻伤",false,{"key":24,"text":25,"correct":26},"B","重伤",true,{"key":28,"text":29,"correct":22},"C","职业病",{"key":31,"text":32,"correct":22},"D","失能伤害","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1117267,"根据《生产安全事故报告和调查处理条例》，下列建设工程施工生产安全事故中属于重大事故的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"某基坑发生透水事件，造成直接经济损失5000 万元，没有人员伤亡",{"key":24,"text":41,"correct":22},"某拆除工程安全事故，造成直接经济损失1000 万元，45 人重伤",{"key":28,"text":43,"correct":22},"某建设工程脚手架倒塌，造成直接经济损失960 万元，8 人重伤",{"key":31,"text":45,"correct":22},"某建设工程提前拆模导致结构坍塌，造成35 人死亡，直接经济损失4500 万元",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1117268,"某施工企业瞒报生产安全事故，建设行政主管部门应依法对其处以（）万元的罚款。",[50,52,54,56],{"key":20,"text":51,"correct":22},"10～30",{"key":24,"text":53,"correct":22},"30～50",{"key":28,"text":55,"correct":22},"50～100",{"key":31,"text":57,"correct":26},"100～500",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1117269,"根据《生产安全事故应急预案管理办法》，施工单位应急预案未按照规定备案的，由县级以上安全生产监督管理部门给予（ ）的处罚。",[62,64,66,68],{"key":20,"text":63,"correct":22},"责令停产停业整顿并处三万元以下罚款",{"key":24,"text":65,"correct":22},"三万元以上五万元以下罚款",{"key":28,"text":67,"correct":26},"一万元以上三万元以下罚款",{"key":31,"text":69,"correct":22},"责令停产停业整顿并处五万元以下罚款",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1117270,"关于安全生产事故应急预案管理的说法，正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"非参建单位的安全生产及应急管理方面的专家，均可受邀参加应急方案评审",{"key":24,"text":77,"correct":22},"应急预案应报同级人民政府和上一级安全生产监督管理部门备案",{"key":28,"text":79,"correct":26},"生产经营单位应每半年至少组织一次现场处置方案演练",{"key":31,"text":81,"correct":22},"生产经营单位应每年至少组织两次综合应急预案演练或者专项应急预案演练",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1117271,"关于建设工程施工现场文明施工措施的说法，正确的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"施工现场要设置在封闭的围挡",{"key":24,"text":89,"correct":22},"施工现场设置的围挡高度不得低于1.5ｍ",{"key":28,"text":91,"correct":26},"施工现场主要场地应硬化",{"key":31,"text":93,"correct":22},"专职安全员为现场文明施工的第一责任人",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1117272,"关于施工现场文明施工和环境保护的说法，正确的是（ ）。",[98,99,101,103],{"key":20,"text":91,"correct":26},{"key":24,"text":100,"correct":22},"施工现场要实行半封闭式管理",{"key":28,"text":102,"correct":22},"沿工地四周连续设置高度不低于1.5m 的围挡",{"key":31,"text":104,"correct":22},"集体宿舍与作业区隔离，人均床铺面积不小于1.5m3",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":31,"analysis":33},1117273,"根据建设工程文明工地指标，施工现场必须设置“五牌一图”，其中“一图”是指（ ）。",[109,111,113,115],{"key":20,"text":110,"correct":22},"施工进度横道图",{"key":24,"text":112,"correct":22},"大型机械布置位置图",{"key":28,"text":114,"correct":22},"施工现场交通组织图",{"key":31,"text":116,"correct":26},"施工现场平面布置图",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":20,"analysis":33},1117274,"施工现场文明施工“五牌一图”中，“五牌”是指（ ）。",[121,123,125,127],{"key":20,"text":122,"correct":26},"工程概况牌、管理人员名单和监督电话牌、消防保卫牌、安全生产牌、文明施工牌",{"key":24,"text":124,"correct":22},"工程概况牌、管理人员名单和监督电话牌、现场平面布置牌、安全生产牌、文明施工牌",{"key":28,"text":126,"correct":22},"工程概况牌、现场危险警示牌、现场平面布置牌、安全生产牌、文明施工牌",{"key":31,"text":128,"correct":22},"工程概况牌、现场危险警示牌、消防保卫牌、安全生产牌、文明施工牌",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":28,"analysis":33},1117275,"施工平行发承包模式的特点是（）。",[133,135,137,139],{"key":20,"text":134,"correct":22},"对每部分施工任务的发包，都以施工图设计为基础，有利于投资的早期控制",{"key":24,"text":136,"correct":22},"由于要进行多次招标，业主用于招标的时间多，建设工期会加长",{"key":28,"text":138,"correct":26},"业主招标工作量大，对业主不利",{"key":31,"text":140,"correct":22},"业主不直接控制所有工程的发包，但可决定所有工作的承包商",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":24,"analysis":33},1117276,"某地铁工程，业主将10 座车站的土建工程分别发包给10 个土建施工单位，机电安装工程分别发包给10 个机电安装单位。业主采用承包模式是（ ）。",[145,147,149,151],{"key":20,"text":146,"correct":22},"施工总承包模式",{"key":24,"text":148,"correct":26},"施工平行承发包模式",{"key":28,"text":150,"correct":22},"施工总承包管理模式",{"key":31,"text":152,"correct":22},"EPC 承包模式",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":28,"analysis":33},1117277,"关于施工总承包模式特点的说法，正确的是（）。 A.施工总承包单位负责项目总进度计划的编制、控制、协调 B.项目质量取决于业主的管理水平和施工总承包单位的技术水平 C.在开工前就有明确的合同价，有利于业主对总造价的早期控制 D.业主需要负责施工总承包单位和分包单位的管理和组织协调",[157,158,159,160,161],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},"E",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":24,"analysis":33},1117278,"某工程项目采用施工总承包管理模式，如施工总承包管理单位想承接该工程部分具体工程的施工任务，则其可通过（ ）。 A.监理单位委托取得任务 B.投标竞争取得任务 C.施工总承包人委托取得任务 D.自行分配取得任务",[167,168,169,170,171],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":28,"analysis":33},1117279,"关于建设工程施工招标评标的说法，正确的是（ ）。 A.投标报价中出现单价与数量的乘积之和与总价不一致时，将作无效标处理 B.投标书中投标报价正本、副本不一致时，将作无效标处理 C.评标委员会推荐的中标候选人应当限定在1~3 人，并标明排列顺序 D.初步评审是对标书进行实质性审查，包括技术评审和商务评审",[176,177,178,179,180],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":28,"analysis":33},1117280,"施工平行承发包模式在合同管理方面的特点是（ ）。",[185,187,189,191],{"key":20,"text":186,"correct":22},"施工单位数量较少，对业主合同管理有利",{"key":24,"text":188,"correct":22},"业主只需要一次招标，合同管理量较小",{"key":28,"text":190,"correct":26},"业主要负责对多个合同的跟踪管理，工作量较大",{"key":31,"text":192,"correct":22},"符合“他人控制”原则，对业主合同管理有利",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":24,"analysis":33},1117281,"在施工总承包管理模式下，项目总进度计划的编制、控制和协调，以及设计、施工、供货之间的进度计划协调由（ ）负责。 A.监理工程师 B.业主 C.施工总承包单位 D.施工总承包管理单位",[197,198,199,200,201],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},1117282,"关于施工总承包模式和施工总承包管理模式比较的说法，正确的是（ ）。 A.采用费率招标的施工总承包模式，对投资控制有利 B.施工总承包管理模式下，发包方招标和合同管理的工作量较小 C.施工总承包管理模式可以提前开工，缩短建设周期 D.施工总承包模式下发包方管理和组织协调的工作量增大",[206,207,208,209,210],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":20,"analysis":33},1117283,"某建设工程采用固定总价方式招标，业主在招标过程中对某项争议工程量不予更正，投标单位正确的应对策略是（ ）。 A.投标时注明工程量存在错误，应按实结算 B.修改工程量后进行报价 C.按业主要求工程量修改单价后报价 D.采用不平衡报价法提供该项工程报价",[215,216,217,218,219],{"key":20,"text":20,"correct":26},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":28,"analysis":33},1117284,"根据《标准施工招标文件》，关于暂停施工的说法，正确的是（ ）。 A.由于发包人原因引起的暂停施工，承包人有权要求延长工期和（或）增加费用，但不得要求补偿利润 B.发包人原因造成暂停施工，承包恩可不负责暂停施工期间工程的保护 C.因发包人原因发生暂停施工的紧急情况时，承包人可以先暂停施工，并及时向监理人提出暂停施工的书面请求 D.施工中出现一些意外需要暂停施工的，所有责任由发包人承担",[224,225,226,227,228],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":24,"analysis":33},1117285,"根据九部委《标准施工招标文件》，监理人对隐蔽工程重新检查，经经验证明工程质量符合合同要求的，发包人应补偿承包人（ ）。 A.工期和费用 B.工期、费用和利润 C.费用和利润 D.工期和利润",[233,234,235,236,237],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},1117286,"某工程项目承包人在2010 年7 月12 日向发包人提交了竣工验收报告，发包人收到报告后，于2010年8 月5 日组织竣工验收，参加验收各方2010 年8 月10 日签署有关竣工验收合格的文件，发包人于2010 年8 月20 日按照有关规定办理了竣工验收备案手续，本项目的实际竣工日期为（）。 A.2010 年8 月10 日 B.2010 年7 月12 日 C.2010 年8 月5 日 D.2010 年8 月20 日",[242,243,244,245,246],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":28,"analysis":33},1117287,"根据《建设工程施工专业分包合同（示范文本）》（GF-2003---0213），不属于承包人责任和义务的是（ ）。 A.组织分包人参加发包人组织的图纸会审，向分包人进行设计图纸交底 B.负责整个施工场地的管理工作，协调分包人与同一施工场地的其他分包人之间的交叉配合 C.负责提供专业分包合同专用条款中约定的保修与试车，并承担由此发生的费用 D.随时为分包人提供确保分包工程施工所要求的施工场地和通道，满足施工运输需要",[251,252,253,254,255],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":28,"analysis":33},1117288,"根据《建设工程施工专业分包合同》（GF-2003-0213），下列说法正确的是（ ）。 A.发包人向分包人提供具备施工条件的施工场地 B.分包人可直接致函发包人或工程师 C.就分包范围内的有关工作，承包人随时可以向分包人发出指令 D.分包合同价与总承包合同相应部分的价款存在连带关系",[260,261,262,263,264],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":31,"analysis":33},1117289,"根据《建设工程施工劳务分包合同（示范文本）》（GF-2003-0214），劳务分包项目的施工组织设计应由（ ）负责编制。 A.发包人 B.监理人 C.劳务分包人 D.承包人",[269,270,271,272,273],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":26},{"key":162,"text":162,"correct":22},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},1117290,"关于建设工程专业分包人的说法，正确的是（ ）。 A.分包人须服从监理人直接发出的与分包工程有关的指令 B.分包人不能直接致函给发包人 C.分包人可直接致函监理人，对相关指令进行澄清 D.分包人在街道监理人要求后，可不执行承包人的指令",[278,279,280,281,282],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":28,"analysis":33},1117291,"根据《建设工程施工企业分包合同（示范文本）》（GF-2003-2013），关于施工企业专业分包的说法，正确的是（ ）。 A. 专业分包人应按规定办理有关施工噪音排放的手续，并承担由此发生的费用 B. 专业分包人只有在承包人发出指令后，允许发包人授权的人员在工作时间进入分包工程施工场地 C. 分包工程合同价款与总包合同相应部分价款没有连带关系 D. 分包工程合同不能采用固定价格合同",[287,288,289,290,291],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":28,"analysis":33},1117292,"某工程因施工需要，需取得出入施工场地的临时道路的通行权，根据《标准施工招标文件》。该通行权应当由（ ）。 A.承包人负责办理，并承担有关费用 B.承包人负责办理，发包人承担有关费用 C.发包人负责办理，发包人承担有关费用 D.发包人负责办理，承包人承担有关费用",[296,297,298,299,300],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":28,"analysis":33},1117293,"根据《标准施工招标文件》，关于发包人责任和义务的说法，错误的是（ ）。 A.按专用合同条款约定提供施工场地 B.提供施工场地内地下管线和地下设施等资料，并保证资料的真实、准确、完整 C.负责办理法律规定的有关施工证件和批件 D.负责赔偿工程或工程的任何部分对土地的占用所造成的第三者产损失",[305,306,307,308,309],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},1117294,"根据《建筑工程施工劳务分包合同（示范文本）》，关于保险办理的说法，正确的是（ ）。 A.劳务分包人施工开始前，应由工程承包人为施工场地内自有人员及第三人人员生命财产办理保险 B.工程承包人提供给劳务分包人使用的施工机械设备由劳务分包人办理保险并支付费用 C.工程承包人需为从事危险作业的劳务人员办理意外伤害险并支付费用 D.运至施工场地用于劳务施工的材料，由工程承包人办理保险并支付费用",[314,315,316,317,318],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":26},{"key":162,"text":162,"correct":22},{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":31,"analysis":33},1117295,"建筑施工企业与物资供应企业就某建筑材料的供应签订合同，如该建筑材料不属于国家定价的产品，则其价格应（ ）。 A.报请物价主管部门确定 B.参考国家定价确定 C.按当地工程造价管理部门公布的指导价确定 D.由供需双方协商确定",[323,324,325,326,327],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":26},{"key":162,"text":162,"correct":22},{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":28,"analysis":33},1117296,"建筑材料采购合同条款的相关说法，正确的是（ ）。 A.不属于国家定价的材料（产品），有供方确定价格 B.需方提货的，交货日期以需方收货戳记的日期为准 C.建筑材料的包装物由供方负责，并且一般不另向需方收费 D.建筑材料采购合同通常采用固定总价合同",[332,333,334,335,336],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":20,"analysis":33},1117297,"下列合同履约情形中，属于发包人违约的情形是（）。",[341,343,345,347],{"key":20,"text":342,"correct":26},"监理人无正当理由未在约定期限内发出复工指示，导致承包人无法复工的",{"key":24,"text":344,"correct":22},"因地震造成工程停工的",{"key":28,"text":346,"correct":22},"发包人支付合同进度款后，承包人未及时发放给民工的",{"key":31,"text":348,"correct":22},"发包人提供的测量资料错误导致承包人工程返工的",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":28,"analysis":33},1117298,"土石方工程采用混合单价方法计价，其中土方工程实行总价包干，包干价20 万元，石方工程实行单价合同，该工程有关的工程量和价格资料如下表所示。则该工程的结算价款是（ ）万元。",[353,355,357,359],{"key":20,"text":354,"correct":22},"87.2",{"key":24,"text":356,"correct":22},"88.2",{"key":28,"text":358,"correct":26},"92.0",{"key":31,"text":360,"correct":22},"93.0",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":24,"analysis":33},1117299,"下列合同计价方式中，对承包商来说风险最小的是（ ）。 A.单价合同 B.成本加酬金合同 C.固定总价合同 D.变动总价合同",[365,366,367,368,369],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},1117300,"下列施工承包合同形式中，承包商承担全部工作量和价格风险的是（ ）。 A.单价合同 B.固定总价合同 C.变动总价合同 D.成本回本合同",[374,375,376,377,378],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":28,"analysis":33},1117301,"固定总价合同中，承包商承担的价格风险是（ ）。 A.工程计量错误 B.工程范围不确定 C.漏报项目 D.工程变更",[383,384,385,386,387],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":28,"analysis":33},1117302,"关于总价合同的说法，正确的是（）。 A.总价合同适用于工期要求紧的项目，业主可在初步设计完成后进行招标。从而缩短招标准备时间 B.工程施工承包招标时，施工期限一年左右的项目一般采用变动总价合同 C.固定总价合同中可以约定，在发生重大工程变更时可以给合同价格进行调整 D.变动总价合同中，通货膨胀等不可预见因素的风险由承包商承担",[392,393,394,395,396],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":28,"analysis":33},1117303,"下列工程项目中，宜采用成本加酬金合同的是（ ）。 A.工程结构和技术简单的工程项目 B.工程设计详细，图纸完整、清楚，工作任务和范围明确的工程项目 C.时间特别紧迫的抢救、救灾工程项目 D.工程量暂不确定的工程项目",[401,402,403,404,405],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},1117304,"对于业主而言，成本加酬合同的优点（ ）。 A.可通过分段施工缩短工期 B.有利于控制投资 C.不承担工程量变化的风险 D.不需介入工程施工和管理",[410,411,412,413,414],{"key":20,"text":20,"correct":26},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":20,"analysis":33},1117305,"关于单价合同的说法，正确的是（ ）。",[419,421,423,425],{"key":20,"text":420,"correct":26},"对于投标书中出现明显数字计算错误时，评标委员会有权先做修改再评标",{"key":24,"text":422,"correct":22},"单价合同允许随工程量变化而调整工程单价，业主承担工程量方面的风险",{"key":28,"text":424,"correct":22},"单价合同分为固定单价合同、变动单价合同、成本补偿合同",{"key":31,"text":426,"correct":22},"实际工程款的支付按照估算工程量乘以合同单价进行",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":28,"analysis":33},1117306,"某工程由于图纸、规范等准备不充分，招标方仅能制定一个估算指标，则在招标时宜采用成本加酬金合同中的（ ）。 A.成本加固定费用合同 B.成本加固定比例费用合同 C.成本加奖金合同 D.最大成本加费用合同",[431,432,433,434,435],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":31,"analysis":33},1117307,"某工程施工过程中，为了纠正出现的进度偏差，承包人采取了夜间加班和增加劳动力投入措施。该措施属于纠偏措施中的（ ）。 A.技术措施 B.经济措施 C.合同措施 D.组织措施",[440,441,442,443,444],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":26},{"key":162,"text":162,"correct":22},{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":20,"analysis":33},1117308,"根据《标准施工招标文件》通用合同条款，承包人应该在收到变更指示最多不超过（ ）天内，向监理人提交变更报价书。 A.14 B.7 C.28 D.30",[449,450,451,452,453],{"key":20,"text":20,"correct":26},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":24,"analysis":33},1117309,"下列合同实施偏差分析的内容中，不属于合同实施趋势分析的是（）。 A.总工期的延误 B.项目管理团队绩效奖惩 C.总成本的超支 D.最终工程经济效益水平",[458,459,460,461,462],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":31,"analysis":33},1117310,"根据九部委《标准施工招标文件》，对于施工合同变更的估价，已标价工程量清单中无适用项目的单价，监理工程师确定承包商提出的变更工作单价时，应按照（ ）原则。 A.固定总价 B.固定单价 C.可调单价 D.成本价利润",[467,468,469,470,471],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":26},{"key":162,"text":162,"correct":22},{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":24,"analysis":33},1117311,"根据九部委《标准施工招标文件》，关于施工合同变更程序的说法，正确的是（ ）。 A.承包人书面报告发包人后，可根据实际情况对工作进行变更 B.承包人根据合同约定，可以向监理人提出书面变更建议 C.发包人可以直接向承包人发出变更意向书 D.监理人应在收到承包人书面建议后30 天内做出变更指示",[476,477,478,479,480],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":24,"analysis":33},1117312,"承包商可以向业主提起索赔的情形是（ ）。 A. 承包商为确保质量而增加的措施费 B. 监理工程师提出的工程变更造成费用的增加 C. 分包商因返工造成费用增加、工期顺延 D. 承包商自行采购材料的质量有问题造成费用增加、工期顺延",[485,486,487,488,489],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},1117313,"工程施工过程中发生索赔事件以后，承包人首先要做的工作是（ ）。 A.向监理工程师提交索赔证据 B.提出索赔意向通知 C.提交索赔报告 D.与业主就索赔事项进行谈判",[494,495,496,497,498],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":28,"analysis":33},1117314,"根据《标准施工招标文件》，关于施工合同索赔程序的规定，正确的是（ ）。 A.设计变更发生后，承包人应在14 天内向发包人提交索赔通知 B.索赔事件持续进行，承包人应在事件终了后立即提交索赔报告 C.承包人在发出索赔意向通知书后28 天内，向监理人正式递交索赔通知书 D.索赔意向通知发出后42 天内，承包人应向监理人提交正式索赔报告",[503,504,505,506,507],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":24,"analysis":33},1117315,"关于对承包人索赔文件审核的说法，正确的是（ ）。 A.监理人收到承包人提交的索赔通知书后，应及时转交发包人，监理人无权要求承包人提交原始记录 B.承包人接受索赔处理结果的，发包人应在索赔处理结果答复后28 天内完成赔付 C.监理人根据发包人的授权，在收到索赔通知书的60 天内将索赔处理结果答复承包人 D.承包人不接受索赔处理结果的，应直接向法院起诉索赔",[512,513,514,515,516],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"key":162,"text":162,"correct":22},[518,521,524,527,530,533],{"id":15,"name":519,"category":7,"favorite":520},"领导干部任职前廉政法规知识测试题",92,{"id":522,"name":523,"category":7,"favorite":15},595,"建筑结构与设备",{"id":525,"name":526,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":528,"name":529,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":531,"name":532,"category":7,"favorite":8},534,"BIM工程师",{"id":534,"name":532,"category":7,"favorite":8},535]