[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-42":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":579},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,42,50,2973,[13,34,46,58,70,82,94,106,116,127,137,146,158,170,182,194,203,212,224,236,248,259,271,283,295,307,316,328,340,352,360,372,384,393,405,417,426,434,446,458,470,482,494,506,518,528,540,550,559,567],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1119132,1,"单选题","根据施工质量控制的特点,施工质量控制应()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","加强对施工过程的质量检査",true,{"key":24,"text":25,"correct":26},"B","解体检査内在质量",false,{"key":28,"text":29,"correct":26},"C","建立固定的生产流水线",{"key":31,"text":32,"correct":26},"D","加强观感质量验收","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1119133,"整个组织内各级胜任、经授权并积极参与的人员，是提高组织创造和提供价值能力的必要条件。这体现了质量管理（ ）的原则。",[38,40,42,44],{"key":20,"text":39,"correct":26},"领导作用",{"key":24,"text":41,"correct":26},"以顾客为关注焦点",{"key":28,"text":43,"correct":26},"持续改进",{"key":31,"text":45,"correct":22},"全员参与",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1119134,"做好( )阶段的质量控制是确保施工质量的先决条件。",[50,52,54,56],{"key":20,"text":51,"correct":26},"设计",{"key":24,"text":53,"correct":26},"决策",{"key":28,"text":55,"correct":22},"施工准备",{"key":31,"text":57,"correct":26},"施工",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1119135,"施工质量控制的基本方法PDCA的中文解释为()。",[62,64,66,68],{"key":20,"text":63,"correct":26},"计划—实施—对比—处理",{"key":24,"text":65,"correct":22},"计划—实施—检查—处理",{"key":28,"text":67,"correct":26},"计划—实施—对比—纠偏",{"key":31,"text":69,"correct":26},"计划—实施—检查—纠偏",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1119136,"施工质量保证体系是按照PDCA循环的原理实施的，根据项目自身可能存在的质量问题、质量通病以及与国家规范规定的质量标准对比的差距提出质量管理目标，属于PDCA循环中的（）环节",[74,76,78,80],{"key":20,"text":75,"correct":22},"计划",{"key":24,"text":77,"correct":26},"实施",{"key":28,"text":79,"correct":26},"检查",{"key":31,"text":81,"correct":26},"处置",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1119137,"质量保证体系必须有明确的质量目标，确定质量目标的基本依据是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"质量手册",{"key":24,"text":89,"correct":26},"质量计划",{"key":28,"text":91,"correct":22},"工程承包合同",{"key":31,"text":93,"correct":26},"程序文件",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1119138,"由于建筑产品的单件性和施工生产的流动性，不具有一般工业产品生产常有的固定的生产流水线、规范化的生产工艺、完善的检测技术、成套的生产设备和稳定的生产环境等条件，体现了施工质量控制（）的特点。",[98,100,102,104],{"key":20,"text":99,"correct":26},"需要控制的因素多",{"key":24,"text":101,"correct":22},"控制的难度大",{"key":28,"text":103,"correct":26},"过程控制要求高",{"key":31,"text":105,"correct":26},"终检局限大",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1119139,"施工质量保证体系的运行，应以质量()为主线，以过程管理为重心。",[110,112,113,114],{"key":20,"text":111,"correct":26},"方针",{"key":24,"text":75,"correct":22},{"key":28,"text":79,"correct":26},{"key":31,"text":115,"correct":26},"宗旨",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":31,"analysis":33},1119140,"在工程项目建设中，完善的()可以满足用户的质量要求。",[120,121,123,125],{"key":20,"text":87,"correct":26},{"key":24,"text":122,"correct":26},"施工质量计划",{"key":28,"text":124,"correct":26},"施工质量管理体系",{"key":31,"text":126,"correct":22},"质量保证体系",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":28,"analysis":33},1119141,"下列关于质量管理体系文件中，能客观反映产品质量水平和质量体系中各项质量活动进行及结果的文件的是（）",[131,132,133,135],{"key":20,"text":93,"correct":26},{"key":24,"text":89,"correct":26},{"key":28,"text":134,"correct":22},"质量记录",{"key":31,"text":136,"correct":26},"质量方针",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":31,"analysis":33},1119142,"构成质量管理体系文件的内容，不包括下列哪一项()。",[141,142,143,144],{"key":20,"text":93,"correct":26},{"key":24,"text":87,"correct":26},{"key":28,"text":89,"correct":26},{"key":31,"text":145,"correct":22},"质量管理",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":20,"analysis":33},1119143,"在施工质量控制环节中，事中控制首先是对( )。",[150,152,154,156],{"key":20,"text":151,"correct":22},"质量活动的行为约束",{"key":24,"text":153,"correct":26},"质量活动过程和结果的监督控制",{"key":28,"text":155,"correct":26},"制订施工方案的控制",{"key":31,"text":157,"correct":26},"质量偏差的纠正和控制",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":20,"analysis":33},1119144,"下列施工质量控制措施中，属于事前控制的是()。",[162,164,166,168],{"key":20,"text":163,"correct":22},"设计交底",{"key":24,"text":165,"correct":26},"重要结构实体检测",{"key":28,"text":167,"correct":26},"隐蔽工程验收",{"key":31,"text":169,"correct":26},"施工质量检查验收",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":28,"analysis":33},1119145,"某施工企业承担了某项施工任务，为保证项目目标的实现，项目经理做了以下各项工作，其中属于项目目标事前控制的内容是()。",[174,176,178,180],{"key":20,"text":175,"correct":26},"收集项目目标的实际值",{"key":24,"text":177,"correct":26},"定期进行项目目标的计划值与实际值比较",{"key":28,"text":179,"correct":22},"针对影响项目目标的各种因素采取预防措施",{"key":31,"text":181,"correct":26},"当发现目标偏离时，采取纠偏措施进行纠偏",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":20,"analysis":33},1119146,"确定施工质量目标和计划，是施工质量的( )。",[186,188,190,192],{"key":20,"text":187,"correct":22},"事前控制",{"key":24,"text":189,"correct":26},"事中控制",{"key":28,"text":191,"correct":26},"过程控制",{"key":31,"text":193,"correct":26},"系统控制",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":20,"analysis":33},1119147,"根据《质量管理体系》GB\u002FT19000-2008，施工企业开展质量管理和质量保证的基础是()。",[198,200,201,202],{"key":20,"text":199,"correct":22},"质量体系文件",{"key":24,"text":87,"correct":26},{"key":28,"text":93,"correct":26},{"key":31,"text":89,"correct":26},{"id":204,"libraryId":5,"type":15,"typeLabel":16,"stem":205,"options":206,"answer":24,"analysis":33},1119148,"施工质量保证体系运行控制中，计划行动方案的交底属于PDCA的()环节。",[207,208,209,210],{"key":20,"text":75,"correct":26},{"key":24,"text":77,"correct":22},{"key":28,"text":79,"correct":26},{"key":31,"text":211,"correct":26},"处理",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":28,"analysis":33},1119149,"质量管理的PDCA循环中，实施阶段工作内容包括（）。",[216,218,220,222],{"key":20,"text":217,"correct":26},"确定质量目标",{"key":24,"text":219,"correct":26},"检查计划执行的结果",{"key":28,"text":221,"correct":22},"进行计划行动方案的部署和交底",{"key":31,"text":223,"correct":26},"制定实现质量目标的行动方案",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":24,"analysis":33},1119150,"质量管理的原则中，全员积极参与是指（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":26},"从事一定范围生产经营活动的企业依存于顾客",{"key":24,"text":231,"correct":22},"整个组织内各级胜任、经授权并积极参与的人员，是提高组织创造和提供价值能力的必要条件",{"key":28,"text":233,"correct":26},"有效的决策应建立在数据和信息分析的基础上",{"key":31,"text":235,"correct":26},"各级人员充分参与，使他们的才干为组织带来收益",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},1119151,"质量管理七项原则中，关系管理是（ ）",[240,242,244,246],{"key":20,"text":241,"correct":26},"将活动和相关资源作为过程进行管理",{"key":24,"text":243,"correct":22},"为了持续成功，组织需要管理与有关相关方（如供方）的关系",{"key":28,"text":245,"correct":26},"将相互关联的过程作为系统加以识别、理解和管理",{"key":31,"text":247,"correct":26},"理解顾客当前和未来的需求",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":28,"analysis":33},1119152,"为了持续成功，组织需要管理与有关相关方（如供方）的关系，这是质量管理七项原则中()的要求。",[252,253,255,257],{"key":20,"text":43,"correct":26},{"key":24,"text":254,"correct":26},"过程方法",{"key":28,"text":256,"correct":22},"关系管理",{"key":31,"text":258,"correct":26},"管理的系统方法",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":24,"analysis":33},1119153,"施工单位对入场水泥进行物理力学性能检验时，同一生产厂、同一等级、同一品种、同一批号且连续进场的水泥，袋装不超过()t为一检验批，每批抽样不少于一次。",[263,265,267,269],{"key":20,"text":264,"correct":26},"100",{"key":24,"text":266,"correct":22},"200",{"key":28,"text":268,"correct":26},"300",{"key":31,"text":270,"correct":26},"500",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":31,"analysis":33},1119154,"分部工程可以按照( )进行划分。",[275,277,279,281],{"key":20,"text":276,"correct":26},"施工工艺、设备类别",{"key":24,"text":278,"correct":26},"工种、材料",{"key":28,"text":280,"correct":26},"楼层、施工段、变形缝",{"key":31,"text":282,"correct":22},"专业性质、建筑部位",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":24,"analysis":33},1119155,"项目划分时，依专业性质、建筑部位来划分的工程属于（ ）。",[287,289,291,293],{"key":20,"text":288,"correct":26},"单位工程",{"key":24,"text":290,"correct":22},"分部工程",{"key":28,"text":292,"correct":26},"分项工程",{"key":31,"text":294,"correct":26},"子分部工程",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":20,"analysis":33},1119156,"当分部工程较大或较复杂时，可按( )划分为若干个子分部工程。",[299,301,303,305],{"key":20,"text":300,"correct":22},"材料种类、施工特点、施工程序、专业系统及类别",{"key":24,"text":302,"correct":26},"材料种类、施工特点、施工方法、专业系统及类别",{"key":28,"text":304,"correct":26},"材料价格、施工特点、施工程序、施工段",{"key":31,"text":306,"correct":26},"材料种类、施工特点、施工程序、施工段",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":20,"analysis":33},1119157,"从建筑工程施工质量验收的角度来说，具备独立施工条件并能形成独立使用功能的建筑物或构筑物，为一个( )。",[311,312,314,315],{"key":20,"text":288,"correct":22},{"key":24,"text":313,"correct":26},"单项工程",{"key":28,"text":290,"correct":26},{"key":31,"text":292,"correct":26},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":28,"analysis":33},1119158,"下列项目的现场质量检查中可以采用“吊”的手段的是（ ）。",[320,322,324,326],{"key":20,"text":321,"correct":26},"清水墙面是否洁净",{"key":24,"text":323,"correct":26},"油漆的光滑程度",{"key":28,"text":325,"correct":22},"砌体垂直度",{"key":31,"text":327,"correct":26},"踢脚线的垂直度",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":20,"analysis":33},1119159,"为了确保使用钢材的质量，专门对该钢材进行了抗拉试验，抗拉试验属于（）。",[332,334,336,338],{"key":20,"text":333,"correct":22},"物理性能试验",{"key":24,"text":335,"correct":26},"化学性能试验",{"key":28,"text":337,"correct":26},"无损试验",{"key":31,"text":339,"correct":26},"X射线探伤试验",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":28,"analysis":33},1119160,"工程中常用的（ ）包括物理力学性能方面的检验和化学成分及其含量的测定等两个方面",[344,346,348,350],{"key":20,"text":345,"correct":26},"书面检验",{"key":24,"text":347,"correct":26},"外观检验",{"key":28,"text":349,"correct":22},"理化试验",{"key":31,"text":351,"correct":26},"无损检验",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":20,"analysis":33},1119161,"根据GB\u002FT19000-2008质量管理体系标准，施工企业开展质量管理和质量保证的基础是（）",[356,357,358,359],{"key":20,"text":199,"correct":22},{"key":24,"text":87,"correct":26},{"key":28,"text":93,"correct":26},{"key":31,"text":89,"correct":26},{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":24,"analysis":33},1119162,"对桩或地基的静载试验，属于现场质量检查方法中的()。",[364,366,368,370],{"key":20,"text":365,"correct":26},"目测法",{"key":24,"text":367,"correct":22},"理化试验法",{"key":28,"text":369,"correct":26},"实测法",{"key":31,"text":371,"correct":26},"无损检测法",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":31,"analysis":33},1119163,"施工质量检验的方法分为目测法和实测法两种，下列选项中全都属于后者的是()",[376,378,380,382],{"key":20,"text":377,"correct":26},"摸、量、吊、套",{"key":24,"text":379,"correct":26},"敲、靠、吊、套",{"key":28,"text":381,"correct":26},"摸、敲、吊、靠",{"key":31,"text":383,"correct":22},"量、靠、吊、套",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":28,"analysis":33},1119164,"通过实测数据与施工规范、质量标准的要求及允许偏差值进行对照，以此判断质量是否符合要求，这一现场质量检查方法属于（ ）。",[388,389,391,392],{"key":20,"text":365,"correct":26},{"key":24,"text":390,"correct":26},"试验法",{"key":28,"text":369,"correct":22},{"key":31,"text":371,"correct":26},{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":20,"analysis":33},1119165,"建设工程项目开工前，工程质量监督的申报手续应由项目()负责。",[397,399,401,403],{"key":20,"text":398,"correct":22},"建设单位",{"key":24,"text":400,"correct":26},"施工企业",{"key":28,"text":402,"correct":26},"监理单位",{"key":31,"text":404,"correct":26},"设计单位",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":31,"analysis":33},1119166,"对施工中发现的质量问题严重的施工单位， 工程质量监督机构可以发出（ ）予以处理。",[409,411,413,415],{"key":20,"text":410,"correct":26},"质量问题整改通知书",{"key":24,"text":412,"correct":26},"局部暂停施工指令单",{"key":28,"text":414,"correct":26},"工程暂停施工通知书",{"key":31,"text":416,"correct":22},"临时收缴资质证书通知书",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":24,"analysis":33},1119167,"对工程项目建设中的结构主要部位，除进行常规检查外，应在( )验收时进行监督，监督检查验收合格后，方可进行后续工程的施工",[421,423,424,425],{"key":20,"text":422,"correct":26},"检验批",{"key":24,"text":290,"correct":22},{"key":28,"text":313,"correct":26},{"key":31,"text":288,"correct":26},{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":28,"analysis":33},1119168,"建设工程质量监督档案按()建立。",[430,431,432,433],{"key":20,"text":292,"correct":26},{"key":24,"text":290,"correct":26},{"key":28,"text":288,"correct":22},{"key":31,"text":313,"correct":26},{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":24,"analysis":33},1119169,"在工程项目开工前，监督机构接受建设单位有关建设工程质量监督的申报手续，并对建设单位提供的有关文件进行审查，审查合格签发有关质量监督文件，建设单位凭工程质量监督文件，向（）申领施工许可证。",[438,440,442,444],{"key":20,"text":439,"correct":26},"质量监督机构",{"key":24,"text":441,"correct":22},"建设行政主管部门",{"key":28,"text":443,"correct":26},"政府主管部门",{"key":31,"text":445,"correct":26},"监督机构负责人",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":31,"analysis":33},1119170,"在工程项目开工前，建设工程质量监督机构在施工现场进行第一次监督检查工作的重点是()。",[450,452,454,456],{"key":20,"text":451,"correct":26},"分部分项的施工方案质量",{"key":24,"text":453,"correct":26},"施工现场机械设备的质量",{"key":28,"text":455,"correct":26},"工程质量控制资料的完成情况",{"key":31,"text":457,"correct":22},"参与工程建设的各方主体的质量行为",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":28,"analysis":33},1119171,"某建筑工程，施工难度大，为了预防施工质量事故的发生，项目经理应当从()入手挖掘可能导致事故发生的原因，采取针对性措施。",[462,464,466,468],{"key":20,"text":463,"correct":26},"严格依法进行施工组织管理",{"key":24,"text":465,"correct":26},"严把建筑材料及制品质量关",{"key":28,"text":467,"correct":22},"分析常见的质量通病",{"key":31,"text":469,"correct":26},"做好技术交底",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":28,"analysis":33},1119172,"下列关于施工质量政府监督管理的原则说法不正确的是（ ）。",[474,476,478,480],{"key":20,"text":475,"correct":26},"监督的目的是保证建设工程使用安全和环境质量",{"key":24,"text":477,"correct":26},"监督的基本依据是法律、法规和工程建设强制性标准",{"key":28,"text":479,"correct":22},"监督的主要方式是政府部门",{"key":31,"text":481,"correct":26},"监督的主要内容是对涉及工程主体结构安全、主要使用功能的工程实体质量和工程建设、勘察、设计、施工、监理单位及质量检测等单位的工程质量行为实施监督",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":20,"analysis":33},1119173,"工程质量监督申报手续应在工程项目()向工程质量监督机构办理。",[486,488,490,492],{"key":20,"text":487,"correct":22},"开工前，由建设单位",{"key":24,"text":489,"correct":26},"验收前，由建设单位",{"key":28,"text":491,"correct":26},"开工前，由施工单位",{"key":31,"text":493,"correct":26},"验收前，由施工单位",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":28,"analysis":33},1119174,"根据制定的事故处理的方案，对质量事故进行认真处理属于()。",[498,500,502,504],{"key":20,"text":499,"correct":26},"事故处理的鉴定验收",{"key":24,"text":501,"correct":26},"制定事故处理方案",{"key":28,"text":503,"correct":22},"事故处理",{"key":31,"text":505,"correct":26},"事故原因分析",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":20,"analysis":33},1119175,"施工单位负责人接到施工现场发生安全事故的报告后，应当在（）小时内向事故发生地有关部门报告。",[510,512,514,516],{"key":20,"text":511,"correct":22},"1",{"key":24,"text":513,"correct":26},"5",{"key":28,"text":515,"correct":26},"12",{"key":31,"text":517,"correct":26},"24",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":31,"analysis":33},1119176,"某学校修建了6栋学生住宅楼，建成使用后产生了严重的地基不均匀沉降。经初步调查，事故可能与住宅楼地下存在古河道，工程地质勘察单位对该古河道淤泥质土承载力判断失误有关，则该质量事故的处理过程不包括()。",[522,524,525,526],{"key":20,"text":523,"correct":26},"事故原因的详细调查分析",{"key":24,"text":501,"correct":26},{"key":28,"text":499,"correct":26},{"key":31,"text":527,"correct":22},"事故损失的评估",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":28,"analysis":33},1119177,"某工厂设备基础的混凝土浇筑时掺入木质素磺酸钙减水剂，因施工管理不善，掺量多于规定7倍，导致混凝土塌落度大于180mm,石子下沉，混凝土结构不均匀，浇筑后5d仍然不凝固硬化，28d的混凝土实际强度不到规定强度的32%，则适宜的处理方式（）",[532,534,536,538],{"key":20,"text":533,"correct":26},"加固处理",{"key":24,"text":535,"correct":26},"修补处理",{"key":28,"text":537,"correct":22},"返工处理",{"key":31,"text":539,"correct":26},"不作处理",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":28,"analysis":33},1119178,"某桥梁工程设计张拉系数为1.3，实际施工达到0.8应当( )",[544,546,547,548],{"key":20,"text":545,"correct":26},"增大截面加固修补处理",{"key":24,"text":533,"correct":26},{"key":28,"text":537,"correct":22},{"key":31,"text":549,"correct":26},"限制使用",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":20,"analysis":33},1119179,"某些混凝土结构表面出现蜂窝、麻面，经调查分析，该部位经返修处理后，不会影响其使用及外观，则应采取的事故处理方法是()。",[554,556,557,558],{"key":20,"text":555,"correct":22},"返修处理",{"key":24,"text":533,"correct":26},{"key":28,"text":549,"correct":26},{"key":31,"text":537,"correct":26},{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":20,"analysis":33},1119180,"在施工质量处理过程中，按照施工验收规范和相关的质量标准，并结合实际量测、试验和检测等方法，评价质量事故的处理是否达到预期目的，是否依然存在隐患属于()。",[563,564,565,566],{"key":20,"text":499,"correct":22},{"key":24,"text":501,"correct":26},{"key":28,"text":503,"correct":26},{"key":31,"text":505,"correct":26},{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":20,"analysis":33},1119181,"由于片面追求施工进度，放松或不按质量标准进行控制和检验而造成的质量事故属于()。",[571,573,575,577],{"key":20,"text":572,"correct":22},"指导责任事故",{"key":24,"text":574,"correct":26},"操作责任事故",{"key":28,"text":576,"correct":26},"技术原因引发的质量事故",{"key":31,"text":578,"correct":26},"社会、经济原因引发的质量事故",[580,583,586,589,592,595],{"id":15,"name":581,"category":7,"favorite":582},"领导干部任职前廉政法规知识测试题",92,{"id":584,"name":585,"category":7,"favorite":15},595,"建筑结构与设备",{"id":587,"name":588,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":590,"name":591,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":593,"name":594,"category":7,"favorite":8},534,"BIM工程师",{"id":596,"name":594,"category":7,"favorite":8},535]