[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-35":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":601},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,35,50,2973,[13,34,46,58,70,82,94,106,116,127,139,151,163,175,187,198,210,222,234,246,258,270,282,294,306,318,330,340,352,364,376,388,400,412,424,436,448,460,468,479,491,501,513,525,536,548,557,569,577,589],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1118780,1,"单选题","（ ）是进度控制的依据。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","施工进度目标",false,{"key":24,"text":25,"correct":22},"B","施工进度计划",{"key":27,"text":28,"correct":22},"C","旋工的总体部署",{"key":30,"text":31,"correct":32},"D","实现进度目标的里程碑事件的进度目标",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1118781,"施工项目经理部在施工过程中编制的月度施工计划和旬施工怍业计划，都属于（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"控制性施工进度计划",{"key":24,"text":41,"correct":22},"指导性施工进度计划",{"key":27,"text":43,"correct":32},"实施性施工进度计划",{"key":30,"text":45,"correct":22},"综合性施工进度计划",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1118782,"下列关于控制性施工进度计划的主要作用的叙述，不正确的是()",[50,52,54,56],{"key":20,"text":51,"correct":22},"论证施工总进度目标",{"key":24,"text":53,"correct":32},"是设计性进度计划的依据",{"key":27,"text":55,"correct":22},"施工总进度目标的分解，确定里程碑事件的进度目标",{"key":30,"text":57,"correct":22},"是编制与该项目相关的其他各种进度计划的依据或参考",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1118783,"控制性施工进度计划的内容不包括(）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"对承包合同规定的施工进度目标进行再论证",{"key":24,"text":65,"correct":22},"分解进度目标",{"key":27,"text":67,"correct":32},"划分各作业班组进度控制的责任",{"key":30,"text":69,"correct":22},"确定控制节点的进度目标",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1118784,"在双代号网络图中，虚工作（虚箭线）表示工作之间的()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"停歇时间",{"key":24,"text":77,"correct":22},"总时差",{"key":27,"text":79,"correct":32},"逻辑关系",{"key":30,"text":81,"correct":22},"自由时差",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1118785,"在双代号网络图中，如果某节点既有内向箭线，又有外向箭线的节点称为（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"起点节点",{"key":24,"text":89,"correct":32},"中间节点",{"key":27,"text":91,"correct":22},"终点节点",{"key":30,"text":93,"correct":22},"所有节点",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1118786,"双代号网络图的组成要素是指（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"时差、最早时间、最迟时间",{"key":24,"text":101,"correct":22},"总时差、局部时差、计算工期",{"key":27,"text":103,"correct":32},"工作、节点、线路",{"key":30,"text":105,"correct":22},"工作、节点、关键线路",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1118787,"下图双代号网络图中,引入虚工作2-3是为了表示（）。 A.对 A、B两项工作的代号加以区分 B.",[110,112,114],{"key":20,"text":111,"correct":32},"B两项工作不能同时结束",{"key":24,"text":113,"correct":22},"工作A完成后、工作B才能开始",{"key":27,"text":115,"correct":22},"B两项工作必须同时结束",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":24,"analysis":33},1118788,"控制性施工进度计划的主要作用是（）。",[120,122,123,125],{"key":20,"text":121,"correct":22},"确定施工作业的具体安排",{"key":24,"text":55,"correct":32},{"key":27,"text":124,"correct":22},"确定一个月度或旬人、材、机的需求",{"key":30,"text":126,"correct":22},"编制指导性进度计划的依据",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":20,"analysis":33},1118789,"按工作持续时间的特点不同，工程网络计划可划分为( )。",[131,133,135,137],{"key":20,"text":132,"correct":32},"肯定型问题网络计划、随机型网络计划和非肯定型问题网络计划",{"key":24,"text":134,"correct":22},"随机型网络计划、事件型网络计划和分级型网络计划",{"key":27,"text":136,"correct":22},"双代号网路计划、单代号网络计划和双代号时标网络计划",{"key":30,"text":138,"correct":22},"肯定型问题网络计划、非肯定型问题网络计划和分级型网络计划",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":24,"analysis":33},1118790,"进度控制工作包括了大量的组织和协调工作，而()是组织协调的重要手段。",[143,145,147,149],{"key":20,"text":144,"correct":22},"研究讨论",{"key":24,"text":146,"correct":32},"会议",{"key":27,"text":148,"correct":22},"制定方案",{"key":30,"text":150,"correct":22},"宣传",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":24,"analysis":33},1118791,"根据组织论的原理，为实现项目的进度目标，施工方应充分重视()。",[155,157,159,161],{"key":20,"text":156,"correct":22},"技术创新",{"key":24,"text":158,"correct":32},"健全项目管理的组织体系",{"key":27,"text":160,"correct":22},"工程网络计划方法的使用",{"key":30,"text":162,"correct":22},"工程进度风险分析",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":30,"analysis":33},1118792,"施工进度计划的调整应包括工程量的调整、工作（工序）起止时间的调整、工作关系的调整、必要的目标的调整以及（）的调整。",[167,169,171,173],{"key":20,"text":168,"correct":22},"施工预算",{"key":24,"text":170,"correct":22},"合同约定工期",{"key":27,"text":172,"correct":22},"施工管理组织",{"key":30,"text":174,"correct":32},"资源提供条件",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":30,"analysis":33},1118793,"下列各项属于建设工程项目进度控制技术措施的是（）。",[179,181,183,185],{"key":20,"text":180,"correct":22},"编制资源需求计划",{"key":24,"text":182,"correct":22},"工程进度的风险分析",{"key":27,"text":184,"correct":22},"进度控制职能分工",{"key":30,"text":186,"correct":32},"选用对实现进度目标有利的施工方案",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":30,"analysis":33},1118794,"施工进度计划的内容,不包括()。",[191,193,195,196],{"key":20,"text":192,"correct":22},"工作关系",{"key":24,"text":194,"correct":22},"工作量",{"key":27,"text":174,"correct":22},{"key":30,"text":197,"correct":32},"工程质量",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":30,"analysis":33},1118795,"下列选项中，属于施工方进度控制主要工作环节的是()。",[202,204,206,208],{"key":20,"text":203,"correct":22},"采取纠偏措施",{"key":24,"text":205,"correct":22},"评审设计方案",{"key":27,"text":207,"correct":22},"进度控制工作管理职能分工",{"key":30,"text":209,"correct":32},"编制施工进度计划及有关的资源需求计划",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":24,"analysis":33},1118796,"关于建设工程进度控制，下列说法正确的是()。",[214,216,218,220],{"key":20,"text":215,"correct":22},"建设工程项目中，业主方进度控制的任务是控制整个项目施工阶段进度",{"key":24,"text":217,"correct":32},"施工方进度控制任务是依据施工合同中施工进度要求控制施工工作进度",{"key":27,"text":219,"correct":22},"设计方不用考虑设计进度与招标、施工和物资采购等工作进度相协调",{"key":30,"text":221,"correct":22},"在国际上设计进度计划主要指确定各设计专业设计图纸的出图计划",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":30,"analysis":33},1118797,"施工方进度控制的主要工作环节是（）。",[226,228,230,232],{"key":20,"text":227,"correct":22},"编制施工进度计划及相关的资源需求计划",{"key":24,"text":229,"correct":22},"施工进度计划的检查与调整",{"key":27,"text":231,"correct":22},"编制施工进度计划及相关的资源需求计划和施工进度计划的检查与调整",{"key":30,"text":233,"correct":32},"编制施工进度计划及相关的资源需求计划、组织施工进度计划的实施和施工进度计划的检查与调整",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":24,"analysis":33},1118798,"某施工方的施工进度控制的环节有：①编制施工进度计划；②组织施工进度计划实施；③编制资源需求计划；④施工进度计划检查与调整。其控制顺序正确的是()。",[238,240,242,244],{"key":20,"text":239,"correct":22},"①②③④",{"key":24,"text":241,"correct":32},"①③②④",{"key":27,"text":243,"correct":22},"③①②④",{"key":30,"text":245,"correct":22},"③①④②",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":30,"analysis":33},1118799,"当计算工期不能满足要求工期时，需要压缩关键工作的持续时间以满足工期要求，则下列选项中不属于选择缩短工作时间应考虑的因素的是( )。",[250,252,254,256],{"key":20,"text":251,"correct":22},"缩短持续时间对质量影响不大的工作",{"key":24,"text":253,"correct":22},"缩短持续时间所需增加的费用最少的工作",{"key":27,"text":255,"correct":22},"有充足备用资源的工作",{"key":30,"text":257,"correct":32},"持续时间最长的工作",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":24,"analysis":33},1118800,"关于单代号网络计划，下列说法不正确的是（）。",[262,264,266,268],{"key":20,"text":263,"correct":22},"从起点节点到终点节点均为关键工作，且所有工作的时间间隔为零的线路是关键线路",{"key":24,"text":265,"correct":32},"某工作的自由时差等于该工作与其紧后工．作之间的时间间隔之和的最大值",{"key":27,"text":267,"correct":22},"网络中间某个工作的总时差等于该工作的各个紧后工作的总时差加该工作与其紧后工作之间的时间间隔之和的最小疽",{"key":30,"text":269,"correct":22},"总时差最小的工作是关键工作",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":30,"analysis":33},1118801,"已知下图单代号网络计划中，工作A最早开始时间(ES)和最早完成时间(E F)分别为10天和24天，工作持续时间为14天，则工作A的紧后工作B的最早开始时间 (E)和最早完成时间 (E)分别为（）。",[274,276,278,280],{"key":20,"text":275,"correct":22},"10天和18天",{"key":24,"text":277,"correct":22},"18天和32天",{"key":27,"text":279,"correct":22},"18天和24天",{"key":30,"text":281,"correct":32},"24天和32天",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":20,"analysis":33},1118802,"当工程网络计划的计算工期小于计划工期时，则( )。",[286,288,290,292],{"key":20,"text":287,"correct":32},"单代号网络计划中关键线路上相邻工作的时间间隔为O",{"key":24,"text":289,"correct":22},"双代号网络计划中关键线路上工作的持续时间之和等于计划工期",{"key":27,"text":291,"correct":22},"双代号网络计划中关键工作的自由时差全部为零",{"key":30,"text":293,"correct":22},"单代号搭接网络计划中总时差最小值为O",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":30,"analysis":33},1118803,"单代号网络计划时间参数首先应计算( )。",[298,300,302,304],{"key":20,"text":299,"correct":22},"工作总时差",{"key":24,"text":301,"correct":22},"工作自由时差",{"key":27,"text":303,"correct":22},"相邻两项工作之间的间隔时间",{"key":30,"text":305,"correct":32},"最早开始时间和最早完成时间",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":20,"analysis":33},1118804,"某工程单代号网络计划如下图所示，节点中下方数字为该工作的持续时间，其关键工作为()。",[310,312,314,316],{"key":20,"text":311,"correct":32},"工作C和工作E",{"key":24,"text":313,"correct":22},"工作B和工作E",{"key":27,"text":315,"correct":22},"工作B和工作D",{"key":30,"text":317,"correct":22},"工作A和工作B",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":27,"analysis":33},1118805,"某建设工程施工进度计划如下图所示（时间单位：天），则该进度计划的计算工期是()天。",[322,324,326,328],{"key":20,"text":323,"correct":22},"20",{"key":24,"text":325,"correct":22},"23",{"key":27,"text":327,"correct":32},"21",{"key":30,"text":329,"correct":22},"25",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":27,"analysis":33},1118806,"在网络计划中，若某项工作的（）最小，则该工作必为关键工作。",[334,336,337,338],{"key":20,"text":335,"correct":22},"持续时间",{"key":24,"text":81,"correct":22},{"key":27,"text":77,"correct":32},{"key":30,"text":339,"correct":22},"时间间隔",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":30,"analysis":33},1118807,"如下所示双代号网络计划（不考虑要求工期），工作E的最迟开始时间是()。",[344,346,348,350],{"key":20,"text":345,"correct":22},"4",{"key":24,"text":347,"correct":22},"11",{"key":27,"text":349,"correct":22},"6",{"key":30,"text":351,"correct":32},"7",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":30,"analysis":33},1118808,"施工进度控制在管理观念方面存在的主要问题不包括()。",[356,358,360,362],{"key":20,"text":357,"correct":22},"缺乏进度计划系统的观念",{"key":24,"text":359,"correct":22},"缺乏动态控制的观念",{"key":27,"text":361,"correct":22},"缺乏进度计划多方案比较和优选的观念",{"key":30,"text":363,"correct":32},"缺乏全程控制的观念",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":27,"analysis":33},1118809,"重视信息技术在进度控制中的应用，属于施工方进度控制的()。",[368,370,372,374],{"key":20,"text":369,"correct":22},"经济措施",{"key":24,"text":371,"correct":22},"技术措施",{"key":27,"text":373,"correct":32},"管理措施",{"key":30,"text":375,"correct":22},"组织措施",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":24,"analysis":33},1118810,"下列施工方进度控制的措施中,属于技术措施的是()。",[380,382,384,386],{"key":20,"text":381,"correct":22},"确定进度控制的工作流程",{"key":24,"text":383,"correct":32},"优化施工方案",{"key":27,"text":385,"correct":22},"选择合适的施工承发包方式",{"key":30,"text":387,"correct":22},"选择合理的合同结构",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":24,"analysis":33},1118811,"工程质量是指工程满足( )的需要，符合国家法律法规、技术规范标准、设计文件及合同规定的特性综合。",[392,394,396,398],{"key":20,"text":393,"correct":22},"施工方",{"key":24,"text":395,"correct":32},"业主方",{"key":27,"text":397,"correct":22},"设计方",{"key":30,"text":399,"correct":22},"监理方",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":24,"analysis":33},1118812,"建筑工程施工质量验收合格应符合建筑工程施工质量验收统一标准和相关专业验收规范的规定，这个要求可以归结为（ ）",[404,406,408,410],{"key":20,"text":405,"correct":22},"按图施工",{"key":24,"text":407,"correct":32},"依法施工",{"key":27,"text":409,"correct":22},"践约施工",{"key":30,"text":411,"correct":22},"获得优质工程奖",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":20,"analysis":33},1118813,"环境因素的控制主要包括现场自然环境条件、施工质量管理环境和()的控制。",[416,418,420,422],{"key":20,"text":417,"correct":32},"施工作业环境",{"key":24,"text":419,"correct":22},"施工经济环境",{"key":27,"text":421,"correct":22},"施工社会环境",{"key":30,"text":423,"correct":22},"施工安全环境",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":24,"analysis":33},1118814,"在施工质量的因素中，保证工程质量的重要基础是加强控制()。",[428,430,432,434],{"key":20,"text":429,"correct":22},"人的因素",{"key":24,"text":431,"correct":32},"材料的因素",{"key":27,"text":433,"correct":22},"机械的因素",{"key":30,"text":435,"correct":22},"方法的因素",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":24,"analysis":33},1118815,"建设工程项目的施工质量是指工程满足（ ）需要的，符合国家法律、法规、技术规范标准、设计文件及合同规定的要求的特性综合。",[440,442,444,446],{"key":20,"text":441,"correct":22},"质量监督机构",{"key":24,"text":443,"correct":32},"业主",{"key":27,"text":445,"correct":22},"监理单位",{"key":30,"text":447,"correct":22},"施工单位",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":20,"analysis":33},1118816,"以下设备中，直接影响到工程项目使用功能的发挥的是()。",[452,454,456,458],{"key":20,"text":453,"correct":32},"电梯",{"key":24,"text":455,"correct":22},"运输设备",{"key":27,"text":457,"correct":22},"吊装设备",{"key":30,"text":459,"correct":22},"计量器具",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":20,"analysis":33},1118817,"以下机械设备中，直接影响到工程项目使用功能的发挥的是（）。",[464,465,466,467],{"key":20,"text":453,"correct":32},{"key":24,"text":455,"correct":22},{"key":27,"text":457,"correct":22},{"key":30,"text":459,"correct":22},{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":30,"analysis":33},1118818,"保证施工质量的重要措施是正确选用以下机械设备中的( )。",[472,473,475,477],{"key":20,"text":453,"correct":22},{"key":24,"text":474,"correct":22},"泵机",{"key":27,"text":476,"correct":22},"消防设备",{"key":30,"text":478,"correct":32},"操作工具",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":20,"analysis":33},1118819,"在影响施工质量的五大因素中，建设主管部门推广的高性能混凝土技术，属于( )的因素。",[483,485,487,489],{"key":20,"text":484,"correct":32},"方法",{"key":24,"text":486,"correct":22},"环境",{"key":27,"text":488,"correct":22},"材料",{"key":30,"text":490,"correct":22},"机械",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":30,"analysis":33},1118820,"下列机械设备中，不属于施工机械设备的是()。",[495,496,498,499],{"key":20,"text":478,"correct":22},{"key":24,"text":497,"correct":22},"测量仪器",{"key":27,"text":459,"correct":22},{"key":30,"text":500,"correct":32},"通风空调",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":30,"analysis":33},1118821,"施工现场照明条件属于影响施工质量环境因素中的()。",[505,507,509,511],{"key":20,"text":506,"correct":22},"自然环境因素",{"key":24,"text":508,"correct":22},"施工质量管理环境因素",{"key":27,"text":510,"correct":22},"技术环境因素",{"key":30,"text":512,"correct":32},"作业环境因素",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":27,"analysis":33},1118822,"在施工质量管理中,以控制人的因素为基本出发点而建立的管理制度是()。",[517,519,521,523],{"key":20,"text":518,"correct":22},"见证取样制度",{"key":24,"text":520,"correct":22},"专项施工方案论证制度",{"key":27,"text":522,"correct":32},"执业资格注册制度",{"key":30,"text":524,"correct":22},"建设工程质量监督管理制度",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":24,"analysis":33},1118823,"影响施工质量的环境因素中，不包括()因素。",[529,531,533,535],{"key":20,"text":530,"correct":22},"现场自然环境",{"key":24,"text":532,"correct":32},"社会环境",{"key":27,"text":534,"correct":22},"施工质量管理环境",{"key":30,"text":417,"correct":22},{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":27,"analysis":33},1118824,"下列影响工程施工质量的因素中，属于施工质量管理环境因素的是（）",[540,542,544,546],{"key":20,"text":541,"correct":22},"施工决策者的质量意识",{"key":24,"text":543,"correct":22},"施工现场的照明设施",{"key":27,"text":545,"correct":32},"施工单位质量管理制度",{"key":30,"text":547,"correct":22},"施工技术方案的优劣",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":20,"analysis":33},1118825,"在施工质量的影响的五大因素中，（ ）的因素起决定性作用。",[552,554,555,556],{"key":20,"text":553,"correct":32},"人",{"key":24,"text":488,"correct":22},{"key":27,"text":484,"correct":22},{"key":30,"text":490,"correct":22},{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":20,"analysis":33},1118826,"关于施工质量的影响因素，下列说法正确的是()。",[561,563,565,567],{"key":20,"text":562,"correct":32},"材料质量是工程质量的基础",{"key":24,"text":564,"correct":22},"在施工质量管理中，方法的因素起决定性的作用",{"key":27,"text":566,"correct":22},"机械设备是所有施工方案和工法得以实施的重要物质基础",{"key":30,"text":568,"correct":22},"环境因素对工程质量的影响具有复杂多变和确定性的特点",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":20,"analysis":33},1118827,"施工质量控制的基本出发点是控制()。",[573,574,575,576],{"key":20,"text":429,"correct":32},{"key":24,"text":431,"correct":22},{"key":27,"text":433,"correct":22},{"key":30,"text":435,"correct":22},{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":24,"analysis":33},1118828,"质量管理就是关于质量的管理，是在质量方面指挥和控制组织的协调活动，可包括制定方针和质量目标，以及通过质量策划（ ）实现这些质量目标的过程",[581,583,585,587],{"key":20,"text":582,"correct":22},"质量控制、质量检查、质量改进",{"key":24,"text":584,"correct":32},"质量控制、质量保证、质量改进",{"key":27,"text":586,"correct":22},"质量检查、质量监督、质量审核",{"key":30,"text":588,"correct":22},"质量检查、质量审核、质量改进",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":20,"analysis":33},1118829,"根据《质量管理体系》GB\u002FT19000-2008，质量要求是指（）。",[593,595,597,599],{"key":20,"text":594,"correct":32},"明示的、隐含的或必须履行的需要和期望",{"key":24,"text":596,"correct":22},"明示的、隐含的需要和期望",{"key":27,"text":598,"correct":22},"法律的、合同的或隐含的需要和期望",{"key":30,"text":600,"correct":22},"法律的、合同的需要和期望",[602,605,608,611,614,617],{"id":15,"name":603,"category":7,"favorite":604},"领导干部任职前廉政法规知识测试题",92,{"id":606,"name":607,"category":7,"favorite":15},595,"建筑结构与设备",{"id":609,"name":610,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":612,"name":613,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":615,"name":616,"category":7,"favorite":8},534,"BIM工程师",{"id":618,"name":616,"category":7,"favorite":8},535]