[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-34":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":603},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,34,50,2973,[13,34,46,58,70,82,94,106,118,126,138,150,162,174,186,198,209,221,233,245,257,269,281,293,304,316,328,339,351,363,375,387,399,411,423,435,447,457,467,479,491,500,511,523,535,543,555,567,579,591],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1118730,1,"单选题","下列为加快施工进度而采取的各项措施中，属于技术措施的是（）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","重视计算机软件的应用",false,{"key":24,"text":25,"correct":22},"B","编制进度控制工作流程",{"key":27,"text":28,"correct":29},"C","用大模板代替小钢模",true,{"key":31,"text":32,"correct":22},"D","实行班组内部承包制","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1118731,"下列不属于施工成本管理中经济措施的是()。",[38,40,42,44],{"key":20,"text":39,"correct":29},"确定最合适的施工机械，设备使用方案",{"key":24,"text":41,"correct":22},"编制资金使用计划",{"key":27,"text":43,"correct":22},"对施工成本管理目标进行风险分析，并制定防范性对策",{"key":31,"text":45,"correct":22},"对各种支出，应认真做好资金的使用计划",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1118732,"施工方案对工程进度有直接的影响，所以在对施工方案的选用进行决策时，不仅应分析技术的先进性和经济合理性，还应考虑其（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"风险性",{"key":24,"text":53,"correct":22},"难易程度",{"key":27,"text":55,"correct":29},"对进度的影响",{"key":31,"text":57,"correct":22},"是否能缩短工期",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1118733,"下列建设工程项目进度控制的措施中，属于技术措施的是（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"确定各类进度计划的审批程序",{"key":24,"text":65,"correct":22},"选择合理的合同结构",{"key":27,"text":67,"correct":22},"选择工程承发包方式",{"key":31,"text":69,"correct":29},"优化项目的设计方案或施工方案",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1118734,"落实加快工程施工进度所需资金的措施属于项目动态控制纠偏措施中的()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"组织措施",{"key":24,"text":77,"correct":29},"经济措施",{"key":27,"text":79,"correct":22},"技术措施",{"key":31,"text":81,"correct":22},"管理措施",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1118735,"施工进度控制的技术措施涉及对实现施工进度目标有利的()的选用。",[86,88,90,92],{"key":20,"text":87,"correct":22},"控制技术",{"key":24,"text":89,"correct":22},"合同结构",{"key":27,"text":91,"correct":22},"组织结构形式",{"key":31,"text":93,"correct":29},"设计技术和施工技术",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1118736,"在施工方的进度控制中，应用信息技术有利于提高进度信息处理的效率，有利于提高进度信息的透明度、有利于促进项目参与各方的协调工作和()",[98,100,102,104],{"key":20,"text":99,"correct":22},"进度计划的编制",{"key":24,"text":101,"correct":22},"进度计划的调整",{"key":27,"text":103,"correct":29},"进度信息的交流",{"key":31,"text":105,"correct":22},"进度计划的检查",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1118737,"施工方进度控制的管理措施涉及管理的思想、方法、手段以及承发包模式、合同类型与风险管理等。其中，工程承发包模式主要影响()。",[110,112,114,116],{"key":20,"text":111,"correct":22},"工作之间的逻辑关系",{"key":24,"text":113,"correct":29},"工程实施的组织与协调",{"key":27,"text":115,"correct":22},"施工技术的选用",{"key":31,"text":117,"correct":22},"经济激励措施的效力",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1118738,"在冬季长，施工期短的北方高纬度地区，采用预制混凝土技术可充分利用混凝土构件非施工期的工厂制作和施工期的快速现场安装，而现场浇捣混凝土则养护时间较长，因此，在施工进度控制技术措施中，涉及对实现施工进度目标有利的（）",[122,123,124,125],{"key":20,"text":87,"correct":22},{"key":24,"text":89,"correct":22},{"key":27,"text":91,"correct":22},{"key":31,"text":93,"correct":29},{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":31,"analysis":33},1118739,"信息技术的应用有利于提高进度信息处理的效率、有利于提高进度信息的透明度、有利于促进进度信息的交流和()。",[130,132,134,136],{"key":20,"text":131,"correct":22},"项目质量管理水平的提高",{"key":24,"text":133,"correct":22},"项目安全管理水平的提高",{"key":27,"text":135,"correct":22},"项目投资效益的提高",{"key":31,"text":137,"correct":29},"项目各参与方的协同工作",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":27,"analysis":33},1118740,"某工程的单代号网络计划如下图所示(时间单位：天)，该计划的计算工期为（ ）天。 注意：第一个圆中，是 A，持续时间为2天。",[142,144,146,148],{"key":20,"text":143,"correct":22},"9",{"key":24,"text":145,"correct":22},"11",{"key":27,"text":147,"correct":29},"12",{"key":31,"text":149,"correct":22},"15",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":20,"analysis":33},1118741,"某建设工程项目采用项目总承包模式，则该项目的总进度目标由()控制。",[154,156,158,160],{"key":20,"text":155,"correct":29},"业主方",{"key":24,"text":157,"correct":22},"总承包方",{"key":27,"text":159,"correct":22},"设计方",{"key":31,"text":161,"correct":22},"监理方",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":20,"analysis":33},1118742,"在工程施工实践中，必须树立和坚持一个最基本的工程管理原则，即控制工程的进度，前提是确保()。",[166,168,170,172],{"key":20,"text":167,"correct":29},"工程质量",{"key":24,"text":169,"correct":22},"投资规模",{"key":27,"text":171,"correct":22},"设计标准",{"key":31,"text":173,"correct":22},"经济效益",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":24,"analysis":33},1118743,"下列不属于建设工程项目总进度目标论证的工作步骤的是()。",[178,180,182,184],{"key":20,"text":179,"correct":22},"调整和收集资料",{"key":24,"text":181,"correct":29},"确定施工作业的具体安排",{"key":27,"text":183,"correct":22},"进行进度计划系统的结构分析",{"key":31,"text":185,"correct":22},"编制各层(各级)进度计划",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":31,"analysis":33},1118744,"关于建设工程项目进度计划系统的说法，错误的是()。",[190,192,194,196],{"key":20,"text":191,"correct":22},"建设工程项目进度计划系统是项目进度控制的依据",{"key":24,"text":193,"correct":22},"项目各参与方可以编制多个不同的建设工程项目进度计划系统",{"key":27,"text":195,"correct":22},"建设工程项目进度计划系统是由多个相互关联的进度计划组成的系统",{"key":31,"text":197,"correct":29},"项目进度计划系统是在初步设计阶段完善的",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":20,"analysis":33},1118745,"按照建设工程项目总进度目标论证的工作步骤，在调查研究和收集资料之后应进行的步骤是（ ）。",[202,204,206,208],{"key":20,"text":203,"correct":29},"进行项目结构分析",{"key":24,"text":205,"correct":22},"确定项目工作编码",{"key":27,"text":207,"correct":22},"编制各层进度计划",{"key":31,"text":183,"correct":22},{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":31,"analysis":33},1118746,"建设工程项目进度计划系统是由多个相互关联的进度计划组成的系统，作为项目进度控制的依据，此系统的建立和完善是在()。",[213,215,217,219],{"key":20,"text":214,"correct":22},"项目立项决策时",{"key":24,"text":216,"correct":22},"项目设计阶段",{"key":27,"text":218,"correct":22},"项目施工准备阶段",{"key":31,"text":220,"correct":29},"项目进展过程中",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":31,"analysis":33},1118747,"甲高级中学教学楼为政府投资项目，其中的教学楼工程由乙设计院设计，由丙建筑公司进行施工总承包，由当地安全质量监管站监督管理，则教学楼建设项目实施阶段的总进度目标控制应当由()负责。",[225,227,229,231],{"key":20,"text":226,"correct":22},"安全质量监督站",{"key":24,"text":228,"correct":22},"乙设计院",{"key":27,"text":230,"correct":22},"丙建筑公司",{"key":31,"text":232,"correct":29},"甲高级中学",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":31,"analysis":33},1118748,"施工方所编制的下列计划都与施工进度有关，但属于项目管理范畴的是( )。",[237,239,241,243],{"key":20,"text":238,"correct":22},"企业年度生产计划",{"key":24,"text":240,"correct":22},"企业月度生产计划",{"key":27,"text":242,"correct":22},"企业旬生产计划",{"key":31,"text":244,"correct":29},"分部分项工程进度计划",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":27,"analysis":33},1118749,"建设工程项目进度计划系统按不同功能编制包括()。",[249,251,253,255],{"key":20,"text":250,"correct":22},"总进度计划、子系统进度计划和单项工程进度计划",{"key":24,"text":252,"correct":22},"设计进度计划、施工和设备安装进度计划、采购和供货进度计划",{"key":27,"text":254,"correct":29},"控制性进度规划、指导性进度规划、实施性进度计划",{"key":31,"text":256,"correct":22},"5年建设进度计划、年度计划、月度计划",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":31,"analysis":33},1118750,"下列关于施工方编制建设工程项目施工进度计划的说法，错误的是( )。",[261,263,265,267],{"key":20,"text":262,"correct":22},"施工条件和资源利用的可行性是编制项目施工进度计划的重要依据",{"key":24,"text":264,"correct":22},"编制项目施工进度计划属于工程项目管理的范畴",{"key":27,"text":266,"correct":22},"项目施工进度计划应符合施工企业施工生产计划的总体安排",{"key":31,"text":268,"correct":29},"项目施工进度计划安排应考虑监理机构人员的进场计划",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":24,"analysis":33},1118751,"关于进度计划编制和调整的说法，错误的是（）。",[273,275,277,279],{"key":20,"text":274,"correct":22},"总进度规划、项目子系统进度规划与项目子系统中的单项工程进度计划之间的联系和协调",{"key":24,"text":276,"correct":29},"预测性进度规划、指导性进度规划与实施性进度计划之间的联系和协调",{"key":27,"text":278,"correct":22},"设计方编制的进度计划、施工和设备安装方编制的进度计划与采购和供货方编制的进度计划之间的联系和协调",{"key":31,"text":280,"correct":22},"业主方编制的整个项目实施的进度计划与采购和供货方编制的进度计划之间的联系和协调",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":27,"analysis":33},1118752,"下列建设工程项目进度计划中，不属于由不同项目参与方的计划构成的进度计划系统的是()。",[285,287,289,291],{"key":20,"text":286,"correct":22},"业主方编制的整个项目实施的进度计划",{"key":24,"text":288,"correct":22},"设计进度计划",{"key":27,"text":290,"correct":29},"实施性进度计划",{"key":31,"text":292,"correct":22},"施工和设备安装进度计划",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":24,"analysis":33},1118753,"在建设工程项目进度计划系统中，由业主方、设计方、施工和设备安装方编制的进度计划应与（）编制的进度计划相互协调。",[297,298,300,302],{"key":20,"text":161,"correct":22},{"key":24,"text":299,"correct":29},"采购和供货方",{"key":27,"text":301,"correct":22},"投资方",{"key":31,"text":303,"correct":22},"政府行政主管部门",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":27,"analysis":33},1118754,"如果一个进度计划系统由总进度计划,项目子系统进度计划,项目子系统的单项工程进度计划组成。该进度计划系统是由()的计划组成的计划系统。",[308,310,312,314],{"key":20,"text":309,"correct":22},"不同功能",{"key":24,"text":311,"correct":22},"不同项目参与方",{"key":27,"text":313,"correct":29},"不同深度",{"key":31,"text":315,"correct":22},"不同周期",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":31,"analysis":33},1118755,"设计单位进度控制的任务是依据（）对设计工作进度的要求控制设计工作进度。",[320,322,324,326],{"key":20,"text":321,"correct":22},"建设项目总进度目标",{"key":24,"text":323,"correct":22},"设计总进度计划",{"key":27,"text":325,"correct":22},"工程工期",{"key":31,"text":327,"correct":29},"设计委托合同",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":20,"analysis":33},1118756,"施工方视项目特点和进度控制的需要，编制()。",[332,334,336,337],{"key":20,"text":333,"correct":29},"施工进度计划",{"key":24,"text":335,"correct":22},"项目动用前准备工作计划",{"key":27,"text":288,"correct":22},{"key":31,"text":338,"correct":22},"主要设备采购工作计划",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":31,"analysis":33},1118757,"工程项目施工进度计划是针对（ ）为对象编制的。",[343,345,347,349],{"key":20,"text":344,"correct":22},"整个企业",{"key":24,"text":346,"correct":22},"分部分项工程",{"key":27,"text":348,"correct":22},"作业班组",{"key":31,"text":350,"correct":29},"一个具体工程项目",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":27,"analysis":33},1118758,"不属于工程项目管理范畴的是( )。",[355,357,359,361],{"key":20,"text":356,"correct":22},"子项目施工进度计划",{"key":24,"text":358,"correct":22},"单体工程施工进度计划",{"key":27,"text":360,"correct":29},"施工企业的施工生产计划",{"key":31,"text":362,"correct":22},"项目施工的年度施工计划",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":27,"analysis":33},1118759,"下列建设工程项目进度控制工作中，属于施工方进度控制任务的是（ ）。",[367,369,371,373],{"key":20,"text":368,"correct":22},"部署项目动用准备工作进度",{"key":24,"text":370,"correct":22},"协商设计、招标的工作进度",{"key":27,"text":372,"correct":29},"编制项目施工的工作计划",{"key":31,"text":374,"correct":22},"编制供货进度计划",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":31,"analysis":33},1118760,"下列关于施工进度计划的类型，说法正确的是（）。",[379,381,383,385],{"key":20,"text":380,"correct":22},"施工方所编制的与施工进度有关的计划只包括施工企业的施工生产计划",{"key":24,"text":382,"correct":22},"建设工程项目施工进度计划，属企业计划的范畴",{"key":27,"text":384,"correct":22},"施工企业的施工生产计划，属工程项目管理的范畴",{"key":31,"text":386,"correct":29},"施工企业的施工生产计划与建设工程项目施工进度计划虽属两个不同系统的计划，但是，两者是紧密相关的",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":27,"analysis":33},1118761,"在理论上和工程实践中，一般而言，工程项目的控制性施工进度计划是指( )。",[391,393,395,397],{"key":20,"text":392,"correct":22},"单位工程施工进度计划",{"key":24,"text":394,"correct":22},"施工企业年度生产计划",{"key":27,"text":396,"correct":29},"工程项目施工总进度规划",{"key":31,"text":398,"correct":22},"工程项目月度施工计划",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":24,"analysis":33},1118762,"建设工程项目进度控制的任务中，业主方进度控制的任务是()。",[403,405,407,409],{"key":20,"text":404,"correct":22},"依据设计任务委托合同对设计工作进度的要求控制设计工作进度",{"key":24,"text":406,"correct":29},"控制整个项目实施阶段的进度",{"key":27,"text":408,"correct":22},"依据施工任务委托合同对施工进度的要求控制施工工作进度",{"key":31,"text":410,"correct":22},"编制深度不同的控制性和直接指导项目施工的进度计划",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":27,"analysis":33},1118763,"业主方进度控制的任务是控制整个项目实施阶段的进度，不包括控制()。",[415,417,419,421],{"key":20,"text":416,"correct":22},"设计准备阶段的工作进度",{"key":24,"text":418,"correct":22},"物资采购工作进度",{"key":27,"text":420,"correct":29},"征地拆迁工作进度",{"key":31,"text":422,"correct":22},"项目动用前准备阶段工作进度",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":24,"analysis":33},1118764,"关于工程网络计划中关键工作判别的说法，正确的是（）。",[427,429,431,433],{"key":20,"text":428,"correct":22},"与紧前工作之间时间间隔为零的工作是关键工作",{"key":24,"text":430,"correct":29},"总时差最小的工作为关键工作",{"key":27,"text":432,"correct":22},"与紧后工作之间时间间隔为零的工作是关键工作",{"key":31,"text":434,"correct":22},"最迟开始时间与最早开始时间之差最大的工作是关键工作",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":31,"analysis":33},1118765,"在某双代号网络计划中，工作A的最早开始时间为第10天，其持续时间为6天，该工作有两项紧后工作，它们的最早开始时间分别为第26天和第31天，最迟开始时间分别为第27天和第34天，则工作A的总时差和自由时差()天。",[439,441,443,445],{"key":20,"text":440,"correct":22},"均为11",{"key":24,"text":442,"correct":22},"分别为10和9",{"key":27,"text":444,"correct":22},"均为10",{"key":31,"text":446,"correct":29},"分别为11和10",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":27,"analysis":33},1118766,"已知下列双代号网络图，其中工作J的最早完成时间为（）天。",[451,453,455,456],{"key":20,"text":452,"correct":22},"4",{"key":24,"text":454,"correct":22},"6",{"key":27,"text":143,"correct":29},{"key":31,"text":145,"correct":22},{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":20,"analysis":33},1118767,"在工程网络计划中，工作M的最迟完成时间为25天，其持续时间为7天。如果工作M最早开始时间为13天，则工作M的总时差为()天。",[461,463,464,466],{"key":20,"text":462,"correct":29},"5",{"key":24,"text":454,"correct":22},{"key":27,"text":465,"correct":22},"7",{"key":31,"text":147,"correct":22},{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":31,"analysis":33},1118768,"当某工程网络计划的计算工期等于计划工期时，该网络计划中的关键工作是指( )的工作。",[471,473,475,477],{"key":20,"text":472,"correct":22},"时标网络计划中没有波形线",{"key":24,"text":474,"correct":22},"与紧后工作之间时间间隔为零",{"key":27,"text":476,"correct":22},"开始节点与完成节点均为关键节点",{"key":31,"text":478,"correct":29},"最早完成时间等于最迟完成时间",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":31,"analysis":33},1118769,"已知在双代号网络计划中，某工作有2项紧前工作，它们的最早完成时间分别为18天和23天。如果该工作的持续时间为6天，则该工作最早完成时间为()。",[483,485,487,489],{"key":20,"text":484,"correct":22},"18天",{"key":24,"text":486,"correct":22},"23天",{"key":27,"text":488,"correct":22},"24天",{"key":31,"text":490,"correct":29},"29天",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":27,"analysis":33},1118770,"某建设工程网络计划中某工作的自由时差为4d，总时差为5d。施工进度检查时发现该工作实际进度拖延导致总工期拖延2d，其他工作未拖延。则该工作实际进度比计划进度拖延()d。",[495,497,498,499],{"key":20,"text":496,"correct":22},"2",{"key":24,"text":454,"correct":22},{"key":27,"text":465,"correct":29},{"key":31,"text":145,"correct":22},{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":24,"analysis":33},1118771,"某网络计划中，工作A的紧后工作是B和 C，工作B的最迟开始时间为15，最早开始时间为9；工作C的最迟完成时间为16，最早完成时间为13；工作A与工作 B、C的时间间隔均为4d，则工作A的总时差为().",[504,506,507,509],{"key":20,"text":505,"correct":22},"3",{"key":24,"text":465,"correct":29},{"key":27,"text":508,"correct":22},"8",{"key":31,"text":510,"correct":22},"10",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":27,"analysis":33},1118772,"在工程双代号网络计划中，某项工作的最早完成时间是指其()。",[515,517,519,521],{"key":20,"text":516,"correct":22},"在各紧前工作全部完成后，工作有可能开始的最早时刻",{"key":24,"text":518,"correct":22},"开始节点的最早时间与工作自由时差之和",{"key":27,"text":520,"correct":29},"在各紧前工作全部完成后，工作有可能完成的最早时刻",{"key":31,"text":522,"correct":22},"开始节点的最早时间与工作总时差之和",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":27,"analysis":33},1118773,"某工程单代号网络计划如下图所示，其关键线路为()。",[527,529,531,533],{"key":20,"text":528,"correct":22},"1—2—4—6",{"key":24,"text":530,"correct":22},"1—3—4—6",{"key":27,"text":532,"correct":29},"1—3—5—6",{"key":31,"text":534,"correct":22},"1—2—5—6",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":27,"analysis":33},1118774,"已知某建设工程网络计划中A工作的自由时差为3天，总时差为5天。监理工程师在检查施工进度时发现只有该工作实际进度拖延，且影响总工期3天，则该工作实际进度比计划进度拖延()天。",[539,540,541,542],{"key":20,"text":505,"correct":22},{"key":24,"text":462,"correct":22},{"key":27,"text":508,"correct":29},{"key":31,"text":510,"correct":22},{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":31,"analysis":33},1118775,"某分部工程双代号网络计划如下图所示，根据下表给定的逻辑关系和双代号网络计划的绘图规则，其作图错误问题是（）。",[547,549,551,553],{"key":20,"text":548,"correct":22},"节点编号不对",{"key":24,"text":550,"correct":22},"逻辑关系不对",{"key":27,"text":552,"correct":22},"有多个起点节点",{"key":31,"text":554,"correct":29},"有多个终点节点",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":20,"analysis":33},1118776,"某双代号网络计划如图所示（时间单位：d），则该计划的关键线路是（）。",[559,561,563,565],{"key":20,"text":560,"correct":29},"①-②-④-⑤-⑥-⑦",{"key":24,"text":562,"correct":22},"①-②-④-⑤-⑦",{"key":27,"text":564,"correct":22},"①-③-④-⑤-⑥-⑦",{"key":31,"text":566,"correct":22},"①-③-④-⑤-⑦",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":20,"analysis":33},1118777,"下列单代号网络计划中，关健工作是（）。",[571,573,575,577],{"key":20,"text":572,"correct":29},"A—B—C—E—G",{"key":24,"text":574,"correct":22},"A—B—D—F—G",{"key":27,"text":576,"correct":22},"A—B—D—E—G",{"key":31,"text":578,"correct":22},"A—B—E—G",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":27,"analysis":33},1118778,"关于双代号网络图的绘制，下列说法不正确的是()。",[583,585,587,589],{"key":20,"text":584,"correct":22},"双代号网络图必须正确表达已定的逻辑关系",{"key":24,"text":586,"correct":22},"网络图中严禁出现循环回路",{"key":27,"text":588,"correct":29},"网络图中不许出现母线法",{"key":31,"text":590,"correct":22},"只允许有一个起始和一个结束节点",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":24,"analysis":33},1118779,"关于横道图进度计划特点，下列说法正确的是()。",[595,597,599,601],{"key":20,"text":596,"correct":22},"工序（工作）之间的逻辑关系表达清楚",{"key":24,"text":598,"correct":29},"适用于手工编制进度计划",{"key":27,"text":600,"correct":22},"可以适应大的进度计划系统",{"key":31,"text":602,"correct":22},"能够直观确定计划的关键工作、关键线路与时差",[604,607,610,613,616,619],{"id":15,"name":605,"category":7,"favorite":606},"领导干部任职前廉政法规知识测试题",92,{"id":608,"name":609,"category":7,"favorite":15},595,"建筑结构与设备",{"id":611,"name":612,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":614,"name":615,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":617,"name":618,"category":7,"favorite":8},534,"BIM工程师",{"id":620,"name":618,"category":7,"favorite":8},535]