[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-33":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":592},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,33,50,2973,[13,34,44,56,68,80,92,104,116,128,140,152,164,176,188,199,211,223,235,247,259,268,277,289,301,313,325,337,349,359,371,383,395,407,419,430,440,449,461,473,485,496,505,517,525,537,548,556,568,580],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1118680,1,"单选题","以下对单代号网络图绘图规则的表述，说法有误的是()。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","单代号网络图中，严禁出现双向箭头或无箭头的连线",false,{"key":24,"text":25,"correct":22},"B","单代号网络图中，严禁出现没有箭尾节点的箭线和没有箭头节点的箭线",{"key":27,"text":28,"correct":29},"C","单代号网络图中只应有一个起点节点且终点节点不超过三个",true,{"key":31,"text":32,"correct":22},"D","绘制网络图时，箭线不宜交叉，当交叉不可避免时，可采用过桥法或指向法绘制","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1118681,".对于单代号网络图的绘图规则，下列叙述中错误的是( )。",[38,40,41,43],{"key":20,"text":39,"correct":22},"单代号网络图中只应有一个起点节点和一个终点节点",{"key":24,"text":21,"correct":22},{"key":27,"text":42,"correct":29},"单代号网络图中，允许出现循环回路",{"key":31,"text":32,"correct":22},{"id":45,"libraryId":5,"type":15,"typeLabel":16,"stem":46,"options":47,"answer":20,"analysis":33},1118682,"单代号网络图中工作的最早开始时间等于( )。",[48,50,52,54],{"key":20,"text":49,"correct":29},"该工作的各个紧前工作的最早完成时间的最大值",{"key":24,"text":51,"correct":22},"该工作的各个紧前工作的最早完成时间的最小值",{"key":27,"text":53,"correct":22},"该工作的最早开始时间加该工作的持续时间",{"key":31,"text":55,"correct":22},"该工作的最迟开始时间减该工作的自由时差",{"id":57,"libraryId":5,"type":15,"typeLabel":16,"stem":58,"options":59,"answer":24,"analysis":33},1118683,"在工程网络计划中，关键工作是指网络计划中()",[60,62,64,66],{"key":20,"text":61,"correct":22},"总时差为零的工作",{"key":24,"text":63,"correct":29},"总时差最小的工作",{"key":27,"text":65,"correct":22},"在不影响紧后工作最早开工的前提下机动时间为零的工作",{"key":31,"text":67,"correct":22},"持续时间最长的工作",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":24,"analysis":33},1118684,"关于工程网络计划中关键工作判别的说法，正确的是()。",[72,74,76,78],{"key":20,"text":73,"correct":22},"与紧前工作之间时间间隔为零的工作是关键工作",{"key":24,"text":75,"correct":29},"总时差最小的工作为关键工作",{"key":27,"text":77,"correct":22},"与紧后工作之间时间间隔为零的工作是关键工作",{"key":31,"text":79,"correct":22},"最迟开始时间与最早开始时间之差最大的工作是关键工作",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":31,"analysis":33},1118685,"在工程网络计划中，关键线路是指()的线路。",[84,86,88,90],{"key":20,"text":85,"correct":22},"单代号网络计划中由关键工作组成",{"key":24,"text":87,"correct":22},"双代号网络计划中由关键点组成",{"key":27,"text":89,"correct":22},"双代号时标网络计划中有波形线",{"key":31,"text":91,"correct":29},"单代号网络计划中时间间隔均为零",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":20,"analysis":33},1118686,"下列关于工程网络计划关键工作的表述中，正确的是()。",[96,98,100,102],{"key":20,"text":97,"correct":29},"双代号时标网络计划中关键工作没有波形线",{"key":24,"text":99,"correct":22},"单代号网络计划中的关键工作与其紧后工作之间的时间间隔为零",{"key":27,"text":101,"correct":22},"工程网络计划中的关键工作的总时差一定为零",{"key":31,"text":103,"correct":22},"双代号网络计划中的关键工作必定全在关键线路上",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":27,"analysis":33},1118687,"某工程双代号网络计划图如图所示（时间单位：天），则该计划的关键线路是()。",[108,110,112,114],{"key":20,"text":109,"correct":22},"1-2-3-4-5-6",{"key":24,"text":111,"correct":22},"1-2-3-4-6",{"key":27,"text":113,"correct":29},"1-3-4-6",{"key":31,"text":115,"correct":22},"1-3-5-6",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":20,"analysis":33},1118688,"当工程网络图中某非关键工作拖延5天，而该工作总时差为3天，则网络计划总工期将拖延( )天。",[120,122,124,126],{"key":20,"text":121,"correct":29},"2",{"key":24,"text":123,"correct":22},"3",{"key":27,"text":125,"correct":22},"5",{"key":31,"text":127,"correct":22},"8",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":24,"analysis":33},1118689,"已知某工程双代号网络计划的计划工期等于计算工期，且工作M的开始节点和完成节点均为关键节点，下列关于工作M说法正确的是（）。",[132,134,136,138],{"key":20,"text":133,"correct":22},"为关键工作",{"key":24,"text":135,"correct":29},"总时差等于自由时差",{"key":27,"text":137,"correct":22},"自由时差为零",{"key":31,"text":139,"correct":22},"总时差大于自由时差",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":20,"analysis":33},1118690,"当计算工期不能满足要求工期时，可通过压缩关健工作的持续时间以满足工期要求，在选择缩短持续时间的关键工作时应考虑的因素不包括( )。",[144,146,148,150],{"key":20,"text":145,"correct":29},"缩短持续时间对综合效益影响不大",{"key":24,"text":147,"correct":22},"缩短持续时间对质量和安全影响不大",{"key":27,"text":149,"correct":22},"缩短持续时间所需增加的费用最小",{"key":31,"text":151,"correct":22},"有充足的备用资源",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":24,"analysis":33},1118691,"工程网络计划中，关键工作是指()的工作。",[156,158,160,162],{"key":20,"text":157,"correct":22},"自由时差最小",{"key":24,"text":159,"correct":29},"总时差最小",{"key":27,"text":161,"correct":22},"时间间隔为零",{"key":31,"text":163,"correct":22},"开始节点和完成节点均为关键节点",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":31,"analysis":33},1118692,"已知某工作的持续时间为4天，最早开始时间为7天，总时差2天，则该工作的最迟完成的时间为()天。",[168,170,172,174],{"key":20,"text":169,"correct":22},"4",{"key":24,"text":171,"correct":22},"9",{"key":27,"text":173,"correct":22},"11",{"key":31,"text":175,"correct":29},"13",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":24,"analysis":33},1118693,"下列关于网络计划的说法，正确的是（）。",[180,182,184,186],{"key":20,"text":181,"correct":22},"一个网络计划只有一条关键线路",{"key":24,"text":183,"correct":29},"一个网络计划可能有多条关键线路",{"key":27,"text":185,"correct":22},"网络图解答的编号顺序应从小到大，必须连续，且可以重复",{"key":31,"text":187,"correct":22},"网络计划中允许存在循环网路",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":27,"analysis":33},1118694,"关于网络计划的说法，正确的是()。",[192,194,196,197],{"key":20,"text":193,"correct":22},"网络计划中允许存在循环回路",{"key":24,"text":195,"correct":22},"由关键工作组成的线路称为非关键线路",{"key":27,"text":183,"correct":29},{"key":31,"text":198,"correct":22},"关键线路上也可能存在非关键工作",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":20,"analysis":33},1118695,"关于利用网络计划中工作自由时差的说法，正确的是()。",[203,205,207,209],{"key":20,"text":204,"correct":29},"不会影响紧后工作，也不会影响总工期",{"key":24,"text":206,"correct":22},"不会影响紧后工作，但会影响总工期",{"key":27,"text":208,"correct":22},"会影响紧后工作，但不会影响总工期",{"key":31,"text":210,"correct":22},"会影响紧后工作，也会影响总工期",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},1118696,"在工程网络计划执行过程中，当某项工作的最早完成时间推迟天数超过其自由时差时，将会影响（）。",[215,217,219,221],{"key":20,"text":216,"correct":22},"该工作平行工作的最早开始时间",{"key":24,"text":218,"correct":29},"该工作紧后工作的最早开始时间",{"key":27,"text":220,"correct":22},"本工作的最迟完成时间",{"key":31,"text":222,"correct":22},"该工作紧后工作的最迟完成时间",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":20,"analysis":33},1118697,"工程网络计划执行过程中，如果某项工作实际进度拖延的时间超过其自由时差，则该工作（）。",[227,229,231,233],{"key":20,"text":228,"correct":29},"必定影响其紧后工作的最早开始",{"key":24,"text":230,"correct":22},"必定变为关键工作",{"key":27,"text":232,"correct":22},"必定导致其后工作的完成时间推迟",{"key":31,"text":234,"correct":22},"必定影响工程总工期",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":20,"analysis":33},1118698,"在不影响总工期的前提下，本工作可以利用的机动时间是()。",[239,241,243,245],{"key":20,"text":240,"correct":29},"总时差",{"key":24,"text":242,"correct":22},"自由时差",{"key":27,"text":244,"correct":22},"时距",{"key":31,"text":246,"correct":22},"时间间隔",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":24,"analysis":33},1118699,"在某工程网络计划中，已知工作A没有自由时差，但总时差为5d，检查实际进度时发现该工作的持续时间拖延了4d，说明此时工作A的实际进度()。",[251,253,255,257],{"key":20,"text":252,"correct":22},"既不用影响工期，也不影响其后续工作的正常进行",{"key":24,"text":254,"correct":29},"不影响总工期，但将其紧后工作的最早开始时间推迟4d",{"key":27,"text":256,"correct":22},"使总工期延长4d，但不影响其后续工作的正常进行",{"key":31,"text":258,"correct":22},"将其后续工作的开始时间推迟4d，并使总工期延长1d",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":31,"analysis":33},1118700,"在网络计划中，若某项工作的()最小，则该工作必为关键工作。",[263,264,266,267],{"key":20,"text":242,"correct":22},{"key":24,"text":265,"correct":22},"持续时间",{"key":27,"text":246,"correct":22},{"key":31,"text":240,"correct":29},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":31,"analysis":33},1118701,"某工程网络计划中，工作N最早完成时间为第17天，持续时间为5天。该工作有三项紧后工作，它们的最早开始时间分别为第25天、第27天和第30天，则工作N的自由时差为( )天。",[272,274,275,276],{"key":20,"text":273,"correct":22},"7",{"key":24,"text":121,"correct":22},{"key":27,"text":123,"correct":22},{"key":31,"text":127,"correct":29},{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":24,"analysis":33},1118702,"在某工程网络计划中，工作M的最早开始时间为第15天，其持续时间为7天。工作M有两项紧后工作，它们的最早开始时间分别为第27天和第30天，最迟完成时间分别为第36天和第42天，工作持续时间分别为8和9，则工作M的总时差和自由时差()天。",[281,283,285,287],{"key":20,"text":282,"correct":22},"均为5",{"key":24,"text":284,"correct":29},"分别为6和5",{"key":27,"text":286,"correct":22},"分别为11和6",{"key":31,"text":288,"correct":22},"均为6",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":31,"analysis":33},1118703,"施工企业进度控制的任务是依(),按照施工进度的要求控制施工进度。",[293,295,297,299],{"key":20,"text":294,"correct":22},"建设项目总进度目标",{"key":24,"text":296,"correct":22},"施工总进度计划",{"key":27,"text":298,"correct":22},"建安工程工期定额",{"key":31,"text":300,"correct":29},"施工承包合同",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":31,"analysis":33},1118704,"施工方进度控制的主要工作环节不包括（）",[305,307,309,311],{"key":20,"text":306,"correct":22},"编制施工进度计划及相关的资源需求计划",{"key":24,"text":308,"correct":22},"组织施工进度计划的实施",{"key":27,"text":310,"correct":22},"施工进度计划的检查与调整",{"key":31,"text":312,"correct":29},"施工进度计划的核实",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":27,"analysis":33},1118705,"下列建设工程项目进度控制工作中，属于施工方进度控制任务的是()。",[317,319,321,323],{"key":20,"text":318,"correct":22},"部署项目动用准备工作进度",{"key":24,"text":320,"correct":22},"协调设计、招标的工作进度",{"key":27,"text":322,"correct":29},"编制项目施工的工作计划",{"key":31,"text":324,"correct":22},"编制供货进度计划",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":24,"analysis":33},1118706,"依据施工承包合同，施工方为确保工程进度按合同如期完成，需对工程施工进度进行有效控制。施工进度控制主要环节包括：①编制施工进度计划；②组织施工进度计划实施；③编制资源需求计划；④施工进度计划检查与调整。控制顺序正确的是（）。",[329,331,333,335],{"key":20,"text":330,"correct":22},"①②③④",{"key":24,"text":332,"correct":29},"①③②④",{"key":27,"text":334,"correct":22},"③①②④",{"key":31,"text":336,"correct":22},"③①④②",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":31,"analysis":33},1118707,"施工进度计划的内容，不包括（）的调整。",[341,343,345,347],{"key":20,"text":342,"correct":22},"工作关系",{"key":24,"text":344,"correct":22},"工作量",{"key":27,"text":346,"correct":22},"资源提供条件",{"key":31,"text":348,"correct":29},"工程质量",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":24,"analysis":33},1118708,"下列不属于施工进度计划的调整内容的是（）。",[353,355,356,357],{"key":20,"text":354,"correct":22},"工程量",{"key":24,"text":348,"correct":29},{"key":27,"text":342,"correct":22},{"key":31,"text":358,"correct":22},"必要目标",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":31,"analysis":33},1118709,"在施工进度计划实施过程中，应有序进行下列工作：①跟踪检查，收集实际进度数据；②；③分析计划执行的情况；④对进度的变化采取措施予以纠正或调整计划；⑤检查措施的落实情况；⑥进度计划的变更必须与有关单位和部门及时沟通。其中，第②的工作是()。",[363,365,367,369],{"key":20,"text":364,"correct":22},"编制施工进度计划",{"key":24,"text":366,"correct":22},"收集施工进度计划数据",{"key":27,"text":368,"correct":22},"落实施工管理组织",{"key":31,"text":370,"correct":29},"将实际数据与进度计划对比",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":27,"analysis":33},1118710,"施工进度计划检査后,应编制进度报告,其内容不包括()。",[375,377,379,381],{"key":20,"text":376,"correct":22},"进度计划实施情況的综合描述",{"key":24,"text":378,"correct":22},"实际工程进度与计划进度的比较",{"key":27,"text":380,"correct":29},"前一次进度计划检査提出问题的整改情况",{"key":31,"text":382,"correct":22},"进度计划在实施过程中存在的问题及其原因分析",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":24,"analysis":33},1118711,"关于建设工程项目进度控制的说法,不正确的是()。",[387,389,391,393],{"key":20,"text":388,"correct":22},"各参与方都有进度控制的任务",{"key":24,"text":390,"correct":29},"项目实施过程中不允许调整进度计划",{"key":27,"text":392,"correct":22},"进度控制是一个动态的管理过程",{"key":31,"text":394,"correct":22},"进度目标的分析论证是进度控制的一个环节",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":31,"analysis":33},1118712,"施工进度计划实施时，将实际数据与进度计划对比之后应进行的工作是()。",[399,401,403,405],{"key":20,"text":400,"correct":22},"跟踪检查，收集实际进度数据",{"key":24,"text":402,"correct":22},"进度计划的变更必须与有关单位和部门及时沟通",{"key":27,"text":404,"correct":22},"检查措施的落实情况",{"key":31,"text":406,"correct":29},"分析计划执行的情况",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":31,"analysis":33},1118713,"下列影响建设工程项目管理目标实现的因素中，起决定性作用的是()。",[411,413,415,417],{"key":20,"text":412,"correct":22},"人",{"key":24,"text":414,"correct":22},"方法",{"key":27,"text":416,"correct":22},"工具",{"key":31,"text":418,"correct":29},"组织",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":31,"analysis":33},1118714,"施工进度计划的调整应包括工程量的调整、工作（工序）起止时间的调整、工作关系的调整、必要的目标的调整以及()的调整。",[423,425,427,429],{"key":20,"text":424,"correct":22},"施工预算",{"key":24,"text":426,"correct":22},"合同约定工期",{"key":27,"text":428,"correct":22},"施工管理组织",{"key":31,"text":346,"correct":29},{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":20,"analysis":33},1118715,"施工进度计划的调整应包括工程量、工作（工序）起止时间、资源提供条件、必要的目标以及（）的调整。",[434,435,437,438],{"key":20,"text":342,"correct":29},{"key":24,"text":436,"correct":22},"技术方案",{"key":27,"text":344,"correct":22},{"key":31,"text":439,"correct":22},"管理措施",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":27,"analysis":33},1118716,"施工进度计划的调整应包括工作（工序）起止时间的调整、工作关系的调整、资源提供条件、必要的目标的调整以及（）的调整。",[444,445,446,447],{"key":20,"text":428,"correct":22},{"key":24,"text":426,"correct":22},{"key":27,"text":354,"correct":29},{"key":31,"text":448,"correct":22},"施工技术方案",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":24,"analysis":33},1118717,"施工方进度控制管理措施涉及管理的思想、方法、手段以及承发包模式、合同类型与风险管理等，其中，工程承发包模式主要影响（）。",[453,455,457,459],{"key":20,"text":454,"correct":22},"工作之间的逻辑关系",{"key":24,"text":456,"correct":29},"工程实施的组织与协调",{"key":27,"text":458,"correct":22},"施工技术的选用",{"key":31,"text":460,"correct":22},"经济激励措施的效力",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":31,"analysis":33},1118718,"为实现进度目标，不但应进行进度控制，还应注意（）。",[465,467,469,471],{"key":20,"text":466,"correct":22},"重视进度目标的分析和论证",{"key":24,"text":468,"correct":22},"选择合理的承发包模式",{"key":27,"text":470,"correct":22},"选择合理项目管理模式",{"key":31,"text":472,"correct":29},"分析影响工程进度的风险",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":31,"analysis":33},1118719,"对于信息技术在进度控制中的应用说法不正确的是()。",[477,479,481,483],{"key":20,"text":478,"correct":22},"有利于促进进度信息的交流和项目各参与方的协同工作",{"key":24,"text":480,"correct":22},"有利于提高进度信息处理的效率",{"key":27,"text":482,"correct":22},"有利于提高进度信息的透明度",{"key":31,"text":484,"correct":29},"信息技术对进度控制而言不只是一种管理手段，更是一种重要的技术措施",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":24,"analysis":33},1118720,"在建设工程进度控制中应用信息技术属于()。",[489,491,492,494],{"key":20,"text":490,"correct":22},"技术措施",{"key":24,"text":439,"correct":29},{"key":27,"text":493,"correct":22},"组织措施",{"key":31,"text":495,"correct":22},"监控措施",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":31,"analysis":33},1118721,"在某大型工程项目的施工过程中，由于“下情不能上传，上情不能下达”，导致项目经理不能及时作出正确决策，拖延了工期.为了加快施工进度，项目经理修正了信息传递工作流程。这种纠偏措施属于动态控制的（）。",[500,501,502,504],{"key":20,"text":490,"correct":22},{"key":24,"text":439,"correct":22},{"key":27,"text":503,"correct":22},"经济措施",{"key":31,"text":493,"correct":29},{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":20,"analysis":33},1118722,"施工进度控制在管理观念方面存在的主要问题不包括（）。",[509,511,513,515],{"key":20,"text":510,"correct":29},"缺乏静态控制的观念",{"key":24,"text":512,"correct":22},"缺乏动态控制的观念",{"key":27,"text":514,"correct":22},"缺乏进度计划系统的观念",{"key":31,"text":516,"correct":22},"缺乏进度计划多方案比较和选优的观念",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":20,"analysis":33},1118723,"编制施工进度控制的工作流程，属于施工方进度控制措施中的( )。",[521,522,523,524],{"key":20,"text":493,"correct":29},{"key":24,"text":503,"correct":22},{"key":27,"text":439,"correct":22},{"key":31,"text":490,"correct":22},{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":24,"analysis":33},1118724,"下列进度控制措施中，属于管理措施的是()",[529,531,533,535],{"key":20,"text":530,"correct":22},"编制施工进度控制的工作流程",{"key":24,"text":532,"correct":29},"应用互联网进行进度计划",{"key":27,"text":534,"correct":22},"制定进度控制工作流程",{"key":31,"text":536,"correct":22},"选择先进的施工技术",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":24,"analysis":33},1118725,"下列进度控制措施中，属于施工方进度控制的管理措施的是（）。",[541,542,544,546],{"key":20,"text":530,"correct":22},{"key":24,"text":543,"correct":29},"用工程网络计划的方法编制进度计划",{"key":27,"text":545,"correct":22},"考虑加快工程进度所需要的资金",{"key":31,"text":547,"correct":22},"选用对实现施工进度目标有利的施工技术",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":31,"analysis":33},1118726,"为了实现项目的进度目标，应选择合理的合同结构，以避免过多的合同交界面而影响工程的进展。这属于进度控制的()。",[552,553,554,555],{"key":20,"text":493,"correct":22},{"key":24,"text":503,"correct":22},{"key":27,"text":490,"correct":22},{"key":31,"text":439,"correct":29},{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":20,"analysis":33},1118727,"下列措施中属于进度控制组织措施的是()。",[560,562,564,566],{"key":20,"text":561,"correct":29},"定义施工进度计划系统的组成",{"key":24,"text":563,"correct":22},"采用工程网络计划的方法编制进度计划",{"key":27,"text":565,"correct":22},"编制与进度计划相适应的资源需求计划",{"key":31,"text":567,"correct":22},"改变施工技术、施工方法",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":24,"analysis":33},1118728,"业主方项目进度控制的任务是控制（）的进度。",[572,574,576,578],{"key":20,"text":573,"correct":22},"项目全寿命周期",{"key":24,"text":575,"correct":29},"整个项目实施阶段",{"key":27,"text":577,"correct":22},"项目施工阶段",{"key":31,"text":579,"correct":22},"整个项目决策阶段",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":20,"analysis":33},1118729,"施工方案对工程进度有直接的影响，在决策其选用时，不仅应分析技术的先进性和经济合理性，还应考虑其对（）的影响。",[584,586,588,590],{"key":20,"text":585,"correct":29},"进度",{"key":24,"text":587,"correct":22},"质量",{"key":27,"text":589,"correct":22},"成本",{"key":31,"text":591,"correct":22},"安全",[593,596,599,602,605,608],{"id":15,"name":594,"category":7,"favorite":595},"领导干部任职前廉政法规知识测试题",92,{"id":597,"name":598,"category":7,"favorite":15},595,"建筑结构与设备",{"id":600,"name":601,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":603,"name":604,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":606,"name":607,"category":7,"favorite":8},534,"BIM工程师",{"id":609,"name":607,"category":7,"favorite":8},535]