[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-31":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":587},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,31,50,2973,[13,34,46,58,70,82,93,102,113,124,133,145,157,169,181,189,201,213,225,237,249,261,273,285,297,305,317,329,341,350,362,374,383,395,407,418,430,442,454,465,475,487,499,509,521,529,541,553,565,577],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1118579,1,"单选题","关于施工进度计划，下列说法不正确的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","施工方编制的与施工进度有关的计划包括施工企业的施工生产计划和建设工程项目施工进度计划",false,{"key":24,"text":25,"correct":22},"B","施工企业的施工生产计划，以整个施工企业为系统",{"key":27,"text":28,"correct":22},"C","建设工程项目施工进度计划，以每个建设工程项目的施工为系统",{"key":30,"text":31,"correct":32},"D","建设工程项目施工进度计划，属于企业计划的范畴",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1118580,"施工企业的施工生产计划，以（ ）为系统。",[38,40,42,44],{"key":20,"text":39,"correct":22},"每个建设工程项目施工",{"key":24,"text":41,"correct":22},"整个建设工程项目施工",{"key":27,"text":43,"correct":32},"整个施工企业",{"key":30,"text":45,"correct":22},"每个施工企业",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1118581,"施工企业的施工生产计划与建设工程项目施工进度计划属于（）的计划。",[50,52,54,56],{"key":20,"text":51,"correct":22},"同一个系统内的同一个层次",{"key":24,"text":53,"correct":32},"二个不同的系统，但紧密相关",{"key":27,"text":55,"correct":22},"同一个层次上二种不同系统",{"key":30,"text":57,"correct":22},"二个不同系统，毫不相关",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1118582,"在安排某小型公路改造项目的进度时，需要编制的进度计划是（）",[62,64,66,68],{"key":20,"text":63,"correct":22},"施工总进度方案",{"key":24,"text":65,"correct":22},"施工总进度规划",{"key":27,"text":67,"correct":32},"施工总进度计划",{"key":30,"text":69,"correct":22},"施工总进度目标",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":30,"analysis":33},1118583,"关于施工方编制建设工程项目施工进度计划，下列说法错误的是()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"施工条件和资源利用的可行性是编制项目施工进度计划的重要依据",{"key":24,"text":77,"correct":22},"编制项目施工进度计划属于工程项目管理的范畴",{"key":27,"text":79,"correct":22},"项目施工进度计划应符合施工企业施工生产计划的总体安排",{"key":30,"text":81,"correct":32},"项目施工进度计划安排应考虑监理机构人员的进场计划",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1118584,"下列属于施工企业的施工生产计划的是()。",[86,87,89,91],{"key":20,"text":67,"correct":22},{"key":24,"text":88,"correct":32},"月度生产计划",{"key":27,"text":90,"correct":22},"项目施工的季度施工计划",{"key":30,"text":92,"correct":22},"单体工程施工进度计划",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":24,"analysis":33},1118585,"施工企业的施工生产计划根据施工任务量、企业经营的需求和资源利用的可能性等，合理安排计划周期内的施工生产活动，它包括（ ）。",[97,98,100,101],{"key":20,"text":92,"correct":22},{"key":24,"text":99,"correct":32},"企业月度生产计划",{"key":27,"text":65,"correct":22},{"key":30,"text":63,"correct":22},{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":27,"analysis":33},1118586,"子项目施工进度计划属于（ ）的组成部分。",[106,108,110,112],{"key":20,"text":107,"correct":22},"企业年度生产计划",{"key":24,"text":109,"correct":22},"项目施工月度计划",{"key":27,"text":111,"correct":32},"工程项目施工进度计划",{"key":30,"text":92,"correct":22},{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":27,"analysis":33},1118587,"建设工程项目施工进度计划属于( )范畴。",[117,118,120,122],{"key":20,"text":92,"correct":22},{"key":24,"text":119,"correct":22},"月度施工计划",{"key":27,"text":121,"correct":32},"工程项目管理",{"key":30,"text":123,"correct":22},"企业管理或企业计划",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":24,"analysis":33},1118588,"施工方所编制的施工企业的施工生产计划，属于()的范畴。",[128,129,131,132],{"key":20,"text":92,"correct":22},{"key":24,"text":130,"correct":32},"企业计划",{"key":27,"text":63,"correct":22},{"key":30,"text":121,"correct":22},{"id":134,"libraryId":5,"type":15,"typeLabel":16,"stem":135,"options":136,"answer":30,"analysis":33},1118589,"双代号网络计划的网络图中，虚箭线的作用是()。",[137,139,141,143],{"key":20,"text":138,"correct":22},"正确表达两个工作的间隔时间",{"key":24,"text":140,"correct":22},"正确表达相关工作的持续时间",{"key":27,"text":142,"correct":22},"正确表达相关工作的自由时差",{"key":30,"text":144,"correct":32},"正确表达相关工作的逻辑关系",{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":27,"analysis":33},1118590,"在双代号网络图中，为了正确地表达图中工作之间的关系，往往需要应用虚箭线。虚工作（虚箭线）表示工作之间的()。",[149,151,153,155],{"key":20,"text":150,"correct":22},"停歇时间",{"key":24,"text":152,"correct":22},"总时差",{"key":27,"text":154,"correct":32},"逻辑关系",{"key":30,"text":156,"correct":22},"自由时差",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":27,"analysis":33},1118591,"某双代号网络计划如下图所示。由于业主方要求图纸修改，工作K施工时间共25天，则会影响工期（）天。",[161,163,165,167],{"key":20,"text":162,"correct":22},"3",{"key":24,"text":164,"correct":22},"4",{"key":27,"text":166,"correct":32},"5",{"key":30,"text":168,"correct":22},"10",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":27,"analysis":33},1118592,"网络图的中间节点()。",[173,175,177,179],{"key":20,"text":174,"correct":22},"既无外向箭线，也无内向箭线",{"key":24,"text":176,"correct":22},"只有外向箭线",{"key":27,"text":178,"correct":32},"既有外向箭线，也有内向箭线",{"key":30,"text":180,"correct":22},"只有内向箭线",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":27,"analysis":33},1118593,"网络图的中间节点是（）的节点。",[185,186,187,188],{"key":20,"text":174,"correct":22},{"key":24,"text":176,"correct":22},{"key":27,"text":178,"correct":32},{"key":30,"text":180,"correct":22},{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":30,"analysis":33},1118594,"下列对网络图节点的编号顺序的表述，说法正确的是（）。",[193,195,197,199],{"key":20,"text":194,"correct":22},"编号顺序应从大到小，需连续，但允许重复",{"key":24,"text":196,"correct":22},"编号顺序应从小到大，可不连续，但允许重复",{"key":27,"text":198,"correct":22},"编号顺序应从大封小，需连续，但不允许重复",{"key":30,"text":200,"correct":32},"编号顺序应从小到大，可不连续，但不允许重复",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":33},1118595,"在双代号网络图中，如果某节点既有指向它的箭线，又有背离它的箭线那么该节点称为()。",[205,207,209,211],{"key":20,"text":206,"correct":22},"起点节点",{"key":24,"text":208,"correct":32},"中间节点",{"key":27,"text":210,"correct":22},"终点节点",{"key":30,"text":212,"correct":22},"所有节点",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":30,"analysis":33},1118596,"下列关于横道图的叙述不正确的是（）。",[217,219,221,223],{"key":20,"text":218,"correct":22},"横道图是一种最简单并运用最广的传统的计划方法",{"key":24,"text":220,"correct":22},"横道图用于小型项目或大型项目子项目上，或用于计算资源需要量",{"key":27,"text":222,"correct":22},"横道图的另一种可能的形式是将工作简要说明直接放在横道上",{"key":30,"text":224,"correct":32},"因为有许多新的计划技术，所以横道图在建设领域中的应用不是很普遍",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":30,"analysis":33},1118597,"关于横道图计划法的表述，不正确的是()。",[229,231,233,235],{"key":20,"text":230,"correct":22},"横道图用于小型项目或大型项目子项目上",{"key":24,"text":232,"correct":22},"按照所表示工作的详细程度，时间单位可以为小时(h)、天(d)、周",{"key":27,"text":234,"correct":22},"横道图计划表中的进度线（横道）与时间坐标相对应，这种表达方式较直观，易看懂计划编制的意图",{"key":30,"text":236,"correct":32},"适应大的进度计划系统",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":20,"analysis":33},1118598,"与工程网络计划方法相比，横道图进度计划方法的缺点是（）。",[241,243,245,247],{"key":20,"text":242,"correct":32},"无法确定计划中的关键工作和时差",{"key":24,"text":244,"correct":22},"不能手动方式改动调整进度计划",{"key":27,"text":246,"correct":22},"难以直观反映计划所需要的资源数量",{"key":30,"text":248,"correct":22},"不可以直观计算计划中工作的时间参数",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":20,"analysis":33},1118599,"建设工程进度网络计划与横道计划相比，其主要优点是能够()。",[253,255,257,259],{"key":20,"text":254,"correct":32},"明确表达各项工作之间的逻辑关系",{"key":24,"text":256,"correct":22},"直观表达工程进度计划的计算工期",{"key":27,"text":258,"correct":22},"明确表达各项工作之间的搭接时间",{"key":30,"text":260,"correct":22},"直观表示各项工作的持续时间",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":20,"analysis":33},1118600,"以箭线表示工作的网络计划是（）。",[265,267,269,271],{"key":20,"text":266,"correct":32},"双代号网络计划",{"key":24,"text":268,"correct":22},"单代号网络计划",{"key":27,"text":270,"correct":22},"双代号时标网络计划",{"key":30,"text":272,"correct":22},"单代号时标网络计划",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":20,"analysis":33},1118602,"我国《工程网络计划技术规程》(JGJ\u002FT121-1999)推荐的常用工程网络计划类型中的双代号网络图是以（）表示工作的网络图。",[277,279,281,283],{"key":20,"text":278,"correct":32},"箭线及其两端节点的编号",{"key":24,"text":280,"correct":22},"虚线及其两端节点的编号",{"key":27,"text":282,"correct":22},"虚线及其两端节点的箭头",{"key":30,"text":284,"correct":22},"箭线及其两端节点的箭头",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":30,"analysis":33},1118603,"下列()不是双代号网络计划的基本符号。",[289,291,293,295],{"key":20,"text":290,"correct":22},"箭线",{"key":24,"text":292,"correct":22},"圆圈",{"key":27,"text":294,"correct":22},"编号",{"key":30,"text":296,"correct":32},"波形线",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":30,"analysis":33},1118604,"《工程网络计划技术规程》(JGJ\u002FT121-1999)推荐的常用工程网络计划类型不包括( )。",[301,302,303,304],{"key":20,"text":266,"correct":22},{"key":24,"text":268,"correct":22},{"key":27,"text":270,"correct":22},{"key":30,"text":272,"correct":32},{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":20,"analysis":33},1118605,"虚箭线是实际工作中并不存在的一项虚设工作，故它们（）。",[309,311,313,315],{"key":20,"text":310,"correct":32},"既不占用时间，也不消耗资源",{"key":24,"text":312,"correct":22},"只占时间，不消耗资源",{"key":27,"text":314,"correct":22},"不占时间，只消耗资源",{"key":30,"text":316,"correct":22},"既占时间，又消耗资源",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":24,"analysis":33},1118606,"关于工程网络计划中虚工作的说法，错误的是（）。",[321,323,325,327],{"key":20,"text":322,"correct":22},"虚工作表示工作之间的逻辑关系",{"key":24,"text":324,"correct":32},"虚工作的总时差和自由时差均为零",{"key":27,"text":326,"correct":22},"虚工作的持续时间为0",{"key":30,"text":328,"correct":22},"在双代号网络计划中存在虚工作",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":30,"analysis":33},1118607,"在双代号网络图中，任意一条实箭线除特殊情况外都()。",[333,335,337,339],{"key":20,"text":334,"correct":22},"只占用时间，不占用资源",{"key":24,"text":336,"correct":22},"只占用资源，不占用时间",{"key":27,"text":338,"correct":22},"既不占用时间，也不占用资源",{"key":30,"text":340,"correct":32},"占用时间、消耗资源",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":27,"analysis":33},1118608,"在双代号网络图中，任意一条实箭线都要占用时间、消耗资源，但有时例外，比如混凝土养护工作（）。",[345,346,348,349],{"key":20,"text":316,"correct":22},{"key":24,"text":347,"correct":22},"既不占时间，也不消耗资源",{"key":27,"text":312,"correct":32},{"key":30,"text":314,"correct":22},{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":27,"analysis":33},1118609,"关于双代号网络计划中的虚箭线，下列说法不正确的是（）。",[354,356,358,360],{"key":20,"text":355,"correct":22},"虚箭线主要用来表达相关工作的逻辑关系",{"key":24,"text":357,"correct":22},"虚箭线所代表的工作不消耗时间",{"key":27,"text":359,"correct":32},"虚箭线代表的可能是虚工作也可能是实工作",{"key":30,"text":361,"correct":22},"虚箭线所代表的工作不消耗资源",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":27,"analysis":33},1118610,"双代号网络图中虚箭线表示()。",[366,368,370,372],{"key":20,"text":367,"correct":22},"资源消耗程度",{"key":24,"text":369,"correct":22},"工作的持续时间",{"key":27,"text":371,"correct":32},"工作之间的逻辑关系",{"key":30,"text":373,"correct":22},"非关键工作",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":20,"analysis":33},1118611,"施工进度计划的编制方法有多种，其中（）是一种最简单并运用最广泛的传统的计划方法。",[378,380,381,382],{"key":20,"text":379,"correct":32},"横道图",{"key":24,"text":266,"correct":22},{"key":27,"text":268,"correct":22},{"key":30,"text":270,"correct":22},{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":30,"analysis":33},1118612,"下列关于横道图进度计划的表述中，错误的是（）。",[387,389,391,393],{"key":20,"text":388,"correct":22},"横道图是一种最简单、运用最广泛的进度计划方法",{"key":24,"text":390,"correct":22},"横道图的表头为工作及其简要说明，工作进展表现在时间表格上",{"key":27,"text":392,"correct":22},"横道图也可将工作简要说明直接放在横道线条上",{"key":30,"text":394,"correct":32},"横道图主要运用于大中型建设项目的进度管理",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":27,"analysis":33},1118613,"下列关于横道图计划法的缺点，正确的是()。",[399,401,403,405],{"key":20,"text":400,"correct":22},"横道图无法表达出工作间的逻辑关系",{"key":24,"text":402,"correct":22},"关键工作和关键路线可以设法表达，但不易表达清楚",{"key":27,"text":404,"correct":32},"计划调整只能用手工方式进行，其工作量时较大",{"key":30,"text":406,"correct":22},"横道图计划难以适用于中小型进度计划系统",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":24,"analysis":33},1118614,"下列计划方式中，工作进度线与时间坐标相对应的计划是（）。",[411,413,415,416],{"key":20,"text":412,"correct":22},"里程碑计划",{"key":24,"text":414,"correct":32},"横道图计划",{"key":27,"text":266,"correct":22},{"key":30,"text":417,"correct":22},"单代号搭接网络计划",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":20,"analysis":33},1118615,"下列关于横道图的说法正确的是（）。",[422,424,426,428],{"key":20,"text":423,"correct":32},"难以适应较大的进度计划系统",{"key":24,"text":425,"correct":22},"横道图无法表达工作间的逻辑关系",{"key":27,"text":427,"correct":22},"可以确定横道图计划的关键工作和关键路线",{"key":30,"text":429,"correct":22},"横道图计划适用于大的进度计划系统",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":20,"analysis":33},1118616,"横道图进度计划的优点是()。",[434,436,438,440],{"key":20,"text":435,"correct":32},"表达方式直观",{"key":24,"text":437,"correct":22},"工作时差易于分析",{"key":27,"text":439,"correct":22},"便于确定关键工作",{"key":30,"text":441,"correct":22},"工作之间的逻辑关系表达清楚",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},1118617,"下列关于横道图计划的特点说法正确的是（）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"计划调整只能用计算机方式进行",{"key":24,"text":449,"correct":32},"工作之间的逻辑关系不易表达清楚",{"key":27,"text":451,"correct":22},"工作量较小",{"key":30,"text":453,"correct":22},"适用于大的进度计划系统",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":24,"analysis":33},1118618,"下列关于横道图进度计划特点的说法，正确的是（）",[458,460,462,463],{"key":20,"text":459,"correct":22},"能够清楚地反映工序之间的逻辑关系",{"key":24,"text":461,"correct":32},"适用于手工编制进度计划",{"key":27,"text":453,"correct":22},{"key":30,"text":464,"correct":22},"能够直观确定计划的关键工作、关键路径与时差",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":27,"analysis":33},1118619,"横道图计划的特点之一是()。",[469,470,472,473],{"key":20,"text":453,"correct":22},{"key":24,"text":471,"correct":22},"能方便地确定关键工作",{"key":27,"text":449,"correct":32},{"key":30,"text":474,"correct":22},"计划调整只能采用计算机进行",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":27,"analysis":33},1118620,"关于双代号网络图绘图规则的说法,正确是()。",[479,481,483,485],{"key":20,"text":480,"correct":22},"箭线不能交叉",{"key":24,"text":482,"correct":22},"关键工作必须安排在图面中心",{"key":27,"text":484,"correct":32},"只有一个起点节点",{"key":30,"text":486,"correct":22},"工作箭线只能用水平线",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":30,"analysis":33},1118621,"某分部工程双代号网络计划如右图所示，根据绘图规则要求，该图的错误为()。",[491,493,495,497],{"key":20,"text":492,"correct":22},"节点编号错误",{"key":24,"text":494,"correct":22},"逻辑关系颠倒",{"key":27,"text":496,"correct":22},"有多个起点节点",{"key":30,"text":498,"correct":32},"有多个终点节点",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":30,"analysis":33},1118622,"根据下表逻辑关系控制的双代号网络图，图中存在的作图错误是()。",[503,505,507,508],{"key":20,"text":504,"correct":22},"节点编号不对",{"key":24,"text":506,"correct":22},"逻辑关系不对",{"key":27,"text":496,"correct":22},{"key":30,"text":498,"correct":32},{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":20,"analysis":33},1118623,"双代号网络计划中关于节点的说法，正确的是()。",[513,515,517,519],{"key":20,"text":514,"correct":32},"一个开始节点和一个结束节点",{"key":24,"text":516,"correct":22},"一个开始节点和多个结束节点",{"key":27,"text":518,"correct":22},"多个开始节点和一个结束节点",{"key":30,"text":520,"correct":22},"多个开始节点和多个结束节点",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":24,"analysis":33},1118624,"根据下表给定的逻辑关系绘制某分部工程双代号网络计划如下图所示，其作图错误的是()。",[525,526,527,528],{"key":20,"text":504,"correct":22},{"key":24,"text":498,"correct":32},{"key":27,"text":496,"correct":22},{"key":30,"text":506,"correct":22},{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":20,"analysis":33},1118625,"节点是双代号网络计划中箭线之间的连接点，每一个双代号网络图有（）。",[533,535,537,539],{"key":20,"text":534,"correct":32},"一个起点节点和一个终点节点",{"key":24,"text":536,"correct":22},"一个起点节点和多个终点节点",{"key":27,"text":538,"correct":22},"多个起点节点和一个终点节点",{"key":30,"text":540,"correct":22},"多个起点节点和多个终点节点",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":24,"analysis":33},1118626,"下列关于双代号网络计划绘图规则的说法，错误的有()。",[545,547,549,551],{"key":20,"text":546,"correct":22},"网络图必须正确表达各工作间的逻辑关系",{"key":24,"text":548,"correct":32},"网络图中可以出现循环回路",{"key":27,"text":550,"correct":22},"单目标网络计划只有一个起点节点和一个终点节点",{"key":30,"text":552,"correct":22},"网络图中严禁出现没有箭头节点或没有箭尾节点的箭线",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":27,"analysis":33},1118627,"关于网络计划的说法，正确的是（）。",[557,559,561,563],{"key":20,"text":558,"correct":22},"网络计划中允许存在循环回路",{"key":24,"text":560,"correct":22},"由关键工作组成的线路称为非关键线路",{"key":27,"text":562,"correct":32},"一个网络计划可能有多条关键线路",{"key":30,"text":564,"correct":22},"关键线路上也可能存在非关键工作",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":20,"analysis":33},1118628,"某承包商承接了相邻两栋高层住宅楼的施工，这两栋楼之间由于资源（人力、材料、机械设备和资金等）调配需要而规定的先后顺序关系称为()。",[569,571,573,575],{"key":20,"text":570,"correct":32},"组织关系",{"key":24,"text":572,"correct":22},"工艺关系",{"key":27,"text":574,"correct":22},"搭接关系",{"key":30,"text":576,"correct":22},"沟通关系",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":20,"analysis":33},1118629,"网络计划中工作之间的先后关系叫做逻辑关系，它包括()。",[581,582,584,586],{"key":20,"text":572,"correct":32},{"key":24,"text":583,"correct":22},"技术关系",{"key":27,"text":585,"correct":22},"控制关系",{"key":30,"text":574,"correct":22},[588,591,594,597,600,603],{"id":15,"name":589,"category":7,"favorite":590},"领导干部任职前廉政法规知识测试题",92,{"id":592,"name":593,"category":7,"favorite":15},595,"建筑结构与设备",{"id":595,"name":596,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":598,"name":599,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":601,"name":602,"category":7,"favorite":8},534,"BIM工程师",{"id":604,"name":602,"category":7,"favorite":8},535]