[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-30":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":595},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,30,50,2973,[13,34,46,54,66,78,89,101,113,125,137,149,161,172,184,196,208,220,232,244,256,268,280,292,304,316,325,337,349,361,373,384,396,407,418,429,441,453,465,474,484,496,508,520,528,540,552,564,573,583],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1118527,1,"单选题","某大型建设工程项目总进度目标论证的部分工作包括：①进行进度计划系统的结构分析；②确定项目的丁作编码；③协调各层进度计划的关系和编制总进度计划；④编制各层（各级）进度计划；⑤进行项目结构分析；⑥调查研究和收集资料。其正确的步骤是()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","⑥②⑤③①④",false,{"key":24,"text":25,"correct":26},"B","⑥⑤①②④③",true,{"key":28,"text":29,"correct":22},"C","⑥③①②⑤④",{"key":31,"text":32,"correct":22},"D","⑥①⑤③②④","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1118528,"进行建设工程项目总进度目标控制前，首先应分析和论证目标实现的可能性。在调查研究和收集整理后，紧接着应进行的工作是（）",[38,40,42,44],{"key":20,"text":39,"correct":22},"进行进度计划系统结构分析",{"key":24,"text":41,"correct":26},"进行项目结构分析",{"key":28,"text":43,"correct":22},"编制各级进度计划",{"key":31,"text":45,"correct":22},"确定工作编码",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1118529,"某市拟新建一办公大楼，项目建设单位组织有关专家对该项目的总进度目标进行论证，在调查研究和收集整理后，紧接着应进行的工作是()。",[50,51,52,53],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":26},{"key":28,"text":43,"correct":22},{"key":31,"text":45,"correct":22},{"id":55,"libraryId":5,"type":15,"typeLabel":16,"stem":56,"options":57,"answer":28,"analysis":33},1118530,"大型建设工程项目总进度目标论证的核心工作是（ ）。",[58,60,62,64],{"key":20,"text":59,"correct":22},"项目结构分析",{"key":24,"text":61,"correct":22},"编制各层进度计划",{"key":28,"text":63,"correct":26},"通过编制总进度纲要论证总进度目标实现的可能性",{"key":31,"text":65,"correct":22},"协调各层进度计划的关系，编制总进度计划",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":31,"analysis":33},1118531,"下列选项中，不属于总进度纲要主要内容的有()",[70,72,74,76],{"key":20,"text":71,"correct":22},"项目实施的总体部署",{"key":24,"text":73,"correct":22},"总进度规划",{"key":28,"text":75,"correct":22},"确定里程碑事件的计划进度目标",{"key":31,"text":77,"correct":26},"施工进度计划及相关的资源需求计划",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":24,"analysis":33},1118532,"下列计划中，属于大型建设工程项目总进度纲要主要内容的是（ ）",[82,84,85,87],{"key":20,"text":83,"correct":22},"进行进度计划系统的结构分析",{"key":24,"text":75,"correct":26},{"key":28,"text":86,"correct":22},"明确项目建设各参与单位的进度计划",{"key":31,"text":88,"correct":22},"确定计划层次",{"id":90,"libraryId":5,"type":15,"typeLabel":16,"stem":91,"options":92,"answer":20,"analysis":33},1118533,"建设工程项目总进度纲要的主要内容包括：①项目实施的总体部署；②总进度规划；③各子系统进度规划；④确定里程碑事件的计划进度目标。下列顺序正确的是()。",[93,95,97,99],{"key":20,"text":94,"correct":26},"①→②→③→④",{"key":24,"text":96,"correct":22},"②→①→③→④",{"key":28,"text":98,"correct":22},"③→①→②→④",{"key":31,"text":100,"correct":22},"④→①→②→③",{"id":102,"libraryId":5,"type":15,"typeLabel":16,"stem":103,"options":104,"answer":31,"analysis":33},1118534,"建设工程项目总进度目标论证的工作包括：①确定项目的工作编码；②调查研究和收集资料；③进行项目结构分析；④进行进度计划系统的结构分析；⑤编制各层（各级）进度计划等。其正确的工作步骤为（ ）。",[105,107,109,111],{"key":20,"text":106,"correct":22},"①—⑤—②—③—④",{"key":24,"text":108,"correct":22},"②—⑤—①—④—③",{"key":28,"text":110,"correct":22},"①—④—②—⑤—①",{"key":31,"text":112,"correct":26},"②—③—④—①—⑤",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":31,"analysis":33},1118535,"建设工程项目总进度目标论证的工作包括：(1) 调查研究和收集资料；(2) 进行进度计划系统的结构分析；(3) 进行项目结构分析；(4) 确定项目的工作编码；(5) 编制各层（各级)进度计划；(6) 若经过多次调整，进度目标无法实现，则报告项目决策者；(7) 协调各层进度计划的关系和编制总进度计划；(8) 若所编制的总进度计划不符合项目的进度目标，则设法调整",[117,119,121,123],{"key":20,"text":118,"correct":22},"(1)、(2)、(3)、(4)、(5)、(6)、(7)、(8)",{"key":24,"text":120,"correct":22},"(1)、(3)、(5)、(4)、(2)、(6)、(7)、(8)",{"key":28,"text":122,"correct":22},"(1)、(2)、(3)、(4)、(6)、(5)、(7)、(8)",{"key":31,"text":124,"correct":26},"(1)、(3)、(2)、(4)、(5)、(7)、(8)、(6)",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":24,"analysis":33},1118536,"大型建设工程项目总进度目标论证的核心工作是通过( )论证总进度目标实现的可能性。",[129,131,133,135],{"key":20,"text":130,"correct":22},"工程实施条件分析",{"key":24,"text":132,"correct":26},"编制总进度纲要",{"key":28,"text":134,"correct":22},"编制施工进度计划及相关的资源需求计划",{"key":31,"text":136,"correct":22},"编制多个不同的建设工程项目进度计划系统",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":31,"analysis":33},1118537,"建设工程项目进度计划系统中，年度、季度、月度和旬计划属于()。",[141,143,145,147],{"key":20,"text":142,"correct":22},"由不同深度的计划构成的进度计划系统",{"key":24,"text":144,"correct":22},"由不同功能的计划构成的进度计划系统",{"key":28,"text":146,"correct":22},"由不同项目参与方的计划构成的进度计划系统",{"key":31,"text":148,"correct":26},"由不同周期的计划构成的进度计划系统",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":31,"analysis":33},1118538,"建设工程项目的5年建设进度计划属于按不同（）编制的进度计划",[153,155,157,159],{"key":20,"text":154,"correct":22},"深度",{"key":24,"text":156,"correct":22},"功能",{"key":28,"text":158,"correct":22},"项目参与方",{"key":31,"text":160,"correct":26},"周期",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":24,"analysis":33},1118539,"在建设工程项目进度计划系统中各进度计划或各子系统进度计划编制和调整时必须注意（）。",[165,167,169,171],{"key":20,"text":166,"correct":22},"各进度计划的相对独立",{"key":24,"text":168,"correct":26},"其相互间的联系和协调",{"key":28,"text":170,"correct":22},"各进度计划的结构分析",{"key":31,"text":59,"correct":22},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":20,"analysis":33},1118540,"建设工程项目的业主和参与方都有进度控制的任务，各方()。",[176,178,180,182],{"key":20,"text":177,"correct":26},"控制的目标和时间范畴各不相同",{"key":24,"text":179,"correct":22},"控制的目标和时间范畴均相同",{"key":28,"text":181,"correct":22},"控制的目标不同、但控制的时间范畴相同",{"key":31,"text":183,"correct":22},"控制的目标相同、但控制的时间范畴不同",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":24,"analysis":33},1118541,"建设工程项目按不同功能编制的进度计划系统包括()。",[188,190,192,194],{"key":20,"text":189,"correct":22},"总进度规划、子系统进度规划、子系统中的单项工程进度计划",{"key":24,"text":191,"correct":26},"控制性、指导性和实施性进度计划",{"key":28,"text":193,"correct":22},"业主方计划、施工方计划和货方计划",{"key":31,"text":195,"correct":22},"年度计划、季度计划、月度计划",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":31,"analysis":33},1118542,"业主方进度控制的任务是控制整个项目()。",[200,202,204,206],{"key":20,"text":201,"correct":22},"建设管理进度",{"key":24,"text":203,"correct":22},"建设施工进度",{"key":28,"text":205,"correct":22},"前期工作进度",{"key":31,"text":207,"correct":26},"实施阶段进度",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":20,"analysis":33},1118543,"供货方进度控制的任务是依据()对供货的要求控制供货工作进度，这是供贷方履行合同的义务。",[212,214,216,218],{"key":20,"text":213,"correct":26},"供货合同",{"key":24,"text":215,"correct":22},"施工工序",{"key":28,"text":217,"correct":22},"业主",{"key":31,"text":219,"correct":22},"施工总进度计划",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":20,"analysis":33},1118544,"建设工程项目进度控制的工作环节包括进度目标的分析论证，进度计划的编制、执行以及对执行情况的检查和( )等。",[224,226,228,230],{"key":20,"text":225,"correct":26},"纠偏",{"key":24,"text":227,"correct":22},"分析",{"key":28,"text":229,"correct":22},"总结",{"key":31,"text":231,"correct":22},"报告",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":28,"analysis":33},1118545,"建设工程项目进度控制工作包括:①编制进度计划;②调整进度计划;③进度目标的分析和论证;④跟踪检査计划的执行情况。其正确的工作程序是()。",[236,238,240,242],{"key":20,"text":237,"correct":22},"①一②一③一④",{"key":24,"text":239,"correct":22},"③一①一②一④",{"key":28,"text":241,"correct":26},"③一①一④一②",{"key":31,"text":243,"correct":22},"④一②一③一①",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":31,"analysis":33},1118546,"只重视进度计划的编制，不重视进度计划必要的调整，则（ ）。",[248,250,252,254],{"key":20,"text":249,"correct":22},"进度无法完成",{"key":24,"text":251,"correct":22},"进度需要调整",{"key":28,"text":253,"correct":22},"进度同样可以得到控制",{"key":31,"text":255,"correct":26},"进度无法得到控制",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":28,"analysis":33},1118547,"关于设计方进度控制的说法，不正确的是（）。",[260,262,264,266],{"key":20,"text":261,"correct":22},"设计方进度控制的任务是依据设计任务委托合同来对设计工作进度进行控制",{"key":24,"text":263,"correct":22},"设计方的进度控制是履行其设计任务委托合同的义务",{"key":28,"text":265,"correct":26},"设计进度计划主要是概念设计和初步设计阶段的设计图纸的出图计划",{"key":31,"text":267,"correct":22},"设计方应尽可能使设计进度与招标、施工和物资采购等进度相协调",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":24,"analysis":33},1118548,"下列建设工程项目进度控制工作中，属于设计方进度控制任务的是()。",[272,274,276,278],{"key":20,"text":273,"correct":22},"部署项目动用准备工作进度",{"key":24,"text":275,"correct":26},"协调设计、招标的工作进度",{"key":28,"text":277,"correct":22},"编制项目施工的工作进度",{"key":31,"text":279,"correct":22},"编制供货进度计划",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":24,"analysis":33},1118549,"建设项目设计方进度控制的任务是依据()对设计工作进度的要求，控制设计工作进度。",[284,286,288,290],{"key":20,"text":285,"correct":22},"设计大纲",{"key":24,"text":287,"correct":26},"设计任务委托合同",{"key":28,"text":289,"correct":22},"设计总进度纲要",{"key":31,"text":291,"correct":22},"可行性研究报告",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":28,"analysis":33},1118550,"施工方应根据()编制施工进度计划，对施工进度进行控制。",[296,298,300,302],{"key":20,"text":297,"correct":22},"施工劳动力需求计划",{"key":24,"text":299,"correct":22},"施工物资需要计划",{"key":28,"text":301,"correct":26},"施工任务委托合同",{"key":31,"text":303,"correct":22},"项目监理规划",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":24,"analysis":33},1118551,"施工方进度控制的任务是依据()控制施工工作进度。",[308,310,312,314],{"key":20,"text":309,"correct":22},"业主方对施工进度的要求",{"key":24,"text":311,"correct":26},"施工任务承包合同对施工进度的要求",{"key":28,"text":313,"correct":22},"建筑施工工期定额",{"key":31,"text":315,"correct":22},"业主方对施工进度的要求和工期定额",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":24,"analysis":33},1118552,"施工单位进度控制的任务是依据()控制施工工作进度。",[320,321,322,323],{"key":20,"text":309,"correct":22},{"key":24,"text":311,"correct":26},{"key":28,"text":313,"correct":22},{"key":31,"text":324,"correct":22},"业主方对施工进度的要求和工期定额等",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":28,"analysis":33},1118553,"在进度计划编制方面，施工方应视()的需要，编制深度不同的控制性和直接指导项目施工的进度计划。",[329,331,333,335],{"key":20,"text":330,"correct":22},"施工的特点和施工进度控制",{"key":24,"text":332,"correct":22},"项目的特点和施工成本控制",{"key":28,"text":334,"correct":26},"项目的特点和施工进度控制",{"key":31,"text":336,"correct":22},"施工的特点和施工成本控制",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":20,"analysis":33},1118554,"施工方进度控制的任务是()。",[341,343,345,347],{"key":20,"text":342,"correct":26},"根据施工任务委托合同对施工进度的要求控制施工进度",{"key":24,"text":344,"correct":22},"控制整个项目实施阶段的进度",{"key":28,"text":346,"correct":22},"依据施工组织设计对施工进度的要求控制施工进度",{"key":31,"text":348,"correct":22},"依据建设单位对项目动用要求控制施工进度",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":20,"analysis":33},1118555,"建设工程施工进度控制中，业主方的任务是控制整个项目()的进度。",[353,355,357,359],{"key":20,"text":354,"correct":26},"实施阶段",{"key":24,"text":356,"correct":22},"决策阶段",{"key":28,"text":358,"correct":22},"项目全寿命周期",{"key":31,"text":360,"correct":22},"使用阶段",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":24,"analysis":33},1118557,"业主方的项目进度控制任务是控制（）的进度。",[365,367,369,371],{"key":20,"text":366,"correct":22},"项目设计阶段",{"key":24,"text":368,"correct":26},"整个项目实施阶段",{"key":28,"text":370,"correct":22},"项目施工阶段",{"key":31,"text":372,"correct":22},"整个项目决策阶段",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":24,"analysis":33},1118558,"业主方进度控制的任务是( )。",[377,379,380,382],{"key":20,"text":378,"correct":22},"依据设计任务委托合同对设计工作进度的要求控制设计工作进度",{"key":24,"text":344,"correct":26},{"key":28,"text":381,"correct":22},"依据施工任务委托合同对施工进度的要求控制施工工作进度",{"key":31,"text":383,"correct":22},"编制深度不同的控制性和直接指导项目施工的进度计划",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":28,"analysis":33},1118559,"施工方应视（）的需要，编制不同深度、不同计划周期的施工计划。",[388,390,392,394],{"key":20,"text":389,"correct":22},"业主方",{"key":24,"text":391,"correct":22},"项目内容和项目特点",{"key":28,"text":393,"correct":26},"项目特点和施工进度控制",{"key":31,"text":395,"correct":22},"施工质量控制和项目特点",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":24,"analysis":33},1118560,"在进度计划编制方面，施工方应视()的需要，编制深度不同的控制性和直接指导项目施工的进度计划，以及按不同计划周期编制的计划。",[400,402,403,405],{"key":20,"text":401,"correct":22},"施工进度控制和施工质量控制",{"key":24,"text":334,"correct":26},{"key":28,"text":404,"correct":22},"项目的内容和项目特点",{"key":31,"text":406,"correct":22},"项目的内容和施工质量控制",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":28,"analysis":33},1118561,"在安排一个小型项目施工的进度时，只需编制（ ）。",[411,413,415,416],{"key":20,"text":412,"correct":22},"施工总进度方案",{"key":24,"text":414,"correct":22},"施工总进度规划",{"key":28,"text":219,"correct":26},{"key":31,"text":417,"correct":22},"施工总进度目标",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":20,"analysis":33},1118562,"下列施工进度计划可以用于直接组织施工作业的是（）。",[422,424,426,428],{"key":20,"text":423,"correct":26},"月度施工计划",{"key":24,"text":425,"correct":22},"年度施工计划",{"key":28,"text":427,"correct":22},"季度施工计划",{"key":31,"text":219,"correct":22},{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":31,"analysis":33},1118563,"在实施性施工进度计划中，()反映各施工作业相应的日历天的安排，以及各施工作业的施工顺序。",[433,435,437,439],{"key":20,"text":434,"correct":22},"年施工作业计划",{"key":24,"text":436,"correct":22},"月施工作业计划",{"key":28,"text":438,"correct":22},"季度施工作业计划",{"key":31,"text":440,"correct":26},"旬施工作业计划",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":28,"analysis":33},1118564,"施工项目经理部在施工过程中编制的月度施工计划和旬施工作业计划，都属于()。",[445,447,449,451],{"key":20,"text":446,"correct":22},"控制性施工进度计划",{"key":24,"text":448,"correct":22},"指导性施工进度计划",{"key":28,"text":450,"correct":26},"实施性施工进度计划",{"key":31,"text":452,"correct":22},"综合性施工进度计划",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":31,"analysis":33},1118565,"实施性施工进度计划的编制应结合工程施工的具体条件，并以（）所确定的里程碑事件的进度目标为依据。",[457,459,461,463],{"key":20,"text":458,"correct":22},"项目年度施工进度计划",{"key":24,"text":460,"correct":22},"项目施工总进度规划",{"key":28,"text":462,"correct":22},"项目施工总进度方案",{"key":31,"text":464,"correct":26},"项目控制性施工进度计划",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":24,"analysis":33},1118566,"下列文件中，()是协调设计进度、物资采购计划和制定资金使用计划等的重要参考文件。",[469,470,471,473],{"key":20,"text":458,"correct":22},{"key":24,"text":446,"correct":26},{"key":28,"text":472,"correct":22},"施工承包合同",{"key":31,"text":450,"correct":22},{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":31,"analysis":33},1118567,"整个项目施工进度控制的纲领性文件是()，并且也是组织和指挥施工的依据。",[478,480,481,483],{"key":20,"text":479,"correct":22},"战略性施工进度计划",{"key":24,"text":450,"correct":22},{"key":28,"text":482,"correct":22},"竞争性施工进度计划",{"key":31,"text":446,"correct":26},{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":31,"analysis":33},1118568,"关于控制性施工进度计划的主要作用，下列表述错误的是（ ）。",[488,490,492,494],{"key":20,"text":489,"correct":22},"是编制与该项目相关的其他各种进度计划的依据或参考依据",{"key":24,"text":491,"correct":22},"是编制实施性进度计划的依据",{"key":28,"text":493,"correct":22},"论证施工总进度目标",{"key":31,"text":495,"correct":26},"施工各层目标的确定，明确里程碑事件的进度目标",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":31,"analysis":33},1118569,"下列各项属于实施性施工进度计划的主要作用的是（ ）。",[500,502,504,506],{"key":20,"text":501,"correct":22},"确定施工作业的工休日期",{"key":24,"text":503,"correct":22},"确定施工作业的采购计划",{"key":28,"text":505,"correct":22},"确定施工作业的人员数量",{"key":31,"text":507,"correct":26},"确定施工作业的具体安排",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":28,"analysis":33},1118570,"下列进度计划中,属于实施性施工进度计划的是()。",[512,514,516,518],{"key":20,"text":513,"correct":22},"项目施工总进度计划",{"key":24,"text":515,"correct":22},"项目施工年度计划",{"key":28,"text":517,"correct":26},"项目月度施工计划",{"key":31,"text":519,"correct":22},"企业旬施工生产计划",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":28,"analysis":33},1118571,"工程项目的月度施工计划和旬施工作业计划属于()。",[524,525,526,527],{"key":20,"text":446,"correct":22},{"key":24,"text":448,"correct":22},{"key":28,"text":450,"correct":26},{"key":31,"text":482,"correct":22},{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":28,"analysis":33},1118572,"工程项目的旬施工作业计划属于()进度计划。",[532,534,536,538],{"key":20,"text":533,"correct":22},"控制性",{"key":24,"text":535,"correct":22},"指导性",{"key":28,"text":537,"correct":26},"实施性",{"key":31,"text":539,"correct":22},"竞争性",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":24,"analysis":33},1118573,"下列进度计划中，可直接用于组织施工作业的计划是()。",[544,546,548,550],{"key":20,"text":545,"correct":22},"施工企业的旬生产计划",{"key":24,"text":547,"correct":26},"建设工程项目月度施工计划",{"key":28,"text":549,"correct":22},"施工企业的月度生产计划",{"key":31,"text":551,"correct":22},"建设工程项目施工总进度计划",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":28,"analysis":33},1118574,"工程项目实施性施工进度计划的编制以()为依据。",[556,558,560,562],{"key":20,"text":557,"correct":22},"施工总进度规划的进度目标",{"key":24,"text":559,"correct":22},"施工总进度计划的进度目标",{"key":28,"text":561,"correct":26},"控制性施工进度计划确定的里程碑事件的进度目标",{"key":31,"text":563,"correct":22},"单位工程施工进度计划的进度目标",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":20,"analysis":33},1118575,"（ ）是协调设计进度、物资采购计划和制定资金使用计划等的重要参考文件。",[568,569,571,572],{"key":20,"text":446,"correct":26},{"key":24,"text":570,"correct":22},"预测性施工进度计划",{"key":28,"text":448,"correct":22},{"key":31,"text":450,"correct":22},{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":31,"analysis":33},1118576,"如果大型工程项目在签订施工承包合同后，设计资料的深度和其他条件还不足以编制比较具体的施工总进度计划时，则可先编制()。",[577,579,580,582],{"key":20,"text":578,"correct":22},"企业年度生产计划",{"key":24,"text":517,"correct":22},{"key":28,"text":581,"correct":22},"单体工程施工进度计划",{"key":31,"text":414,"correct":26},{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":28,"analysis":33},1118577,"下列选项中，一般而言属于工程项目控制性施工进度计划的是（）。",[587,589,591,593],{"key":20,"text":588,"correct":22},"单位工程施工进度计划",{"key":24,"text":590,"correct":22},"施工企业年度生产计划",{"key":28,"text":592,"correct":26},"工程项目施工总进度计划",{"key":31,"text":594,"correct":22},"工程项目月度施工计划",[596,599,602,605,608,611],{"id":15,"name":597,"category":7,"favorite":598},"领导干部任职前廉政法规知识测试题",92,{"id":600,"name":601,"category":7,"favorite":15},595,"建筑结构与设备",{"id":603,"name":604,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":606,"name":607,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":609,"name":610,"category":7,"favorite":8},534,"BIM工程师",{"id":612,"name":610,"category":7,"favorite":8},535]