[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":608},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,3,50,2973,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,224,236,248,260,272,284,296,308,320,332,342,354,366,378,390,402,414,426,435,447,455,467,479,491,503,515,524,536,548,560,572,584,596],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1117166,1,"单选题","采用时间一成本累积曲线编制建设工程项目进度计划时，从节约资金贷款利息的角度出发，适宜采取的做法是（）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","所有工作均按最早时间开始",false,{"key":24,"text":25,"correct":22},"B","关键工作均按最迟开始时间开始",{"key":27,"text":28,"correct":29},"C","所有工作均按最迟开始时间开始",true,{"key":31,"text":32,"correct":22},"D","关键工作均按最早开始时间开始","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1117167,"关于施工成本控制的说法，正确的是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"施工成本管理体系由社会有关组织进行评审和认证",{"key":24,"text":41,"correct":29},"要做好施工成本的过程控制，必须制定规范化的过程控制程序",{"key":27,"text":43,"correct":22},"管理行为控制程序是进行成本过程控制的重点",{"key":31,"text":45,"correct":22},"管理行为控制程序和指标控制程序是相互独立的",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1117168,"某土方工程，计划总工程量为4800m3预算单价为580 元\u002Fm3，计划6 个月内均衡完成，开工后，实际单价为600 元\u002Fm3，施工至第3 个月底，累计实际完成工程量3000m3，若运用赢得值法分析，则至第3 个月底的费用偏差为（）万元。",[50,52,54,56],{"key":20,"text":51,"correct":22},"-34.8",{"key":24,"text":53,"correct":29},"-6",{"key":27,"text":55,"correct":22},"6",{"key":31,"text":57,"correct":22},"34.8",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1117169,"某分部工程的成本计划数据如下表所示，则第五周的施工成本计划值是（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"75",{"key":24,"text":65,"correct":29},"155",{"key":27,"text":67,"correct":22},"80",{"key":31,"text":69,"correct":22},"125",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1117170,"施工项目年度成本分析的重点是（）",[74,76,78,80],{"key":20,"text":75,"correct":22},"通过实际成本与目标成本的对比，分析目标成本落实情况",{"key":24,"text":77,"correct":22},"通过对技术组织措施执行效果的分析，寻求更加有效的节约途径",{"key":27,"text":79,"correct":22},"通过实际成本与计划成本的对比，分析成本降低水平",{"key":31,"text":81,"correct":29},"针对下一年度进展情况，制定切实可行的成本管理措施",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1117171,"业务核算是施工成本分析的依据之一，其目的是（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"预测成本变化发展的趋势",{"key":24,"text":89,"correct":29},"迅速取得资料，及时采取措施调整经济活动",{"key":27,"text":91,"correct":22},"计算当前的实际成本水平",{"key":31,"text":93,"correct":22},"记录企业的一切生产经营活动",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1117172,"某项目施工成本数据如下表，根据差额计算法，成本降低率提高对成本降低额的影响程度为（）万元。",[98,100,102,104],{"key":20,"text":99,"correct":22},"0.6",{"key":24,"text":101,"correct":22},"0.7",{"key":27,"text":103,"correct":22},"1.1",{"key":31,"text":105,"correct":29},"1.2",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1117173,"分部分项工程成本分析采用的\"三算\"对比分析法，其\"三算\"对比指的是（）的比较。",[110,112,114,116],{"key":20,"text":111,"correct":22},"概算成本、预算成本、决算成本",{"key":24,"text":113,"correct":29},"预算成本、目标成本、实际成本",{"key":27,"text":115,"correct":22},"月度成本、季度成本、年度成本",{"key":31,"text":117,"correct":22},"预算成本、计划成本、目标成本",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1117174,"在建设工程项目施工成本分析中，成本盈亏异常分析属于（）方法。",[122,124,126,128],{"key":20,"text":123,"correct":22},"因素分析",{"key":24,"text":125,"correct":22},"综合成本分析",{"key":27,"text":127,"correct":29},"专项成本分析",{"key":31,"text":129,"correct":22},"成本项目分析",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1117175,"某项目在进行资金成本分析时，其计算期实际工程款收入为220 万元，计算期实际成本支出为119万元，计划工期成本为150 万元，则该项目成本支出率为（）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"30.69%",{"key":24,"text":137,"correct":29},"54.09%",{"key":27,"text":139,"correct":22},"68.18%",{"key":31,"text":141,"correct":22},"79.33%",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1117176,"成本核算要求的归集“三同步”是指（）的取值范围应当一致。",[146,148,150,152],{"key":20,"text":147,"correct":29},"形象进度、产值统计、实际成本",{"key":24,"text":149,"correct":22},"成本预测、成本计划、成本分析",{"key":27,"text":151,"correct":22},"目标成本、预算成本、实际成本",{"key":31,"text":153,"correct":22},"人工成本、材料成本、机械成本",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1117177,"关于施工成本分析依据的说法，正确的是（）。",[158,160,162,164],{"key":20,"text":159,"correct":29},"统计核算可以用货币计算",{"key":24,"text":161,"correct":22},"业务核算主要是价值核算",{"key":27,"text":163,"correct":22},"统计核算的计量尺度比会计核算窄",{"key":31,"text":165,"correct":22},"会计核算可以对尚未发生的经济活动进核算",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1117178,"在进行建设工程项目总进度目标控制前，首先应（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"进行项目结构分析",{"key":24,"text":173,"correct":22},"确定项目的工作编码",{"key":27,"text":175,"correct":22},"编制各层进度计划",{"key":31,"text":177,"correct":29},"分析和论证目标实施的可能性",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1117179,"建设工程项目的总进度目标是在项目的（ ）阶段确定的。",[182,184,186,188],{"key":20,"text":183,"correct":29},"决策",{"key":24,"text":185,"correct":22},"设计",{"key":27,"text":187,"correct":22},"招标",{"key":31,"text":189,"correct":22},"施工",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1117180,"对于采用建设项目总承包模式的建设工程，项目总进度目标的控制是（ ）项目的任务。",[194,196,198,200],{"key":20,"text":195,"correct":29},"业主",{"key":24,"text":197,"correct":22},"总承包方",{"key":27,"text":199,"correct":22},"设计方",{"key":31,"text":201,"correct":22},"监理方",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},1117181,"关于建设工程项目总进度目标的说法，正确的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"建设工程项目总进度目标的控制是施工总承包方项目管理的任务",{"key":24,"text":209,"correct":22},"项目实施阶段的总进度指的就是施工进度",{"key":27,"text":211,"correct":29},"在进行项目总进度目标控制前，应分析和论证目标实现的可能性",{"key":31,"text":213,"correct":22},"项目总进度目标论证就是要编制项目的总进度计划",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1117182,"根据建设工程项目总进度目标论证的工作步骤，编制各层（各级）进度计划的紧前工作是（ ）",[218,219,221,222],{"key":20,"text":173,"correct":29},{"key":24,"text":220,"correct":22},"调查研究和资料收集",{"key":27,"text":171,"correct":22},{"key":31,"text":223,"correct":22},"进行进度计划系统的结构分析",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":24,"analysis":33},1117183,"业主方项目进度控制的任务是控制（ ）的进度。",[228,230,232,234],{"key":20,"text":229,"correct":22},"项目设计阶段",{"key":24,"text":231,"correct":29},"整个项目实施阶段",{"key":27,"text":233,"correct":22},"项目施工阶段",{"key":31,"text":235,"correct":22},"整个项目决策阶段",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":20,"analysis":33},1117184,"大型建设工程项目总进度目标论证的核心工作是通过（ ）。",[240,242,244,246],{"key":20,"text":241,"correct":29},"编制总进度纲要，论证总进度目标实现的可能性",{"key":24,"text":243,"correct":22},"分析工程发包组织方式，论证总进度目标分解的合理性",{"key":27,"text":245,"correct":22},"分析施工技术方面的资料，论证总进度目标的控制措施",{"key":31,"text":247,"correct":22},"分析施工组织资料论证总进度目标实现的条件",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":31,"analysis":33},1117185,"建设工程项目总进度目标论证的工作包括：①进行项目结构分析；②调查研究和收集资料；③编制各层进度计划；④协调各层进度计划的关系和编制总进度计划；⑤确定项目的工作编码，其正确的工作步骤是（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":22},"①→③→④→②→⑤",{"key":24,"text":255,"correct":22},"①→④→②→⑤→③",{"key":27,"text":257,"correct":22},"②→③→①→④→⑤",{"key":31,"text":259,"correct":29},"②→①→⑤→③→④",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":20,"analysis":33},1117186,"在建设工程项目进度控制工作中，分析和论证进度目标的目的是分析和论证（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":29},"进度目标的合理性及实现的可能性",{"key":24,"text":267,"correct":22},"进度目标实现措施的经济性和可操作性",{"key":27,"text":269,"correct":22},"进度目标与成本目标、质量目标的匹配性",{"key":31,"text":271,"correct":22},"进度目标与成本目标、质量目标的一致性",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":31,"analysis":33},1117187,"工程项目的施工总进度计划是属于（ ）。",[276,278,280,282],{"key":20,"text":277,"correct":22},"项目的施工总进度方案",{"key":24,"text":279,"correct":22},"项目的指导性施工进度计划",{"key":27,"text":281,"correct":22},"项目施工的年度施工计划",{"key":31,"text":283,"correct":29},"项目的控制性施工进度计划",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":27,"analysis":33},1117188,"控制性施工进度计划的内容不包括（ ）",[288,290,292,294],{"key":20,"text":289,"correct":22},"对承包合同的进度目标进行分析论证",{"key":24,"text":291,"correct":22},"确定施工的总体部署",{"key":27,"text":293,"correct":29},"划分各作业班组进度控制的责任",{"key":31,"text":295,"correct":22},"确定控制节点的进度目标",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":24,"analysis":33},1117189,"下列进度计划中，可直接用于组织施工作业的计划是（ ）。",[300,302,304,306],{"key":20,"text":301,"correct":22},"施工企业的旬生产计划",{"key":24,"text":303,"correct":29},"建设工程项目施工的月度施工计划",{"key":27,"text":305,"correct":22},"施工企业的月度生产计划",{"key":31,"text":307,"correct":22},"建设工程项目施工的季度施工计划",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":31,"analysis":33},1117190,"编制控制性措施进度计划的主要目的是（ ）",[312,314,316,318],{"key":20,"text":313,"correct":22},"合理安排施工企业计划周期内的生产活动",{"key":24,"text":315,"correct":22},"具体指导建设工程施工",{"key":27,"text":317,"correct":22},"确定项目实施计划周期内的资金需求",{"key":31,"text":319,"correct":29},"对施工承包合同所规定的施工进度目标进行论证",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":31,"analysis":33},1117191,"关于横道图进度计划的说法，正确的时（ ）",[324,326,328,330],{"key":20,"text":325,"correct":22},"横道图的一行只能表达一项工作",{"key":24,"text":327,"correct":22},"工作的简要说明必须放在表头内",{"key":27,"text":329,"correct":22},"横道图不能表达工作间的逻辑关系",{"key":31,"text":331,"correct":29},"横道图的工作可按项目对象排序",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":24,"analysis":33},1117192,"某双代号网络计划如下图所示(时间：天)，则工作D 的自由时差是（ ）天。",[336,338,340],{"key":20,"text":337,"correct":22},"3",{"key":24,"text":339,"correct":29},"2",{"key":27,"text":341,"correct":22},"1",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":20,"analysis":33},1117193,"某工程网络计划中，工作F 的最早开始时间为第11 天，持续时间为5 天，工作F 有三项紧后工作，它们的最早开始时间分别为第20 天、第22 天和第23 天，最迟开始时间分别为第21 天、第24 天和第27 天，则工作F 的总时差和自由时差分别为（ ）。",[346,348,350,352],{"key":20,"text":347,"correct":29},"5；4",{"key":24,"text":349,"correct":22},"11；7",{"key":27,"text":351,"correct":22},"5；5",{"key":31,"text":353,"correct":22},"4；4",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":31,"analysis":33},1117194,"某网络计划中，已知工作M 的持续时间为6 天，总时差和自由时差分别为3 天和1 天；检查中发现该工作实际持续时间为9 天，则其对工程的影响是（）。",[358,360,362,364],{"key":20,"text":359,"correct":22},"既不影响总工期，也不影响其紧后工作的正常进行",{"key":24,"text":361,"correct":22},"使其紧后工作的最迟开始时间推迟3 天，并使总工期延长1 天",{"key":27,"text":363,"correct":22},"使其紧后工作的最早开始时间推迟1 天，并使总工期延长3 天",{"key":31,"text":365,"correct":29},"不影响总工期，但使其紧后工作的最早开始时间推迟2 天",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":24,"analysis":33},1117195,"某工程单目标双代号网络计划如下图所示，图中的错误是( )。",[370,372,374,376],{"key":20,"text":371,"correct":22},"有多个起点节点",{"key":24,"text":373,"correct":29},"有多个终点节点",{"key":27,"text":375,"correct":22},"有双向箭头联线",{"key":31,"text":377,"correct":22},"有循环回路",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":31,"analysis":33},1117196,"某网络计划中，工作F 有且仅有两项并行的紧后工作G 和 H，G 工作的最迟开始时间为第12 天，最早开始时间为第8 天，H 工作的最迟完成时间为第14 天，最早完成时间为第12 天，工作F 与 G、H 的时间间隔分别为4 天和5 天，则F 工作的总时差为（）天。",[382,384,386,388],{"key":20,"text":383,"correct":22},"4",{"key":24,"text":385,"correct":22},"5",{"key":27,"text":387,"correct":22},"8",{"key":31,"text":389,"correct":29},"7",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":31,"analysis":33},1117197,"双代号网络计划中的关键线路是指（ ）。",[394,396,398,400],{"key":20,"text":395,"correct":22},"总时差为零的线路",{"key":24,"text":397,"correct":22},"总的工作持续时间最短的线路",{"key":27,"text":399,"correct":22},"一经确定，不会发生转移的线路",{"key":31,"text":401,"correct":29},"自始至终全部由关键工作组成的线路",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":27,"analysis":33},1117198,"某工程的单代号网络计划如下图所示（时间单位：天），该计划的计算工期为（ ）天。",[406,408,410,412],{"key":20,"text":407,"correct":22},"9",{"key":24,"text":409,"correct":22},"11",{"key":27,"text":411,"correct":29},"12",{"key":31,"text":413,"correct":22},"15",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":27,"analysis":33},1117199,"单代号网络计划时间参数计算中，相邻两项工作之间的时间间隔（LAGi-j）（ ）。",[418,420,422,424],{"key":20,"text":419,"correct":22},"紧后工作最早开始时间和本工作最早开始时间之差",{"key":24,"text":421,"correct":22},"紧后工作最早完成时间和本工作最早开始时间之差",{"key":27,"text":423,"correct":29},"紧后工作最早开始时间和本工作最早完成时间之差",{"key":31,"text":425,"correct":22},"紧后工作最迟完成时间和本工作最早完成时间之差",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":24,"analysis":33},1117200,"某单代号网络计划如下图所示（时间单位：天），工作5 的最迟完成时间是（ ）。",[430,432,433,434],{"key":20,"text":431,"correct":22},"10",{"key":24,"text":407,"correct":29},{"key":27,"text":387,"correct":22},{"key":31,"text":389,"correct":22},{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":20,"analysis":33},1117201,"双代号网络计划如下图所示（时间单位：天），其计算工期是（ ）天。",[439,441,443,445],{"key":20,"text":440,"correct":29},"16",{"key":24,"text":442,"correct":22},"17",{"key":27,"text":444,"correct":22},"18",{"key":31,"text":446,"correct":22},"20",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":27,"analysis":33},1117202,"某双代号网络计划如下图所示（时间单位：天），其关键线路有（ ）条。",[451,452,453,454],{"key":20,"text":383,"correct":22},{"key":24,"text":341,"correct":22},{"key":27,"text":339,"correct":29},{"key":31,"text":337,"correct":22},{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":27,"analysis":33},1117203,"关于双代号网络图中终点节点和箭线关系的说法，正确的是（ ）。",[459,461,463,465],{"key":20,"text":460,"correct":22},"既有内向箭线，又有外向箭线",{"key":24,"text":462,"correct":22},"只有外向箭线，没有内向箭线",{"key":27,"text":464,"correct":29},"只有内向箭线，没有外向箭线",{"key":31,"text":466,"correct":22},"既无内向箭线，又无外向箭线",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":24,"analysis":33},1117204,"下列施工方进度控制的措施中，属于组织措施的是（ ）。",[471,473,475,477],{"key":20,"text":472,"correct":22},"优化工程施工方案",{"key":24,"text":474,"correct":29},"制定进度控制工作流程",{"key":27,"text":476,"correct":22},"应用BIM 信息模型",{"key":31,"text":478,"correct":22},"采用网络计划技术",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":27,"analysis":33},1117205,"下列建设工程施工方进度控制的措施中，属于技术措施的是（ ）",[483,485,487,489],{"key":20,"text":484,"correct":22},"重视信息技术在进度控制中的作用",{"key":24,"text":486,"correct":22},"采用网络计划方法编制进度计划",{"key":27,"text":488,"correct":29},"分析工程设计变更的必要性和可能性",{"key":31,"text":490,"correct":22},"编制与进度相适应的资源需求计划",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":24,"analysis":33},1117206,"施工质量特性主要体现在由施工形成的建筑产品的（ ）。",[495,497,499,501],{"key":20,"text":496,"correct":22},"适用性、先进性、耐久性、可靠性",{"key":24,"text":498,"correct":29},"适用性、安全性、耐久性、可靠性",{"key":27,"text":500,"correct":22},"安全性、耐久性、美观性、可靠性",{"key":31,"text":502,"correct":22},"适用性、安全性、美观性、耐久性",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":20,"analysis":33},1117207,"下列影响建设工程施工质量的因素中，作为施工质量控制基本出发点的因素是（ ）。",[507,509,511,513],{"key":20,"text":508,"correct":29},"人",{"key":24,"text":510,"correct":22},"机械",{"key":27,"text":512,"correct":22},"材料",{"key":31,"text":514,"correct":22},"环境",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":24,"analysis":33},1117208,"在影响施工质量的五大主要因素中，建设主管部门推广的高性能混凝土技术，属于（ ）的因素。",[519,520,522,523],{"key":20,"text":514,"correct":22},{"key":24,"text":521,"correct":29},"方法",{"key":27,"text":512,"correct":22},{"key":31,"text":510,"correct":22},{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":24,"analysis":33},1117209,"关于施工质量控制特点的说法，正确的是（ ）。",[528,530,532,534],{"key":20,"text":529,"correct":22},"需要控制的因素少，只有4M1E 五大方面",{"key":24,"text":531,"correct":29},"施工生产的流动性导致控制的难度大",{"key":27,"text":533,"correct":22},"生产受业主监督，因此过程控制要求低",{"key":31,"text":535,"correct":22},"工程竣工验收是对施工质量的全面检查",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":31,"analysis":33},1117210,"根据建筑工程质量终身责任制要求，施工单位项目经理对工程质量承担责任的时间期限是（ ）。",[540,542,544,546],{"key":20,"text":541,"correct":22},"建筑工程实际使用年限",{"key":24,"text":543,"correct":22},"建筑单位要求年限",{"key":27,"text":545,"correct":22},"缺陷责任期",{"key":31,"text":547,"correct":29},"建筑工程设计使用年限",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":24,"analysis":33},1117211,"根据GB\u002FT19000-2008 质量管理体系标准，质量管理就是确定和建立质量方针、质量目标及职责，并在质量管理体系中通过（ ）等手段来实施和实现全部质量管理职能的所有活动。",[552,554,556,558],{"key":20,"text":553,"correct":22},"质量规划、质量控制、质量检查和质量改进",{"key":24,"text":555,"correct":29},"质量策划、质量控制、质量保证和质量改进",{"key":27,"text":557,"correct":22},"质量策划、质量检查、质量监督和质量审核",{"key":31,"text":559,"correct":22},"质量规划、质量检查、质量审核和质量改进",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":24,"analysis":33},1117212,"影响施工质量的环境因素中，施工作业环境因素包括（ ）。",[564,566,568,570],{"key":20,"text":565,"correct":22},"地下障碍物的影响",{"key":24,"text":567,"correct":29},"施工现场交通运输条件",{"key":27,"text":569,"correct":22},"质量管理制度",{"key":31,"text":571,"correct":22},"施工工艺与工法",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":27,"analysis":33},1117213,"下列施工质量保证体系的内容中，属于工作保证体系的是（ ）。",[576,578,580,582],{"key":20,"text":577,"correct":22},"明确施工质量目标",{"key":24,"text":579,"correct":22},"梳理“质量第一”的观点",{"key":27,"text":581,"correct":29},"建立质量检查制度",{"key":31,"text":583,"correct":22},"建立质量管理组织",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":20,"analysis":33},1117214,"项目施工方编制施工质量计划的依据是项目质量目标和（ ）。",[588,590,592,594],{"key":20,"text":589,"correct":29},"施工企业的质量手册",{"key":24,"text":591,"correct":22},"施工质量成本计划",{"key":27,"text":593,"correct":22},"项目施工质量控制方法",{"key":31,"text":595,"correct":22},"项目施工质量记录",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":20,"analysis":33},1117215,"建设工程施工质量保证体系运行的主线是（ ）。",[600,602,604,606],{"key":20,"text":601,"correct":29},"质量计划",{"key":24,"text":603,"correct":22},"过程管理",{"key":27,"text":605,"correct":22},"PDCA 循环",{"key":31,"text":607,"correct":22},"质量手册",[609,612,615,618,621,624],{"id":15,"name":610,"category":7,"favorite":611},"领导干部任职前廉政法规知识测试题",92,{"id":613,"name":614,"category":7,"favorite":15},595,"建筑结构与设备",{"id":616,"name":617,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":619,"name":620,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":622,"name":623,"category":7,"favorite":8},534,"BIM工程师",{"id":625,"name":623,"category":7,"favorite":8},535]