[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-28":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":610},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,28,50,2973,[13,34,46,58,70,81,93,105,117,129,141,152,164,175,187,199,211,223,235,247,259,271,283,295,307,319,331,343,353,365,377,389,401,413,425,436,448,460,472,484,496,508,520,532,540,552,564,576,586,598],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1118427,1,"单选题","建设工程人工定额中的时间定额一般不包括()。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","准备与结束时间",false,{"key":24,"text":25,"correct":22},"B","基本工作时间",{"key":27,"text":28,"correct":22},"C","辅助工作时间",{"key":30,"text":31,"correct":32},"D","多余和偶然时间",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1118428,"预算定额只能用于计算( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"直接工程费",{"key":24,"text":41,"correct":22},"间接费",{"key":27,"text":43,"correct":32},"人工、材料、机械消耗量",{"key":30,"text":45,"correct":22},"建筑工程费",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1118429,"工程项目措施项目费计算中，对于室内空气污染测试，应采用的计价方法是()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"综合单价法",{"key":24,"text":53,"correct":22},"参数法",{"key":27,"text":55,"correct":32},"分包法",{"key":30,"text":57,"correct":22},"总包法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1118430,"某工程采用工程量清单计价招标，工程量清单中的挖土方量为3000m3，投标人根据工程实际情况及施工方案计算的挖土方量为5200m3，人工费为40000元，材料费为15000元，施工机械使用费为35000元，管理费以人材机合计为计算基数，费率取15%，利润以人材机和管理费合计为计算基数，费率取10%，则投标人填报的综合单价应为()元／m3",[62,64,66,68],{"key":20,"text":63,"correct":22},"21.89",{"key":24,"text":65,"correct":32},"37.95",{"key":27,"text":67,"correct":22},"35.5",{"key":30,"text":69,"correct":22},"38.95",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1118431,"根据《建设工程工程量清单计价规范》(GB50500-2013)，下列费用不属于投标人所填报的分部分项工程综合单价的是()。",[74,76,78,80],{"key":20,"text":75,"correct":32},"规费",{"key":24,"text":77,"correct":22},"利润",{"key":27,"text":79,"correct":22},"管理费",{"key":30,"text":39,"correct":22},{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":30,"analysis":33},1118432,"编制工程量清单时，若有总承包服务费，则应列在( )中。",[85,87,89,91],{"key":20,"text":86,"correct":22},"分部分项工程量清单",{"key":24,"text":88,"correct":22},"措施项目清单",{"key":27,"text":90,"correct":22},"其他项目清单的招标人部分",{"key":30,"text":92,"correct":32},"其他项目清单的投标人部分",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":30,"analysis":33},1118433,"根据现行《建筑安装工程费用项目组成》（建标[2013]44号），全费用综合单价的组成是()。",[97,99,101,103],{"key":20,"text":98,"correct":22},"人工费+材料费+机械费+规费+税金",{"key":24,"text":100,"correct":22},"分部分项工程费+措施项目费+其他项目费+规费+税金",{"key":27,"text":102,"correct":22},"分部分项工程费+措施项目费+其他项目费+利润+规费+税金",{"key":30,"text":104,"correct":32},"人工费+材料费+施工机具使用费+管理费+利润+规费+税金",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":20,"analysis":33},1118434,"暂列金额是指招标人在工程量清单中暂定并包括在合同价款中的一笔款项，已签约合同价中的暂列金额由（）掌握使用。",[109,111,113,115],{"key":20,"text":110,"correct":32},"发包人",{"key":24,"text":112,"correct":22},"承包人",{"key":27,"text":114,"correct":22},"监理工程师",{"key":30,"text":116,"correct":22},"承发包双方",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":24,"analysis":33},1118435,"某工程合同价为500万元，合同价的60%为可调部分。可调部分中，人工费占35%，材料费占55%，其余占10%。结算时，人工费价格指数增长了10%，材料费价格指数增长了20%，其余未发生变化，按调值公式法计算，该工程的结算工程价款为()。",[121,123,125,127],{"key":20,"text":122,"correct":22},"610．0万元",{"key":24,"text":124,"correct":32},"543.5万元",{"key":27,"text":126,"correct":22},"511.25万元",{"key":30,"text":128,"correct":22},"500.09万元",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":30,"analysis":33},1118436,"某基础工程包含土石方和混凝土两个子项工程，工程量清单中的土石方工程量为5000m3，混凝土工程量为2500m3，合同约定：土石方工程综合单价为80元\u002Fm3，混凝土工程综合单价为450元\u002Fm3；工程预付款额度为合同价的15%，则该工程预付款额度为()万元。",[133,135,137,139],{"key":20,"text":134,"correct":22},"17.1",{"key":24,"text":136,"correct":22},"17.55",{"key":27,"text":138,"correct":22},"20.25",{"key":30,"text":140,"correct":32},"22.875",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":27,"analysis":33},1118437,"某独立土方工程按现行工程量清单计价规范计价，招标文件中预计工程量为1万m3，合同中规定：土方工程单价为30元\u002Fm3，当实际工程量超过估计工程量10%时，超出部分价格调整为25元\u002Fm3。该工程完成后实际工程量为1.2万m3，则该土方工程的结算工程款为()万元。",[145,147,149,150],{"key":20,"text":146,"correct":22},"30",{"key":24,"text":148,"correct":22},"32.5",{"key":27,"text":67,"correct":32},{"key":30,"text":151,"correct":22},"36",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":27,"analysis":33},1118438,"某工程定额工期为400天，按相关规定，招标人在确定合同工期时，压缩的工期天数不得超过()，超过者，招标人应在招标文件中明示增加赶工的费用",[156,158,160,162],{"key":20,"text":157,"correct":22},"30天",{"key":24,"text":159,"correct":22},"45天",{"key":27,"text":161,"correct":32},"80天",{"key":30,"text":163,"correct":22},"90天",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":27,"analysis":33},1118439,"某工程项目在本年度的安全文明施工费总额为50万元，则发包人应在工程开工后28天内，预付给承包人的安全文明施工费应不低于()万元",[168,170,172,174],{"key":20,"text":169,"correct":22},"20",{"key":24,"text":171,"correct":22},"16",{"key":27,"text":173,"correct":32},"25",{"key":30,"text":146,"correct":22},{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":27,"analysis":33},1118440,"某工程项目由业主原因造成工程停工两天，施工企业的租赁设备由于停工造成的窝工费按（）计算。",[179,181,183,185],{"key":20,"text":180,"correct":22},"机械折旧费",{"key":24,"text":182,"correct":22},"机械折旧费+设备进出场的分摊费",{"key":27,"text":184,"correct":32},"设备租赁费",{"key":30,"text":186,"correct":22},"机械台班费",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":24,"analysis":33},1118441,"某工程由于设计变更，工程师签发了停工一个月的暂时停工令，承包商可索赔的费用是()。",[191,193,195,197],{"key":20,"text":192,"correct":22},"租赁机械折旧费",{"key":24,"text":194,"correct":32},"机械台班折旧费",{"key":27,"text":196,"correct":22},"自有机械台班费",{"key":30,"text":198,"correct":22},"承包商损失费",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":27,"analysis":33},1118442,"价格调整公式中的各可调因子、定值和变值权重，以及基本价格指数及其来源在()价格指数和权重表中约定。",[203,205,207,209],{"key":20,"text":204,"correct":22},"投标报价说明",{"key":24,"text":206,"correct":22},"合同专用条款",{"key":27,"text":208,"correct":32},"投标函附录",{"key":30,"text":210,"correct":22},"合同补充条款",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":30,"analysis":33},1118443,"下列由于不可抗力引起的损失中，由承包人承担的是()。",[215,217,219,221],{"key":20,"text":216,"correct":22},"运至施工场地用于施工的材料的损害",{"key":24,"text":218,"correct":22},"因工程损害导致第三方人员伤亡和财产损失",{"key":27,"text":220,"correct":22},"工程所需清理、修复的费用",{"key":30,"text":222,"correct":32},"承包人的施工机械设备损坏",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},1118444,"建立施工项目成本管理制、开展成本控制的基础是（）",[227,229,231,233],{"key":20,"text":228,"correct":22},"成本预测",{"key":24,"text":230,"correct":32},"成本计划",{"key":27,"text":232,"correct":22},"成本核算",{"key":30,"text":234,"correct":22},"成本考核",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":30,"analysis":33},1118445,"采用( )控制施工成本，应贯穿于整个合同周期。",[239,241,243,245],{"key":20,"text":240,"correct":22},"组织措施",{"key":24,"text":242,"correct":22},"技术措施",{"key":27,"text":244,"correct":22},"经济措施",{"key":30,"text":246,"correct":32},"合同措施",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":24,"analysis":33},1118446,"(2005真题)直接成本是指施工过程中耗费的构成工程实体或有助于工程实体形成的各项费用支出，其是可以直接计入工程对象的费用，包括人工费、材料费、( )和施工措施费等。",[251,253,255,257],{"key":20,"text":252,"correct":22},"施工机械安拆费",{"key":24,"text":254,"correct":32},"施工机具使用费",{"key":27,"text":256,"correct":22},"燃料动力费",{"key":30,"text":258,"correct":22},"施工机械场外运费",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":27,"analysis":33},1118447,"为了取得施工成本管理的理想效果，项目经理可采取的经济措施是()",[263,265,267,269],{"key":20,"text":264,"correct":22},"对不同的技术方案比选和进行技术经济分析",{"key":24,"text":266,"correct":22},"加强施工调度，避免窝工损失",{"key":27,"text":268,"correct":32},"对各种变更及时落实业主签证，及时结算工程款",{"key":30,"text":270,"correct":22},"研究合同条款，寻找索赔机会",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":20,"analysis":33},1118448,"下列合同实施偏差的调整措施中，属于组织措施的是()。",[275,277,279,281],{"key":20,"text":276,"correct":32},"增加人员投入",{"key":24,"text":278,"correct":22},"增加资金投入",{"key":27,"text":280,"correct":22},"变更技术方案",{"key":30,"text":282,"correct":22},"变更合同条款",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":27,"analysis":33},1118449,"某地下工程合同约定，计划1月份开挖土方80000立方米，2月份开挖160000立方米，合同单价均为85元\u002F立方米；计划3月份完成混凝土工程量500立方米，4月份完成450立方米，合同单价均为600元\u002F立方米。而至各月底，经确认的工程实际进展情况为，1月份实际开挖土方90000立方米，2月份开挖180000立方米，实际单价均为72元\u002F立方米；3月份和4月份实际完成的混凝土工程量均为400立方米，实际单价700元\u002F立方米。到2月底，该工程的以工作量表示的进度偏差(SV)为()万元。",[287,289,291,293],{"key":20,"text":288,"correct":22},"170",{"key":24,"text":290,"correct":22},"-170",{"key":27,"text":292,"correct":32},"255",{"key":30,"text":294,"correct":22},"-255",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":30,"analysis":33},1118450,"关于赢得值法中的进度偏差，表述不正确的是()。",[299,301,303,305],{"key":20,"text":300,"correct":22},"当进度偏差为负值时，表示进度延误",{"key":24,"text":302,"correct":22},"进度偏差=已完工作预算费用-计划工作预算费用",{"key":27,"text":304,"correct":22},"当进度偏差为正值时，表示进度提前",{"key":30,"text":306,"correct":32},"进度偏差=已完工作预算费用-已完工作实际费用",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":24,"analysis":33},1118451,"( )作为施工成本控制的依据之一，既包括预定的具体成本目标，又包括实现控制目标的措施和规划，是施工成本控制的指导文件。",[311,313,315,317],{"key":20,"text":312,"correct":22},"工程承包合同",{"key":24,"text":314,"correct":32},"施工成本计划",{"key":27,"text":316,"correct":22},"进度报告",{"key":30,"text":318,"correct":22},"施工组织设计",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":24,"analysis":33},1118452,"“时间一成本累积曲线”的特征是( )。",[323,325,327,329],{"key":20,"text":324,"correct":22},"每个工程只有一条“时间～成本累积曲线”",{"key":24,"text":326,"correct":32},"每一条“时间一成本累积曲线”都对应某一特定的工程进度计划",{"key":27,"text":328,"correct":22},"“时间一成本累积曲线”是按最早开始时间编制所形成的曲线",{"key":30,"text":330,"correct":22},"“时间成本累积曲线”必然包络在由关键工作都按最早开始时间开始和关键工作都按最迟必须开始时间开始的曲线所组成的“香蕉图”内",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":24,"analysis":33},1118453,"某工程主体结构混凝土工程量约3200m3，预算单价550元／m3，计划4个月内均衡完成。开工后，混凝土实际采购价格为560元／m3。施工至第二个月底，实际完成混凝土工程量1800m3。运用赢得值法，可分析得到该工程发生了费用偏差，此时应采取的可行的纠偏措施是()。",[335,337,339,341],{"key":20,"text":336,"correct":22},"加快施工进度",{"key":24,"text":338,"correct":32},"重新选择混凝土供应商",{"key":27,"text":340,"correct":22},"调整工程数量",{"key":30,"text":342,"correct":22},"进行材料代用",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":27,"analysis":33},1118454,"某地下工程施工合同约定，计划2月份开挖160000m3，合同单价均为85元\u002Fm3。到2月底，经确认实际开挖土方180000m3，实际单价为72元\u002Fm3，则该工程的以工作量表示的进度偏差（SV）为（）万元。",[347,349,351,352],{"key":20,"text":348,"correct":22},"234",{"key":24,"text":350,"correct":22},"-234",{"key":27,"text":288,"correct":32},{"key":30,"text":290,"correct":22},{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":20,"analysis":33},1118455,"在工程成本执行过程中，最理想的状态是（）",[357,359,361,363],{"key":20,"text":358,"correct":32},"已完工作实际费用、计划工作费用、已完工作预算费用三曲线靠的很近，平稳上升。",{"key":24,"text":360,"correct":22},"已完工作实际费用、计划工作费用靠的很近,已完工作预算费用靠的很远。",{"key":27,"text":362,"correct":22},"已完工作实际费用、已完工作预算费用靠的很近,计划工作费用靠的很远。",{"key":30,"text":364,"correct":22},"计划工作费用、已完工作预算费用三曲线靠的很近，已完工作实际费用靠的很远。",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":30,"analysis":33},1118456,"某土方工程，计划工程量为3000m3，预算单价为550元m3，实际完成工程量为2800m3，实际单价为580元\u002Fm3。若运用赢得值法分析，则该项目的成本控制效果是（）。",[369,371,373,375],{"key":20,"text":370,"correct":22},"费用偏差为8.4万元，项目运行节支",{"key":24,"text":372,"correct":22},"费用偏差为-8.4万元，项目运行节支",{"key":27,"text":374,"correct":22},"费用偏差为8.4万元，项目运行超出预算费用",{"key":30,"text":376,"correct":32},"费用偏差为-8.4万元，项目运行超出预算费用",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":30,"analysis":33},1118457,"建设工程项目施工准备阶段的施工预算成本计划,以项目实施方案为依据,采用()编制形式。",[381,383,385,387],{"key":20,"text":382,"correct":22},"人工定额",{"key":24,"text":384,"correct":22},"概算定额",{"key":27,"text":386,"correct":22},"预算定额",{"key":30,"text":388,"correct":32},"施工定额",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":24,"analysis":33},1118458,"某工程施工至2016年6月底，已完工程预算费用(BCWP)为600万元，已完工程实际费用(ACWP)为800万元，计划工程预算费用(BCWS)为700万元，则该工程此时的偏差情况是()。",[393,395,397,399],{"key":20,"text":394,"correct":22},"费用节约，进度提前",{"key":24,"text":396,"correct":32},"费用超支，进度拖后",{"key":27,"text":398,"correct":22},"费用节约，进度拖后",{"key":30,"text":400,"correct":22},"费用超支，进度提前",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":24,"analysis":33},1118459,"施工成本计划通常有三类指标,即（）。",[405,407,409,411],{"key":20,"text":406,"correct":22},"拟定工作预算成本指标,已完成工作预算成本指标和成本降低率指标",{"key":24,"text":408,"correct":32},"成本计划的数量指标、质量指标、效益指标",{"key":27,"text":410,"correct":22},"预算成本指标,计划成本指标和实际成本指标",{"key":30,"text":412,"correct":22},"人、财、物成本指标",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":24,"analysis":33},1118460,"施工成本核算中的“三同步”是指（）。",[417,419,421,423],{"key":20,"text":418,"correct":22},"计划成小、目标成本和实际成本同步",{"key":24,"text":420,"correct":32},"形象进度、产值统计、成本归集同步",{"key":27,"text":422,"correct":22},"形象进度、统计施工产值和实际成本归集均应是相同的数值",{"key":30,"text":424,"correct":22},"成本核算资料（成本信息）与目标成本、预算成本同步",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":24,"analysis":33},1118461,"某施工项目定额分部分项工程费为500万元，定额中可以计量的措施项目费为300万元，该施工项目的安全施工费费率为2％，计算基数为定额基价，则该施工项目的安全文明施工费为()万元。",[429,431,432,434],{"key":20,"text":430,"correct":22},"24",{"key":24,"text":171,"correct":32},{"key":27,"text":433,"correct":22},"8",{"key":30,"text":435,"correct":22},"6",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":24,"analysis":33},1118462,"某工程采用工程量清单计价招标，工程量清单中的挖方量为2800m3，投标人根据地质资料和施工方案计算的挖方量为5200m3，人工费为44000元，材料费为16000元，机械费为39000元，管理费以人、材、机费合计为计算基础，费率为17%，利润以人、材、机费与管理费合计为计算基础，费率为10%，则投标人填报的综合单价应为（）元\u002Fm3。",[440,442,444,446],{"key":20,"text":441,"correct":22},"24.5",{"key":24,"text":443,"correct":32},"45.5",{"key":27,"text":445,"correct":22},"24.2",{"key":30,"text":447,"correct":22},"44.9",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":20,"analysis":33},1118463,"根据现行合同价款的调整要求，承包人采购材料和工程设备的，应在合同中约定主要材料或工程设备价格变化的范围和幅度，如没有约定，则单价变化超过（）时，超过部分应做相应的调整。",[452,454,456,458],{"key":20,"text":453,"correct":32},"5%",{"key":24,"text":455,"correct":22},"10%",{"key":27,"text":457,"correct":22},"15%",{"key":30,"text":459,"correct":22},"20%",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":27,"analysis":33},1118464,"施工项目成本控制是企业全面成本管理的重要环节，应贯穿于施工项目()。",[464,466,468,470],{"key":20,"text":465,"correct":22},"从筹建到竣工的全过程",{"key":24,"text":467,"correct":22},"从招标到竣工的全过程",{"key":27,"text":469,"correct":32},"从投标到保证金返还的全过程",{"key":30,"text":471,"correct":22},"从开工到竣工的全过程",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":20,"analysis":33},1118465,"应用相关比率法进行施工成本分析、考察管理成果的好坏，所采用的对比指标具有的特点通常是()。",[476,478,480,482],{"key":20,"text":477,"correct":32},"性质不同但相关",{"key":24,"text":479,"correct":22},"性质不同又不相关",{"key":27,"text":481,"correct":22},"概念相关时期相同",{"key":30,"text":483,"correct":22},"概念相关时期不同",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":27,"analysis":33},1118466,"某工程施工期间，因承包人原因导致工期延误，且在延误期内国家相关政策发生变化，由此引起的合同价款调整，应该（）。",[488,490,492,494],{"key":20,"text":489,"correct":22},"调增的和调减的均予以调整",{"key":24,"text":491,"correct":22},"调增的和调减的均不予调整",{"key":27,"text":493,"correct":32},"调增的不予调整，调减的予以调整",{"key":30,"text":495,"correct":22},"调增的予以调整，调减的不予调整",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":20,"analysis":33},1118467,"下列可以直接计入工程对象的费用是()。",[500,502,504,506],{"key":20,"text":501,"correct":32},"支付给生产工人的工资",{"key":24,"text":503,"correct":22},"差旅交通费",{"key":27,"text":505,"correct":22},"支付给管理人员的工资",{"key":30,"text":507,"correct":22},"办公费",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":20,"analysis":33},1118468,"按建标[2003] 206号文件的规定，施工企业为职工缴纳的基本养老保险费属于 建筑安装工程的( )。",[512,514,516,518],{"key":20,"text":513,"correct":32},"社会保障费",{"key":24,"text":515,"correct":22},"人工费",{"key":27,"text":517,"correct":22},"企业管理费",{"key":30,"text":519,"correct":22},"现场管理费",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":24,"analysis":33},1118469,"下面关于企业定额的说法，错误的是（）。",[524,526,528,530],{"key":20,"text":525,"correct":22},"企业定额是施工企业根据本企业管理水平和技术装备水平编制的",{"key":24,"text":527,"correct":32},"企业定额是建设单位对建设项目施工管理的标准",{"key":27,"text":529,"correct":22},"企业定额是施工企业投标报价确定综合单价的依据之一",{"key":30,"text":531,"correct":22},"没有企业定额时，施工企业可根据企业自身情况参照消耗量定额进行调整",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":27,"analysis":33},1118470,"进行施工成本控制，工程实际完成量、成本实际支出等信息的获得，主要是通过()。",[536,537,538,539],{"key":20,"text":312,"correct":22},{"key":24,"text":314,"correct":22},{"key":27,"text":316,"correct":32},{"key":30,"text":318,"correct":22},{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":27,"analysis":33},1118471,"某建筑公司承担一大学新校区工程项目的施工任务，主要项目有图书馆、教学楼学生宿舍等。在进行工程项目竣工成本综合分析时，可作为成本核算对象的是()。",[544,546,548,550],{"key":20,"text":545,"correct":22},"新校区工程项目",{"key":24,"text":547,"correct":22},"单项工程，如图书馆、教学楼、学生宿舍",{"key":27,"text":549,"correct":32},"单位工程，如图书馆工程",{"key":30,"text":551,"correct":22},"分部工程，如图书馆打桩工程",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":24,"analysis":33},1118472,"某地下工程合同约定，计划1月份开挖土方80000立方米，2月份开挖160000立方米，合同单价均为85元\u002F立方米；计划3月份完成混凝土工程量500立方米，4月份完成450立方米，合同单价均为600元\u002F立方米。而至各月底，经确认的工程实际进展情况为，1月份实际开挖土方90000立方米，2月份开挖180000立方米，实际单价均为72元\u002F立方米；3月份和4月份实际完成的混凝土工程量均为400立方米，实际单价700元\u002F立方米。至3月底，该工程的费用绩效指数(CPI)为()。",[556,558,560,562],{"key":20,"text":557,"correct":22},"0.800",{"key":24,"text":559,"correct":32},"1.176",{"key":27,"text":561,"correct":22},"0.857",{"key":30,"text":563,"correct":22},"1.250",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":20,"analysis":33},1118473,"人工定额的编制，主要包括（ ）两项工作。",[568,570,572,574],{"key":20,"text":569,"correct":32},"拟定正常的施工条件以及拟定定额时间",{"key":24,"text":571,"correct":22},"拟定定额数量以及拟定产品质量",{"key":27,"text":573,"correct":22},"拟定施工的正常条件以及拟定定额数量",{"key":30,"text":575,"correct":22},"拟定施工的正常条件以及拟定产品质量",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":27,"analysis":33},1118474,"按照《建筑安装工程费用项目组成》（44号文）的费用构成要素划分，施工企业生产工人的劳动保护费应计入建筑安装工程的( )。",[580,581,583,584],{"key":20,"text":515,"correct":22},{"key":24,"text":582,"correct":22},"措施项目费",{"key":27,"text":517,"correct":32},{"key":30,"text":585,"correct":22},"社会保险费",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":30,"analysis":33},1118475,"斗容量1m3正铲挖土机，挖四类土，装车，深度在2m内，小组成员两人，机械台班产量为4．76(定额单位100m3)，则挖100m3的人工时间定额为( )工日。",[590,592,594,596],{"key":20,"text":591,"correct":22},"0.21",{"key":24,"text":593,"correct":22},"0.22",{"key":27,"text":595,"correct":22},"0.23",{"key":30,"text":597,"correct":32},"0.42",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":30,"analysis":33},1118476,"已知某斗容量1m3正铲挖土机，机械台班产量为476m3，机械利用系数为0.85，则它在正常工作条件下，1h纯工作时间内可以挖土约()m3。",[602,604,606,608],{"key":20,"text":603,"correct":22},"47",{"key":24,"text":605,"correct":22},"51",{"key":27,"text":607,"correct":22},"56",{"key":30,"text":609,"correct":32},"70",[611,614,617,620,623,626],{"id":15,"name":612,"category":7,"favorite":613},"领导干部任职前廉政法规知识测试题",92,{"id":615,"name":616,"category":7,"favorite":15},595,"建筑结构与设备",{"id":618,"name":619,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":621,"name":622,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":624,"name":625,"category":7,"favorite":8},534,"BIM工程师",{"id":627,"name":625,"category":7,"favorite":8},535]