[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-27":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":591},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,27,50,2973,[13,34,46,58,68,80,92,104,112,124,136,144,153,161,173,185,197,209,217,225,237,249,261,273,285,297,309,321,333,345,357,368,380,392,404,416,426,438,450,462,473,484,496,508,519,531,543,555,567,579],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1118376,1,"单选题","进行分部分项工程成本分析时，需分别计算实际偏差和目标偏差，其中实际偏差的获得是比较（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","实际成本与计划成本",false,{"key":24,"text":25,"correct":26},"B","实际成本与预算成本",true,{"key":28,"text":29,"correct":22},"C","实际成本与概算成本",{"key":31,"text":32,"correct":22},"D","实际成本与估算成本","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1118377,"将同类指标不同时期的数值进行对比，求出比率，以分析该项指标的发展方向和发展速度的成本分析方法是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"相关比率法",{"key":24,"text":41,"correct":22},"构成比率法",{"key":28,"text":43,"correct":22},"静态比率法",{"key":31,"text":45,"correct":26},"动态比率法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1118378,"进行综合成本的分析时，（）是施工项目成本分析的基础。",[50,52,54,56],{"key":20,"text":51,"correct":22},"月（季）度成本分析",{"key":24,"text":53,"correct":26},"分部分项工程成本分析",{"key":28,"text":55,"correct":22},"年度成本分析",{"key":31,"text":57,"correct":22},"单位工程竣工成本分析",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1118379,"分部分项工程成本的分析过程中，实际偏差的获得是比较()。",[62,64,66,67],{"key":20,"text":63,"correct":22},"实际成本与实际收入",{"key":24,"text":65,"correct":26},"实际成本与施工预算成本",{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":22},{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":20,"analysis":33},1118380,"应用相关比率法进行施工成本分析、考察管理成果的好坏，通常所采用的对比指标具有的特点是()。",[72,74,76,78],{"key":20,"text":73,"correct":26},"性质不同但相关",{"key":24,"text":75,"correct":22},"性质不同又不相关",{"key":28,"text":77,"correct":22},"概念相关时期相同",{"key":31,"text":79,"correct":22},"概念相关时期不同",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":28,"analysis":33},1118381,"业务核算是施工成本分析的依据之一，其特点是()。",[84,86,88,90],{"key":20,"text":85,"correct":22},"预测成本变化发展的趋势",{"key":24,"text":87,"correct":22},"主要价值核算",{"key":28,"text":89,"correct":26},"不但可以对发生的，而且还可以对尚未发生或正在发生的经济活动进行核算",{"key":31,"text":91,"correct":22},"记录企业的一切生产经营活动，提出一些有关资产、负债、所有者权益等要素指标",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":31,"analysis":33},1118382,"通过两个以上的指标的比例进行分析，观察其相互之间的关系，这是施工成本分析方法中的()",[96,98,100,102],{"key":20,"text":97,"correct":22},"比较法",{"key":24,"text":99,"correct":22},"因素分析法",{"key":28,"text":101,"correct":22},"差额计算法",{"key":31,"text":103,"correct":26},"比率法",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":28,"analysis":33},1118383,"某施工项目经理对商品混凝土的施工成本进行分析，发现其目标成本是44万元，实际成本是48万元，因此要分析产量、单价、损耗率等因素对混凝土成本的影响程度，最适宜采用的分析方法是（）。",[108,109,110,111],{"key":20,"text":97,"correct":22},{"key":24,"text":41,"correct":22},{"key":28,"text":99,"correct":26},{"key":31,"text":45,"correct":22},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":28,"analysis":33},1118384,"某分项工程的混凝土成本数据如下（产量的目标值为800立方，实际的目标责任为850立方；单价的目标值为600元，实际值为640元；损耗率的目标为4%，实际值为3%）。应用因素分析法分析各因素对成本的影响程度，则可得出由于产量提高增加的成本是（）万元。",[116,118,120,122],{"key":20,"text":117,"correct":22},"10880",{"key":24,"text":119,"correct":22},"35700",{"key":28,"text":121,"correct":26},"31200",{"key":31,"text":123,"correct":22},"56320",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":31,"analysis":33},1118385,"在对单位工程竣工成本进行分析时，不包括()。",[128,130,132,134],{"key":20,"text":129,"correct":22},"竣工成本分析",{"key":24,"text":131,"correct":22},"主要资源节超对比分析",{"key":28,"text":133,"correct":22},"主要技术措施及经济效果分析",{"key":31,"text":135,"correct":26},"月度成本分析",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":28,"analysis":33},1118386,"下列成本分析中，属于定期的、经常性的中间成本分析的是()。",[140,141,142,143],{"key":20,"text":53,"correct":22},{"key":24,"text":55,"correct":22},{"key":28,"text":51,"correct":26},{"key":31,"text":129,"correct":22},{"id":145,"libraryId":5,"type":15,"typeLabel":16,"stem":146,"options":147,"answer":28,"analysis":33},1118387,"下列比率法中，不属于施工成本分析中的比率法的是（）。",[148,149,150,152],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":22},{"key":28,"text":151,"correct":26},"指标比率法",{"key":31,"text":45,"correct":22},{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":20,"analysis":33},1118388,"施工成本分析的方法中，通过技术经济指标的对比，检查目标的完成情况，分析产生差异的原因，进而挖掘内部潜力的方法是()。",[157,158,159,160],{"key":20,"text":97,"correct":26},{"key":24,"text":99,"correct":22},{"key":28,"text":101,"correct":22},{"key":31,"text":103,"correct":22},{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":31,"analysis":33},1118389,"施工项目年度成本分析的重点是()。",[165,167,169,171],{"key":20,"text":166,"correct":22},"通过实际成本与目标成本的对比，分析目标成本落实情况",{"key":24,"text":168,"correct":22},"通过对技术组织措施执行效果的分析，寻求更加有效的节约途径",{"key":28,"text":170,"correct":22},"通过实际成本与计划成本的对比，分析成本降低水平",{"key":31,"text":172,"correct":26},"针对下一年度进展情况，规划切实可行的成本管理措施",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":20,"analysis":33},1118390,"有关分部分项工程成本分析的资料来源的说法正确的是（）。",[177,179,181,183],{"key":20,"text":178,"correct":26},"预算成本来自投标报价成本",{"key":24,"text":180,"correct":22},"实际成本来自施工预算",{"key":28,"text":182,"correct":22},"目标成本来自施工任务单的实际工程量、实耗人工和限额领料单的实耗材料",{"key":31,"text":184,"correct":22},"预算成本来自施工预算",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":24,"analysis":33},1118391,"(2013年真题)下列施工成本计划指标中，属于质量指标的是( )。",[189,191,193,195],{"key":20,"text":190,"correct":22},"单位工程成本计划额",{"key":24,"text":192,"correct":26},"设计预算成本计划降低率",{"key":28,"text":194,"correct":22},"设计预算成本计划降低额",{"key":31,"text":196,"correct":22},"材料计划成本额",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":28,"analysis":33},1118392,"下列关于成本分析的方法，叙述错误的是（）。",[201,203,205,207],{"key":20,"text":202,"correct":22},"因素分析法可用来分析各种因素对成本的影响程度",{"key":24,"text":204,"correct":22},"差额分析法是因素分析法的一种简化形式",{"key":28,"text":206,"correct":26},"构成比率法能够分析该项指标的发展方向和发展速度",{"key":31,"text":208,"correct":22},"分部分项工程成本分析法是施工项目成本分析的基础",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":20,"analysis":33},1118393,"下列施工成本计划指标中，属于质量指标的是（）。",[213,214,215,216],{"key":20,"text":192,"correct":26},{"key":24,"text":190,"correct":22},{"key":28,"text":194,"correct":22},{"key":31,"text":196,"correct":22},{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":24,"analysis":33},1118394,"在综合成本分析方法中，可作为施工项目成本分析基础的是()。",[221,222,223,224],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":26},{"key":28,"text":55,"correct":22},{"key":31,"text":57,"correct":22},{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":28,"analysis":33},1118395,"施工企业进行会计核算时的会计要素包括( )。",[229,231,233,235],{"key":20,"text":230,"correct":22},"负债、利息、税金",{"key":24,"text":232,"correct":22},"存货、折旧、成本",{"key":28,"text":234,"correct":26},"资产、负债、所有者权益",{"key":31,"text":236,"correct":22},"利息、所有者权益、成本税金",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":28,"analysis":33},1118396,"比较法是施工成本分析的基本方法之一，其常用的比较形式是( )。",[241,243,245,247],{"key":20,"text":242,"correct":22},"本期实际指标与上期目标指标对比",{"key":24,"text":244,"correct":22},"上期实际指标与本期目标指标对比",{"key":28,"text":246,"correct":26},"本期实际指标与上期实际指标对比",{"key":31,"text":248,"correct":22},"上期目标指标与本期目标指标对比",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":28,"analysis":33},1118397,"下列不属于因素分析法的计算步骤的是()。",[253,255,257,259],{"key":20,"text":254,"correct":22},"确定分析对象，并计算出实际与目标数的差异",{"key":24,"text":256,"correct":22},"确定该指标是由哪几个因素组成的，并按其相互关系进行排序",{"key":28,"text":258,"correct":26},"以目标数为基础，将各因素的目标数相加作为分析替代的基数",{"key":31,"text":260,"correct":22},"各个因素的影响程度之和，应与分析对象的总差异相等",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":28,"analysis":33},1118399,"施工期内因材料价格波动影响合同价格时，根据造价信息差额调整法，如果承包人投标报价中材料单价低于基准单价，下列做法正确的是()。",[265,267,269,271],{"key":20,"text":266,"correct":22},"材料单价跌幅以基准单价为基础超过合同约定的风险幅度值时，其超过部分按实调整",{"key":24,"text":268,"correct":22},"材料单价涨幅以投标报价为基础超过合同约定的风险幅度值时，其超过部分按实调整",{"key":28,"text":270,"correct":26},"合同履行期间材料单价跌幅以基准价格为基础超过5%时，其超过部分据实调整。",{"key":31,"text":272,"correct":22},"应按省级或行业建设主管部门或其授权的工程造价机构发布的材料成本文件调整",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":20,"analysis":33},1118400,"某工程每月所需混凝土量相同，混凝土用量为4000m3,计划5个月完成，混凝土综合价格为1000元\u002Fm3;实际混凝土用量为6000m3,用时6个月，从第1个月至第6个月各月混凝土价格指数（%）为100,115,110,105,115,120。则根据赢得值法，前4个月的费用偏差为（）万元。",[277,279,281,283],{"key":20,"text":278,"correct":26},"-30",{"key":24,"text":280,"correct":22},"-45",{"key":28,"text":282,"correct":22},"-22",{"key":31,"text":284,"correct":22},"-20",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},1118401,"分部分项工程成本分析“三算”对比分析，是指()的比较。",[289,291,293,295],{"key":20,"text":290,"correct":26},"预算成本、目标成本、实际成本",{"key":24,"text":292,"correct":22},"概算成本、预算成本、决算成本",{"key":28,"text":294,"correct":22},"月度成本、季度成本、年度成本",{"key":31,"text":296,"correct":22},"预算成本、计划成本、目标成本",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":31,"analysis":33},1118402,"目标成本是分部分项工程成本分析的关键，下列成本费用中，属于目标成本来源的是（）。",[301,303,305,307],{"key":20,"text":302,"correct":22},"实际消耗成本",{"key":24,"text":304,"correct":22},"工程概算",{"key":28,"text":306,"correct":22},"投标报价成本",{"key":31,"text":308,"correct":26},"施工预算",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":28,"analysis":33},1118403,"由于业主原因，造成工期延长。在工期延长期间的管理人员的工资、办公、通讯和交通费等应归为索赔费用中的（）。",[313,315,317,319],{"key":20,"text":314,"correct":22},"人工费",{"key":24,"text":316,"correct":22},"利润",{"key":28,"text":318,"correct":26},"管理费",{"key":31,"text":320,"correct":22},"间接费",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":28,"analysis":33},1118404,"下列税费项目中，不属于企业管理费的是（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":22},"差旅交通费",{"key":24,"text":328,"correct":22},"固定资产使用费",{"key":28,"text":330,"correct":26},"工程排污费",{"key":31,"text":332,"correct":22},"检验试验费",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":24,"analysis":33},1118405,"下列造成工程成本费用偏差的原因中，属于建设项目业主原因的是（）。",[337,339,341,343],{"key":20,"text":338,"correct":22},"法规变化、社会原因",{"key":24,"text":340,"correct":26},"组织不落实、建设手续不全",{"key":28,"text":342,"correct":22},"设计标准化、设计保守",{"key":31,"text":344,"correct":22},"人工、材料、设备涨价",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":31,"analysis":33},1118406,"下列说法不正确的是()",[349,351,353,355],{"key":20,"text":350,"correct":22},"按定额的表现形式不同，人工定额可分为两种",{"key":24,"text":352,"correct":22},"工人小组的定额时间是指适合施工机械作业的工人小组的工作时间总和",{"key":28,"text":354,"correct":22},"机械的正常利用系数，指的是机械在施工作业班内对作业时间的利用率",{"key":31,"text":356,"correct":26},"企业定额可分为时间定额和产量定额两种",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":20,"analysis":33},1118407,"下列属于施工成本计划数量指标的是()。",[361,363,365,367],{"key":20,"text":362,"correct":26},"按子项汇总的工程项目计划总成本指标",{"key":24,"text":364,"correct":22},"施工项目总成本降低率",{"key":28,"text":366,"correct":22},"工程项目成本降低额",{"key":31,"text":194,"correct":22},{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":24,"analysis":33},1118408,"某施工项目直接费为1200万元，其中直接工程费为800万元，措施费400万元，直接工程费中的人工费为300万元，该施工项目的安全施工费费率为2%，则该施工项目的安全施工费为（ ）万元。",[372,374,376,378],{"key":20,"text":373,"correct":22},"24",{"key":24,"text":375,"correct":26},"16",{"key":28,"text":377,"correct":22},"8",{"key":31,"text":379,"correct":22},"6",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":28,"analysis":33},1118409,"《建设工程工程量清单计价规范》规定，分部分项工程综合单价由( )组成。",[384,386,388,390],{"key":20,"text":385,"correct":22},"人工费、材料费、机械使用费",{"key":24,"text":387,"correct":22},"人工费、材料费、机械使用费、管理费",{"key":28,"text":389,"correct":26},"人工费、材料费、机械使用费、管理费和利润、一定范围内的风险费用",{"key":31,"text":391,"correct":22},"人工费、材料费、机械使用费、措施费、管理费、规费、利润和税金",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":20,"analysis":33},1118410,"根据竣工结算的计价原则，措施项目中的总价项目除（）外，其他应依据合同约定的项目和金额计算；如发生调整的，以发承包双方确认调整的金额计算。",[396,398,400,402],{"key":20,"text":397,"correct":26},"安全文明施工费",{"key":24,"text":399,"correct":22},"夜间施工费",{"key":28,"text":401,"correct":22},"二次搬运费",{"key":31,"text":403,"correct":22},"冬雨期施工费",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":28,"analysis":33},1118411,"某工程合同总价1000万元，合同基准日期为2006年3月。固定系数0.2，2006年8月完成的工程款占合同总价的10％。调值部分中钢材、水泥价格发生了变化，钢材占工程价款的50％，水泥占工程款的10％。2006年3月钢材、水泥价格指数均为100，7月、8月钢材的现行价格指数分别为110和115，水泥现行价格指数分别为105和110，则2006年8月经调值后的工程款为（）万元",[408,410,412,414],{"key":20,"text":409,"correct":22},"105.5",{"key":24,"text":411,"correct":22},"106",{"key":28,"text":413,"correct":26},"108.5",{"key":31,"text":415,"correct":22},"108",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":24,"analysis":33},1118412,"下列建筑安装工程费用中，按照《建筑安装工程费用项目组成》（44号文）的费用构成要素划分属于规费的是()。",[420,422,424,425],{"key":20,"text":421,"correct":22},"施工机械使用费",{"key":24,"text":423,"correct":26},"为职工缴纳的住房公积金",{"key":28,"text":397,"correct":22},{"key":31,"text":401,"correct":22},{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":20,"analysis":33},1118413,"根据《建筑安装工程费用项目组成》（44号文），建设工程在竣工验收前，对已完工程及设备进行保护所需的费用属于()。",[430,432,434,436],{"key":20,"text":431,"correct":26},"建筑安装工程措施项目费",{"key":24,"text":433,"correct":22},"建设企业管理费",{"key":28,"text":435,"correct":22},"建筑安装工程现场经费",{"key":31,"text":437,"correct":22},"建筑安装工程施工机械使用费",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":28,"analysis":33},1118414,"根据【2013】44号《建筑安装工程费用项目组成》，下列应计入建筑安装工程费中人工费的是()",[442,444,446,448],{"key":20,"text":443,"correct":22},"劳动保护费",{"key":24,"text":445,"correct":22},"上下班交通补贴",{"key":28,"text":447,"correct":26},"高空津贴",{"key":31,"text":449,"correct":22},"冬季取暖补贴",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":20,"analysis":33},1118415,"建设单位委托检测机构对施工企业提供的具有合格证明的材料进行检测，且检测结果合格时，此类检测发生的费用，在（）中列出。",[454,456,458,460],{"key":20,"text":455,"correct":26},"建设单位的工程建设其他费用",{"key":24,"text":457,"correct":22},"施工企业的工程建设其他费用",{"key":28,"text":459,"correct":22},"建设单位的企业管理费",{"key":31,"text":461,"correct":22},"施工企业的施工管理费",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},1118416,"根据现行《建筑安装工程费用项目组成》（建标[2013]44号），下列建筑安装工程费用中，属于措施项目费的是()。",[466,467,469,471],{"key":20,"text":332,"correct":22},{"key":24,"text":468,"correct":26},"工程定位复测费",{"key":28,"text":470,"correct":22},"地方教育附加",{"key":31,"text":472,"correct":22},"总承包服务费",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":24,"analysis":33},1118417,"根据《建筑安装工程费用项目组成》（建标【2013】44号），下列费用中，属于材料费的是（）。",[477,479,481,483],{"key":20,"text":478,"correct":22},"施工机械折旧费",{"key":24,"text":480,"correct":26},"运输损耗费",{"key":28,"text":482,"correct":22},"仪器仪表使用费",{"key":31,"text":328,"correct":22},{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":31,"analysis":33},1118418,"某建筑工程项目的分部分项工程费为180万元，其中人工费为45万元，可计量的措施项目费为65万元，安全文明施工费以定额基价为计算基础，费率为2.25%，则该项目的安全文明施工费为（ ）万元。",[488,490,492,494],{"key":20,"text":489,"correct":22},"1.46",{"key":24,"text":491,"correct":22},"2.48",{"key":28,"text":493,"correct":22},"4.05",{"key":31,"text":495,"correct":26},"5.51",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":20,"analysis":33},1118419,"某施工机械预算价格为120万元，折旧年限为10年，残值率为6%，年平均工作245个台班，则该机械台班折旧费为（ ）元。",[500,502,504,506],{"key":20,"text":501,"correct":26},"460",{"key":24,"text":503,"correct":22},"490",{"key":28,"text":505,"correct":22},"560",{"key":31,"text":507,"correct":22},"590",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":28,"analysis":33},1118420,"某施工企业按规定为职工购买防暑降温饮料的支出属于（ ）。",[512,514,516,517],{"key":20,"text":513,"correct":22},"人工费里的补贴",{"key":24,"text":515,"correct":22},"职工福利费",{"key":28,"text":443,"correct":26},{"key":31,"text":518,"correct":22},"企业管理费中的其他费用",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":31,"analysis":33},1118421,"某施工企业为某施工机械按国家规定缴纳的保险费及年检费属于（ ）。",[523,525,527,529],{"key":20,"text":524,"correct":22},"企业管理费",{"key":24,"text":526,"correct":22},"社会保险费",{"key":28,"text":528,"correct":22},"税金",{"key":31,"text":530,"correct":26},"施工机具使用费",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":31,"analysis":33},1118422,"斗容量为1m3的反铲挖土机,挖三类土,装车,深度在3m内,小组成员4人,机械台班产量为3.84(定额单位100m3),则挖100m3的人工时间定额为( )工日。",[535,537,539,541],{"key":20,"text":536,"correct":22},"3.84",{"key":24,"text":538,"correct":22},"0.78",{"key":28,"text":540,"correct":22},"0.26",{"key":31,"text":542,"correct":26},"1.04",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":28,"analysis":33},1118423,"按照定额项目综合程度从大到小排序，下列顺序中正确的是( )。",[547,549,551,553],{"key":20,"text":548,"correct":22},"施工定额、预算定额、概算定额",{"key":24,"text":550,"correct":22},"预算定额、概算定额、施工定额",{"key":28,"text":552,"correct":26},"概算定额、预算定额、施工定额",{"key":31,"text":554,"correct":22},"施工定额、概算定额、预算定额",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":20,"analysis":33},1118424,"砌筑1立方米标准砖墙，在确定标准砖的净用量时使用的方法是()。",[559,561,563,565],{"key":20,"text":560,"correct":26},"理论计算法",{"key":24,"text":562,"correct":22},"观察法",{"key":28,"text":564,"correct":22},"经验法",{"key":31,"text":566,"correct":22},"测定法",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":20,"analysis":33},1118425,"根据生产技术和施工组织条件，对施工过程中各工序采用测时法、写实记录法、工作日写实法，测出各工序的工时消耗等资料，再对所获得的资料进行科学的分析，制定出人工定额的方法是()。",[571,573,575,577],{"key":20,"text":572,"correct":26},"技术测定法",{"key":24,"text":574,"correct":22},"统计分析法",{"key":28,"text":576,"correct":22},"比较类推法",{"key":31,"text":578,"correct":22},"经验估计法",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":28,"analysis":33},1118426,"作为确定建设项目投资额的依据的是（）",[583,585,587,589],{"key":20,"text":584,"correct":22},"施工定额",{"key":24,"text":586,"correct":22},"预算定额",{"key":28,"text":588,"correct":26},"概算定额",{"key":31,"text":590,"correct":22},"投资估算指标",[592,595,598,601,604,607],{"id":15,"name":593,"category":7,"favorite":594},"领导干部任职前廉政法规知识测试题",92,{"id":596,"name":597,"category":7,"favorite":15},595,"建筑结构与设备",{"id":599,"name":600,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":602,"name":603,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":605,"name":606,"category":7,"favorite":8},534,"BIM工程师",{"id":608,"name":606,"category":7,"favorite":8},535]