[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":597},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,26,50,2973,[13,34,46,58,70,82,92,104,116,128,140,152,163,172,181,193,205,217,229,241,253,265,277,285,297,309,321,333,344,356,368,380,390,398,410,422,433,445,457,469,481,493,505,517,529,541,551,563,573,585],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1118326,1,"单选题","某工程按月编制的成本计划如下图，若6月、8月实际成本为1000万元和700万元，其余月份的实际成本与计划成本均相同。关于该工程施工成本的说法，正确的是()。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","第6月末计划成本累值为3100万元",false,{"key":24,"text":25,"correct":22},"B","第8月末计划成本累值为4500万元",{"key":27,"text":28,"correct":22},"C","第8月末计划成本累值为4600万元",{"key":30,"text":31,"correct":32},"D","第6月末计划成本累值为3000万元",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1118327,"费用偏差的原因分析中，属于业主原因的是()。",[38,40,42,44],{"key":20,"text":39,"correct":32},"组织不落实",{"key":24,"text":41,"correct":22},"施工方案不当",{"key":27,"text":43,"correct":22},"图纸提供不及时",{"key":30,"text":45,"correct":22},"材料代用",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},1118328,"绘制S形曲线这种编制成本计划的方法是()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"按施工成本组成编制",{"key":24,"text":53,"correct":22},"按子项目组成和按工程进度相结合编制",{"key":27,"text":55,"correct":22},"按工程进度编制",{"key":30,"text":57,"correct":32},"按施工成本组成和工程进度相结合编制",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1118329,"某建筑公司经过投标获得了某工程的施工任务，在签订了施工合同后，公司有关部门开始做施工前的准备工作，包括项目管理班子的组建和成本计划的编制等。则该阶段所编制的成本计划类型属于()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"竞争性成本计划",{"key":24,"text":65,"correct":32},"指导性成本计划",{"key":27,"text":67,"correct":22},"实施性成本计划",{"key":30,"text":69,"correct":22},"按成本分解的成本计划",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1118330,"某施工项目按人工费、材料费、施工机械使用费、措施费和间接费对施工成本计划进行了编制，这种编制方法属于()。",[74,76,78,80],{"key":20,"text":75,"correct":32},"按施工成本组成编制施工成本计划",{"key":24,"text":77,"correct":22},"按子项目组成编制施工成本计划",{"key":27,"text":79,"correct":22},"按工程进度编制施工成本计划",{"key":30,"text":81,"correct":22},"以上三种方法的综合运用",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1118331,"将项目总施工成本分解到单项工程和单位工程中，再进一步分解为分部工程和分项工程，该种施工成本计划的编制方式属于()。",[86,87,89,90],{"key":20,"text":51,"correct":22},{"key":24,"text":88,"correct":32},"按项目组成编制",{"key":27,"text":55,"correct":22},{"key":30,"text":91,"correct":22},"按合同结构编制",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":20,"analysis":33},1118332,"施工成本计划作为成本控制的依据，需要包括的内容之一是()。",[96,98,100,102],{"key":20,"text":97,"correct":32},"实现控制目标的措施",{"key":24,"text":99,"correct":22},"预算收入目标",{"key":27,"text":101,"correct":22},"成本支付的情况",{"key":30,"text":103,"correct":22},"工程变更目标",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":30,"analysis":33},1118333,"关于应用曲线法进行施工进度偏差分析的说法，正确的是（）。",[108,110,112,114],{"key":20,"text":109,"correct":22},"计划工作预算费用曲线-已完工作实际费用曲线间的两项参数之差表示费用偏差",{"key":24,"text":111,"correct":22},"计划工作预算费用曲线-已完工作预算费用曲线间的两项参数之差表示费用偏差",{"key":27,"text":113,"correct":22},"已完工作实际费用曲线-已完工作预算费用曲线间的两项参数之差表示进度偏差",{"key":30,"text":115,"correct":32},"已完工作预算费用曲线-计划工作预算费用曲线间的两项参数之差表示进度偏差",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":30,"analysis":33},1118334,"某工程主体结构混凝土工程量约为3200立方米，预算单价为500元每立方米，计划四个月内均衡完成，实际采购价560元每立方，施工至第二个月底，实际完成混凝土工程量为1800立方米，运用赢得值法，可分析的该工程进度偏差SV为()万元",[120,122,124,126],{"key":20,"text":121,"correct":22},"-1.8",{"key":24,"text":123,"correct":22},"1.8",{"key":27,"text":125,"correct":22},"-10",{"key":30,"text":127,"correct":32},"10",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":30,"analysis":33},1118335,"已知某工程的计划工作预算费用为5000万元，已完工作预算费用为6000万元，已完工作实际费用为5800万元，则此工程的进度绩效指数为()。",[132,134,136,138],{"key":20,"text":133,"correct":22},"0.7",{"key":24,"text":135,"correct":22},"0.9",{"key":27,"text":137,"correct":22},"1.02",{"key":30,"text":139,"correct":32},"1.2",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":24,"analysis":33},1118336,"按照成本构成，可以将施工成本分解为( )。",[144,146,148,150],{"key":20,"text":145,"correct":22},"人工费、材料费、施工机械使用费、现场管理费",{"key":24,"text":147,"correct":32},"人工费、材料费、施工机械使用费、企业管理费",{"key":27,"text":149,"correct":22},"人工费、材料费、措施费、施工机械使用费",{"key":30,"text":151,"correct":22},"人工费、材料费、现场管理费、措施费",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":30,"analysis":33},1118337,"费用偏差原因分析中，属于物价上涨的是()。",[156,157,159,161],{"key":20,"text":43,"correct":22},{"key":24,"text":158,"correct":22},"基础处理",{"key":27,"text":160,"correct":22},"工期拖延",{"key":30,"text":162,"correct":32},"利率、汇率变化",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":30,"analysis":33},1118338,"下列各项不属于施工成本计划的分类的是（）。",[167,168,169,170],{"key":20,"text":63,"correct":22},{"key":24,"text":65,"correct":22},{"key":27,"text":67,"correct":22},{"key":30,"text":171,"correct":32},"目标性成本计划",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":24,"analysis":33},1118339,"某工程企业经过投标获得了某工程的施工任务，合同签订后，公司有关部门开始选派项目经理并编制成本计划。该阶段所编制的成本计划属于（）",[176,177,178,179],{"key":20,"text":63,"correct":22},{"key":24,"text":65,"correct":32},{"key":27,"text":67,"correct":22},{"key":30,"text":180,"correct":22},"战略性成本计划",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":27,"analysis":33},1118340,"某工程项目实施过程中，已完工作预算费用曲线（BCWP）与已完工作实际费用曲线（ACWP）靠的很近，而与计划工作预算费用曲线（BCWS）离开很远，则表示该工程项目在（）。",[185,187,189,191],{"key":20,"text":186,"correct":22},"费用与进度上均是按预定计划目标进行的",{"key":24,"text":188,"correct":22},"费用与进度上均没有按预定计划目标进行的",{"key":27,"text":190,"correct":32},"费用上是按预定计划目标进行的",{"key":30,"text":192,"correct":22},"进度上是按预定计划目标进行的",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":20,"analysis":33},1118341,"按照项目组成编制施工成本计划，宜将项目按( )的顺序依次进行分解后，再具体地分配成本，编制成本支出计划。",[197,199,201,203],{"key":20,"text":198,"correct":32},"单项工程—单位工程—分部工程—分项工程",{"key":24,"text":200,"correct":22},"单项工程—分部工程—单位工程—分项工程",{"key":27,"text":202,"correct":22},"单位工程—单项工程—分部工程—分项工程",{"key":30,"text":204,"correct":22},"单位工程—单项工程—分项工程—分部工程",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":20,"analysis":33},1118342,"施工企业准备现场材料、签发任务书、进行经济核算的依据是()。",[209,211,213,215],{"key":20,"text":210,"correct":32},"施工预算",{"key":24,"text":212,"correct":22},"施工图预算",{"key":27,"text":214,"correct":22},"投标报价",{"key":30,"text":216,"correct":22},"生产成本",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":24,"analysis":33},1118343,"关于按施工项目组成编制施工成本计划的说法，正确的是()。",[221,223,225,227],{"key":20,"text":222,"correct":22},"按成本构成分解为人工费、材料费、施工机具使用费和企业管理费等，在此基础上编制施工成本计划",{"key":24,"text":224,"correct":32},"按单项工程、单位工程、分部分项工程分解项目，在此基础上具体分配成本，编制成本支出计划，从而形成详细的成本计划表",{"key":27,"text":226,"correct":22},"对施工成本目标按时间进行分解，在网络计划基础上进一步编制成本计划",{"key":30,"text":228,"correct":22},"按单项工程、单位工程等进行项目分解并结合项目进度计划的横道图进一步编制成本计划",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":20,"analysis":33},1118344,"施工成本计划作为施工成本控制的指导文件,其内容包括()。",[233,235,237,239],{"key":20,"text":234,"correct":32},"预定的具体成本目标和实现控制目标的措施",{"key":24,"text":236,"correct":22},"预定的具体成本目标和有可能出现的成本偏差",{"key":27,"text":238,"correct":22},"预定的经济效益目标和实现经济效益目标的手段",{"key":30,"text":240,"correct":22},"可能的工程变更和对变更的控制措施",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":24,"analysis":33},1118345,"某地下工程施工合同约定，第一个月计划完成开挖土方70000m3，计划单价为80元／m3，经确认第一个月实际完成开挖土方80000m3，实际单价为72元／m3，则该工程的费用偏差和费用绩效指数分别为()",[245,247,249,251],{"key":20,"text":246,"correct":22},"56万元，1.13",{"key":24,"text":248,"correct":32},"64万元，1.11",{"key":27,"text":250,"correct":22},"-56万元，0.9",{"key":30,"text":252,"correct":22},"-64万元，0.9",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":20,"analysis":33},1118346,"下列有关施工预算和施工图预算的说法，正确的是()。",[257,259,261,263],{"key":20,"text":258,"correct":32},"施工预算的编制以施工定额为主要依据",{"key":24,"text":260,"correct":22},"施工预算是投标报价的主要依据",{"key":27,"text":262,"correct":22},"施工图预算是施工企业内部管理用的一种文件",{"key":30,"text":264,"correct":22},"施工图预算是施工企业签发作者务单，进行经济核算的依据",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":20,"analysis":33},1118347,"某地下工程施工合同约定，计划1月份开挖土方80000m3，合同单价均为85元\u002Fm3。至1月底，经确定实际开挖土方90000m3，实际单价为72元\u002Fm3，则该工程的费用偏差（CV）为（）万元。",[269,271,273,275],{"key":20,"text":270,"correct":32},"117",{"key":24,"text":272,"correct":22},"-117",{"key":27,"text":274,"correct":22},"85",{"key":30,"text":276,"correct":22},"-85",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":20,"analysis":33},1118348,"建设工程项目招标投标及签订合同阶段，应编制()",[281,282,283,284],{"key":20,"text":63,"correct":32},{"key":24,"text":65,"correct":22},{"key":27,"text":67,"correct":22},{"key":30,"text":180,"correct":22},{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":27,"analysis":33},1118349,"某建筑工程施工至某月月末，出现了工程的费用偏差小于0、进度偏差大于0的状况，则该工程的已完工作实际费用(ACWP)、计划工作预算费用(BCWS)和已完工作预算费用(BCWP)的关系可表示为()。",[289,291,293,295],{"key":20,"text":290,"correct":22},"BCWP＞ACWP＞BCWS",{"key":24,"text":292,"correct":22},"BCWS＞BCWP＞ACWP",{"key":27,"text":294,"correct":32},"ACWP＞BCWP＞BCWS",{"key":30,"text":296,"correct":22},"BCWS＞ACWP＞BCWP",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":20,"analysis":33},1118350,"某分项工程计划工程量3000m3，计划成本15元\u002Fm3，实际完成工程量2500m3，实际成本20元\u002Fm3，则该分项工程的施工进度偏差为()。",[301,303,305,307],{"key":20,"text":302,"correct":32},"拖后7500元",{"key":24,"text":304,"correct":22},"提前7500元",{"key":27,"text":306,"correct":22},"拖后12500元",{"key":30,"text":308,"correct":22},"提前12500元",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":20,"analysis":33},1118351,"施工成本控制的指导文件是()。",[313,315,317,319],{"key":20,"text":314,"correct":32},"施工成本计划",{"key":24,"text":316,"correct":22},"工程进度报告",{"key":27,"text":318,"correct":22},"工程承包合同",{"key":30,"text":320,"correct":22},"工程变更报告",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":30,"analysis":33},1118352,"关于竞争性成本计划、指导性成本计划和实施性成本计划三者区别的说法,正确的是()。",[325,327,329,331],{"key":20,"text":326,"correct":22},"指导性成本计划是项目施工准备阶段的施工预算成本计划,比较详细",{"key":24,"text":328,"correct":22},"实施性成本计划是选派项目经理阶段的预算成本计划",{"key":27,"text":330,"correct":22},"指导性成本计划是以项目实施方案为依据编制的",{"key":30,"text":332,"correct":32},"竞争性成本计划是项目投标和签订合同阶段的估算成本计划,比较粗略",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":30,"analysis":33},1118353,"施工成本控制的依据中，()提供了每一时刻工程实际完成量，工程施工成本实际支付情况等重要信息。",[337,338,340,342],{"key":20,"text":314,"correct":22},{"key":24,"text":339,"correct":22},"工程变更文件",{"key":27,"text":341,"correct":22},"施工组织设计",{"key":30,"text":343,"correct":32},"进度报告",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":27,"analysis":33},1118354,"某工程施工至某月底，经偏差分析得到费用偏差(CV)＜0，进度偏差(SV)＜0，则表明()。",[348,350,352,354],{"key":20,"text":349,"correct":22},"已完工程实际费用节约",{"key":24,"text":351,"correct":22},"已完工程实际进度超前",{"key":27,"text":353,"correct":32},"已完工程实际费用＞已完工作预算费用",{"key":30,"text":355,"correct":22},"计划工作预算费用＞已完工作实际费用",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":27,"analysis":33},1118355,"某地下工程合同约定，计划1月份开挖土方60000m3，2月份开挖140000m3，合同单价均为85元\u002Fm3；计划3月份完成混凝土工程量500m3，4月份完成450m3，合同单价均为600元\u002Fm3。而至月底，经确认的工程实际进展情况为，1月份实际开挖土方70000m3，2月份开挖160000m3，实际单价均为72元\u002Fm3；3月份和4月份实际完成的混凝士工程量均为400m3，实际单价700元\u002Fm3。到4月底，该工程的进度绩效指数(SPI)为()。",[360,362,364,366],{"key":20,"text":361,"correct":22},"0.926",{"key":24,"text":363,"correct":22},"1.086",{"key":27,"text":365,"correct":32},"1.140",{"key":30,"text":367,"correct":22},"1.175",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":27,"analysis":33},1118356,"按项目组成编制施工成本计划，首先要把项目总施工成本分解到( )中。",[372,374,376,378],{"key":20,"text":373,"correct":22},"单体工程和单项工程",{"key":24,"text":375,"correct":22},"分部工程和分项工程",{"key":27,"text":377,"correct":32},"单项工程和单位工程",{"key":30,"text":379,"correct":22},"单项工程和分部分项工程",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":20,"analysis":33},1118357,"下列费用偏差原因，属于由于业主原因的是（）。",[384,386,388,389],{"key":20,"text":385,"correct":32},"协调不佳",{"key":24,"text":387,"correct":22},"人工涨价",{"key":27,"text":43,"correct":22},{"key":30,"text":45,"correct":22},{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":27,"analysis":33},1118358,"下列施工成本控制依据中，能提供工程实际完成量及工程款实际支付情况的是（）。",[394,395,396,397],{"key":20,"text":318,"correct":22},{"key":24,"text":314,"correct":22},{"key":27,"text":343,"correct":32},{"key":30,"text":339,"correct":22},{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":24,"analysis":33},1118359,"某地下工程施工合同约定，计划4月份完成混凝土工程量450立方米，合同单价均为600元\u002F立方米。该工程4月份实际完成的混凝土工程量为400立方米，实际单价700元\u002F立方米。至4月底，该工程的进度绩效指数(SPI)为()。",[402,404,406,408],{"key":20,"text":403,"correct":22},"0.857",{"key":24,"text":405,"correct":32},"0.889",{"key":27,"text":407,"correct":22},"1.125",{"key":30,"text":409,"correct":22},"1.167",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":30,"analysis":33},1118360,"某土方工程，月计划工程量2800立方米，预算单价25元\u002F立方米，到月末时已完工程量3000立方米，实际单价26元\u002F立方米，对该项工作采用赢得值法进行偏差分析的说法，正确的是（）。",[414,416,418,420],{"key":20,"text":415,"correct":22},"已完成工作实际费用为75000元",{"key":24,"text":417,"correct":22},"费用绩效指数＞1,表明项目运行超出预算费用",{"key":27,"text":419,"correct":22},"进度绩效指数＜1,表明实际进度比计划进度拖后",{"key":30,"text":421,"correct":32},"费用偏差为-3000元,表明项目运行超出预算费用",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":30,"analysis":33},1118361,"某土方工程月计划工程量2800m3，预算单价25元\u002Fm3，到月末时已完工程量3000m3，实际单价26元\u002Fm3。对该工程采用赢得值法进行偏差分析的下列说法，正确的是（）。",[426,428,429,431],{"key":20,"text":427,"correct":22},"已完工程实际费用为75000元",{"key":24,"text":417,"correct":22},{"key":27,"text":430,"correct":22},"进度绩效指数＜1，表明实际进度比计划加快",{"key":30,"text":432,"correct":32},"费用偏差为-3000元，表明项目运行超出预算费用",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":20,"analysis":33},1118362,"关于赢得值法中的费用绩效指数，表述不正确的是()。",[437,439,441,443],{"key":20,"text":438,"correct":32},"费用绩效指数=已完工作预算费用／计划工作预算费用",{"key":24,"text":440,"correct":22},"当费用绩效指数CPI>I时，表示节支，即实际费用低于预算费用",{"key":27,"text":442,"correct":22},"当费用绩效指数CPI＜I时，表示超支，即实际费用高于预算费用",{"key":30,"text":444,"correct":22},"费用绩效指数=已完工作预算费用／已完工作实际费用",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":20,"analysis":33},1118363,"施工形象进度、产值统计、实际成本归集的三者之间的()是一致的。",[449,451,453,455],{"key":20,"text":450,"correct":32},"取值范围",{"key":24,"text":452,"correct":22},"施工成本",{"key":27,"text":454,"correct":22},"工程量",{"key":30,"text":456,"correct":22},"措施项目费",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":20,"analysis":33},1118364,"关于综合成本的分析方法，下列说法正确的是()",[461,463,465,467],{"key":20,"text":462,"correct":32},"分部分项工程成本分析施工成本项目成本分析的基础",{"key":24,"text":464,"correct":22},"需要对每一个分部分项工程进行成本分析",{"key":27,"text":466,"correct":22},"企业成本要求一年结算一次，可以将成本转入下一年度",{"key":30,"text":468,"correct":22},"分部分项工程进行计划成本、目标成本和实际成本的“三算”对比",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":20,"analysis":33},1118365,"建设项目分部分项工程成本分析中预算成本和目标成本分别来自()。",[473,475,477,479],{"key":20,"text":474,"correct":32},"投标报价成本和施工预算",{"key":24,"text":476,"correct":22},"投标报价成本和施工图预算",{"key":27,"text":478,"correct":22},"招标控制价成本和施工预算",{"key":30,"text":480,"correct":22},"招标控制价成本和投标报价成本",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":24,"analysis":33},1118366,"会计核算的主要内容是()。",[485,487,489,491],{"key":20,"text":486,"correct":22},"统计核算",{"key":24,"text":488,"correct":32},"价值核算",{"key":27,"text":490,"correct":22},"工期核算",{"key":30,"text":492,"correct":22},"业务核算",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":30,"analysis":33},1118367,"以下不属于比较法所具有的特点是()。",[497,499,501,503],{"key":20,"text":498,"correct":22},"通俗易懂",{"key":24,"text":500,"correct":22},"便于掌握",{"key":27,"text":502,"correct":22},"简单易行",{"key":30,"text":504,"correct":32},"适应范围广",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":30,"analysis":33},1118368,"施工成本分析中，通过()对比，可以看出各项技术经济指标的变动情况，反映施工管理水平的提高程度。",[509,511,513,515],{"key":20,"text":510,"correct":22},"与本行业最低水平",{"key":24,"text":512,"correct":22},"实际指标与目标指标",{"key":27,"text":514,"correct":22},"与本行业平均水平、先进水平",{"key":30,"text":516,"correct":32},"本期实际指标与上期实际指标",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":24,"analysis":33},1118369,"有关业务核算的表述，不正确的是()。",[521,523,525,527],{"key":20,"text":522,"correct":22},"业务核算的目的是在于迅速取得资料，在经济活动中及时采取措施进行调整",{"key":24,"text":524,"correct":32},"业务核算的范围比会计、统计核算要窄",{"key":27,"text":526,"correct":22},"业务核算既可以对已经发生的，又可以对尚未发生或正在发生的经济活动进行核算",{"key":30,"text":528,"correct":22},"业务核算是各业务部门根据业务工作的需要而建立的核算制度",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":24,"analysis":33},1118370,"施工成本核算中的“三同步”是指()。",[533,535,537,539],{"key":20,"text":534,"correct":22},"计划成本、目标成本和实际成本同步",{"key":24,"text":536,"correct":32},"形象进度、产值统计、实际归集成本",{"key":27,"text":538,"correct":22},"成本核算资料（成本信息）与目标成本、预算成本同步",{"key":30,"text":540,"correct":22},"形象进度、统计施工产值和实际成本归集均应是相同的数值",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":30,"analysis":33},1118371,"施工成本分析的依据中，对经济活动进行核算范围最广的是()。",[545,547,549,550],{"key":20,"text":546,"correct":22},"会计核算",{"key":24,"text":548,"correct":22},"成本核算",{"key":27,"text":486,"correct":22},{"key":30,"text":492,"correct":32},{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":27,"analysis":33},1118372,"某工程商品混凝土的目标产量为500立方米，单价720元／立方米，损耗率4%。实际产量为550立方米，单价730元立方米，损耗率3%。采用因素分析法进行分析，由于单价提高使费用增加了()元。",[555,557,559,561],{"key":20,"text":556,"correct":22},"43160",{"key":24,"text":558,"correct":22},"37440",{"key":27,"text":560,"correct":32},"5720",{"key":30,"text":562,"correct":22},"1705",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":27,"analysis":33},1118373,"施工过程中，在分部分项工程成本分析时，目标成本应来自()。",[567,569,570,571],{"key":20,"text":568,"correct":22},"概算成本",{"key":24,"text":214,"correct":22},{"key":27,"text":210,"correct":32},{"key":30,"text":572,"correct":22},"实际成本",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":30,"analysis":33},1118374,"可以全面了解单位工程成本构成和降低成本来源的施工成本分析方法是()。",[577,579,581,583],{"key":20,"text":578,"correct":22},"分部分项工程成本分析",{"key":24,"text":580,"correct":22},"月（季）度成本分析",{"key":27,"text":582,"correct":22},"年度成本分析",{"key":30,"text":584,"correct":32},"竣工成本综合分析",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":27,"analysis":33},1118375,"关于施工综合成本分析方法中的分部分项工程成本分析的产法，正确的是（）",[589,591,593,595],{"key":20,"text":590,"correct":22},"分部分项工程成本分析的对象为未完分部分项工程",{"key":24,"text":592,"correct":22},"分部分项工程成本分析的方法是进行“两算”对比",{"key":27,"text":594,"correct":32},"分部分项工程成本分析是施工项目成本分析的基础",{"key":30,"text":596,"correct":22},"分部分项工程成本分析必须是对每一个分部分项工程都进行成本分析",[598,601,604,607,610,613],{"id":15,"name":599,"category":7,"favorite":600},"领导干部任职前廉政法规知识测试题",92,{"id":602,"name":603,"category":7,"favorite":15},595,"建筑结构与设备",{"id":605,"name":606,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":608,"name":609,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":611,"name":612,"category":7,"favorite":8},534,"BIM工程师",{"id":614,"name":612,"category":7,"favorite":8},535]