[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-25":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":589},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,25,50,2973,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,199,207,219,231,243,255,267,275,287,299,311,323,332,342,354,366,378,390,402,414,426,435,444,456,468,480,488,500,512,521,533,545,557,569,577],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1118275,1,"单选题","某项目编制施工成本计划时，先将成本按分部分项工程进行了划分，又将各分部分项工程成本按人工费、材料费和施工机械使用费等分开编制，这种编制方法属于()。 A.按施工成本组成编制施工成本计划",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","按项目组成编制施工成本计划",false,{"key":24,"text":25,"correct":22},"B","按工程进度编制施工成本计划",{"key":27,"text":28,"correct":22},"C","上述",{"key":30,"text":31,"correct":32},"D","B两种方法的综合运用",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1118276,"作为施工成本控制的重要依据，工程实际完成量和成本实际支出等信息主要是从（）中获取的。",[38,40,42,44],{"key":20,"text":39,"correct":22},"业务核算报告",{"key":24,"text":41,"correct":22},"施工组织设计",{"key":27,"text":43,"correct":32},"工程进度报告",{"key":30,"text":45,"correct":22},"工程变更报告",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1118277,"项目施工准备所需的施工预算成本计划是指（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"竞争性成本管理",{"key":24,"text":53,"correct":22},"指导性成本管理",{"key":27,"text":55,"correct":32},"实施性成本管理",{"key":30,"text":57,"correct":22},"战略性成本管理",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},1118278,"以下关于费用绩效的说法，正确的是()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"当费用绩效指数SPI小于1时，表示进度延误，即实际进度比计划进度拖后",{"key":24,"text":65,"correct":22},"当费用绩效指数SPE大于1时，表示进度提前，即实际进度比计划进度快",{"key":27,"text":67,"correct":22},"当费用绩效指数CPI小于1时，表示进度提前，即实际进度比计划进度快",{"key":30,"text":69,"correct":32},"当费用绩效指数CPI大于1时，表示节支，即实际费用低于预算费用",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":30,"analysis":33},1118279,"施工预算的作用是()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"施工招标的主要依据",{"key":24,"text":77,"correct":22},"建设单位投资控制的主要依据",{"key":27,"text":79,"correct":22},"建设单位与施工单位结算的依据",{"key":30,"text":81,"correct":32},"施工企业组织生产、进行经济核算的依据",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1118280,"赢得值法评价指标之一的费用偏差反映的是()。",[86,88,90,92],{"key":20,"text":87,"correct":22},"统计偏差",{"key":24,"text":89,"correct":22},"平均偏差",{"key":27,"text":91,"correct":32},"绝对偏差",{"key":30,"text":93,"correct":22},"相对偏差",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1118281,"某打桩工程合同约定，第一个月计划完成工程桩120根，单价为1.2万元／根。至第一个月底，经确认的承包商实际完成的工程桩为110根，实际单价为1.3万元／根。则在第一个月度内，该打桩工程的计划工作预算费用(BCWS)为()万元。",[98,100,102,104],{"key":20,"text":99,"correct":22},"132",{"key":24,"text":101,"correct":22},"143",{"key":27,"text":103,"correct":32},"144",{"key":30,"text":105,"correct":22},"156",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1118282,"某打桩工程施工至第二个月底，出现了工程的费用偏差小于0，进度偏差大于0的状况。则至第二个月底中该打桩工程的已完工作实际费用(ACWP)、计划工作预算费用(BCWS)和已完工作预算费用(BCWP)的关系可表示为()。",[110,112,114,116],{"key":20,"text":111,"correct":22},"BCWP>ACWP>BCWS",{"key":24,"text":113,"correct":22},"BCWS>BCWP>ACWP",{"key":27,"text":115,"correct":32},"ACWP>BCWP>BCWS",{"key":30,"text":117,"correct":22},"BCWS>ACWP>BCWP",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1118283,"宏达公司负责某工程的施工任务，编制了施工成本计划。其中主体混凝土工程量约3200立方米，预算单价550元／立方米，计划4个月内均衡完成。开工后，混凝土实际采购价格为560元\u002F立方米。施工至第二个月底，实际完成混凝土工程量1800立方米。运用赢得值法，分析得到第二个月底的进度偏差sv为11万元。根据偏差分析，确定的可行的纠偏措施是()。",[122,124,126,128],{"key":20,"text":123,"correct":22},"加快施工进度",{"key":24,"text":125,"correct":32},"重新选择混凝土供应商",{"key":27,"text":127,"correct":22},"调整工程数量",{"key":30,"text":129,"correct":22},"进行材料代用",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1118284,"下列关于施工成本控制中获得成本信息的说法，正确的是（）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"通过工程承包合同获取预定的具体成本控制目标、实现控制成本的措施等信息",{"key":24,"text":137,"correct":22},"通过施工成本计划获取将要发生工程量、支付情况等信息",{"key":27,"text":139,"correct":32},"通过进度报告获取工程实际完成量、成本实际支出等信息",{"key":30,"text":141,"correct":22},"通过施工组织设计获取工程预算收入、实际成本等信息",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1118285,"下列施工成本纠偏措施中，能压缩已经超支的费用而不损害其他目标的是（）",[146,148,150,152],{"key":20,"text":147,"correct":22},"减少工程范围",{"key":24,"text":149,"correct":22},"降低设计标准",{"key":27,"text":151,"correct":32},"提高生产效率",{"key":30,"text":153,"correct":22},"增加替换材料",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1118286,"施工成本控制要以()为依据，围绕降低工程成本这个目标，从预算收入和实际成本两方面，努力挖掘增收节支潜力，以求获得最大的经济效益。",[158,160,162,164],{"key":20,"text":159,"correct":32},"工程承包合同",{"key":24,"text":161,"correct":22},"工程变更",{"key":27,"text":163,"correct":22},"施工成本计划",{"key":30,"text":165,"correct":22},"进度报告",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1118287,"赢得值法的三个基本参数不包括()。",[170,172,174,176],{"key":20,"text":171,"correct":32},"计划工作实际费用",{"key":24,"text":173,"correct":22},"计划工作预算费用",{"key":27,"text":175,"correct":22},"已完工作实际费用",{"key":30,"text":177,"correct":22},"已完工作预算费用",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1118288,"施工成本计划中，()成本计划即选派项目经理阶段的预算成本计划，是项目经理的责任成本目标。",[182,184,186,188],{"key":20,"text":183,"correct":22},"竞争性",{"key":24,"text":185,"correct":32},"指导性",{"key":27,"text":187,"correct":22},"实施性",{"key":30,"text":189,"correct":22},"战略性",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},1118289,"施工成本控制依据中，提供每一时刻工程实际完成量，工程施工成本实际支付情况等重要信息的是()。",[194,195,196,197],{"key":20,"text":161,"correct":22},{"key":24,"text":41,"correct":22},{"key":27,"text":165,"correct":32},{"key":30,"text":198,"correct":22},"分包合同",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":24,"analysis":33},1118290,"下列各项中，（）既是施工成本控制的依据．又是施工成本控制的指导文件。",[203,204,205,206],{"key":20,"text":159,"correct":22},{"key":24,"text":163,"correct":32},{"key":27,"text":165,"correct":22},{"key":30,"text":41,"correct":22},{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":27,"analysis":33},1118291,"赢得值法进行费用、（）综合分析控制，基本参数有三项，既已完工作预算费用、计划工作预算费用和已完工作实际费用。",[211,213,215,217],{"key":20,"text":212,"correct":22},"速度",{"key":24,"text":214,"correct":22},"质量",{"key":27,"text":216,"correct":32},"进度",{"key":30,"text":218,"correct":22},"指数",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":20,"analysis":33},1118292,"某地下工程合同约定，计划1月份开挖土方80300m3，2月份开挖160000m3，合同单价均为85元\u002Fm3；讦划3月份完成混凝土工程量500m3，4月份完成450m3，合同单价均为600元\u002Fm3。而至各月底，经确认的工程实际进展情况为：1月份实际开挖土方90000m3，2月份开挖180000m3，实际单价均为72元\u002Fm3；3月份和4月份实际完成的混凝土工程量均为400m3，实际单阶700元\u002Fm3。到1月底，该工程的费用偏差(CV)为（）万元。",[223,225,227,229],{"key":20,"text":224,"correct":32},"117",{"key":24,"text":226,"correct":22},"-117",{"key":27,"text":228,"correct":22},"85",{"key":30,"text":230,"correct":22},"-85",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":27,"analysis":33},1118293,"因社会原因、自然因素、基础处理以及法规变化等产生费用偏差属于()。",[235,237,239,241],{"key":20,"text":236,"correct":22},"物价上涨",{"key":24,"text":238,"correct":22},"施工原因",{"key":27,"text":240,"correct":32},"客观原因",{"key":30,"text":242,"correct":22},"业主原因",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":20,"analysis":33},1118294,"对工程1000万元的工程项目进行期中检查，截止检查时己完成工作预算费用410万元，计划工作预算费用为400万元，己完成工作实际费用为430万元，则其费用绩效指数为( )。",[247,249,251,253],{"key":20,"text":248,"correct":32},"0.953",{"key":24,"text":250,"correct":22},"0.430",{"key":27,"text":252,"correct":22},"0.930",{"key":30,"text":254,"correct":22},"1.075",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":24,"analysis":33},1118295,"编制成本计划时，施工成本可以按成本构成分解为( )。",[259,261,263,265],{"key":20,"text":260,"correct":22},"人工费、材料费、施工机械使用费、规费和企业管理费",{"key":24,"text":262,"correct":32},"人工费、材料费、施工机械使用费、企业管理费",{"key":27,"text":264,"correct":22},"人工费、材料费、施工机械使用费、规费和间接费",{"key":30,"text":266,"correct":22},"人工费、材料费、施工机械使用费、间接费、利润和税金",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":20,"analysis":33},1118296,"进行施工成本控制，工程实际完成量、成本实际支付等信息主要是通过（）获得。",[271,272,273,274],{"key":20,"text":165,"correct":32},{"key":24,"text":163,"correct":22},{"key":27,"text":159,"correct":22},{"key":30,"text":41,"correct":22},{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":27,"analysis":33},1118297,"某土方工程，某月计划开挖160000m3，合同单价85元\u002Fm3，至月底实际完成土方量为180000m3，实际单价72元\u002Fm3，则该土方工程的以工作量表示的进度偏差（SV）为（）万元。",[279,281,283,285],{"key":20,"text":280,"correct":22},"214",{"key":24,"text":282,"correct":22},"-214",{"key":27,"text":284,"correct":32},"170",{"key":30,"text":286,"correct":22},"-170",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":20,"analysis":33},1118298,"若按项目组成编制施工成本计划，则项目应按()的顺序依次进行分解。",[291,293,295,297],{"key":20,"text":292,"correct":32},"单项工程一单位工程一分部工程一分项工程",{"key":24,"text":294,"correct":22},"单项工程一分部工程一单位工程一分项工程",{"key":27,"text":296,"correct":22},"单位工程一单项工程一分部工程一分项工程",{"key":30,"text":298,"correct":22},"单位工程一单项工程一分项工程一分部工程",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":24,"analysis":33},1118299,"某土方工程项目，按施工进度计划安排，工程进展到3个月底时计划完成土方工程量1000m3，挖土方的合同单价50元\u002Fm3；当工程实际进展到3月底时，完成土方工程量1200m3，挖土方的实际单价60元\u002Fm3，则该土方工程到3月底的成本偏差与进度偏差分别为()万元。",[303,305,307,309],{"key":20,"text":304,"correct":22},"-1.2,-1.2",{"key":24,"text":306,"correct":32},"-1.2,1.0",{"key":27,"text":308,"correct":22},"1.2，-1.0",{"key":30,"text":310,"correct":22},"1.2,1.2",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":24,"analysis":33},1118300,"某土方工程，计划总工程量为4800m3，预算单价为580元\u002Fm3，计划6个月内均衡完成，开工后，实际单价为600元\u002Fm3，施工至第3个月底，累计实际完成工程量3000m3若运用赢得值法分析，则至第3个月底的费用偏差为()万元。",[315,317,319,321],{"key":20,"text":316,"correct":22},"-34.8",{"key":24,"text":318,"correct":32},"-6",{"key":27,"text":320,"correct":22},"6",{"key":30,"text":322,"correct":22},"34.8",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":24,"analysis":33},1118301,"施工成本控制需要进行实际成本情况与施工成本计划的比较，其中实际成本情况是通过()反映的。",[327,329,330,331],{"key":20,"text":328,"correct":22},"工程变更文件",{"key":24,"text":165,"correct":32},{"key":27,"text":41,"correct":22},{"key":30,"text":198,"correct":22},{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":27,"analysis":33},1118302,"某地下室施工合同约定，计划2月份开挖160000m3，合同单价均为85元\u002Fm3。到2月底，经确认实际开挖土方180000m3，实际单价为72元\u002Fm3，则该工程的以工作量表示的进度偏差（sv）为（）万元。",[336,338,340,341],{"key":20,"text":337,"correct":22},"234",{"key":24,"text":339,"correct":22},"-234",{"key":27,"text":284,"correct":32},{"key":30,"text":286,"correct":22},{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":24,"analysis":33},1118303,"某地下工程施工合同约定，计划3月份完成混凝土工程量500m3，合同单价为600元\u002Fm3。该工程3月份实际完成的混凝土工程量为400m3，实际单价700元\u002Fm3。至3月底，该工程的费用绩效指数（CPI）为（）。",[346,348,350,352],{"key":20,"text":347,"correct":22},"0.800",{"key":24,"text":349,"correct":32},"0.857",{"key":27,"text":351,"correct":22},"1.167",{"key":30,"text":353,"correct":22},"1.250",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":30,"analysis":33},1118304,"某工程主体结构混凝土工程量约3200m3，预算单价550元\u002Fm3，计划4个月内均衡完成。开工后，混凝土实际采购价格为560元／m3。施工至第二个月底，实际完成混凝土工程量1800m3。运用赢得值法，可分析得到该工程的进度偏差sv为()万元。",[358,360,362,364],{"key":20,"text":359,"correct":22},"-1.8",{"key":24,"text":361,"correct":22},"1.8",{"key":27,"text":363,"correct":22},"-11",{"key":30,"text":365,"correct":32},"11",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":20,"analysis":33},1118305,"施工成本计划作为施工成本控制的依据，应包括的重要内容是（）。",[370,372,374,376],{"key":20,"text":371,"correct":32},"控制目标的措施",{"key":24,"text":373,"correct":22},"预算收入目标",{"key":27,"text":375,"correct":22},"成本支付的情况",{"key":30,"text":377,"correct":22},"工程变更目标",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":20,"analysis":33},1118306,"某土方工程某月计划开挖9000m3，合同单价30元／m3，到月底实际完成土方量为9500m3，实际单价为28元／m3，则该工程的费用偏差(cv)为()万元。",[382,384,386,388],{"key":20,"text":383,"correct":32},"1.9",{"key":24,"text":385,"correct":22},"-1.9",{"key":27,"text":387,"correct":22},"1.4",{"key":30,"text":389,"correct":22},"-1.5",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":20,"analysis":33},1118307,"施工企业在投标及签订合同阶段，需要编制()。",[394,396,398,400],{"key":20,"text":395,"correct":32},"竞争性成本计划",{"key":24,"text":397,"correct":22},"指导性成本计划",{"key":27,"text":399,"correct":22},"实施性成本计划",{"key":30,"text":401,"correct":22},"考核性成本计划",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":24,"analysis":33},1118309,"实施性施工成本计划应当以()为主要依据编制。",[406,408,410,412],{"key":20,"text":407,"correct":22},"预算定额",{"key":24,"text":409,"correct":32},"施工定额",{"key":27,"text":411,"correct":22},"概算定额",{"key":30,"text":413,"correct":22},"估算指标",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":24,"analysis":33},1118310,"某钢门窗安装工程，工程进行到第三个月末时，已完工作预算费用为35万元，已完工作实际费用为30万元，则该项目的成本控制效果是()。",[418,420,422,424],{"key":20,"text":419,"correct":22},"费用偏差为-5万元，项目运行超出预算",{"key":24,"text":421,"correct":32},"费用偏差为5万元，项目运行节支",{"key":27,"text":423,"correct":22},"费用偏差为5万元，项目运行超出预算",{"key":30,"text":425,"correct":22},"费用偏差为-5万元，项目运行节支",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":20,"analysis":33},1118311,"某施工企业为获得某工程的施工任务，在投标过程中估算本企业完成招标工程所需要支出的全部费用。该阶段所编制的成本计划属于（）",[430,431,432,433],{"key":20,"text":395,"correct":32},{"key":24,"text":397,"correct":22},{"key":27,"text":399,"correct":22},{"key":30,"text":434,"correct":22},"战略性成本计划",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":27,"analysis":33},1118312,"建设工程项目施工图预算编制的主要依据是()。",[439,441,442,443],{"key":20,"text":440,"correct":22},"人工定额",{"key":24,"text":411,"correct":22},{"key":27,"text":407,"correct":32},{"key":30,"text":409,"correct":22},{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":30,"analysis":33},1118313,"用曲线法进行施工成本偏差分析时，在检测时间点上已完工作实际费用曲线与已完工作预算费用曲线的竖向距离表示()。",[448,450,452,454],{"key":20,"text":449,"correct":22},"质量偏差",{"key":24,"text":451,"correct":22},"投资偏差",{"key":27,"text":453,"correct":22},"进度偏差",{"key":30,"text":455,"correct":32},"费用偏差",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":24,"analysis":33},1118314,"某施工承包企业将其承接的高速公路项目的目标总成本分解为桥梁、隧道、道路工程成本等子项，并编制相应的成本计划，这是按()分解的。",[460,462,464,466],{"key":20,"text":461,"correct":22},"成本组成",{"key":24,"text":463,"correct":32},"项目组成",{"key":27,"text":465,"correct":22},"工程类别",{"key":30,"text":467,"correct":22},"工程性质",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":20,"analysis":33},1118315,"施工企业组织生产、编制施工计划。签发任务书的依据是()。",[472,474,476,478],{"key":20,"text":473,"correct":32},"施工预算",{"key":24,"text":475,"correct":22},"施工图预算",{"key":27,"text":477,"correct":22},"投标报价",{"key":30,"text":479,"correct":22},"项目经理的责任成本",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":24,"analysis":33},1118316,"用赢得值法进行成本控制,其基本参数不包括()。",[484,485,486,487],{"key":20,"text":177,"correct":22},{"key":24,"text":171,"correct":32},{"key":27,"text":173,"correct":22},{"key":30,"text":175,"correct":22},{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":27,"analysis":33},1118317,"施工成本计划是根据施工项目的具体情况制定的施工成本控制方案，包括()。",[492,494,496,498],{"key":20,"text":493,"correct":22},"预定的具体成本目标和有可能出现的成本偏差",{"key":24,"text":495,"correct":22},"可能的工程变更和对变更的控制措施",{"key":27,"text":497,"correct":32},"预定的具体成本目标和实现控制目标的措施",{"key":30,"text":499,"correct":22},"预定的经济效益目标和实现经济效益目标的手段",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":20,"analysis":33},1118318,"关于按工程实施编制施工成本计划方法的说法中，错误的是()。",[504,506,508,510],{"key":20,"text":505,"correct":32},"在编制网络计划时，应充分考虑进度控制对项目划分要求，不必考虑施工成本支出计划对项目划分的要求",{"key":24,"text":507,"correct":22},"按时间进度的施工成本计划，通常可利用控制项目进度的网络图进一步扩充而得",{"key":27,"text":509,"correct":22},"通过对施工成本目标按时间进行分解，在网络计划基础上，可获得项目进度计划的横道图",{"key":30,"text":511,"correct":22},"在建立网络图时，除确定完成各项工作所需花费的时间外，还要确定完成这一工作的施工成本支出计划",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":20,"analysis":33},1118319,"施工项目的成本计划中，()是工程项目投标及签订合同阶段的估算成本计划。",[516,517,518,519],{"key":20,"text":395,"correct":32},{"key":24,"text":397,"correct":22},{"key":27,"text":399,"correct":22},{"key":30,"text":520,"correct":22},"单位工程成本计划",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":20,"analysis":33},1118320,"施工成本控制要以工程承包合同为依据，围绕降低工程成本这个目标，从()，努力挖掘增收节支潜力。",[525,527,529,531],{"key":20,"text":526,"correct":32},"预算收入和实际成本",{"key":24,"text":528,"correct":22},"预算支出和实际成本",{"key":27,"text":530,"correct":22},"预算收入和成本支出",{"key":30,"text":532,"correct":22},"实际成本和成本支出",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":24,"analysis":33},1118321,"某工程施工至2014年12月底，经分析，已完工作预算费用为150万元，已完工作实际费用为165万元，计划工程预算费用为185万元，则该工程的进度偏差为()。",[537,539,541,543],{"key":20,"text":538,"correct":22},"超前15万元",{"key":24,"text":540,"correct":32},"延误35万元",{"key":27,"text":542,"correct":22},"超前20万元",{"key":30,"text":544,"correct":22},"延误30万元",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":20,"analysis":33},1118322,"某土方开挖工程，2月份计划完成工程量为2500m3，预算单价为450元\u002Fm3。工程进行到第2个月末时，实际完成工程量为2000m3，实际单价为480元\u002Fm3，则该项目控制的效果是()。",[549,551,553,555],{"key":20,"text":550,"correct":32},"费用偏差为-6万元，项目运行超出预算",{"key":24,"text":552,"correct":22},"进度偏差为6万元，项目运行节支",{"key":27,"text":554,"correct":22},"费用偏差为22.5万元，实际进度落后于计划进度",{"key":30,"text":556,"correct":22},"进度偏差为-22.5万元，实际进度快于计划进度",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":30,"analysis":33},1118323,"施工预算和施工图预算虽仅一字之差，但区别较大，以下有关说法正确的是（）。",[561,563,565,567],{"key":20,"text":562,"correct":22},"施工图预算的编制以施工定额为主要依据",{"key":24,"text":564,"correct":22},"施工预算既适用于建设单位，又适用于施工单位",{"key":27,"text":566,"correct":22},"施工预算的编制以预算定额为主要依据",{"key":30,"text":568,"correct":32},"施工图预算是投标报价的主要依据",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":24,"analysis":33},1118324,"选派项目经理阶段的预算成本计划是指()。",[573,574,575,576],{"key":20,"text":395,"correct":22},{"key":24,"text":397,"correct":32},{"key":27,"text":399,"correct":22},{"key":30,"text":434,"correct":22},{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":24,"analysis":33},1118325,"关于施工预算和施工图预算比较的说法，正确的是（）",[581,583,585,587],{"key":20,"text":582,"correct":22},"施工预算既适合于建设单位，也适用于施工单位",{"key":24,"text":584,"correct":32},"施工预算的编制以施工定额为依据，施工图预算的编制以预算定额为依据",{"key":27,"text":586,"correct":22},"施工预算是投标报价的依据，施工图预算是施工企业组织生产的依据",{"key":30,"text":588,"correct":22},"编制施工预算依据的定额的比编制施工图预算依据的定额粗略一些",[590,593,596,599,602,605],{"id":15,"name":591,"category":7,"favorite":592},"领导干部任职前廉政法规知识测试题",92,{"id":594,"name":595,"category":7,"favorite":15},595,"建筑结构与设备",{"id":597,"name":598,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":600,"name":601,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":603,"name":604,"category":7,"favorite":8},534,"BIM工程师",{"id":606,"name":604,"category":7,"favorite":8},535]