[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":562},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,24,50,2973,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,223,235,246,258,266,278,289,298,310,318,326,338,346,354,362,370,382,391,403,415,425,437,445,456,468,476,486,497,505,517,529,541,550],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1118224,1,"单选题","某基础土方工程，招标文件中估算工程量为4000m3，合同中约定，土方单价为5元／m3，当实际工程量超过估算工程量15%时，调整单价为4元／m3，工程结束时实际完成土方工程量为4900m3，则土方工程款为()元",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","20000",false,{"key":24,"text":25,"correct":26},"B","24200",true,{"key":28,"text":29,"correct":22},"C","29350",{"key":31,"text":32,"correct":22},"D","27500","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1118225,"有关竣工结算，下列选项中正确的是()",[38,40,42,44],{"key":20,"text":39,"correct":26},"除专用合同条款另有约定外，承包人应在工程竣工验收合格后28天内向发包人和监理人提交竣工结算申请单",{"key":24,"text":41,"correct":22},"竣工结算申请单应不包括竣工结算合同价格",{"key":28,"text":43,"correct":22},"发包人在收到承包人提交竣工结算申请书后14天内未完成审批且未提出异议的，视为发包人认可承包人提交的竣工结算申请单",{"key":31,"text":45,"correct":22},"除专用合同条款另有约定外，发包人应在签发竣工付款证书后的56天内，完成对承包人的竣工付款",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1118226,"工程施工过程中，下列因不可抗力事件导致的人员伤亡、财产损失及其费用增加，由承包人承担的是（）",[50,52,54,56],{"key":20,"text":51,"correct":22},"工程所需清理、修复费用",{"key":24,"text":53,"correct":22},"合同工程本身的损害",{"key":28,"text":55,"correct":26},"承包人人员伤亡",{"key":31,"text":57,"correct":22},"待安装设备的损害",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1118227,"招标人应当依据相关工程的工期定额合理计算工期，压缩工期天数不得超过定额工期的（），否则，应在招标文件中明示增加赶工的费用。",[62,64,66,68],{"key":20,"text":63,"correct":22},"10%",{"key":24,"text":65,"correct":22},"15%",{"key":28,"text":67,"correct":26},"20%",{"key":31,"text":69,"correct":22},"25%",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1118228,"某工程原定2014年5月20日竣工，因承包人原因，致使工程延至2014年6月20日竣工，但在2014年6月因法规的变化导致工程造价增加150万元，工程合同价款应()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"调增60万元",{"key":24,"text":77,"correct":26},"不予调整",{"key":28,"text":79,"correct":22},"调增150万元",{"key":31,"text":81,"correct":22},"调增90万元",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1118229,"由于业主原因引起承包商索赔施工机械闲置费时，当机械设备是从外部租赁的，索赔费用标准一般按照设备的（）计算。",[86,88,90,92],{"key":20,"text":87,"correct":22},"台班费",{"key":24,"text":89,"correct":22},"台班费与进出场费用",{"key":28,"text":91,"correct":22},"机械折旧费",{"key":31,"text":93,"correct":26},"租赁费",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1118230,"根据《建设工程工程量清単计价规范》(GB50500-2013),关于暂列金额的说法,正确的是()。",[98,100,102,104],{"key":20,"text":99,"correct":26},"已签约合同的暂列金额应由发包人掌握使用",{"key":24,"text":101,"correct":22},"已签约合同的暂列金额应由承包人掌握使用",{"key":28,"text":103,"correct":22},"发包人按照合同规定将暂列金额作出支付后,剩余金额归承包人所有",{"key":31,"text":105,"correct":22},"发包人按照合同规定将暂列金额作出支付后,剩余金额由发包人和承包人共同所有",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1118231,"由于法律法规变化，发承包双方应当按照合同约定调整合同价款。对于实行招标的建设工程，一般以()前28天作为基准日。",[110,112,114,116],{"key":20,"text":111,"correct":26},"投标截止日",{"key":24,"text":113,"correct":22},"中标通知书发出",{"key":28,"text":115,"correct":22},"合同签订",{"key":31,"text":117,"correct":22},"招标截止日",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1118232,"《建设工程工程量清单计价规范》GB 50500-2013规定，招标时用于合同约定调整因素出现时工程材料价款调整的费用应计入( )中。",[122,124,126,128],{"key":20,"text":123,"correct":26},"暂列金额",{"key":24,"text":125,"correct":22},"总承包服务费",{"key":28,"text":127,"correct":22},"材料暂估价",{"key":31,"text":129,"correct":22},"分部分项综合单价",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},1118233,"某混凝土工程，招标文件中估计工程量为4000m3合同约定的综合单价为600元\u002Fm3，当实际工程量超过清单工程量15%时可调整单价，调整系数为0.8。工程结束时实际工程量为4800m3，则该混凝土工程的结算价款是()万元。",[134,136,138,140],{"key":20,"text":135,"correct":22},"240.0",{"key":24,"text":137,"correct":22},"270.0",{"key":28,"text":139,"correct":26},"285.6",{"key":31,"text":141,"correct":22},"192.0",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1118234,"根据《建设工程工程量计价规范》（GB50500-2013），关于暂列金额的说法，正确的是（）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"已签约合同中的暂列金额应由发包人掌握使用",{"key":24,"text":149,"correct":22},"已签约合同中的暂列金额应由承包人掌握使用",{"key":28,"text":151,"correct":22},"发包人按照合同规定将暂列金额作出支付后，剩金额归承包人所有",{"key":31,"text":153,"correct":22},"发包人按照合同规定将暂列金额作出支付后，剩金额由发包人和承包人共同所有",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1118235,"发包人应在签发最终结清支付证书后的( )天内，按照最终结清支付证书列明的金额向承包人支付最终结清款。",[158,160,162,164],{"key":20,"text":159,"correct":26},"7",{"key":24,"text":161,"correct":22},"14",{"key":28,"text":163,"correct":22},"21",{"key":31,"text":165,"correct":22},"28",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1118236,"施工成本管理的每一个环节都是相互联系和相互作用的，()是成本决策所确定目标的具体化。",[170,172,174,176],{"key":20,"text":171,"correct":26},"成本计划",{"key":24,"text":173,"correct":22},"成本控制",{"key":28,"text":175,"correct":22},"成本预测",{"key":31,"text":177,"correct":22},"成本考核",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},1118237,"项目目标动态控制的纠偏措施，不包括()。",[182,184,186,188],{"key":20,"text":183,"correct":22},"组织措施",{"key":24,"text":185,"correct":22},"合同措施",{"key":28,"text":187,"correct":22},"经济措施",{"key":31,"text":189,"correct":26},"预防措施",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},1118238,"下列关于施工成本分析的表述中正确的是()。",[194,196,198,200],{"key":20,"text":195,"correct":22},"施工成本分析的实质是在施工之前对成本进行估算",{"key":24,"text":197,"correct":22},"施工成本分析是指科学地预测成本水平及其发展趋势",{"key":28,"text":199,"correct":22},"施工成本分析是指预测成本控制的薄弱环节",{"key":31,"text":201,"correct":26},"施工成本分析应贯穿于施工成本管理的全过程",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},1118239,"下列施工成本管理的措施中，属于组织措施的是()。",[206,208,210,212],{"key":20,"text":207,"correct":22},"确定最佳的施工方案",{"key":24,"text":209,"correct":22},"对施工成本管理目标进行风险分析，并制定防范性对策",{"key":28,"text":211,"correct":22},"选用合适的合同结构",{"key":31,"text":213,"correct":26},"加强施工定额管理和施工任务单管理，控制活动和物化活动的消耗",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1118240,"加强施工定额管理和施工任务单管理，控制活劳动和物化劳动的消耗，属于施工成本管理的是()。",[218,219,221,222],{"key":20,"text":183,"correct":26},{"key":24,"text":220,"correct":22},"技术措施",{"key":28,"text":187,"correct":22},{"key":31,"text":185,"correct":22},{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":20,"analysis":33},1118241,"下列建筑安装工程的费用中，属于可以直接计入工程对象是（）。",[227,229,231,233],{"key":20,"text":228,"correct":26},"支付给生产工人的工资",{"key":24,"text":230,"correct":22},"差旅交通费",{"key":28,"text":232,"correct":22},"支付给管理人员的工资",{"key":31,"text":234,"correct":22},"办公费",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":31,"analysis":33},1118242,"( )是对成本计划是否实现的最后检验。",[239,240,242,244],{"key":20,"text":175,"correct":22},{"key":24,"text":241,"correct":22},"成本评审",{"key":28,"text":243,"correct":22},"成本概算",{"key":31,"text":245,"correct":26},"成本核算",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":24,"analysis":33},1118243,"施工成本管理的任务和环节中，（）是对成本计划的最后检验，它所提供的成本信息又将成为下一个施工项目成本预测和决策提供基础资料。",[250,252,254,256],{"key":20,"text":251,"correct":22},"施工项目成本控制",{"key":24,"text":253,"correct":26},"施工项目成本核算",{"key":28,"text":255,"correct":22},"施工项目成本计划",{"key":31,"text":257,"correct":22},"施工项目成本分析",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":28,"analysis":33},1118244,"进行技术经济分析，确定最佳的施工方案，属于施工成本管理措施中的()。",[262,263,264,265],{"key":20,"text":185,"correct":22},{"key":24,"text":187,"correct":22},{"key":28,"text":220,"correct":26},{"key":31,"text":183,"correct":22},{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":31,"analysis":33},1118245,"施工成本管理任务中，()是以货币形式编制施工项目在计划期内的生产费用、成本水平、成本降低率以及为降低成本所采取的主要措施和规划的书面方案。",[270,272,274,276],{"key":20,"text":271,"correct":22},"施工成本预测",{"key":24,"text":273,"correct":22},"施工成本考核",{"key":28,"text":275,"correct":22},"施工成本分析",{"key":31,"text":277,"correct":26},"施工成本计划",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":31,"analysis":33},1118246,"下列属于施工成本控制经济措施的是()。",[282,284,286,288],{"key":20,"text":283,"correct":22},"进行技术经济分析，确定最佳的施工方案",{"key":24,"text":285,"correct":22},"通过生产要素的优化配置、合理使用、动态管理，控制实际成本",{"key":28,"text":287,"correct":22},"密切注视对方合同执行的情况，以寻求合同索赔的机会",{"key":31,"text":209,"correct":26},{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":24,"analysis":33},1118247,"对成本的形成过程和影响成本升降的因素进行分析，以寻求进一步降低成本的途径，指的是( )。",[293,294,295,296],{"key":20,"text":271,"correct":22},{"key":24,"text":275,"correct":26},{"key":28,"text":273,"correct":22},{"key":31,"text":297,"correct":22},"施工成本核算",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},1118248,"施工过程中耗费的构成工程实体或有助于工程实体形成的各项费用支出，称为()。",[302,304,306,308],{"key":20,"text":303,"correct":26},"直接成本",{"key":24,"text":305,"correct":22},"间接成本",{"key":28,"text":307,"correct":22},"施工成本",{"key":31,"text":309,"correct":22},"经营成本",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":28,"analysis":33},1118249,"施工项目降低成本的指导文件及设立目标成本的依据，指的是()。",[314,315,316,317],{"key":20,"text":271,"correct":22},{"key":24,"text":275,"correct":22},{"key":28,"text":277,"correct":26},{"key":31,"text":297,"correct":22},{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":20,"analysis":33},1118250,"通过生产要素的优化配置，有效控制实际成本，属于()。",[322,323,324,325],{"key":20,"text":183,"correct":26},{"key":24,"text":220,"correct":22},{"key":28,"text":187,"correct":22},{"key":31,"text":185,"correct":22},{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":24,"analysis":33},1118251,"施工成本的核算对象一般是()。",[330,332,334,336],{"key":20,"text":331,"correct":22},"单项工程",{"key":24,"text":333,"correct":26},"单位工程",{"key":28,"text":335,"correct":22},"分部工程",{"key":31,"text":337,"correct":22},"分项工程",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":20,"analysis":33},1118252,"落实施工成本管理的组织机构和人员，属于施工成本管理措施中的()。",[342,343,344,345],{"key":20,"text":183,"correct":26},{"key":24,"text":220,"correct":22},{"key":28,"text":185,"correct":22},{"key":31,"text":187,"correct":22},{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},1118253,"结合项目的施工组织设计及自然地理条件，降低材料的库存成本和运输成本，属于施工成本管理的（）。",[350,351,352,353],{"key":20,"text":220,"correct":26},{"key":24,"text":183,"correct":22},{"key":28,"text":187,"correct":22},{"key":31,"text":185,"correct":22},{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":31,"analysis":33},1118254,"编制施工成本控制工作计划、确定合理详细的工作流程是( )的内容之一。",[358,359,360,361],{"key":20,"text":185,"correct":22},{"key":24,"text":187,"correct":22},{"key":28,"text":220,"correct":22},{"key":31,"text":183,"correct":26},{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":28,"analysis":33},1118255,"编制资金使用计划、确定和分解施工成本管理目标等措施属于施工成本管理的( )。",[366,367,368,369],{"key":20,"text":183,"correct":22},{"key":24,"text":220,"correct":22},{"key":28,"text":187,"correct":26},{"key":31,"text":185,"correct":22},{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},1118256,"成本偏差的控制，( )是关键，要针对偏差发生原因，采取切实措施，加以纠正。",[374,376,378,380],{"key":20,"text":375,"correct":22},"纠偏",{"key":24,"text":377,"correct":26},"分析",{"key":28,"text":379,"correct":22},"核算",{"key":31,"text":381,"correct":22},"控制",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":28,"analysis":33},1118257,"某大学新校区建设项目，主要项目有图书馆、教学楼、学生宿舍等。进行工程项目竣工成本综合分析，作为成本核算对象的是()。",[386,388,389,390],{"key":20,"text":387,"correct":22},"建设项目",{"key":24,"text":331,"correct":22},{"key":28,"text":333,"correct":26},{"key":31,"text":335,"correct":22},{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":20,"analysis":33},1118258,"企业财务部门应对()进行核算分析，考核企业经营效益",[395,397,399,401],{"key":20,"text":396,"correct":26},"竣工工程完全成本",{"key":24,"text":398,"correct":22},"竣工工程现场成本",{"key":28,"text":400,"correct":22},"预算成本",{"key":31,"text":402,"correct":22},"目标成本",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":20,"analysis":33},1118259,"某施工企业为获得某工程的施工任务，在投标过程中估算企业完成招标所需要支出的全部费用。该阶段所编制的成本计划属于（）",[407,409,411,413],{"key":20,"text":408,"correct":26},"竞争性成本计划",{"key":24,"text":410,"correct":22},"指导性成本计划",{"key":28,"text":412,"correct":22},"实施性成本计划",{"key":31,"text":414,"correct":22},"战略性成本计划",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":20,"analysis":33},1118260,"下列各项中属于成本管理的组织措施的是()",[419,421,422,423],{"key":20,"text":420,"correct":26},"编制施工成本控制工作计划，确定合理详细的工作流程",{"key":24,"text":283,"correct":22},{"key":28,"text":209,"correct":22},{"key":31,"text":424,"correct":22},"密切关注合同执行的情况，寻求合同索赔机会",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":28,"analysis":33},1118261,"施工成本分析贯穿于施工成本管理的全过程，它是在成本的形成过程中，主要利用施工项目的（），与目标成本、预算成本以及类似的施工项目的实际成本进行比较。",[429,431,433,435],{"key":20,"text":430,"correct":22},"计划成本",{"key":24,"text":432,"correct":22},"成本预测资料",{"key":28,"text":434,"correct":26},"成本核算资料",{"key":31,"text":436,"correct":22},"成本控制程度",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":24,"analysis":33},1118262,"通过加强施工定额管理和施工任务单管理,控制活劳动和物化劳动的消耗。这属于施工成本管理措施的()。",[441,442,443,444],{"key":20,"text":220,"correct":22},{"key":24,"text":183,"correct":26},{"key":28,"text":187,"correct":22},{"key":31,"text":185,"correct":22},{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":28,"analysis":33},1118263,"属于施工成本管理技术措施的是()。",[449,450,452,454],{"key":20,"text":209,"correct":22},{"key":24,"text":451,"correct":22},"对各种合同结构模式进行分析、比较",{"key":28,"text":453,"correct":26},"结合施工方法，进行材料使用的比选",{"key":31,"text":455,"correct":22},"及时落实业主签证",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":31,"analysis":33},1118264,"下列施工成本管理的措施中，属于技术措施的是()。",[460,462,464,466],{"key":20,"text":461,"correct":22},"加强施工任务单的管理",{"key":24,"text":463,"correct":22},"编制施工成本控制工作计划",{"key":28,"text":465,"correct":22},"寻求施工过程中的索赔机会",{"key":31,"text":467,"correct":26},"确定最合适的施工机械方案",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":24,"analysis":33},1118265,"施工成本管理的措施中，()是最易为人们接受和采用的措施。",[472,473,474,475],{"key":20,"text":220,"correct":22},{"key":24,"text":187,"correct":26},{"key":28,"text":185,"correct":22},{"key":31,"text":183,"correct":22},{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":28,"analysis":33},1118266,"下列属于直接成本的是()。",[480,482,483,485],{"key":20,"text":481,"correct":22},"管理人员的工资",{"key":24,"text":234,"correct":22},{"key":28,"text":484,"correct":26},"人工费",{"key":31,"text":230,"correct":22},{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":28,"analysis":33},1118267,"下列不属于工程项目施工成本的直接成本的是（）。",[490,491,493,495],{"key":20,"text":484,"correct":22},{"key":24,"text":492,"correct":22},"材料费",{"key":28,"text":494,"correct":26},"工具用具使用费",{"key":31,"text":496,"correct":22},"施工措施费",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":24,"analysis":33},1118268,"为施工准备、组织和管理施工生产的全部费用的支出，称为()。",[501,502,503,504],{"key":20,"text":303,"correct":22},{"key":24,"text":305,"correct":26},{"key":28,"text":307,"correct":22},{"key":31,"text":430,"correct":22},{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":24,"analysis":33},1118270,"施工成本管理的五个环节的任务顺序是()。",[509,511,513,515],{"key":20,"text":510,"correct":22},"分析—计划—控制—核算—核算",{"key":24,"text":512,"correct":26},"计划—控制—核算—分析—考核",{"key":28,"text":514,"correct":22},"分析—计划—控制—核算—考核",{"key":31,"text":516,"correct":22},"计划—控制—考核—分析—核算",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":28,"analysis":33},1118271,"采用赢得值法分析成本偏差得到的结果如下图所示，正确的是( )。",[521,523,525,527],{"key":20,"text":522,"correct":22},"进度滞后，费用节支",{"key":24,"text":524,"correct":22},"进度提前，费用节支",{"key":28,"text":526,"correct":26},"进度提前，费用超支",{"key":31,"text":528,"correct":22},"进度滞后，费用超支",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":31,"analysis":33},1118272,"某工程项目有4800m3的土方开挖施工任务，交由某分包商承担，计划在6个月内完成，每月计划完成工程量为800m3，预算单价为580元／m3。开工后发现实际单价为600元／m3。工程进行了3个月，累计完成工程量3000m3。运用赢得值法分析，至第3个月底的进度偏差位为（）万元。",[533,535,537,539],{"key":20,"text":534,"correct":22},"-34.8",{"key":24,"text":536,"correct":22},"-6",{"key":28,"text":538,"correct":22},"6",{"key":31,"text":540,"correct":26},"34.8",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":24,"analysis":33},1118273,"以合同标书为依据，依据企业的预算定额标准制定的设计预算成本计划属于（）。",[545,546,547,548],{"key":20,"text":408,"correct":22},{"key":24,"text":410,"correct":26},{"key":28,"text":412,"correct":22},{"key":31,"text":549,"correct":22},"按成本分解的成本计划",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":24,"analysis":33},1118274,"关于施工预算与施工图预算的说法，错误的是()。",[554,556,558,560],{"key":20,"text":555,"correct":22},"施工预算的编制以施工定额为主要依据，施工图预算的编制以预算定额为主要依据",{"key":24,"text":557,"correct":26},"施工预算是投标报价的主要依据",{"key":28,"text":559,"correct":22},"施工预算是施工企业内部管理用的一种文件",{"key":31,"text":561,"correct":22},"施工预算是承包人改善经营管理，降低生产成本的重要手段",[563,566,569,572,575,578],{"id":15,"name":564,"category":7,"favorite":565},"领导干部任职前廉政法规知识测试题",92,{"id":567,"name":568,"category":7,"favorite":15},595,"建筑结构与设备",{"id":570,"name":571,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":573,"name":574,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":576,"name":577,"category":7,"favorite":8},534,"BIM工程师",{"id":579,"name":577,"category":7,"favorite":8},535]