[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":590},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,23,50,2973,[13,34,46,56,68,80,92,104,116,128,140,152,163,175,187,199,211,223,231,243,255,267,279,291,303,315,327,336,348,360,372,384,396,407,419,430,442,454,465,474,486,498,507,516,526,538,547,559,571,582],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1118174,1,"单选题","根据《标准施工招标文件》中通用条款的内容，如果承包人在施工过程中发现文物、古迹而导致工期延误时，承包人可以向发包人索赔（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","工期",false,{"key":24,"text":25,"correct":26},"B","工期+费用",true,{"key":28,"text":29,"correct":22},"C","利润",{"key":31,"text":32,"correct":22},"D","费用","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1118175,"在索赔费用的计算方法中，（）是最常用的一种方法。",[38,40,42,44],{"key":20,"text":39,"correct":26},"实际费用法",{"key":24,"text":41,"correct":22},"总费用法",{"key":28,"text":43,"correct":22},"修正总费用法",{"key":31,"text":45,"correct":22},"实物费用法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1118176,"计算工程索赔时最常用的方法是（）。",[50,51,53,55],{"key":20,"text":41,"correct":22},{"key":24,"text":52,"correct":22},"修正预算单价法",{"key":28,"text":54,"correct":22},"修正的总费用法",{"key":31,"text":39,"correct":26},{"id":57,"libraryId":5,"type":15,"typeLabel":16,"stem":58,"options":59,"answer":31,"analysis":33},1118177,"某混凝土工程，工程量清单中的混凝土工程量2000m3，合同约定：混凝土工程综合单价为420元\u002Fm3；当实际工程量增加或减少超过10%时可调整单价，增加超过10%时综合单价的调整系数为0.9，减少超过10%时综合单价的调整系数为1.15。工程施工过程中由于出现设计变更，承包商实际完成的混凝土工程量为2500m3。则该混凝土工程的价款为（）。",[60,62,64,66],{"key":20,"text":61,"correct":22},"75.60万元",{"key":24,"text":63,"correct":22},"94.50万元",{"key":28,"text":65,"correct":22},"102.90万元",{"key":31,"text":67,"correct":26},"103.74万元",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":28,"analysis":33},1118178,"某独立土方工程，招标文件中估计工程量为120万m3，合同中规定：土方工程单价为6元\u002Fm3，当实际工程量超过估计工程量15%时，调整单价，单价调为4元\u002Fm3。工程结束时实际完成土方工程量为160万m3，则土方工程款为()万元。",[72,74,76,78],{"key":20,"text":73,"correct":22},"828",{"key":24,"text":75,"correct":22},"880",{"key":28,"text":77,"correct":26},"916",{"key":31,"text":79,"correct":22},"960",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":28,"analysis":33},1118179,"由于监理工程师原因引起承包商向业主索赔施工机械闲置费时，承包商自有设备闲置费一般按设备的()计算。",[84,86,88,90],{"key":20,"text":85,"correct":22},"台班费",{"key":24,"text":87,"correct":22},"台班费与进出场费用",{"key":28,"text":89,"correct":26},"机械折旧费",{"key":31,"text":91,"correct":22},"市场租赁价格",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":20,"analysis":33},1118180,"某基础工程，施工合同约定的计日工每工日工资标准为40元。在基坑开挖过程中，由于业主未按合同约定履行造成承包商8人窝工5天，而承包商由于劳动力计划安排不当导致5人窝工10天，窝工费按照日工资标准的80%计算，则承包商可提出的人工费索赔为()元。",[96,98,100,102],{"key":20,"text":97,"correct":26},"1280",{"key":24,"text":99,"correct":22},"1600",{"key":28,"text":101,"correct":22},"2880",{"key":31,"text":103,"correct":22},"3600",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":24,"analysis":33},1118181,"某筑坝围海工程完成过半时，遭遇强台风正面登陆，堤坝已完合格部分被摧毁，不得不重新设计，工期延长，其损失应由()承担。",[108,110,112,114],{"key":20,"text":109,"correct":22},"承包人",{"key":24,"text":111,"correct":26},"业主",{"key":28,"text":113,"correct":22},"设计单位",{"key":31,"text":115,"correct":22},"监理单位",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":24,"analysis":33},1118182,"某新校区抗震模拟实验室工程，模拟振动台设备基础采用钢筋混凝土大块基础，混凝土施工要求使用商品混凝土。但在模拟振动器台设备基础施工中，由于业主要求从使用商品混凝土变为现场搅拌，致使工期延期3天。则承包商可索赔材料费的是()。",[120,122,124,126],{"key":20,"text":121,"correct":22},"人工价格上涨",{"key":24,"text":123,"correct":26},"材料超期储存",{"key":28,"text":125,"correct":22},"材料被盗和损坏",{"key":31,"text":127,"correct":22},"材料进货日期变化",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":28,"analysis":33},1118183,"某工程合同价为1000万元，合同价的60%为可调部分。可调部分中，人工费占35%，材料费占55%，其余占10%。结算时，人工费价格指数增长了15%，材料费价格指数增长了20%，其余未发生变化，按调值公式法计算，该工程的结算工程价款为()万元。",[132,134,136,138],{"key":20,"text":133,"correct":22},"1025",{"key":24,"text":135,"correct":22},"1080.5",{"key":28,"text":137,"correct":26},"1097.5",{"key":31,"text":139,"correct":22},"1110.5",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":31,"analysis":33},1118184,"工程施工中，发生了不可抗力事件，导致的人员伤亡、财产损失及其费用增加，由承包人承担的是()",[144,146,148,150],{"key":20,"text":145,"correct":22},"合同工程本身的损害",{"key":24,"text":147,"correct":22},"运到施工场地用于施工的材料的损害",{"key":28,"text":149,"correct":22},"工程所需清理、修复的费用",{"key":31,"text":151,"correct":26},"承包人的施工机械设备损坏",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":31,"analysis":33},1118185,"施工机械使用费的索赔中，窝工费的计算，如系承包商自有设备一般按()计算。",[156,158,160,161],{"key":20,"text":157,"correct":22},"实际租金",{"key":24,"text":159,"correct":22},"调进调出费的分摊",{"key":28,"text":85,"correct":22},{"key":31,"text":162,"correct":26},"台班折旧费",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":28,"analysis":33},1118186,"某建设工程项目施工单位在施工中发生如下人工费：完成业主要求的合同外工作花费4万元；由于业主原因导致工效降低，使人工费增加2万元；施工机械故障造成人员窝工损失2万元：为实现创优质工程要求增加1万元。则施工单位可向业主索赔的人工费为()万元。",[167,169,171,173],{"key":20,"text":168,"correct":22},"8",{"key":24,"text":170,"correct":22},"7",{"key":28,"text":172,"correct":26},"6",{"key":31,"text":174,"correct":22},"4",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":20,"analysis":33},1118187,"对于任一招标工程量清单项目，如果因本规定的工程量偏差和工程变更等原因导致工程量偏差超过（）,综合单价进行调整。",[179,181,183,185],{"key":20,"text":180,"correct":26},"15%",{"key":24,"text":182,"correct":22},"10%",{"key":28,"text":184,"correct":22},"20%",{"key":31,"text":186,"correct":22},"25%",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":31,"analysis":33},1118188,"根据《标准施工招标文件》，下列时间中承包人可以获得工期、费用和利润的补偿的是()。",[191,193,195,197],{"key":20,"text":192,"correct":22},"施工过程发现文物",{"key":24,"text":194,"correct":22},"发包人的原因导致的工程缺陷和损失",{"key":28,"text":196,"correct":22},"异常恶劣的气候条件",{"key":31,"text":198,"correct":26},"发包人的原因造成工期延误",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":28,"analysis":33},1118189,"发生合同工程工期延误时，计划进度日期后续工程的价格应采用()。",[203,205,207,209],{"key":20,"text":204,"correct":22},"计划进度日期与实际进度日期两者的较高者",{"key":24,"text":206,"correct":22},"因发包人原因导致工期延误时，计划进度日期后续工程的价格，采用计划进度日期与实际进度日期两者的较低者",{"key":28,"text":208,"correct":26},"因承包人原因导致工期延误时，计划进度日期后续工程的价格，采用计划进度日期与实际进度日期两者的较低者",{"key":31,"text":210,"correct":22},"计划进度日期与实际进度日期两者的较低者",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":20,"analysis":33},1118190,"某独立土方工程，招标文件中估计工程量为200万m3，合同中规定：土方工程单价为5元\u002Fm3，当实际工程量超过估计工程量15%时，调整单价为4元\u002Fm3。工程结束时实际完成土方工程量为260万。则土方工程款为()万元。",[215,217,219,221],{"key":20,"text":216,"correct":26},"1270",{"key":24,"text":218,"correct":22},"1150",{"key":28,"text":220,"correct":22},"1000",{"key":31,"text":222,"correct":22},"800",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":20,"analysis":33},1118191,"根据《标准施工招标文件》，下列时间中承包人可以获得工期和费用补偿，但不能获得利润补偿的是()。",[227,228,229,230],{"key":20,"text":192,"correct":26},{"key":24,"text":194,"correct":22},{"key":28,"text":196,"correct":22},{"key":31,"text":198,"correct":22},{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":20,"analysis":33},1118192,"某土方开挖工程，工程量清单的工程量为2400m3，合同约定的综合单价为500元\u002Fm3，当实际工程量超过清单工程量10%时可调整单价，调整系数为0.9。工程结束时实际工程量为2800m3，则该土方工程的结算价款是()万元。",[235,237,239,241],{"key":20,"text":236,"correct":26},"139.2",{"key":24,"text":238,"correct":22},"132",{"key":28,"text":240,"correct":22},"126",{"key":31,"text":242,"correct":22},"127.2",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":28,"analysis":33},1118193,"某施工机械因业主原因造成停工10个台班，每一天安排1个台班。该机械台班费820元\u002F台班，折旧费480元\u002F台班，租赁费800元\u002F台班，该机械为租赁设备。则索赔费用（）。",[247,249,251,253],{"key":20,"text":248,"correct":22},"8200",{"key":24,"text":250,"correct":22},"5800",{"key":28,"text":252,"correct":26},"8000",{"key":31,"text":254,"correct":22},"4800",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":28,"analysis":33},1118194,"修正的总费用法是对总费用的改进，即在总费用计算的原则上，去掉一些不合理的因素，如（），使其更合理。",[259,261,263,265],{"key":20,"text":260,"correct":22},"计算该时段内所有施工工作所有的损失",{"key":24,"text":262,"correct":22},"与该项工作部分无关的和有关的费用列入总费用",{"key":28,"text":264,"correct":26},"将计算索赔款的时段局限于受到外界影响的时间，而不是整个施工期",{"key":31,"text":266,"correct":22},"按该项目工作原定单价进行核算，乘以实际完成的该项工作的工程量，得出调整后的报价费用",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":31,"analysis":33},1118195,"对于费用索赔中的人工费，通常不包括()。",[271,273,275,277],{"key":20,"text":272,"correct":22},"完成合同之外的额外工作所花费的人工费用",{"key":24,"text":274,"correct":22},"由于非承包商责任的工效降低所增加的人工费用",{"key":28,"text":276,"correct":22},"超过法定工作时间的加班报酬",{"key":31,"text":278,"correct":26},"人工费增长",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":24,"analysis":33},1118196,"根据《标准施工招标文件》中通用合同条款的规定,发包人认为有必要时,由监理人通知承包人以()方式实施变更的零星工作。",[283,285,287,289],{"key":20,"text":284,"correct":22},"临时工",{"key":24,"text":286,"correct":26},"计日工",{"key":28,"text":288,"correct":22},"钟点工",{"key":31,"text":290,"correct":22},"计件工",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":28,"analysis":33},1118197,"工程施工期间,因承包人原因导致工期延误,且在延误期内国家相关政策发生变化,由此引起的合同价款调整,应该()。",[295,297,299,301],{"key":20,"text":296,"correct":22},"调增的和调减的均予以调整",{"key":24,"text":298,"correct":22},"调增的和调减的均不予调整",{"key":28,"text":300,"correct":26},"调增的不予调整,调减的予以调整",{"key":31,"text":302,"correct":22},"调增的予以调整,调减的不予调整",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":31,"analysis":33},1118198,"工程竣工结算书编制与核对的责任分工是()。",[307,309,311,313],{"key":20,"text":308,"correct":22},"发包人编制，承包人核对",{"key":24,"text":310,"correct":22},"监理机构编制，发包人核对",{"key":28,"text":312,"correct":22},"造价咨询人编制，承包人核对",{"key":31,"text":314,"correct":26},"承包人编制，发包人核对",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":20,"analysis":33},1118199,"合同履行期间，由于招标工程量清单中缺项，新增分部分项工程清单项目的，应()。",[319,321,323,325],{"key":20,"text":320,"correct":26},"按照变更价款确定方法确定单价，调整合同价款",{"key":24,"text":322,"correct":22},"不予调整",{"key":28,"text":324,"correct":22},"按照计价规范的规定自行调整合同价款",{"key":31,"text":326,"correct":22},"按照计价规范的规定，在承包人提交的实施方案被发包人批准后调整合同价款",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":24,"analysis":33},1118200,"最常用的计算索赔费用的方法是()。",[331,333,334,335],{"key":20,"text":332,"correct":22},"关键线路法",{"key":24,"text":39,"correct":26},{"key":28,"text":41,"correct":22},{"key":31,"text":54,"correct":22},{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":28,"analysis":33},1118201,"由于承包人原因使工程未在约定的工期内竣工的，对原约定竣工日期后继续施工的工程进行价格调整时，涉及原约定竣工日期价格指数与实际竣工日期价格指数，则调整价格差额计算应采用()。",[340,342,344,346],{"key":20,"text":341,"correct":22},"原约定日期的价格指数",{"key":24,"text":343,"correct":22},"实际竣工日期的价格指数",{"key":28,"text":345,"correct":26},"原约定竣工日期价格指数与实际竣工日期价格指数中较低的一个",{"key":31,"text":347,"correct":22},"原约定日期的价格指数与实际竣工日期价格指数的平均值",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":20,"analysis":33},1118202,"下列承包商增加的人工费中，不可以向业主索赔的是()。",[352,354,356,358],{"key":20,"text":353,"correct":26},"特殊恶劣气候导致的人员窝工费",{"key":24,"text":355,"correct":22},"完成合同之外的工作增加的人工费",{"key":28,"text":357,"correct":22},"由于非承包商责任的工效降低而增加的人工费",{"key":31,"text":359,"correct":22},"监理工程师原因导致工程暂停的人员窝工费",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":31,"analysis":33},1118203,"根据《建设工程工程量清单计价规范》GB 50500-2013，关于措施项目费调整的规定，说法正确的是()。",[364,366,368,370],{"key":20,"text":365,"correct":22},"措施项目费按照实际发生变化的措施项目调整，不得浮动",{"key":24,"text":367,"correct":22},"采用综合单价计算的项目设计费，按照实际发生变化的措施项目按照前述已标价工程量清单项目的规定确定单价",{"key":28,"text":369,"correct":22},"按单价计算的措施项目费，按照实际发生变化的措施项目调整",{"key":31,"text":371,"correct":26},"安全文明施工费按照实际发生变化的措施项目调整，不得浮动",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":31,"analysis":33},1118204,"某工程项目成工程量清单方式招标并签订单价合同，再施工过程中，承包人按照合同约定的计量周期和时间，向发包人提交了当期已完工程量报告，下列做法中符合建设工程量清单计价规范规定的是()",[376,378,380,382],{"key":20,"text":377,"correct":22},"发包人应在收到报告后14天内核实，并将核实结果通知承包人。",{"key":24,"text":379,"correct":22},"发包人未到约定时间内进行核实的，承包人应重新计量",{"key":28,"text":381,"correct":22},"发包人在未通知承包人且承包人未参加的情况下进行现场计量核实，计量结果有效",{"key":31,"text":383,"correct":26},"承包人应于每月25日向监理人报送上月2 0日至当月19日已完成的工程量报告",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":31,"analysis":33},1118205,"承包商承揽的某工程项目，由于业主就某项设计变更不能按时提供变更图纸，使相关工作拖延3天，导致承包商自有机械窝工10个台班，该机械台班费150元\u002F台班，台班折旧费为20元\u002F台班，该工作有3天的总时差，承包商按规定提交了索赔文件，下列说法正确的是( )。",[388,390,392,394],{"key":20,"text":389,"correct":22},"承包商将不能获得工期及费用补偿",{"key":24,"text":391,"correct":22},"承包商可获得适当的工期补偿及费用补偿",{"key":28,"text":393,"correct":22},"承包商可获得3天的工期补偿，费用补偿200元",{"key":31,"text":395,"correct":26},"承包商不能获得工期补偿，但可获得费用补偿200元",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":20,"analysis":33},1118206,"根据标准施工招标文件，下列合同事件中承包人只能索赔工期和费用的是（）。",[400,402,404,405],{"key":20,"text":401,"correct":26},"施工过程中发现文物和古迹",{"key":24,"text":403,"correct":22},"发包人要求向承包人提前交付材料和工程设备",{"key":28,"text":196,"correct":22},{"key":31,"text":406,"correct":22},"发包人原因导致试运行失败的",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":28,"analysis":33},1118207,"下列情形中，承包人不可以提出索赔的是（）。",[411,413,415,417],{"key":20,"text":412,"correct":22},"法规变化",{"key":24,"text":414,"correct":22},"因工程变更造成的时间损失",{"key":28,"text":416,"correct":26},"不可抗力导致承包人的设备损坏",{"key":31,"text":418,"correct":22},"对合同规定以外的项目进行检验，且检验合格",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":28,"analysis":33},1118208,"发包人在招标工程量清单中给定暂估价的专业工程，依法必须招标的，应当由（）依法组织招标选择专业分包人，并接受有管辖权的建设工程招标投标管理机构的监督。",[423,424,426,428],{"key":20,"text":109,"correct":22},{"key":24,"text":425,"correct":22},"发包人",{"key":28,"text":427,"correct":26},"承发包双方",{"key":31,"text":429,"correct":22},"招标代理机构",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":28,"analysis":33},1118209,"施工期间，如果承包人未经发包人核对即自行采购新材料，采购完成后才报发包人确认调整合同价款的，则（）。",[434,436,438,440],{"key":20,"text":435,"correct":22},"发包人应按承包人采购材料予以批准",{"key":24,"text":437,"correct":22},"发包人全部不予批准",{"key":28,"text":439,"correct":26},"发包人不同意，则不作调整",{"key":31,"text":441,"correct":22},"发包人部分予以批准",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},1118210,"工程施工过程中，下列因不可抗力事件导致的人员伤亡、财产损失及其费用增加，由承包人承担的是()。",[446,448,450,452],{"key":20,"text":447,"correct":22},"合同工程本身损害",{"key":24,"text":449,"correct":26},"施工机械的停工损失",{"key":28,"text":451,"correct":22},"待安装设备的损害",{"key":31,"text":453,"correct":22},"工程修复费用",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":24,"analysis":33},1118211,"承包人应在接受发包人要求的( )天内向发包人提出签证",[458,460,461,463],{"key":20,"text":459,"correct":22},"3",{"key":24,"text":170,"correct":26},{"key":28,"text":462,"correct":22},"14",{"key":31,"text":464,"correct":22},"21",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":24,"analysis":33},1118212,"某合同工程由于设计变更，发生现场签证事项，承包人为了赶工，在未经发包人现场确认和书面同意的情况下便擅自施工，由此产生的费用由（）承担。",[469,470,471,473],{"key":20,"text":425,"correct":22},{"key":24,"text":109,"correct":26},{"key":28,"text":472,"correct":22},"承发包双方共同",{"key":31,"text":113,"correct":22},{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":28,"analysis":33},1118213,"施工单位在编制工程竣工结算时，下列选项不作为其编制依据的是（）。",[478,480,482,484],{"key":20,"text":479,"correct":22},"计价规范",{"key":24,"text":481,"correct":22},"工程合同",{"key":28,"text":483,"correct":26},"招标文件",{"key":31,"text":485,"correct":22},"投标文件",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":28,"analysis":33},1118214,"根据竣工结算的计算原则，计日工应按（）计算。",[490,492,494,496],{"key":20,"text":491,"correct":22},"计价规范相关规定",{"key":24,"text":493,"correct":22},"合同约定的金额",{"key":28,"text":495,"correct":26},"发包人实际签证确认的事项",{"key":31,"text":497,"correct":22},"发承包人双方签证确认的金额",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":31,"analysis":33},1118215,"除专用合同条款另有约定外，发包人应在签发竣工付款证书后的1 4天内，完成对承包人的竣工付款。发包人逾期支付的，按照中国人民银行发布的同期同类贷款基准利率支付违约金。逾期支付超过( )天的，按照中国人民银行发布的同期同类贷款基准利率的两倍支付违约金",[502,503,504,505],{"key":20,"text":170,"correct":22},{"key":24,"text":462,"correct":22},{"key":28,"text":464,"correct":22},{"key":31,"text":506,"correct":26},"56",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":31,"analysis":33},1118216,"发包人在收到承包人提交竣工结算申请书后()天内未完成审批且未提出异议的，视为发包人认可承包人提交的竣工结算申请单",[511,512,513,514],{"key":20,"text":170,"correct":22},{"key":24,"text":462,"correct":22},{"key":28,"text":464,"correct":22},{"key":31,"text":515,"correct":26},"28",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":31,"analysis":33},1118217,"预付款的支付按照专用合同条款约定执行，但至迟应在开工通知载明的开工日期()天前支付。",[520,522,524,525],{"key":20,"text":521,"correct":22},"10",{"key":24,"text":523,"correct":22},"9",{"key":28,"text":168,"correct":22},{"key":31,"text":170,"correct":26},{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":20,"analysis":33},1118218,"根据《标准施工招标文件》，招标工程以()为基准日，其后国家的法律、法规、规章和政策发生变化引起工程造价增减变化的，发承包双方应当按照相关规定调整合同价款。",[530,532,534,536],{"key":20,"text":531,"correct":26},"投标截止日前28天",{"key":24,"text":533,"correct":22},"合同签订前28天",{"key":28,"text":535,"correct":22},"招标截止日前28天",{"key":31,"text":537,"correct":22},"合同备案前28天",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":31,"analysis":33},1118219,"在计算索赔费用时，最常采用的方法是（）。",[542,543,544,546],{"key":20,"text":41,"correct":22},{"key":24,"text":54,"correct":22},{"key":28,"text":545,"correct":22},"预算费用法",{"key":31,"text":39,"correct":26},{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":20,"analysis":33},1118220,"由于承包人原因未在约定的工期内竣工的，则对原约定竣工日期后继续施工的工期，在使用价格调整公式是，应采用原约定竣工日期与实际竣工日期的两个价格指数()作为现行价格指数。",[551,553,555,557],{"key":20,"text":552,"correct":26},"较低",{"key":24,"text":554,"correct":22},"较高",{"key":28,"text":556,"correct":22},"平均值",{"key":31,"text":558,"correct":22},"的和",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":28,"analysis":33},1118221,"采用修正总费用法计算索赔费用的计算公式为( )。",[563,565,567,569],{"key":20,"text":564,"correct":22},"索赔金额=直接费+间接费+利润",{"key":24,"text":566,"correct":22},"索赔金额=实际总费用-投标报价估算总费用",{"key":28,"text":568,"correct":26},"索赔金额=某项工作调整后的实际总费用-该项工作报价费用",{"key":31,"text":570,"correct":22},"索赔金额=直接费+间接费+利润+税金",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":20,"analysis":33},1118222,"根据国际惯例，承包商自有设备的窝工费一般按()计算。",[575,576,578,580],{"key":20,"text":89,"correct":26},{"key":24,"text":577,"correct":22},"机械折旧费+设备进出现场的分摊费",{"key":28,"text":579,"correct":22},"机械使用费",{"key":31,"text":581,"correct":22},"同类型设备的租金",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":20,"analysis":33},1118223,"索赔费用的计算方法有多种，最常用的方法是()",[586,587,588,589],{"key":20,"text":39,"correct":26},{"key":24,"text":41,"correct":22},{"key":28,"text":54,"correct":22},{"key":31,"text":45,"correct":22},[591,594,597,600,603,606],{"id":15,"name":592,"category":7,"favorite":593},"领导干部任职前廉政法规知识测试题",92,{"id":595,"name":596,"category":7,"favorite":15},595,"建筑结构与设备",{"id":598,"name":599,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":601,"name":602,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":604,"name":605,"category":7,"favorite":8},534,"BIM工程师",{"id":607,"name":605,"category":7,"favorite":8},535]