[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":602},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,22,50,2973,[13,34,46,58,70,82,94,106,118,130,141,153,165,175,187,199,211,220,231,243,255,267,277,289,298,310,322,334,344,356,368,380,392,404,416,428,440,452,464,476,488,500,512,524,536,548,558,570,582,590],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1118124,1,"单选题","根据《建设工程工程量清单计价规范》GB50500-2013，招标文件中要求投标人承担的风险费用，投标人应（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","在投标总价的基础上加上一定比例",false,{"key":24,"text":25,"correct":26},"B","在综合单价中给予考虑",true,{"key":28,"text":29,"correct":22},"C","在总承包服务中给予考虑",{"key":31,"text":32,"correct":22},"D","在其他项目费中给予考虑","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1118125,"在施工过程中必须发生，但在投标时很难具体分项预测的二次搬运费和冬雨期施工费用的计价适宜采用（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"实物量法",{"key":24,"text":41,"correct":22},"综合单价法",{"key":28,"text":43,"correct":26},"参数法",{"key":31,"text":45,"correct":22},"分包法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1118126,"在招投标过程中，若出现招标文件中分部分项工程量清单特征描述与设计图纸不符，投标人应以（）为准确定投标报价的综合单价。",[50,52,54,56],{"key":20,"text":51,"correct":22},"设计图纸",{"key":24,"text":53,"correct":22},"消耗量定额",{"key":28,"text":55,"correct":26},"工程量清单的项目特征描述",{"key":31,"text":57,"correct":22},"企业定额",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1118127,"施工过程中，当出现的风险内容及其范围在招标文件规定的范围内时，则综合单价（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"可以变动",{"key":24,"text":65,"correct":22},"可以变动，工程款可以调整",{"key":28,"text":67,"correct":26},"不得变动",{"key":31,"text":69,"correct":22},"不得变动，但工程款予以调整",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1118128,"根据《建设工程工程量清单计价规范》GB50500-2013编制投标文件时，招标文件中提供了暂估单价的材料，应按（）计入综合单价。",[74,76,78,80],{"key":20,"text":75,"correct":22},"投标时的市场价格",{"key":24,"text":77,"correct":22},"投标人自主确定的价格",{"key":28,"text":79,"correct":26},"按暂估的单价",{"key":31,"text":81,"correct":22},"政府主管部门公布的价格",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1118129,"招标文件中的工程量清单标明的工程量是（）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"按施工图图示尺寸和清单工程量计算规则计算得到的工程净量",{"key":24,"text":89,"correct":22},"承包人在履行合同义务中应予完成的实际工程量",{"key":28,"text":91,"correct":22},"设计文件结合不同施工方案确定的工程量均值",{"key":31,"text":93,"correct":22},"工程实体量和损耗量的合计",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1118130,"根据现行《建筑安装工程费用项目组成》GB50500-2013，下列措施项目适合采用分包法计价的是（）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"室内空气污染测试",{"key":24,"text":101,"correct":22},"夜间施工费",{"key":28,"text":103,"correct":22},"二次搬运费",{"key":31,"text":105,"correct":22},"冬雨期施工的计价",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1118131,"根据现行《建筑安装工程费用组成》（建标[2013]44号），暂列金额应计入建筑安装工程的（）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"规费",{"key":24,"text":113,"correct":22},"措施费",{"key":28,"text":115,"correct":22},"人工费",{"key":31,"text":117,"correct":26},"其他项目费",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1118132,"工程量清单计价模式下，关于分部分项工程量和定额子目的说法，错误的是（）。P63",[122,124,126,128],{"key":20,"text":123,"correct":22},"清单工程量是按施工图图示尺寸和工程量清单计算规则计算得到的工程净量",{"key":24,"text":125,"correct":22},"定额子目工程量应严格按照与所采用的定额相对应的工程量计算规则计算",{"key":28,"text":127,"correct":22},"一个清单项目对应一个定额子目时，清单工程量和定额工程量很可能不同",{"key":31,"text":129,"correct":26},"清单工程量是承包人履行合同义务中应予完成的实际施工工程量",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1118133,"根据国家标准《建设工程工程量清单计价规范》（GB50500-2008），工程量清单中的其他项目清单不包括（）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"总承包服务费",{"key":24,"text":137,"correct":22},"材料暂估价",{"key":28,"text":139,"correct":22},"暂列金额",{"key":31,"text":111,"correct":26},{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":31,"analysis":33},1118134,"确定分部分项工程和措施项目中的单价项目综合单价的最重要依据之一是清单的()",[145,147,149,151],{"key":20,"text":146,"correct":22},"项目名称",{"key":24,"text":148,"correct":22},"项目编码",{"key":28,"text":150,"correct":22},"项目计量单位",{"key":31,"text":152,"correct":26},"项目特征描述",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":20,"analysis":33},1118135,"对于招标的工程，按照《建设工程工程量清单计价规范》GB50500-2013，工程合同价款约定应遵循的规定下列正确的是()",[157,159,161,163],{"key":20,"text":158,"correct":26},"合同价款应在中标通知书发出之日起30日内约定",{"key":24,"text":160,"correct":22},"合同价款的约定是约定工程价款的计算与结算方式",{"key":28,"text":162,"correct":22},"合同价款约定依据是招标文件",{"key":31,"text":164,"correct":22},"合同价款约定依据是工程量清单",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":24,"analysis":33},1118136,"根据《建筑安装工程费用项目组成》的现行规定，为完成建设工程施工，发生于该工程施工前和施工过程中的技术、生活、安全、环境保护等方面的费用需要计入（）",[169,171,173,174],{"key":20,"text":170,"correct":22},"分部分项工程费",{"key":24,"text":172,"correct":26},"措施项目费",{"key":28,"text":117,"correct":22},{"key":31,"text":111,"correct":22},{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":20,"analysis":33},1118137,"工程量清单中分部分项工程量的确定依据是（）。",[179,181,183,185],{"key":20,"text":180,"correct":26},"工程量清单编制人按施工图图示尺寸和清单工程量计算规则计算得到的工程净量",{"key":24,"text":182,"correct":22},"工程量清单编制人按实际施工方案和清单工程量计算规则计算得到的工程净量",{"key":28,"text":184,"correct":22},"工程投标人按实际施工方案和清单工程量计算规则计算得到的工程净量",{"key":31,"text":186,"correct":22},"工程投标人按施工图图示尺寸和清单工程量计算规则计算得到的工程净量",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":28,"analysis":33},1118138,"关于招标人在工程量清单中提供的暂估价和暂列金额，下列说法正确的是（）。",[191,193,195,197],{"key":20,"text":192,"correct":22},"暂列金额和暂估价由投标人按估算金额确定",{"key":24,"text":194,"correct":22},"依法必须招标的暂估价材料和专业工程，由招标人、承包人与分包人共同通过招标确定材料单价与专业工程分包价",{"key":28,"text":196,"correct":26},"若暂估价材料不属于依法必须招标的，经发承包双方协商确认单价计价",{"key":31,"text":198,"correct":22},"若暂估价的专业工程不属于依法必须招标的，由发包人、总承包人按有关计价依据进行计价",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":20,"analysis":33},1118139,"在编制综合单价的时候，计算综合单价的第一步是()。",[203,205,207,209],{"key":20,"text":204,"correct":26},"将清单项目的工程内容与定额项目的工程内容进行比较",{"key":24,"text":206,"correct":22},"测算人料机消耗量",{"key":28,"text":208,"correct":22},"计算定额子目工程量",{"key":31,"text":210,"correct":22},"确定人料机单价",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":20,"analysis":33},1118140,"投标时，建筑安装工程费中的()不具备竞争性。",[215,217,218,219],{"key":20,"text":216,"correct":26},"规费和税金",{"key":24,"text":170,"correct":22},{"key":28,"text":172,"correct":22},{"key":31,"text":117,"correct":22},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":24,"analysis":33},1118141,"在措施项目费的计算方法中，()适用于室内空气污染测试。",[224,225,227,229],{"key":20,"text":41,"correct":22},{"key":24,"text":226,"correct":26},"分包法计价",{"key":28,"text":228,"correct":22},"参数法计价",{"key":31,"text":230,"correct":22},"混合单价法",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":20,"analysis":33},1118142,"按照《建设工程工程量清单计价规范》GB50500-2013文件的规定，工程量清单综合单价可表示为( )。",[235,237,239,241],{"key":20,"text":236,"correct":26},"人工费+材料费+机械使用费+管理费+利润+风险费",{"key":24,"text":238,"correct":22},"人工费+材料费+机械使用费+管理费+利润+风险费+措施项目费",{"key":28,"text":240,"correct":22},"人工费+材料费+机械使用费+管理费+利润+风险费+措施项目费+规费",{"key":31,"text":242,"correct":22},"人工费+材料费+机械使用费+管理费+利润+风险费+措施项目费+规费+税金",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":31,"analysis":33},1118143,"根据《建设工程工程量清单计价规范》，以“项”为计量单位的措施项目费()。",[247,249,251,253],{"key":20,"text":248,"correct":22},"采用工程量清单综合单价计价方式",{"key":24,"text":250,"correct":22},"包括除利润、税金外的全部费用",{"key":28,"text":252,"correct":22},"包括除规费、利润、税金外的全部费用",{"key":31,"text":254,"correct":26},"包括除规费、税金外的全部费用",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":20,"analysis":33},1118144,"业主方在招标文件中规定了300万元的暂列金额。则每一个承包商在投标报价时对该项暂列金额的正确处理方式是（）。",[259,261,263,265],{"key":20,"text":260,"correct":26},"计入投标总报价，但承包商无权自主使用，余额归发包人所有",{"key":24,"text":262,"correct":22},"计入投标总报价，且承包商有权自主使用，余额归发包人所有",{"key":28,"text":264,"correct":22},"不计入投标总价，在实际发生时由业主支付",{"key":31,"text":266,"correct":22},"计入投标总价，由工程师决定是否使用，余额归承包人所有",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":24,"analysis":33},1118145,"工程量清单中综合单价的构成中包括下列选项中的()。",[271,272,274,275],{"key":20,"text":172,"correct":22},{"key":24,"text":273,"correct":26},"管理费",{"key":28,"text":216,"correct":22},{"key":31,"text":276,"correct":22},"风险费用",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":24,"analysis":33},1118146,"某工程根据清单规则计算的挖土方量3000m3,根据地质资料和施工方案计算需要人工挖土方量5200m3，人工挖土单价为8元\u002Fm3,机械运土方量为2200m3，机具费单价为20\u002Fm3,管理费取人、料、机费的14%，利润取人、料、机与管理费之和的8%。根据建筑工程量清单规则计算该土方工程的综合单价为（）元\u002Fm3。",[281,283,285,287],{"key":20,"text":282,"correct":22},"26.27",{"key":24,"text":284,"correct":26},"35.13",{"key":28,"text":286,"correct":22},"28.53",{"key":31,"text":288,"correct":22},"38.91",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":24,"analysis":33},1118147,"工程量清单中综合单价的构成中包括下列选项中的（）。",[293,294,295,296],{"key":20,"text":172,"correct":22},{"key":24,"text":273,"correct":26},{"key":28,"text":111,"correct":22},{"key":31,"text":297,"correct":22},"税金",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},1118148,"某工程项目采用单价合同，在施工过程中进行某分项工程计量时发现因工程变更，承包人实际完成的工程量超过了工程量清单中的工程量，则进行该分项工程计量时()。",[302,304,306,308],{"key":20,"text":303,"correct":22},"按照招标工程量清单中的工程量计算",{"key":24,"text":305,"correct":26},"按承包人在履行合同义务中完成的工程量计算",{"key":28,"text":307,"correct":22},"按承包人提交的已完工程量计算",{"key":31,"text":309,"correct":22},"按发包人核实后的工程量计算",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},1118149,"索赔费用组成中，分包费用是指()的索赔款额。",[314,316,318,320],{"key":20,"text":315,"correct":22},"总包商向分包商",{"key":24,"text":317,"correct":26},"分包商向总包商",{"key":28,"text":319,"correct":22},"分包商向发包人",{"key":31,"text":321,"correct":22},"发包人向分包商",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":28,"analysis":33},1118150,"按照年度施工计划，某工程项目在本年度的安全文明施工费总额为40万元，则发包人应在工程开工后28天内，预付给承包人的安全文明施工费应不低于( )万元。",[326,328,330,332],{"key":20,"text":327,"correct":22},"16",{"key":24,"text":329,"correct":22},"24",{"key":28,"text":331,"correct":26},"20",{"key":31,"text":333,"correct":22},"28",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},1118151,"在招标过程中，若出现招标文件中分部分项工程量清单描述与设计图纸不符，投标人确定投标报价的综合单价应该以()为准。",[338,340,342,343],{"key":20,"text":339,"correct":22},"设计文件",{"key":24,"text":341,"correct":26},"项目特征的描述",{"key":28,"text":57,"correct":22},{"key":31,"text":53,"correct":22},{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":20,"analysis":33},1118152,"下列干扰事件中，承包商不能提出工期索赔的是()。",[348,350,352,354],{"key":20,"text":349,"correct":26},"工程师指示承包商加快施工进度",{"key":24,"text":351,"correct":22},"开工前发包人原因引起的暂停施工",{"key":28,"text":353,"correct":22},"异常恶劣的气候条件",{"key":31,"text":355,"correct":22},"业主未能及时支付工程款造成工期延误",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":28,"analysis":33},1118153,"某工程合同价为100万元，合同约定：采用调值公式进行动态结算，其中固定要素比重为0.3，调价要素 A、 B、C分别占合同价的比重为0.15、0.25、0.3，结算时价格指数分别增长了20％、15％、25％，则该工程实际结算款额为（ ）万元。",[360,362,364,366],{"key":20,"text":361,"correct":22},"119.75",{"key":24,"text":363,"correct":22},"128.75",{"key":28,"text":365,"correct":26},"114.25",{"key":31,"text":367,"correct":22},"127.25",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":31,"analysis":33},1118154,"下列关于工程计量的表述，错误的是（）",[372,374,376,378],{"key":20,"text":373,"correct":22},"工程量必须以承包人完成合同工程应予计量的工程量确定",{"key":24,"text":375,"correct":22},"施工中进行工程量计量时，当发现招标工程量清单中出现缺项引起工程量增减时，应按承包人在履行合同义务中完成的工程量计量",{"key":28,"text":377,"correct":22},"监理人应在收到承包人提交的工程量报告后7天内完成对承包人提交的工程量报表的审核并报送发包人",{"key":31,"text":379,"correct":26},"超出合同工程范围施工或返工的工程量，发包人均应予以计量",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":24,"analysis":33},1118155,"合同工程实施期间，如果出现招标工程量清单中措施项目缺项，承包人应将新增措施项目实施方案提交发包人批准后，按照（）的规定调整合同价款。",[384,386,388,390],{"key":20,"text":385,"correct":22},"变更价款",{"key":24,"text":387,"correct":26},"计价规范",{"key":28,"text":389,"correct":22},"合同约定",{"key":31,"text":391,"correct":22},"措施项目清单",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":20,"analysis":33},1118156,"下面关于安全文明施工费说法正确的是（）",[396,398,400,402],{"key":20,"text":397,"correct":26},"安全文明施工费发包人应在工程开工后的28天内预付安全文明施工费总额的50%。",{"key":24,"text":399,"correct":22},"安全文明施工费发包人应在工程开工后的28天内预付不低于当年施工进度计划的安全文明施工费总额的40%。",{"key":28,"text":401,"correct":22},"发包人在付款期满后的14天内仍未支付安全文明施工费的，发生安全事故，发包人应承担连带责任。",{"key":31,"text":403,"correct":22},"发包人在付款期满后的28天内仍未支付安全文明施工费的，发生安全事故，发包人应承担连带责任。",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":24,"analysis":33},1118157,"施工期间，需要进行价格调整的材料，承包人在采购前应将材料单价和采购数量报发包人核对，发包人应在（）个工作日内予以答复，否则视为已经认可。",[408,410,412,414],{"key":20,"text":409,"correct":22},"1",{"key":24,"text":411,"correct":26},"5",{"key":28,"text":413,"correct":22},"7",{"key":31,"text":415,"correct":22},"3",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":24,"analysis":33},1118158,"某工程合同价为1000万元，合同约定：物价变化时合同价款调整采用价格指数法，其中固定要素比例为0．3，调价要素为人工费、钢材、水泥三类，分别占合同价的比例为0．2、0．15、0．35，结算时价格指数分别增长了20％、15％、25％，则该工程实际价款的变化值为（）万元。",[420,422,424,426],{"key":20,"text":421,"correct":22},"125",{"key":24,"text":423,"correct":26},"150",{"key":28,"text":425,"correct":22},"175",{"key":31,"text":427,"correct":22},"200",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":31,"analysis":33},1118159,"某施工现场有塔式起重机1台，由施工企业租得，台班单价5000元\u002F台班，租赁费为2000元\u002F台班，人工工资为80元\u002F工日，窝工补贴25元\u002F工日，以人工费和机械费合计为计算基础的综合费率为30%。在施工过程中发生了如下事件：监理人对已经覆盖的隐蔽工程要求重新检查且检查结果合格，配合用工10工日，塔式起重机1台班。为此，施工企业可向业主索赔的费用为()元。",[432,434,436,438],{"key":20,"text":433,"correct":22},"2250",{"key":24,"text":435,"correct":22},"2925",{"key":28,"text":437,"correct":22},"5800",{"key":31,"text":439,"correct":26},"7540",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":20,"analysis":33},1118160,"合同工程实施期间，如果出现设计图纸（含设计变更）与招标工程量清单任一项目的特征描述不符，且由此导致工程造价增减变化的，应按（）的规定重新确定相应工程量清单项目的综合单价，调整合同价款。",[444,446,448,450],{"key":20,"text":445,"correct":26},"实际施工的项目特征",{"key":24,"text":447,"correct":22},"设计图纸的项目特征",{"key":28,"text":449,"correct":22},"招标工程量清单",{"key":31,"text":451,"correct":22},"暂估价",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":28,"analysis":33},1118161,"根据《建设工程工程量清单计价规范》GB50500——2013，当承包人投标报价中材料单价高于基准单价时，施工期间材料单价跌幅以（）为基础，超过合同约定的风险幅度值的，其超过部分按实调整。",[456,458,460,462],{"key":20,"text":457,"correct":22},"投标报价",{"key":24,"text":459,"correct":22},"招标控制价",{"key":28,"text":461,"correct":26},"基准单价",{"key":31,"text":463,"correct":22},"实际单价",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":28,"analysis":33},1118162,"施工过程中，如果工程变更项目出现承包人在工程量清单中填报的综合单价与发包人招标控制价相应清单项目的综合单价偏差超过（），则工程变更项目的综合单价可由发承包双方协商调整。",[468,470,472,474],{"key":20,"text":469,"correct":22},"5%",{"key":24,"text":471,"correct":22},"10%",{"key":28,"text":473,"correct":26},"15%",{"key":31,"text":475,"correct":22},"20%",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":31,"analysis":33},1118163,"某新校区抗震模拟实验室工程，主体部分采用钢架结构，施工合同约定钢材由业主供料，其余材料均委托承包商采购。但承包商在以自有机械设备进行主体钢结构制作吊装过程中，由于业主供应钢材不及时导致承包商停工7天，则承包商计算施工机械窝工费时，应按（）向业主提出索赔。",[480,482,484,486],{"key":20,"text":481,"correct":22},"机械台班费",{"key":24,"text":483,"correct":22},"机械租赁费",{"key":28,"text":485,"correct":22},"机械使用费",{"key":31,"text":487,"correct":26},"机械折旧费",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":28,"analysis":33},1118164,"关于工程量清单计价模式下的暂列金额，下列说法错误的是（）。",[492,494,496,498],{"key":20,"text":493,"correct":22},"暂列金额用于工程合同签订时尚未确定或者不可预见的采购或施工中可能发生的费用",{"key":24,"text":495,"correct":22},"暂列金额是指招标人在工程量清单中暂定并包括在合同价款中的一笔款项",{"key":28,"text":497,"correct":26},"已签订合同价中的暂列金额由承包人掌握使用",{"key":31,"text":499,"correct":22},"发包人按照合同的规定作出支付后如有剩余，则暂列金额归发包人所有",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":24,"analysis":33},1118165,"按我国《建设工程施工合同（示范文本）》的规定，如果施工过程中发生工程变更，合同中有类似变更工程价格，则变更价款应( )。",[504,506,508,510],{"key":20,"text":505,"correct":22},"由工程师与承包人协商确认",{"key":24,"text":507,"correct":26},"参照合同价格确认",{"key":28,"text":509,"correct":22},"由承包人提出价格，工程师确认",{"key":31,"text":511,"correct":22},"按合同价格确认",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":28,"analysis":33},1118166,"2017年5月实际完成的某工程按2015年5月签约时的价格计算，工程价款为1000万元。该工程固定要素的系数为0.2，各参加调值的部分，除钢材和水泥的价格指数分别增长了10%和15%外，其余都未发生变化。钢材和水泥的费用分别占调值部分的40%和20%，按价格指数调整公式法计算，则该工程实际价款变化值为( )万元。",[516,518,520,522],{"key":20,"text":517,"correct":22},"36",{"key":24,"text":519,"correct":22},"46",{"key":28,"text":521,"correct":26},"56",{"key":31,"text":523,"correct":22},"66",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":24,"analysis":33},1118167,"“非典”期间，有不少在建工程停工，由于这种流行性疾病属于不能预见、不能避免并不能克服的客观情况、构成不可抗力，发包人要求承包人安排管理人员及保费人员的费用原则上应由( )负担。",[528,530,532,534],{"key":20,"text":529,"correct":22},"政府部门",{"key":24,"text":531,"correct":26},"业主",{"key":28,"text":533,"correct":22},"设计部门",{"key":31,"text":535,"correct":22},"承包商",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":24,"analysis":33},1118168,"当发生多次索赔事件以后，适宜采用( )计算索赔金额。",[540,542,544,546],{"key":20,"text":541,"correct":22},"实际费用法",{"key":24,"text":543,"correct":26},"总费用法",{"key":28,"text":545,"correct":22},"综合费用法",{"key":31,"text":547,"correct":22},"修正费用法",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":20,"analysis":33},1118169,"当工作内容增加引起的设备费索赔时，设备费的标准按照( )计算。",[552,553,554,556],{"key":20,"text":481,"correct":26},{"key":24,"text":487,"correct":22},{"key":28,"text":555,"correct":22},"机械修理费",{"key":31,"text":557,"correct":22},"设备租赁费",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":24,"analysis":33},1118170,"某混凝土工程招标清单工程量为200m3，综合单价为300元\u002Fm3。在施工过程中，由于工程变更导致实际完成工程量为250m3。合同约定当实际工程量增加超过15%时可调整单价，调价系数为0.9。该混凝土工程的实际工程费用为（）万元。",[562,564,566,568],{"key":20,"text":563,"correct":22},"6",{"key":24,"text":565,"correct":26},"7.44",{"key":28,"text":567,"correct":22},"7.5",{"key":31,"text":569,"correct":22},"8.25",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":28,"analysis":33},1118171,"某工程的定额工期为300天，按照相关规定，招标人在确定合同工期时，压缩的工期天数不得超过（）天，超过者，招标人应在招标文件中明示增加赶工费用。",[574,576,578,580],{"key":20,"text":575,"correct":22},"30",{"key":24,"text":577,"correct":22},"45",{"key":28,"text":579,"correct":26},"60",{"key":31,"text":581,"correct":22},"90",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":24,"analysis":33},1118172,"某工程招标控制价为2000万元，签订的中标价为1800万元，如果施工过程中发生已标价工程清单中没有适用也没有类似的工程变更，承包人可以根据报价浮动率提出变更工程项目的单价，报发包人确认后调整。则承包人报价浮动率应控制在（）范围内。",[586,587,588,589],{"key":20,"text":469,"correct":22},{"key":24,"text":471,"correct":26},{"key":28,"text":473,"correct":22},{"key":31,"text":475,"correct":22},{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":24,"analysis":33},1118173,"某钢筋混凝土基础工程，施工合同约定采用现场搅拌混凝土方式浇筑。但在基础施工过程中，由于业主要求将现场搅拌混凝土方式变更为商品混凝土方式，致使工程延期3天，则承包商可索赔材料费的情况是（）。",[594,596,598,600],{"key":20,"text":595,"correct":22},"材料损耗费",{"key":24,"text":597,"correct":26},"材料超期储存",{"key":28,"text":599,"correct":22},"材料被盗和损坏",{"key":31,"text":601,"correct":22},"材料进货日期变化",[603,606,609,612,615,618],{"id":15,"name":604,"category":7,"favorite":605},"领导干部任职前廉政法规知识测试题",92,{"id":607,"name":608,"category":7,"favorite":15},595,"建筑结构与设备",{"id":610,"name":611,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":613,"name":614,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":616,"name":617,"category":7,"favorite":8},534,"BIM工程师",{"id":619,"name":617,"category":7,"favorite":8},535]