[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-21":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":565},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,21,50,2973,[13,34,46,55,63,75,83,95,104,112,124,136,148,156,167,179,188,200,208,216,228,240,252,264,276,284,296,308,320,330,342,353,361,373,385,397,407,415,427,439,451,463,475,487,499,510,522,533,541,553],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1118074,1,"单选题","概算定额一般是在预算定额的基础上以()为对象编制而成的，以作为编制设计概算的依据。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","单位工程",false,{"key":24,"text":25,"correct":22},"B","单项工程",{"key":27,"text":28,"correct":29},"C","扩大分项工程",true,{"key":31,"text":32,"correct":22},"D","分项工程","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1118075,"施工企业（建筑安装企业）组织生产和加强管理在企业内部使用的一种定额是()，且属于企业定额的性质。",[38,40,42,44],{"key":20,"text":39,"correct":22},"预算定额",{"key":24,"text":41,"correct":22},"概算定额",{"key":27,"text":43,"correct":29},"施工定额",{"key":31,"text":45,"correct":22},"概算指标",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1118076,"以建筑物或构筑各个分部分项工程为对象编制的定额为()。",[50,51,52,54],{"key":20,"text":41,"correct":22},{"key":24,"text":39,"correct":29},{"key":27,"text":53,"correct":22},"企业定额",{"key":31,"text":43,"correct":22},{"id":56,"libraryId":5,"type":15,"typeLabel":16,"stem":57,"options":58,"answer":27,"analysis":33},1118077,"概算定额是以（ ）为对象编制的。",[59,60,61,62],{"key":20,"text":25,"correct":22},{"key":24,"text":21,"correct":22},{"key":27,"text":28,"correct":29},{"key":31,"text":32,"correct":22},{"id":64,"libraryId":5,"type":15,"typeLabel":16,"stem":65,"options":66,"answer":20,"analysis":33},1118078,"按（ ）分类，建设工程定额分为人工定额、材料消耗定额和施工机械台班使用定额。",[67,69,71,73],{"key":20,"text":68,"correct":29},"生产要素内容",{"key":24,"text":70,"correct":22},"编制程序和用途",{"key":27,"text":72,"correct":22},"编制单位和适用范围",{"key":31,"text":74,"correct":22},"投资的费用性质",{"id":76,"libraryId":5,"type":15,"typeLabel":16,"stem":77,"options":78,"answer":31,"analysis":33},1118079,"工程建设定额中分项最细、定额子目最多的一种定额是( )。",[79,80,81,82],{"key":20,"text":45,"correct":22},{"key":24,"text":41,"correct":22},{"key":27,"text":39,"correct":22},{"key":31,"text":43,"correct":29},{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":24,"analysis":33},1118080,"材料的损耗一般以( )表示。",[87,89,91,93],{"key":20,"text":88,"correct":22},"损耗量",{"key":24,"text":90,"correct":29},"损耗率",{"key":27,"text":92,"correct":22},"净用量",{"key":31,"text":94,"correct":22},"总损耗量",{"id":96,"libraryId":5,"type":15,"typeLabel":16,"stem":97,"options":98,"answer":31,"analysis":33},1118081,"在项目建议书和可行性研究阶段确定建设项目投资可以依据（ ）。",[99,100,101,102],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":22},{"key":27,"text":45,"correct":22},{"key":31,"text":103,"correct":29},"投资估算指标",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":20,"analysis":33},1118082,"在下列定额中，可反映施工企业生产与组织的技术和管理水平的是()。",[108,109,110,111],{"key":20,"text":43,"correct":29},{"key":24,"text":39,"correct":22},{"key":27,"text":41,"correct":22},{"key":31,"text":45,"correct":22},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":31,"analysis":33},1118083,"某施工机械的时间定额是0.391台班\u002F100m3，与之配合的工人小组有4人，则该机械的产量定额为()m3\u002F台班。",[116,118,120,122],{"key":20,"text":117,"correct":22},"0.64",{"key":24,"text":119,"correct":22},"2.56",{"key":27,"text":121,"correct":22},"64",{"key":31,"text":123,"correct":29},"256",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":31,"analysis":33},1118084,"编制人工定额时，应计入定额时间的是( )。",[128,130,132,134],{"key":20,"text":129,"correct":22},"工人在工作时间内聊天时间",{"key":24,"text":131,"correct":22},"工人午饭后迟到时间",{"key":27,"text":133,"correct":22},"材料供应中断造成的停工时间",{"key":31,"text":135,"correct":29},"工作结束后的整理工作时间",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":27,"analysis":33},1118085,"砌筑“1砖混水砖墙”砌筑小组由3人组成，正常施工条件下。10m3砖墙砌筑耗时32小时，则砌筑10m3混水砖墙的人工时间定额为()",[140,142,144,146],{"key":20,"text":141,"correct":22},"5",{"key":24,"text":143,"correct":22},"15",{"key":27,"text":145,"correct":29},"12",{"key":31,"text":147,"correct":22},"120",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":20,"analysis":33},1118086,"施工项目经理部编制作业计划时，最合理的定额依据是()。",[152,153,154,155],{"key":20,"text":43,"correct":29},{"key":24,"text":39,"correct":22},{"key":27,"text":41,"correct":22},{"key":31,"text":45,"correct":22},{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":24,"analysis":33},1118087,"编制标准砖砌体材料消耗定额时,砖的消耗量应按( )规定。",[160,161,163,165],{"key":20,"text":92,"correct":22},{"key":24,"text":162,"correct":29},"净用量+损耗量",{"key":27,"text":164,"correct":22},"一次损耗量",{"key":31,"text":166,"correct":22},"损耗量+补耗量",{"id":168,"libraryId":5,"type":15,"typeLabel":16,"stem":169,"options":170,"answer":20,"analysis":33},1118088,"根据生产技术和施工组织条件，对施工过程中各工序的工时消耗等资料进行测定，再对所获得的资料进行科学的分析而制定人工定额的方法属于()。",[171,173,175,177],{"key":20,"text":172,"correct":29},"技术测定法",{"key":24,"text":174,"correct":22},"经验估计法",{"key":27,"text":176,"correct":22},"理论计算法",{"key":31,"text":178,"correct":22},"比较类推法",{"id":180,"libraryId":5,"type":15,"typeLabel":16,"stem":181,"options":182,"answer":20,"analysis":33},1118089,"人工定额的制定方法中，简单易行，适用于施工条件正常、产品稳定、工序重复量大和统计工作制度健全施工过程的方法，是()。",[183,185,186,187],{"key":20,"text":184,"correct":29},"统计分析法",{"key":24,"text":178,"correct":22},{"key":27,"text":174,"correct":22},{"key":31,"text":172,"correct":22},{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":24,"analysis":33},1118090,"建设工程定额中周转材料消耗量指标中，应当用()两个指标表示。",[192,194,196,198],{"key":20,"text":193,"correct":22},"一次使用量和消耗量",{"key":24,"text":195,"correct":29},"一次使用量和摊销量",{"key":27,"text":197,"correct":22},"一次消耗量和计划使用量",{"key":31,"text":199,"correct":22},"一次消耗量和摊销量",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":31,"analysis":33},1118091,"根据已建工程或现有工程的价格数据和资料，经分析、归纳和整理编制而形成的定额是( )。",[204,205,206,207],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":22},{"key":27,"text":45,"correct":22},{"key":31,"text":103,"correct":29},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":24,"analysis":33},1118092,"某施工机械的时间定额为0.391台班／100立方米，与之配合的工人小组有4人，则该机械的产量定额为( )立方米／台班。",[212,213,214,215],{"key":20,"text":119,"correct":22},{"key":24,"text":123,"correct":29},{"key":27,"text":117,"correct":22},{"key":31,"text":121,"correct":22},{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":24,"analysis":33},1118093,"下列工作中，应以预算定额作为编制依据的是（）。",[220,222,224,226],{"key":20,"text":221,"correct":22},"编制施工作业计划",{"key":24,"text":223,"correct":29},"编制单位估价表",{"key":27,"text":225,"correct":22},"建设单位编制年度投资计划",{"key":31,"text":227,"correct":22},"结算计件工资",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":31,"analysis":33},1118094,"某施工机械的台班产量为500m3，与之配合的工人小组中有4人，则人工定额为（）。",[232,234,236,238],{"key":20,"text":233,"correct":22},"0.2工日\u002Fm3",{"key":24,"text":235,"correct":22},"0.8工日\u002Fm3",{"key":27,"text":237,"correct":22},"0.2工日\u002F100m3",{"key":31,"text":239,"correct":29},"0.8工日\u002F100m3",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":24,"analysis":33},1118095,"关于建设工程施工定额，下列说法正确的是（）。",[244,246,248,250],{"key":20,"text":245,"correct":22},"施工定额是社会性的定额",{"key":24,"text":247,"correct":29},"施工定额由人工定额、材料消耗定额、施工机械台班使用定额所组成",{"key":27,"text":249,"correct":22},"施工定额是以建筑物或构筑物各个分部分项工程为对象编制的定额",{"key":31,"text":251,"correct":22},"施工定额水平反映建筑行业生产与组织的技术水平的管理水平",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":20,"analysis":33},1118096,"建设工程定额按工程专业和性质的分类不包括()。",[256,258,260,262],{"key":20,"text":257,"correct":29},"材料消耗定额",{"key":24,"text":259,"correct":22},"建筑工程定额",{"key":27,"text":261,"correct":22},"装饰装修工程定额",{"key":31,"text":263,"correct":22},"市政工程定额",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":31,"analysis":33},1118097,"关于投资估算指标的说法中，正确的是()。",[268,270,272,274],{"key":20,"text":269,"correct":22},"投资估算指标是在项目设计任务书阶段编制投资估算、计算投资需要量时使用的一种指标",{"key":24,"text":271,"correct":22},"投资估算指标是根据在建工程的价格数据和资料，经分析、归纳和整理编制而成的",{"key":27,"text":273,"correct":22},"投资估算指标是生产产品数量标准或项目费用标准",{"key":31,"text":275,"correct":29},"投资估算指标是合理确定建设工程项目投资的基础",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":27,"analysis":33},1118098,"以独立的单项工程或完整的工程项目为计算对象编制确定的生产要素消耗的数量标准或项目费用标准是( )。",[280,281,282,283],{"key":20,"text":41,"correct":22},{"key":24,"text":45,"correct":22},{"key":27,"text":103,"correct":29},{"key":31,"text":39,"correct":22},{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":20,"analysis":33},1118099,"下列关于投资估算指标的表述中，错误的是（）",[288,290,292,294],{"key":20,"text":289,"correct":29},"投资估算指标是概算指标的综合与扩大",{"key":24,"text":291,"correct":22},"投资估算指标是在项目建议书阶段编制投资估算时使用的",{"key":27,"text":293,"correct":22},"投资估算指标是以独立的单项工程或完整的工程项目为对象编制的",{"key":31,"text":295,"correct":22},"投资估算指标是根据已建或现有工程的价格数据和资料编制的",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":27,"analysis":33},1118100,"已知某挖土机挖土的一个工作循环需5分钟，每循环一次挖土1.5m3，工作班的延续时间为8小时，时间利用系数K=0.9，则其台班产量定额为()。",[300,302,304,306],{"key":20,"text":301,"correct":22},"10.8（立方米）\u002F台班",{"key":24,"text":303,"correct":22},"15（立方米）\u002F台班",{"key":27,"text":305,"correct":29},"129.6（立方米）\u002F台班",{"key":31,"text":307,"correct":22},"120（立方米）\u002F台班",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":27,"analysis":33},1118101,"已知某斗容量1m3正铲挖土机，挖四类土，装车，深度在2m内，小组成员两人，定额单位为100m3，机械时间定额为0.21台班，则挖100m3的人工时间定额为（）",[312,314,316,318],{"key":20,"text":313,"correct":22},"0.42台班",{"key":24,"text":315,"correct":22},"4.76工日",{"key":27,"text":317,"correct":29},"0.42工日",{"key":31,"text":319,"correct":22},"4.76台班",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":27,"analysis":33},1118102,"已知某挖土机挖土的一个工作循环需2分钟，每循环一次挖土0.5m3，工作班的延续时间为8小时，时间利用系数K=0.85，则该机械的产量定额为()m3／台班。",[324,326,327,329],{"key":20,"text":325,"correct":22},"12.8",{"key":24,"text":143,"correct":22},{"key":27,"text":328,"correct":29},"102",{"key":31,"text":147,"correct":22},{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":20,"analysis":33},1118103,"下列选项中，属于材料消耗净用量的确定方法（）。",[334,336,338,340],{"key":20,"text":335,"correct":29},"理论计算法、测定法、图纸计算法、经验法",{"key":24,"text":337,"correct":22},"理论计算法、测定法、图纸计算法、比较类推法",{"key":27,"text":339,"correct":22},"理论计算法、统计分析法、图纸计算法、比较类推法",{"key":31,"text":341,"correct":22},"理论计算法、统计分析法、图纸计算法、经验法",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":27,"analysis":33},1118104,"根据试验情况和现场测定的资料数据确定材料的净用量，体现了材料净用量确定方法中的()。",[346,348,350,352],{"key":20,"text":347,"correct":22},"图纸计算法",{"key":24,"text":349,"correct":22},"经验法",{"key":27,"text":351,"correct":29},"测定法",{"key":31,"text":176,"correct":22},{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":20,"analysis":33},1118105,"对于施工条件正常、产品稳定、工序重复量大、统计制度健全的施工过程，确定其人工定额时间可以采用()。",[357,358,359,360],{"key":20,"text":184,"correct":29},{"key":24,"text":172,"correct":22},{"key":27,"text":178,"correct":22},{"key":31,"text":174,"correct":22},{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":31,"analysis":33},1118106,"编制施工机械合班使用定额时，施工机械必须消耗时间包括有效工作时间、不可避免的中断时间以及( )。",[365,367,369,371],{"key":20,"text":366,"correct":22},"施工本身造成的停工时间",{"key":24,"text":368,"correct":22},"非施工本身造成的停工时间",{"key":27,"text":370,"correct":22},"低负荷下的工作时间",{"key":31,"text":372,"correct":29},"不可避免的无负荷工作时间",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":24,"analysis":33},1118107,"下列属于建筑安装工程费用定额的是()。",[377,379,381,383],{"key":20,"text":378,"correct":22},"单位估价表",{"key":24,"text":380,"correct":29},"措施费定额",{"key":27,"text":382,"correct":22},"其他费用定额",{"key":31,"text":384,"correct":22},"直接费定额",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":24,"analysis":33},1118108,"某施工工序的人工产量定额为4.56m3，则该工序的人工时间定额为()。",[389,391,393,395],{"key":20,"text":390,"correct":22},"0.22工日\u002Fm3",{"key":24,"text":392,"correct":29},"0.22工日",{"key":27,"text":394,"correct":22},"1.76工日\u002Fm3",{"key":31,"text":396,"correct":22},"4.56工日\u002Fm3",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":31,"analysis":33},1118109,"施工定额的定额水平反映施工企业生产与组织的技术水平和管理水平，可以直接用于施工项目的管理。在进行施工项目管理时，施工定额不可以用于()。",[401,403,404,405],{"key":20,"text":402,"correct":22},"签发限额领料单",{"key":24,"text":221,"correct":22},{"key":27,"text":227,"correct":22},{"key":31,"text":406,"correct":29},"工程价款的结算",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":31,"analysis":33},1118110,"编制扩大初步设计概算、确定建设项目投资额的依据是( )。",[411,412,413,414],{"key":20,"text":45,"correct":22},{"key":24,"text":39,"correct":22},{"key":27,"text":103,"correct":22},{"key":31,"text":41,"correct":29},{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":31,"analysis":33},1118111,"实行招标的工程合同价款应在中标通知书发出之日起()天内,由承发包双方依据招标文件和中标人的投标文件在书面合同中约定。",[419,421,423,425],{"key":20,"text":420,"correct":22},"7",{"key":24,"text":422,"correct":22},"14",{"key":27,"text":424,"correct":22},"28",{"key":31,"text":426,"correct":29},"30",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":24,"analysis":33},1118112,"关于工程量清单计价下投标价的编制原则，下列说法错误的是（）。",[431,433,435,437],{"key":20,"text":432,"correct":22},"投标报价由投标人根据《建设工程工程量清单计价规范》强制性规定自主确定",{"key":24,"text":434,"correct":29},"投标报价不得低于社会平均工程成本",{"key":27,"text":436,"correct":22},"投标人必须按招标工程量清单填报价格",{"key":31,"text":438,"correct":22},"投标报价要以招标文件中设定的承发包双方责任划分作为设定投标报价费用项目和费用计算的基础",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":31,"analysis":33},1118113,"建设工程量清单计价中的其他项目清单不包括()。",[443,445,447,449],{"key":20,"text":444,"correct":22},"暂列金额",{"key":24,"text":446,"correct":22},"总承包服务费",{"key":27,"text":448,"correct":22},"计日工",{"key":31,"text":450,"correct":29},"规费",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":27,"analysis":33},1118114,"根据《建设工程工程量清单计价规范》(GB50500-2013),招投标时不能作为竞争性费用的是（）。",[455,457,459,461],{"key":20,"text":456,"correct":22},"夜间施工费",{"key":24,"text":458,"correct":22},"冬雨季施工费",{"key":27,"text":460,"correct":29},"安全文明施工费",{"key":31,"text":462,"correct":22},"已完工程及设备保护费",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":27,"analysis":33},1118115,"某工程根据清单规则计算的挖方量为2500m3，根据地质资料和施工方案计算需人工挖土方量为5000m3，人工挖土单价为8.4元／m3，机械运土方量为2000m3，机具费单价为20元／m3，管理费取人、料、机费的14%，利润取人、料、机与管理费之和的8%。根据建筑工程量清单计算规则计算该土方工程的综合单价为()元／m3。",[467,469,471,473],{"key":20,"text":468,"correct":22},"20，19",{"key":24,"text":470,"correct":22},"32,80",{"key":27,"text":472,"correct":29},"40.38",{"key":31,"text":474,"correct":22},"45.36",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":31,"analysis":33},1118116,"某工程，招标人提供的工程量清单中挖土方的工程量为3000m3，投标人根据其施工方案计算出的挖土方作业量为3500m3，完成该分项工程的人工、材料、机械费为70000元，管理费为15000元，利润为4000元，其他因素均不考虑，则根据已知条件，投标人应报的综合单价为()元\u002Fm3。",[479,481,483,485],{"key":20,"text":480,"correct":22},"24.29",{"key":24,"text":482,"correct":22},"25.43",{"key":27,"text":484,"correct":22},"28.33",{"key":31,"text":486,"correct":29},"29.67",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":24,"analysis":33},1118117,"对于其他项目中的计日工，投标人正确的报价方式是()。",[491,493,495,497],{"key":20,"text":492,"correct":22},"待签证时报价",{"key":24,"text":494,"correct":29},"自主报价",{"key":27,"text":496,"correct":22},"按政策规定标准估算报价",{"key":31,"text":498,"correct":22},"按招标文件提供的金额报价",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":20,"analysis":33},1118118,"《建设工程工程量清单计价规范》GB50500-2013，投标人所填报的分部分项工程的综合单价中不包括( )。",[503,504,506,508],{"key":20,"text":450,"correct":29},{"key":24,"text":505,"correct":22},"利润",{"key":27,"text":507,"correct":22},"管理费",{"key":31,"text":509,"correct":22},"材料费",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":24,"analysis":33},1118119,"对于夜间施工费，采用工程量清单计价宜采用（）的方法",[514,516,518,520],{"key":20,"text":515,"correct":22},"综合单价法",{"key":24,"text":517,"correct":29},"参数法计价",{"key":27,"text":519,"correct":22},"分包法计价",{"key":31,"text":521,"correct":22},"全费用综合单价",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":20,"analysis":33},1118120,"措施项目费的计算方法中，( )计价适用于可以计算工程量的措施项目，主要是指一些与工程实体有紧密联系的项目。",[526,528,529,531],{"key":20,"text":527,"correct":29},"综合法",{"key":24,"text":351,"correct":22},{"key":27,"text":530,"correct":22},"参数法",{"key":31,"text":532,"correct":22},"分包法",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":27,"analysis":33},1118121,"根据《建设工程工程量清单计价规范》GB50500-2013，招投标时不能作为竞争性费用的是()。",[537,538,539,540],{"key":20,"text":456,"correct":22},{"key":24,"text":458,"correct":22},{"key":27,"text":460,"correct":29},{"key":31,"text":462,"correct":22},{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":20,"analysis":33},1118122,"将清单项目的()汇总得到该清单项目的合价，将该清单项目合价除以清单项目的工程量即可得到该清单项目的综合单价。",[545,547,549,551],{"key":20,"text":546,"correct":29},"直接工程费、管理费和利润",{"key":24,"text":548,"correct":22},"直接工程费、规费和利润",{"key":27,"text":550,"correct":22},"间接费、措施费和利润",{"key":31,"text":552,"correct":22},"措施费、规费和利润",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":20,"analysis":33},1118123,"在计算工程量清单项目的综合单价时，应将该清单项目合价除以（）。",[557,559,561,563],{"key":20,"text":558,"correct":29},"清单工程量",{"key":24,"text":560,"correct":22},"复核工程量",{"key":27,"text":562,"correct":22},"清单工程量与复核工程量的均值",{"key":31,"text":564,"correct":22},"实体工程量",[566,569,572,575,578,581],{"id":15,"name":567,"category":7,"favorite":568},"领导干部任职前廉政法规知识测试题",92,{"id":570,"name":571,"category":7,"favorite":15},595,"建筑结构与设备",{"id":573,"name":574,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":576,"name":577,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":579,"name":580,"category":7,"favorite":8},534,"BIM工程师",{"id":582,"name":580,"category":7,"favorite":8},535]