[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":603},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,2,50,2973,[13,34,46,58,70,82,92,104,116,128,140,152,163,175,183,192,204,216,228,240,252,264,276,288,300,312,324,336,348,360,372,384,396,408,420,432,444,456,468,480,492,504,516,524,533,545,557,569,580,592],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1117083,1,"单选题","根据《建设工程质量管理条例》，未经（ ）签字的建筑材料不得在工程上使用。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","监理员",false,{"key":24,"text":25,"correct":26},"B","专业监理工程师",true,{"key":28,"text":29,"correct":22},"C","总监理工程师代表",{"key":31,"text":32,"correct":22},"D","总监理工程师","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1117084,"根据现行《建设工程监理规范》要求，监理工程师对建设工程实施监理的形式包括（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"旁站、巡视和班组自检",{"key":24,"text":41,"correct":22},"巡视、平行检验和班组自检",{"key":28,"text":43,"correct":22},"平行检验、班组互检和旁站",{"key":31,"text":45,"correct":26},"旁站、巡视和平行检验",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1117086,"当业主方和施工方发生利益冲突或矛盾时，受业主的委托进行工程建设监理活动的监理机构应该以事实为依据，以法律和合同为准绳进行处理。这体现了监理的（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"服务性",{"key":24,"text":53,"correct":26},"公正性",{"key":28,"text":55,"correct":22},"科学性",{"key":31,"text":57,"correct":22},"独立性",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1117087,"根据现行《建设工程安全生产管理条例》，工程监理单位应当审查施工组织设计中的安全技术措施是否符合（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"工程建设强制性标准",{"key":24,"text":65,"correct":22},"建设工程承包合同",{"key":28,"text":67,"correct":22},"工程监理大纲",{"key":31,"text":69,"correct":22},"设计文件",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1117089,"根据《建设工程安全生产管理条例》，关于工程监理单位安全责任的说法，正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"在实施监理过程中发现情况严重的安全事故隐患，应要求施工单位整改",{"key":24,"text":77,"correct":22},"在实施监理过程中发现情况严重的安全事故隐患，应及时向有关主管部门报告",{"key":28,"text":79,"correct":22},"对于情节严重的安全事故隐患，施工单位拒不整改时应向建设单位报告",{"key":31,"text":81,"correct":26},"应审查专项施工方案是否符合工程建设强制性标准",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1117091,"对专业性较强的工程项目,项目监理机构应编制工程建设监理实施细则,并必须经（ ）批准后执行。",[86,88,89,90],{"key":20,"text":87,"correct":22},"监理单位技术负责人",{"key":24,"text":32,"correct":26},{"key":28,"text":25,"correct":22},{"key":31,"text":91,"correct":22},"专业工程师",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":20,"analysis":33},1117093,"根据《建筑安装工程费用项目组成》，施工企业发生的下列费用中，应计入企业管理费的是（ ）。",[96,98,100,102],{"key":20,"text":97,"correct":26},"劳动保险费",{"key":24,"text":99,"correct":22},"医疗保险费",{"key":28,"text":101,"correct":22},"住房公积金",{"key":31,"text":103,"correct":22},"养老保险费",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":31,"analysis":33},1117094,"根据《建筑安装工程费用项目组成》，施工企业为高空、井下、海上作业等特殊工种工人缴纳的工伤保险费属于（ ）。",[108,110,112,114],{"key":20,"text":109,"correct":22},"直接费",{"key":24,"text":111,"correct":22},"施工企业须向业主索赔的费用",{"key":28,"text":113,"correct":22},"施工企业管理费",{"key":31,"text":115,"correct":26},"规费",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":20,"analysis":33},1117096,"根据《建设工程工程量清单计价规范》暂列金额可用于支付（ ）。",[120,122,124,126],{"key":20,"text":121,"correct":26},"施工中发生设计变更增加的费用",{"key":24,"text":123,"correct":22},"业主提供了暂估价的材料采购费用",{"key":28,"text":125,"correct":22},"因承包人原因导致隐蔽工程质量不合格的返工费用",{"key":31,"text":127,"correct":22},"因施工缺陷造成的工程维修费用",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":31,"analysis":33},1117097,"某施工企业采购一批材料，出厂价3000 元\u002F吨。运杂费是材料采购价的5%。运输中材料的损耗率为1%，保管费率为2%，则该批材料的单价应为（ ）元\u002F吨。",[132,134,136,138],{"key":20,"text":133,"correct":22},"3150.00",{"key":24,"text":135,"correct":22},"3240.00",{"key":28,"text":137,"correct":22},"3244.50",{"key":31,"text":139,"correct":26},"3245.13",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":31,"analysis":33},1117099,"按照我国现行规定，关于其他项目费的计价，下列说法中正确的是（ ）。",[144,146,148,150],{"key":20,"text":145,"correct":22},"暂列金额由承包人掌握使用，扣除合同价款调整后如有余额，归建设单位",{"key":24,"text":147,"correct":22},"计日工按照工程量清单中的计日工表中的量和价格计价",{"key":28,"text":149,"correct":22},"总承包服务费由发包人在其他项目清单中规定",{"key":31,"text":151,"correct":26},"总承包服务费由施工企业投标时自主报价，施工过程中按签约合同价执行",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":20,"analysis":33},1117101,"根据《建筑安装工程费用项目组成》，因病而按计时工资标准的一定比例支付的工资属于（ ）。",[156,158,159,161],{"key":20,"text":157,"correct":26},"特殊情况下支付的工资",{"key":24,"text":99,"correct":22},{"key":28,"text":160,"correct":22},"职工福利费",{"key":31,"text":162,"correct":22},"津贴补贴",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":28,"analysis":33},1117102,"根据《建筑安装工程费用项目组成》（建标［2013］44 号），施工项目所用的砂子在运输过程中不可避免的损耗，应计入（ ）。",[167,169,171,173],{"key":20,"text":168,"correct":22},"企业管理费",{"key":24,"text":170,"correct":22},"二次搬运费",{"key":28,"text":172,"correct":26},"材料费",{"key":31,"text":174,"correct":22},"措施费",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":31,"analysis":33},1117104,"根据《建筑安装工程费用项目组成》，施工企业对建筑以及材料、构件和建筑安装物进行一般鉴定，检查所发生的费用，应计入建筑安装工程费用项目中的（）。",[179,180,181,182],{"key":20,"text":174,"correct":22},{"key":24,"text":115,"correct":22},{"key":28,"text":172,"correct":22},{"key":31,"text":168,"correct":26},{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":31,"analysis":33},1117105,"在建筑安装工程费用的项目组成中，工具用具使用费属于（ ）。",[187,189,190,191],{"key":20,"text":188,"correct":22},"施工机械使用费",{"key":24,"text":172,"correct":22},{"key":28,"text":174,"correct":22},{"key":31,"text":168,"correct":26},{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":24,"analysis":33},1117107,"关于周转性材料消耗量的说法，正确的是（）。",[196,198,200,202],{"key":20,"text":197,"correct":22},"周转性材料的消耗量是指材料使用量",{"key":24,"text":199,"correct":26},"周转性材料的消耗量应当用材料的一次使用量和摊销量两个指标表示",{"key":28,"text":201,"correct":22},"周转性材料的摊销量供施工企业组织使用",{"key":31,"text":203,"correct":22},"周转性材料的消耗与周转使用次数无关",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":24,"analysis":33},1117109,"编制标准砖砌体材料消耗定额时，砖的消耗量应按（）确定。",[208,210,212,214],{"key":20,"text":209,"correct":22},"净用量",{"key":24,"text":211,"correct":26},"净用量加损耗量",{"key":28,"text":213,"correct":22},"一次损耗量",{"key":31,"text":215,"correct":22},"损耗量加补损量",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":24,"analysis":33},1117110,"预算定额是编制概算定额的基础，是以（）为对象编制的定额。",[220,222,224,226],{"key":20,"text":221,"correct":22},"同一性质的施工过程",{"key":24,"text":223,"correct":26},"建筑物各个分部分项工程",{"key":28,"text":225,"correct":22},"扩大的分部分项工程",{"key":31,"text":227,"correct":22},"整个建筑物和构筑物",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":24,"analysis":33},1117112,"施工机械台班产量定额等于（）。",[232,234,236,238],{"key":20,"text":233,"correct":22},"机械净工作生产率x 工作班延续时间",{"key":24,"text":235,"correct":26},"机械净工作生产率x 工作班延续时间x 机械利用系数",{"key":28,"text":237,"correct":22},"机械净工作生产率x 机械利用系数",{"key":31,"text":239,"correct":22},"机械净工作生产率x 工作班延续时间x 机械运行时间",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":20,"analysis":33},1117113,"某出料容量0.5m3的混凝土搅拌机，每一次循环中，装料、搅拌、卸料、中断需要的时间分别为1、3、1、1 分钟，机械利用系数为0.8，则该搅拌机的台班产量定额是（）m3\u002F台班。",[244,246,248,250],{"key":20,"text":245,"correct":26},"32",{"key":24,"text":247,"correct":22},"36",{"key":28,"text":249,"correct":22},"40",{"key":31,"text":251,"correct":22},"50",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":31,"analysis":33},1117114,"已知某斗容量1m3正铲挖土机，机械台班产量为476m3，机械利用系数0.85，则它在正常工作条件下，1h 纯工作时间内可以挖土约（）m3。",[256,258,260,262],{"key":20,"text":257,"correct":22},"47",{"key":24,"text":259,"correct":22},"51",{"key":28,"text":261,"correct":22},"56",{"key":31,"text":263,"correct":26},"70",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":31,"analysis":33},1117116,"对于同类型产品规格多、工序重复、工作量小的施工过程，编制人工定额宜采用的方法是（）。",[268,270,272,274],{"key":20,"text":269,"correct":22},"经验估算法",{"key":24,"text":271,"correct":22},"技术测定法",{"key":28,"text":273,"correct":22},"统计分析法",{"key":31,"text":275,"correct":26},"比较类推法",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":31,"analysis":33},1117118,"若施工作业所能依据的定额齐全，则在编制施工作业计划时宜采用的定额是（）。",[280,282,284,286],{"key":20,"text":281,"correct":22},"概算指标",{"key":24,"text":283,"correct":22},"概算定额",{"key":28,"text":285,"correct":22},"预算定额",{"key":31,"text":287,"correct":26},"施工定额",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":24,"analysis":33},1117119,"某建设工程采用《建设工程工程量清单计价规范》。招标工程量清单中挖土方工程量为2500m3。投标人根据地质条件和施工方案计算的挖土方工程量4000m3，完成该土方分项工程的人、材、机费用为98000元，管理费13500 元，利润8000 元。如不考虑其他因素，投标人报计价时的挖土方综合单价为（）元\u002Fm3。",[292,294,296,298],{"key":20,"text":293,"correct":22},"29.88",{"key":24,"text":295,"correct":26},"47.80",{"key":28,"text":297,"correct":22},"42.40",{"key":31,"text":299,"correct":22},"44.60",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":20,"analysis":33},1117121,"根据《建设工程工程量清单计价规范（GB50500-2013），对于任一招标工程量清单项目，如果因业主方变更的原因导致工程量偏差，则调整原则为（）。",[304,306,308,310],{"key":20,"text":305,"correct":26},"当工程量增加超过15%以上时，其增加部分的工程量单价应予调低",{"key":24,"text":307,"correct":22},"当工程量增加超过15%以上时，其增加部分的工程量单价应予调高",{"key":28,"text":309,"correct":22},"当工程量减少超过15%以上时，其相应部分的措施费应予调低",{"key":31,"text":311,"correct":22},"当工程量增加超过15%以上时，其相应部分的措施费应予调高",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":20,"analysis":33},1117122,"根据《建设工程工程量清单计价规范》（GB50500-2013），某工程签订了单价合同，在执行过程中，某分项工程原清单工程量1000m3，综合单价为25 元\u002Fm3，后因业主方原因实际工程量变更为1500m3，合同中约定，若实际工程量超过计划工程量15%以上，超过部分综合单价调整为原来的0.9，不考虑其他因素，则该分项工程的结算款应为（）。",[316,318,320,322],{"key":20,"text":317,"correct":26},"36625",{"key":24,"text":319,"correct":22},"35000",{"key":28,"text":321,"correct":22},"33750",{"key":31,"text":323,"correct":22},"32875",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":28,"analysis":33},1117124,"根据我国现行规定，发包人安全文明施工费预付的时间和金额分别为（）。",[328,330,332,334],{"key":20,"text":329,"correct":22},"付时间为工程开工后42 天内，金额不低于当年施工进度计划的安全文明施工费总额的60%",{"key":24,"text":331,"correct":22},"预付时间为工程开工后42 天内，金额不低于当年施工进度计划的安全文明施工费总额的50%",{"key":28,"text":333,"correct":26},"预付时间为工程开工后28 天内，金额不低于当年施工进度计划的安全文明施工费总额的50%",{"key":31,"text":335,"correct":22},"预付时间为工程开工后28 天内，金额不低于当年施工进度计划的安全文明施工费总额的80%",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":28,"analysis":33},1117125,"某工程施工合同规定用价格指数调整法对建安工程价款进行动态结算，某分部工程预算进度款为300万元，相关调整要素和数据如下表所示，则调整后该分部工程结算款为（）万元。",[340,342,344,346],{"key":20,"text":341,"correct":22},"321.63",{"key":24,"text":343,"correct":22},"303.54",{"key":28,"text":345,"correct":26},"298.74",{"key":31,"text":347,"correct":22},"280.65",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":20,"analysis":33},1117127,"实际费用法是工程费用索赔中最常用的一种计算方法，该方法的计算原则是（）。",[352,354,356,358],{"key":20,"text":353,"correct":26},"以承包商为某项索赔工作所支付的实际开支为根据",{"key":24,"text":355,"correct":22},"以承包商为某项索赔工作所支付的含税工程造价为根据",{"key":28,"text":357,"correct":22},"以承包商为某项索赔工作所支付的直接工程费为根据",{"key":31,"text":359,"correct":22},"以承包商为某项索赔工作所支付的直接费为根据",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":20,"analysis":33},1117129,"根据《建设工程工程量计价规范》，关于暂列金额的说法，正确的是（）。",[364,366,368,370],{"key":20,"text":365,"correct":26},"已签约合同中的暂列金额应由发包人掌握使用",{"key":24,"text":367,"correct":22},"已签约合同中的暂列金额应由承包人掌握使用",{"key":28,"text":369,"correct":22},"发包人按照合同规定将暂列金额作出支付后，剩余金额归承包人所有",{"key":31,"text":371,"correct":22},"发包人按照合同规定将暂列金额作出支付后，剩余金额由发包人和承包人共同所有",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":20,"analysis":33},1117130,"某建设工程由于业主临时设计变更导致停工，承包商的工人窝工8 个工日，窝工费为300 元\u002F工日；承包商租赁的挖土机窝工2 个台班，挖土机租赁费为1000 元\u002F台班，动力费160 元\u002F台班，承包商自有的自卸汽车窝工2 个台班，该汽车折旧费用400 元\u002F台班，动力费为200 元\u002F台班，则承包商可以向业主索赔的费用为（）元。",[376,378,380,382],{"key":20,"text":377,"correct":26},"5200",{"key":24,"text":379,"correct":22},"4800",{"key":28,"text":381,"correct":22},"5400",{"key":31,"text":383,"correct":22},"5800",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":24,"analysis":33},1117132,"工程计量过程中，对于钻孔桩的桩长一般采用（）进行计量。",[388,390,392,394],{"key":20,"text":389,"correct":22},"均摊法",{"key":24,"text":391,"correct":26},"图纸法",{"key":28,"text":393,"correct":22},"断面法",{"key":31,"text":395,"correct":22},"分解计量法",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":20,"analysis":33},1117136,"按照我国现行规定，合同价款采用造价信息差额调整法调整时，当承包人投标报价中材料单价低于基准单价，施工期间材料单价涨幅以（）为基础超过合同约定的风险幅度值时，其超过部分按实调整。",[400,402,404,406],{"key":20,"text":401,"correct":26},"基准单价",{"key":24,"text":403,"correct":22},"投标报价",{"key":28,"text":405,"correct":22},"市场价格",{"key":31,"text":407,"correct":22},"投标价和基准价的平均值",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":31,"analysis":33},1117138,"在施工成本管理的各类措施中，一般不需增加费用，而且是其他各类措施的前提和保障的是（）。",[412,414,416,418],{"key":20,"text":413,"correct":22},"过程控制措施",{"key":24,"text":415,"correct":22},"经济措施",{"key":28,"text":417,"correct":22},"技术措施",{"key":31,"text":419,"correct":26},"组织措施",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":20,"analysis":33},1117140,"项目经理部对竣工工程成本核算的目的是（）。",[424,426,428,430],{"key":20,"text":425,"correct":26},"考核项目管理绩效",{"key":24,"text":427,"correct":22},"寻求进一步降低成本的途径",{"key":28,"text":429,"correct":22},"考核企业经营效益",{"key":31,"text":431,"correct":22},"分析成本偏差的原因",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":28,"analysis":33},1117142,"施工成本分析是在（）的基础上，对成本的形成过程和影响因素进行分析。",[436,438,440,442],{"key":20,"text":437,"correct":22},"施工成本计划",{"key":24,"text":439,"correct":22},"施工成本预测",{"key":28,"text":441,"correct":26},"施工成本核算",{"key":31,"text":443,"correct":22},"施工成本考核",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":28,"analysis":33},1117144,"根据建设工程项目施工成本的组成，属于直接成本的是（）",[448,450,452,454],{"key":20,"text":449,"correct":22},"工具用具使用费",{"key":24,"text":451,"correct":22},"职工教育经费",{"key":28,"text":453,"correct":26},"机械折旧费",{"key":31,"text":455,"correct":22},"管理人员工资",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":28,"analysis":33},1117146,"作为施工企业全面成本管理的重要环节，施工项目成本控制应贯穿于（）的全过程。",[460,462,464,466],{"key":20,"text":461,"correct":22},"从项目策划开始到项目开始运营",{"key":24,"text":463,"correct":22},"从项目设计开始到项目开始运营",{"key":28,"text":465,"correct":26},"从项目投标开始到项目保证金返还",{"key":31,"text":467,"correct":22},"从项目施工开始到项目竣工验收",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":20,"analysis":33},1117148,"为了取得成本管理的理想效果，项目经理可采取的组织措施是（）。",[472,474,476,478],{"key":20,"text":473,"correct":26},"加强施工调度，避免窝工损失",{"key":24,"text":475,"correct":22},"进行技术经济分析，确定最佳施工方案",{"key":28,"text":477,"correct":22},"对各种变更及时落实业主签证",{"key":31,"text":479,"correct":22},"研究合同条款，寻找索赔机会",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":28,"analysis":33},1117150,"建筑施工企业编制实施性成本计划时，宜以（）为依据。",[484,486,488,490],{"key":20,"text":485,"correct":22},"施工图预算成本",{"key":24,"text":487,"correct":22},"工程概算成本",{"key":28,"text":489,"correct":26},"施工预算成本",{"key":31,"text":491,"correct":22},"施工结算成本",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":24,"analysis":33},1117152,"某施工企业经过投标获得了某工程的施工任务，合同签订后，公司有关部门开始选派项目经理并编制成本计划。该阶段所编制的成本计划属于（）。",[496,498,500,502],{"key":20,"text":497,"correct":22},"竞争性成本计划",{"key":24,"text":499,"correct":26},"指导性成本计划",{"key":28,"text":501,"correct":22},"实施性成本计划",{"key":31,"text":503,"correct":22},"战略性成本计划",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":31,"analysis":33},1117154,"某工程的赢得值曲线如下图，关于t1 时点成本和进度状态的说法，正确的是（）。",[508,510,512,514],{"key":20,"text":509,"correct":22},"费用节约、进度超前",{"key":24,"text":511,"correct":22},"费用超支、进度拖延",{"key":28,"text":513,"correct":22},"费用节约、进度拖延",{"key":31,"text":515,"correct":26},"费用超支、进度超前",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":20,"analysis":33},1117156,"下列时间-成本累计曲线中，符合施工计划成本变化规律的曲线是（）。",[520,521,522,523],{"key":20,"text":20,"correct":26},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":31,"analysis":33},1117158,"建设工程项目施工准备阶段的施工预算成本计划以项目实施方案为依据，采用（）编制。",[528,530,531,532],{"key":20,"text":529,"correct":22},"人工定额",{"key":24,"text":283,"correct":22},{"key":28,"text":285,"correct":22},{"key":31,"text":287,"correct":26},{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":31,"analysis":33},1117160,"关于施工图预算和施工预算的说法，错误的是（）。",[537,539,541,543],{"key":20,"text":538,"correct":22},"施工预算的材料消耗量一般低于施工图预算的材料消耗量",{"key":24,"text":540,"correct":22},"施工预算是施工企业内部管理的一种文件，与建设单位无直接关系",{"key":28,"text":542,"correct":22},"施工预算的用工量一般比施工图预算的用工量低",{"key":31,"text":544,"correct":26},"施工图预算中的脚手架是根据施工方案确定的搭设方式和材料计算的",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":24,"analysis":33},1117161,"在编制施工成本计划时，通常需要进行“两算”对比分析，“两算”指的是（）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"施工图预算、成本核算",{"key":24,"text":552,"correct":26},"施工图预算、施工预算",{"key":28,"text":554,"correct":22},"施工预算、成本核算",{"key":31,"text":556,"correct":22},"施工预算、施工决算",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":24,"analysis":33},1117162,"施工成本控制需要进行实际成本情况与施工成本计划的比较，其中实际成本情况是通过（）反映的。",[561,563,565,567],{"key":20,"text":562,"correct":22},"工程变更文件",{"key":24,"text":564,"correct":26},"进度报告",{"key":28,"text":566,"correct":22},"施工组织设计",{"key":31,"text":568,"correct":22},"分包合同",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":20,"analysis":33},1117163,"施工企业组织生产、编制施工计划。签发任务书的依据是（）。",[573,575,577,578],{"key":20,"text":574,"correct":26},"施工预算",{"key":24,"text":576,"correct":22},"施工图预算",{"key":28,"text":403,"correct":22},{"key":31,"text":579,"correct":22},"项目经理的责任成本",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":20,"analysis":33},1117164,"若按项目组成编制施工成本计划，项目应按（）的顺序依次进行分解。",[584,586,588,590],{"key":20,"text":585,"correct":26},"单项工程-单位工程-分部工程-分项工程",{"key":24,"text":587,"correct":22},"单项工程-分部工程-单位工程-分项工程",{"key":28,"text":589,"correct":22},"单位工程-单项工程-分部工程-分项工程",{"key":31,"text":591,"correct":22},"单位工程-单项工程-分项工程-分部工程",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":24,"analysis":33},1117165,"编制大中型建设工程项目施工成本支出计划时，要在项目总的方面考虑总的预备费，也要在（）中考虑不可预见费。",[596,598,600,601],{"key":20,"text":597,"correct":22},"前期工作",{"key":24,"text":599,"correct":26},"主要分项工程",{"key":28,"text":168,"correct":22},{"key":31,"text":602,"correct":22},"所有的分项工程",[604,607,610,613,616,619],{"id":15,"name":605,"category":7,"favorite":606},"领导干部任职前廉政法规知识测试题",92,{"id":608,"name":609,"category":7,"favorite":15},595,"建筑结构与设备",{"id":611,"name":612,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":614,"name":615,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":617,"name":618,"category":7,"favorite":8},534,"BIM工程师",{"id":620,"name":618,"category":7,"favorite":8},535]