[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-18":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":607},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,18,50,2973,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,249,261,273,285,297,309,319,331,341,353,365,377,389,401,410,422,434,446,458,470,482,494,506,518,527,539,550,562,574,585,596],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1117924,1,"单选题","下列竣工验收阶段建设监理工作的主要任务，说法有误的是()。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","督促和检查施工单位及时整理竣工文件和验收资料",false,{"key":24,"text":25,"correct":22},"B","审查施工单位提交的竣工验收申请",{"key":27,"text":28,"correct":22},"C","编写工程质量评估报告",{"key":30,"text":31,"correct":32},"D","组织工程验收",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1117925,"根据《中华人民共和国建筑法》，工程监理人员认为工程（），有权要求建筑施工企业改正。",[38,40,42,44],{"key":20,"text":39,"correct":32},"施工不符合工程设计要求的",{"key":24,"text":41,"correct":22},"设计不符合建筑工程质量标准的",{"key":27,"text":43,"correct":22},"设计不符合合同约定的质量要求的",{"key":30,"text":45,"correct":22},"施工工期不符合工期目标的",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1117926,"在实施施工监理过程中，发现存在安全事故隐患，情况严重的，其正确的处理方法是()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"签发监理工程师通知单",{"key":24,"text":53,"correct":22},"要求施工单位整改",{"key":27,"text":55,"correct":32},"总监理工程师应及时下达工程暂停指令，要求施工单位暂时停止施工，并及时报告业主",{"key":30,"text":57,"correct":22},"通过业主及时向有关主管部门报告",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1117927,"施工企业根据监理企业制定的旁站监理方案，在需要实施旁站监理的关键部位、关键工序进行施工前（）小时，应当书面通知监理企业派驻工地的项目监理机构。",[62,64,66,68],{"key":20,"text":63,"correct":22},"2",{"key":24,"text":65,"correct":22},"12",{"key":27,"text":67,"correct":32},"24",{"key":30,"text":69,"correct":22},"48",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1117928,"甲工程监理单位在实施监理的过程中，发现乙施工单位存在安全事故隐患，则甲工程监理单位应当()。",[74,76,78,80],{"key":20,"text":75,"correct":32},"要求乙施工单位整改",{"key":24,"text":77,"correct":22},"向政府有关部门报告",{"key":27,"text":79,"correct":22},"要求乙施工单位全面停工",{"key":30,"text":81,"correct":22},"要求建设单位整改",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1117929,"凡旁站监理人员和施工企业现场质检人员未在()上签字的，不得进行下一道工序施工。",[86,88,90,92],{"key":20,"text":87,"correct":22},"验收合格证书",{"key":24,"text":89,"correct":32},"旁站监理记录",{"key":27,"text":91,"correct":22},"技术交底记录",{"key":30,"text":93,"correct":22},"质量问题说明书",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1117930,"项目经理由于主观原因而导致的质量事故，政府主管部门将追究的主要是其()。",[98,100,102,104],{"key":20,"text":99,"correct":32},"法律责任",{"key":24,"text":101,"correct":22},"社会责任",{"key":27,"text":103,"correct":22},"经济责任",{"key":30,"text":105,"correct":22},"政治责任",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1117931,"分析各种风险的损失量属于()阶段的工作。",[110,112,114,116],{"key":20,"text":111,"correct":22},"风险识别",{"key":24,"text":113,"correct":32},"风险评估",{"key":27,"text":115,"correct":22},"风险响应",{"key":30,"text":117,"correct":22},"风险控制",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1117932,"组织论中反映了一个组织系统中各子系统之间或各元素之间的指令关系的是()。",[122,124,126,128],{"key":20,"text":123,"correct":32},"组织结构模式",{"key":24,"text":125,"correct":22},"组织分工",{"key":27,"text":127,"correct":22},"工作流程组织",{"key":30,"text":129,"correct":22},"组织工具",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1117933,"设计方作为工程项目建设的一个参与方，其项目管理工作除了维护自身的利益外，还应服务于()。",[134,136,138,140],{"key":20,"text":135,"correct":22},"材料供应方的利益",{"key":24,"text":137,"correct":22},"工程施工方的利益",{"key":27,"text":139,"correct":32},"项目的整体利益",{"key":30,"text":141,"correct":22},"工程监理方的利益",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1117934,"施工组织设计内容中，用以衡量组织施工水平的是()。",[146,148,150,152],{"key":20,"text":147,"correct":32},"主要技术经济指标",{"key":24,"text":149,"correct":22},"施工平面图",{"key":27,"text":151,"correct":22},"施工进度计划",{"key":30,"text":153,"correct":22},"施工方案",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1117935,"根据《建设工程监理规范》的规定，工程监理规划应在签订委托监理合同及收到设计文件后开始编制，完成后必须经（）审核批准，并在召开第一次工地会议前报送业主。",[158,160,162,164],{"key":20,"text":159,"correct":22},"建设单位技术负责人",{"key":24,"text":161,"correct":32},"监理单位技术负责人",{"key":27,"text":163,"correct":22},"设计单位技术负责人",{"key":30,"text":165,"correct":22},"有关主管部门负责人",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":30,"analysis":33},1117936,"运用动态控制原理控制施工成本的步骤中，第一步应做的工作是（）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"按照成本控制的要求，收集施工成本的实际值",{"key":24,"text":173,"correct":22},"施工进度目标的逐层分解",{"key":27,"text":175,"correct":22},"定期对施工成本的计划值和实际值进行比较",{"key":30,"text":177,"correct":32},"施工成本目标的逐层分解",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":30,"analysis":33},1117937,"工程建设监理的“公正性”，要求监理在处理业主和承包商之间的矛盾或利益冲突时应()。",[182,184,186,188],{"key":20,"text":183,"correct":22},"站在绝对公平的立场协调业主和承包商的利益",{"key":24,"text":185,"correct":22},"在维护承包商利益的同时，兼顾业主的利益",{"key":27,"text":187,"correct":22},"尽最大可能同时维护业主和承包商的利益",{"key":30,"text":189,"correct":32},"在维护业主利益的同时，不损害承包商的利益",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1117938,"派驻某施工现场的甲监理机构受建设单位委托对乙施工单位施工阶段的施工活动实施监理。甲监理机构旁站监理员王某发现乙施工单位在主体结构的施工中有违反工程建设强制性标准的行为，则旁站监理员王某()。",[194,196,198,200],{"key":20,"text":195,"correct":22},"有权向乙施工企业下达局部停工令",{"key":24,"text":197,"correct":32},"有权责令乙施工企业立即整改",{"key":27,"text":199,"correct":22},"应当报告建设单位并采取应急措施",{"key":30,"text":201,"correct":22},"应当报告政府主管部门并采取措施",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1117939,"项目目标的动态控制是项目管理最基本的方法论，目标动态控制的核心是()",[206,208,210,212],{"key":20,"text":207,"correct":22},"事先分析可能导致目标偏离的各种影响因素",{"key":24,"text":209,"correct":32},"进行目标的实际值和计划值的比较，发现目标偏离采取纠偏措施",{"key":27,"text":211,"correct":22},"对目标进行分解，确定目标控制的计划值",{"key":30,"text":213,"correct":22},"收集实际值",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},1117940,"审查施工组织设计属于()阶段建设监理工作的主要任务。",[218,220,222,224],{"key":20,"text":219,"correct":22},"设计",{"key":24,"text":221,"correct":22},"施工招标",{"key":27,"text":223,"correct":32},"施工准备",{"key":30,"text":225,"correct":22},"工程施工",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":30,"analysis":33},1117941,"根据《建设工程项目管理规范》(GB\u002FT50326-2006)，项目管理目标责任书应在项目实施之前，由()制定。",[230,232,234,236],{"key":20,"text":231,"correct":22},"项目技术负责人",{"key":24,"text":233,"correct":22},"法定负责人",{"key":27,"text":235,"correct":22},"项目经理与项目承包人协商",{"key":30,"text":237,"correct":32},"法定代表人与项目经理协商",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1117942,"在实施监理过程中，发现施工企业存在安全隐患的，应()",[242,243,245,247],{"key":20,"text":53,"correct":32},{"key":24,"text":244,"correct":22},"由总监下达工程暂停令",{"key":27,"text":246,"correct":22},"及时向业主报告",{"key":30,"text":248,"correct":22},"及时向上级有关主管部门报告",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":30,"analysis":33},1117943,"甲企业为某工程项目的施工总承包方，乙企业为甲企业的分包单位，丙企业则为该工程项目业主认定的专业分包单位，这三家企业在施工及管理中的正确关系是()。",[253,255,257,259],{"key":20,"text":254,"correct":22},"甲企业只负责完成自己承担的施工任务",{"key":24,"text":256,"correct":22},"丙企业只听从业主的指令",{"key":27,"text":258,"correct":22},"丙企业只指挥乙企业的施工",{"key":30,"text":260,"correct":32},"甲企业负责组织和指挥乙企业与丙企业的施工",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},1117944,"在()组织结构中，每一个工作部门的指令源是惟一的。",[265,267,269,271],{"key":20,"text":266,"correct":22},"职能",{"key":24,"text":268,"correct":32},"线性",{"key":27,"text":270,"correct":22},"矩阵",{"key":30,"text":272,"correct":22},"项目管理",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":24,"analysis":33},1117945,"下列建设市场主体中，其工作性质属于业主方项目管理范畴的是()。",[277,279,281,283],{"key":20,"text":278,"correct":22},"设备供货单位",{"key":24,"text":280,"correct":32},"建设监理单位",{"key":27,"text":282,"correct":22},"工程施工总承包单位",{"key":30,"text":284,"correct":22},"工程设计单位",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":27,"analysis":33},1117946,"建设工程项目管理的内涵中，“费用目标”对业主而言是（）。",[289,291,293,295],{"key":20,"text":290,"correct":22},"成本目标",{"key":24,"text":292,"correct":22},"财务目标",{"key":27,"text":294,"correct":32},"投资目标",{"key":30,"text":296,"correct":22},"费用目标",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":27,"analysis":33},1117947,"为了对项目目标进行动态跟踪和控制，在确定了项目目标计划值后的施工过程中，首先应做的是()。",[301,303,305,307],{"key":20,"text":302,"correct":22},"调整项目目标",{"key":24,"text":304,"correct":22},"采取纠偏措施进行纠偏",{"key":27,"text":306,"correct":32},"收集工程进度的实际值",{"key":30,"text":308,"correct":22},"比较项目目标的实际值与计划值",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":27,"analysis":33},1117948,"项目资源需求计划应当包括在施工组织设计的（）内容后。",[313,315,316,317],{"key":20,"text":314,"correct":22},"施工部署",{"key":24,"text":153,"correct":22},{"key":27,"text":151,"correct":32},{"key":30,"text":318,"correct":22},"施工平面布置",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":24,"analysis":33},1117949,"能够用图的形式反映一个组织系统中各项工作之间逻辑关系的组织工具是()。",[323,325,327,329],{"key":20,"text":324,"correct":22},"项目结构图",{"key":24,"text":326,"correct":32},"工作流程图",{"key":27,"text":328,"correct":22},"工作任务分工表",{"key":30,"text":330,"correct":22},"组织结构图",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":27,"analysis":33},1117950,"某施工企业签订了工程施工承包合同，在项目管理目标责任书中确定了成本目标，项目经理运用动态控制原理控制施工成本的步骤中，第一步应做的工作是()。",[335,337,339,340],{"key":20,"text":336,"correct":22},"按照成本控制的要求收集施工成本的实际值",{"key":24,"text":338,"correct":22},"找出偏差，采取纠偏措施",{"key":27,"text":177,"correct":32},{"key":30,"text":175,"correct":22},{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":27,"analysis":33},1117951,"甲监理单位受乙建设单位委托对某工程项目实施监理，该工程项目的设计单位为丙设计院。在监理过程中，甲监理单位的某专业监理工程师发现丙设计院的工程设计不符合建筑工程设计标准，该监理工程师应当()。",[345,347,349,351],{"key":20,"text":346,"correct":22},"要求丙设计院改正",{"key":24,"text":348,"correct":22},"要求乙建设单位改正",{"key":27,"text":350,"correct":32},"报告乙建设单位要求丙设计院改正",{"key":30,"text":352,"correct":22},"报告总监理工程师下达停工令",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":30,"analysis":33},1117952,"建设工程项目管理，是指自项目开始至项目完成，通过项目策划和项目控制，实现项目的费用目标、进度目标和质量目标。对此，下列理解中正确的是()。",[357,359,361,363],{"key":20,"text":358,"correct":22},"自项目开始至项目完成指的是项目的寿命期",{"key":24,"text":360,"correct":22},"项目策划的主要任务是项目定义",{"key":27,"text":362,"correct":22},"费用目标对业主而言就是成本目标",{"key":30,"text":364,"correct":32},"项目实施期管理的主要任务是通过管理使项目目标得以实现",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":30,"analysis":33},1117953,"设计变更工作流程组织属于()。",[369,371,373,375],{"key":20,"text":370,"correct":22},"信息处理工作流程",{"key":24,"text":372,"correct":22},"施工作业工作流程组织",{"key":27,"text":374,"correct":22},"物质流程组织",{"key":30,"text":376,"correct":32},"管理工作流程组织",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":20,"analysis":33},1117954,"组织分工反映的是一个组织系统中各子系统或各元素的工作任务分工和()。",[381,383,385,387],{"key":20,"text":382,"correct":32},"管理职能分工",{"key":24,"text":384,"correct":22},"管理责任分工",{"key":27,"text":386,"correct":22},"管理权限分工",{"key":30,"text":388,"correct":22},"管理目标分工",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":24,"analysis":33},1117955,"对一个建设工程项目管理来说，()的项目管理是管理的核心。",[393,395,397,399],{"key":20,"text":394,"correct":22},"施工方",{"key":24,"text":396,"correct":32},"业主方",{"key":27,"text":398,"correct":22},"设计方",{"key":30,"text":400,"correct":22},"供货方",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":27,"analysis":33},1117956,"施工方作为工程项目建设的一个参与方，其项目管理工作除了维护自身的利益外，还应服务于（）。",[405,406,408,409],{"key":20,"text":135,"correct":22},{"key":24,"text":407,"correct":22},"建设项目工程总承包方的利益",{"key":27,"text":139,"correct":32},{"key":30,"text":141,"correct":22},{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":20,"analysis":33},1117957,"业主方的项目管理包括项目实施的全过程，其工作内容不包括（）",[414,416,418,420],{"key":20,"text":415,"correct":32},"编制项目建议书",{"key":24,"text":417,"correct":22},"编制设计任务书",{"key":27,"text":419,"correct":22},"动用前的准备工作",{"key":30,"text":421,"correct":22},"保修期的管理工作",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":20,"analysis":33},1117958,"在施工过程中，暂列金额由建设单位掌握使用，扣除合同价款调整后如有余额，归（ ）。",[426,428,430,432],{"key":20,"text":427,"correct":32},"建设单位",{"key":24,"text":429,"correct":22},"施工单位",{"key":27,"text":431,"correct":22},"监理单位",{"key":30,"text":433,"correct":22},"总承包单位",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":27,"analysis":33},1117959,"施工现场设立的安全警示标志，现场围挡等所需的费用应计入下列( )费用。",[438,440,442,444],{"key":20,"text":439,"correct":22},"分部分项工程",{"key":24,"text":441,"correct":22},"规费项目",{"key":27,"text":443,"correct":32},"措施项目",{"key":30,"text":445,"correct":22},"其他项目",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":30,"analysis":33},1117960,"根据建筑安装工程费用项目组成，工程施工中所使用的仪器仪表的维修费用应计入( )",[450,452,454,456],{"key":20,"text":451,"correct":22},"工具用具使用费",{"key":24,"text":453,"correct":22},"固定资产使用费",{"key":27,"text":455,"correct":22},"企业管理费",{"key":30,"text":457,"correct":32},"施工机具使用费",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":24,"analysis":33},1117961,"某施工机械预算价格为80万元，折旧年限为10年，年平均工作250个台班，一次大修理费为18万元，大修次数为3次，则该台机械台班大修理费为（ ）元。",[462,464,466,468],{"key":20,"text":463,"correct":22},"320",{"key":24,"text":465,"correct":32},"216",{"key":27,"text":467,"correct":22},"240",{"key":30,"text":469,"correct":22},"264",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":30,"analysis":33},1117962,"建筑安装工程费用中，其他项目费中的计日工是指（ ）。",[474,476,478,480],{"key":20,"text":475,"correct":22},"建设单位暂定的并包括在工程合同价款中的一笔款项",{"key":24,"text":477,"correct":22},"建设单位用于合同签订时尚未确定或不可预见的采购、变更、索赔等情况的费用",{"key":27,"text":479,"correct":22},"招标人按估算金额确定的一笔费用",{"key":30,"text":481,"correct":32},"施工企业完成建设单位提出的施工图纸以外的零星项目或工作所需的费用",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":20,"analysis":33},1117963,"下列属于建筑安装工程费用中人工费的是（ ）。",[486,488,490,492],{"key":20,"text":487,"correct":32},"津贴、补贴",{"key":24,"text":489,"correct":22},"职工福利费",{"key":27,"text":491,"correct":22},"工会经费",{"key":30,"text":493,"correct":22},"失业保险费",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":20,"analysis":33},1117964,"建筑安装工程费按造价形成，由（）组成。",[498,500,502,504],{"key":20,"text":499,"correct":32},"分部分项工程费+措施项目费+其他项目费+规费+税金",{"key":24,"text":501,"correct":22},"人工费十材料费+施工机具使用费+措施项目费+规费+税金",{"key":27,"text":503,"correct":22},"人工费十材料费+施工机具使用费+其他项目费+规费+税金",{"key":30,"text":505,"correct":22},"分部分项工程费+施工机具使用费+其他项目费+规费+税金",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":30,"analysis":33},1117965,"根据《建筑安装工程费用项目组成》（建标[2013]44号），不可以作为安全文明施工费计算基数的是（）。",[510,512,514,516],{"key":20,"text":511,"correct":22},"定额分部分项工程费+定额中可以计量的措施项目费",{"key":24,"text":513,"correct":22},"定额人工费",{"key":27,"text":515,"correct":22},"定额人工费+定额机械费",{"key":30,"text":517,"correct":32},"定额分部分项工程费+定额中可以计量的措施项目费+企业管理费",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":20,"analysis":33},1117966,"暂列金额在施工过程中由()掌握使用。",[522,523,524,526],{"key":20,"text":427,"correct":32},{"key":24,"text":429,"correct":22},{"key":27,"text":525,"correct":22},"设计单位",{"key":30,"text":431,"correct":22},{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":27,"analysis":33},1117967,"根据现行规定，施工企业为职工缴纳的工伤保险费，属于建筑安装工程费中的()。",[531,533,535,537],{"key":20,"text":532,"correct":22},"文明施工费",{"key":24,"text":534,"correct":22},"劳动保险费",{"key":27,"text":536,"correct":32},"规费",{"key":30,"text":538,"correct":22},"安全施工费",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":27,"analysis":33},1117968,"施工现场临时设施的搭设、维修、拆除、清理费用归为()。",[543,545,546,548],{"key":20,"text":544,"correct":22},"建筑安装工程材料费",{"key":24,"text":455,"correct":22},{"key":27,"text":547,"correct":32},"措施项目费",{"key":30,"text":549,"correct":22},"建设单位管理费",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":20,"analysis":33},1117969,"总承包服务费由建设单位在招标控制价中根据总包服务范围和有关计价规定编制，施工企业投标时()报价。",[554,556,558,560],{"key":20,"text":555,"correct":32},"自主",{"key":24,"text":557,"correct":22},"按规定",{"key":27,"text":559,"correct":22},"按签证",{"key":30,"text":561,"correct":22},"按合同",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":24,"analysis":33},1117970,"根据现行《建筑安装工程费用项目组成》（建标[2013]44号），下列建筑安装工程费用中，属于材料费的是()。",[566,568,570,572],{"key":20,"text":567,"correct":22},"检验试验费",{"key":24,"text":569,"correct":32},"工地保管费",{"key":27,"text":571,"correct":22},"燃料动力费",{"key":30,"text":573,"correct":22},"二次搬运费",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":24,"analysis":33},1117971,"根据《建筑安装工程费用项目组成》(44号文)，施工企业按照规定支付员工的集体福利费、夏季防暑降温、冬季采暖补贴、上下班交通补贴等属于()。",[578,580,582,584],{"key":20,"text":579,"correct":22},"劳动保护费",{"key":24,"text":581,"correct":32},"劳动保险费和职工福利费",{"key":27,"text":583,"correct":22},"人工费",{"key":30,"text":536,"correct":22},{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":24,"analysis":33},1117972,"根据《建筑安装工程费用项目组成》，下列费用中，属于材料费的是（）",[589,591,593,595],{"key":20,"text":590,"correct":22},"施工机械折旧费",{"key":24,"text":592,"correct":32},"运输损耗费",{"key":27,"text":594,"correct":22},"仪器仪表使用费",{"key":30,"text":453,"correct":22},{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":27,"analysis":33},1117973,"某施工企业对已完工程及设备的保护费用属于( )。",[600,602,604,605],{"key":20,"text":601,"correct":22},"安全文明施工费",{"key":24,"text":603,"correct":22},"财产保险费",{"key":27,"text":547,"correct":32},{"key":30,"text":606,"correct":22},"其他项目费",[608,611,614,617,620,623],{"id":15,"name":609,"category":7,"favorite":610},"领导干部任职前廉政法规知识测试题",92,{"id":612,"name":613,"category":7,"favorite":15},595,"建筑结构与设备",{"id":615,"name":616,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":618,"name":619,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":621,"name":622,"category":7,"favorite":8},534,"BIM工程师",{"id":624,"name":622,"category":7,"favorite":8},535]