[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":590},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,17,50,2973,[13,34,46,58,70,82,94,106,118,126,138,149,158,167,179,191,199,211,223,235,246,258,266,278,290,302,311,323,332,344,356,365,377,389,401,411,423,435,447,459,471,483,495,506,518,530,542,554,566,578],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1117874,1,"单选题","建设工程项目设计阶段的工作内容包括()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","技术设计",true,{"key":24,"text":25,"correct":26},"B","编制项目建议书",false,{"key":28,"text":29,"correct":26},"C","编制可行性研究报告",{"key":31,"text":32,"correct":26},"D","编制设计任务书","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1117875,"建设项目工程总承包方项目管理工作涉及项目()的全过程。",[38,40,42,44],{"key":20,"text":39,"correct":26},"审批阶段",{"key":24,"text":41,"correct":22},"实施阶段",{"key":28,"text":43,"correct":26},"决策阶段",{"key":31,"text":45,"correct":26},"使用阶段",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1117876,"某道路建成通车，属于业主方项目管理目标中的()。",[50,52,54,56],{"key":20,"text":51,"correct":26},"投资目标",{"key":24,"text":53,"correct":22},"进度目标",{"key":28,"text":55,"correct":26},"成本目标",{"key":31,"text":57,"correct":26},"质量目标",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1117877,"对于某政府机关办公楼项目的业主方项目管理而言，其进度目标是该项目的（）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"立项时间目标",{"key":24,"text":65,"correct":26},"投产时间目标",{"key":28,"text":67,"correct":22},"启用时间目标",{"key":31,"text":69,"correct":26},"运营时间目标",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1117878,"项目决策期管理工作的主要任务是()，而项目实施期管理的主要任务是通过管理使项目的目标得以实现。",[74,76,78,80],{"key":20,"text":75,"correct":26},"确定项目的工期",{"key":24,"text":77,"correct":22},"确定项目的定义",{"key":28,"text":79,"correct":26},"确定项目的造价",{"key":31,"text":81,"correct":26},"确定项目的负责人",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1117879,"建设项目决策阶段管理工作的主要任务是（）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"项目策划",{"key":24,"text":89,"correct":26},"项目控制",{"key":28,"text":91,"correct":26},"通过管理使项目目标实现",{"key":31,"text":93,"correct":22},"项目定义",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1117880,"建没工程项目管理是自项目开始至项目完成，通过项目策划和项目控制，以使项目的费用目标、进度目标和质量目标得以实现。其中，“进度目标”对业主而言是项目()的时间目标。",[98,100,102,104],{"key":20,"text":99,"correct":26},"竣工",{"key":24,"text":101,"correct":22},"动用",{"key":28,"text":103,"correct":26},"调试",{"key":31,"text":105,"correct":26},"试生产",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1117881,"对于建设工程项目而言，虽然有代表不同利益方的项目管理，但核心是()方的项目管理。",[110,112,114,116],{"key":20,"text":111,"correct":26},"设计",{"key":24,"text":113,"correct":26},"总承包",{"key":28,"text":115,"correct":26},"监理",{"key":31,"text":117,"correct":22},"业主",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1117882,"工程项目建设有众多的参与方，各方为实现特定目标而进行不同类型的项目管理，但核心是（）方的项目管理。",[122,123,124,125],{"key":20,"text":111,"correct":26},{"key":24,"text":113,"correct":26},{"key":28,"text":115,"correct":26},{"key":31,"text":117,"correct":22},{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":28,"analysis":33},1117883,"“自项目开始至项目完成”指的是项目的( )。",[130,132,134,136],{"key":20,"text":131,"correct":26},"研究期",{"key":24,"text":133,"correct":26},"准备期",{"key":28,"text":135,"correct":22},"实施期",{"key":31,"text":137,"correct":26},"验收期",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":20,"analysis":33},1117884,"东安大学作为项目业主通过公开招标的方式选择远达建筑公司作为该学校体育馆项目的施工方，那么远达建筑公司的项目管理目标包括( )。",[142,144,146,147],{"key":20,"text":143,"correct":22},"工期、质量、成本目标",{"key":24,"text":145,"correct":26},"设计目标",{"key":28,"text":51,"correct":26},{"key":31,"text":148,"correct":26},"利润最大化",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":20,"analysis":33},1117885,"东安大学作为项目业主通过设计竞赛和公开招标的方式分别选择了东安市建筑设计院和远达建筑公司作为该学校体育馆项目的设计方和施工方，那么远达建筑公司的项目管理目标包括( )。",[153,155,156,157],{"key":20,"text":154,"correct":22},"进度、质量、成本目标",{"key":24,"text":145,"correct":26},{"key":28,"text":51,"correct":26},{"key":31,"text":148,"correct":26},{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":24,"analysis":33},1117886,"可行性研究报告的编制工作所处的阶段属于建设工程全寿命周期的()。",[162,163,164,166],{"key":20,"text":41,"correct":26},{"key":24,"text":43,"correct":22},{"key":28,"text":165,"correct":26},"设计阶段",{"key":31,"text":45,"correct":26},{"id":168,"libraryId":5,"type":15,"typeLabel":16,"stem":169,"options":170,"answer":31,"analysis":33},1117887,"关于施工总承包管理模式的说法，错误的是（）。",[171,173,175,177],{"key":20,"text":172,"correct":26},"建设单位可与多个单位组成的联合体签订施工总承包管理协议",{"key":24,"text":174,"correct":26},"施工总承包管理企业负责整个项目的施工组织与管理",{"key":28,"text":176,"correct":26},"施工总承包管理模式的招标可在设计阶段进行",{"key":31,"text":178,"correct":22},"施工总承包管理企业可不经过投标，直接承担部分工程的施工",{"id":180,"libraryId":5,"type":15,"typeLabel":16,"stem":181,"options":182,"answer":20,"analysis":33},1117888,"反映组成该项目的所有工作任务的组织工具是()。",[183,185,187,189],{"key":20,"text":184,"correct":22},"项目结构图",{"key":24,"text":186,"correct":26},"管理职能分工表",{"key":28,"text":188,"correct":26},"组织结构图",{"key":31,"text":190,"correct":26},"工作任务分工表",{"id":192,"libraryId":5,"type":15,"typeLabel":16,"stem":193,"options":194,"answer":24,"analysis":33},1117889,"明确各项工作任务由哪个工作部门（或个人）负责，由哪些工作部门（或个人）配合或参与的组织工具是()。",[195,196,197,198],{"key":20,"text":184,"correct":26},{"key":24,"text":190,"correct":22},{"key":28,"text":186,"correct":26},{"key":31,"text":188,"correct":26},{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":20,"analysis":33},1117890,"在组织结构图中，矩形框表示工作部门，上级工作部门对其直接下属工作部门的指令关系用（）表示。",[203,205,207,209],{"key":20,"text":204,"correct":22},"单向箭头",{"key":24,"text":206,"correct":26},"双向箭头",{"key":28,"text":208,"correct":26},"直线",{"key":31,"text":210,"correct":26},"虚线",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":28,"analysis":33},1117891,"在某地铁建设项目中，总承包商选择了矩阵式组织结构模式，使得一些项目成员不得不接受来自纵向和横向两个部门的指令。其中发出横向“指令的”工作部门可以是（）。",[215,217,219,221],{"key":20,"text":216,"correct":26},"项目经理办公室",{"key":24,"text":218,"correct":26},"采购管理部",{"key":28,"text":220,"correct":22},"各子项目管理部",{"key":31,"text":222,"correct":26},"预算管理部",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},1117892,"工作流程图反映一个组织系统中各项工作之间的（）关系。",[227,229,231,233],{"key":20,"text":228,"correct":26},"指令",{"key":24,"text":230,"correct":22},"逻辑",{"key":28,"text":232,"correct":26},"主次",{"key":31,"text":234,"correct":26},"合同",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":24,"analysis":33},1117893,"某纺织职业技术学校新区建设中，总承包商的项目经理在开工前组织有关人员对项目结构进行了逐层分解，则这项工作所采用的组织工具应是()。",[239,241,242,244],{"key":20,"text":240,"correct":26},"项目组织结构图",{"key":24,"text":184,"correct":22},{"key":28,"text":243,"correct":26},"工作流程图",{"key":31,"text":245,"correct":26},"合同结构图",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":28,"analysis":33},1117894,"关于工作流程与工作流程图，说法正确的是()。",[250,252,254,256],{"key":20,"text":251,"correct":26},"业主方与项目各参与方的工作流程任务是一致的。",{"key":24,"text":253,"correct":26},"工作流程组织的任务就是编制组织结构图",{"key":28,"text":255,"correct":22},"工作流程图可以用来描述工作流程组织",{"key":31,"text":257,"correct":26},"工作流程图中用双向箭线表示工作间的逻辑关系",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":24,"analysis":33},1117895,"某建设工程项目实施过程中，用来反映组成该建设项目所有工作任务的组织工具是（）。",[262,263,264,265],{"key":20,"text":240,"correct":26},{"key":24,"text":184,"correct":22},{"key":28,"text":243,"correct":26},{"key":31,"text":245,"correct":26},{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":24,"analysis":33},1117896,"下列说法属于矩阵组织结构模式的特点的是()。",[270,272,274,276],{"key":20,"text":271,"correct":26},"组织内每个工作部门可能有多个矛盾的指令源",{"key":24,"text":273,"correct":22},"组织内每个工作部门有横向和纵向两个指令源",{"key":28,"text":275,"correct":26},"指令路径长",{"key":31,"text":277,"correct":26},"组织内每个工作部门只接受一个上级的直接领导",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":24,"analysis":33},1117897,"在常用的组织结构模式中,会产生多个矛盾的指令源的是()。",[282,284,286,288],{"key":20,"text":283,"correct":26},"线性组织结构",{"key":24,"text":285,"correct":22},"职能组织结构",{"key":28,"text":287,"correct":26},"矩阵组织结构",{"key":31,"text":289,"correct":26},"混合组织结构",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":24,"analysis":33},1117898,"建设工程项目的组织结构如采用矩阵组织结构模式，则每一个工作部门的指令源有()个。",[294,296,298,300],{"key":20,"text":295,"correct":26},"1",{"key":24,"text":297,"correct":22},"2",{"key":28,"text":299,"correct":26},"3",{"key":31,"text":301,"correct":26},"4",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":28,"analysis":33},1117899,"每一个建设工程项目有不同类型和不同用途的信息，对这些信息要进行编码。对项目结构各层中的每一项任务进行编码的依据是()。",[306,307,308,309],{"key":20,"text":245,"correct":26},{"key":24,"text":188,"correct":26},{"key":28,"text":184,"correct":22},{"key":31,"text":310,"correct":26},"任务分工表",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":20,"analysis":33},1117900,"某城市准备实施一个大型地铁建设项目。对于该项目的组织系统宜采用的组织结构模式是()组织结构。",[315,317,319,321],{"key":20,"text":316,"correct":22},"矩阵",{"key":24,"text":318,"correct":26},"事业部",{"key":28,"text":320,"correct":26},"线性",{"key":31,"text":322,"correct":26},"职能",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":24,"analysis":33},1117901,"东盛建设公司准备实施一个大型地铁建设项目的施工管理任务。为提高项目组织系统的运行效率，决定设置纵向和横向工作部门以减少项目组织结构的层次。该项目所选用的组织结构模式是( )。",[327,328,329,330],{"key":20,"text":283,"correct":26},{"key":24,"text":287,"correct":22},{"key":28,"text":285,"correct":26},{"key":31,"text":331,"correct":26},"项目组织结构",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":20,"analysis":33},1117902,"单位工程在施工组织总设计的指导下，由直接组织施工的单位根据施工图设计进行编制，用以直接指导( )的施工活动。",[336,338,340,342],{"key":20,"text":337,"correct":22},"单位工程",{"key":24,"text":339,"correct":26},"分项工程",{"key":28,"text":341,"correct":26},"分部工程",{"key":31,"text":343,"correct":26},"单项工程",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":24,"analysis":33},1117903,"根据施工组织总设计编制程序，编制施工总进度计划的前一项工作是（）。",[348,350,352,354],{"key":20,"text":349,"correct":26},"编制资源需求量计划",{"key":24,"text":351,"correct":22},"拟定施工方案",{"key":28,"text":353,"correct":26},"确定施工的总体部署",{"key":31,"text":355,"correct":26},"计算主要工种工程的工程量",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":24,"analysis":33},1117904,"根据施工组织总设计编制程序，编制施工总进度计划的前一项工作是()。",[360,361,363,364],{"key":20,"text":349,"correct":26},{"key":24,"text":362,"correct":22},"拟订施工方案",{"key":28,"text":353,"correct":26},{"key":31,"text":355,"correct":26},{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":28,"analysis":33},1117905,"下列施工组织设计的基本内容中，可以反映现场文明施工组织的是()。",[369,371,373,375],{"key":20,"text":370,"correct":26},"工程概况",{"key":24,"text":372,"correct":26},"施工部署",{"key":28,"text":374,"correct":22},"施工平面图",{"key":31,"text":376,"correct":26},"技术经济指标",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":24,"analysis":33},1117906,"施工组织设计的内容应当包括工程概况、施工部署及施工方案、施工进度计划、施工平面图，以及()。",[381,383,385,387],{"key":20,"text":382,"correct":26},"技术措施",{"key":24,"text":384,"correct":22},"主要技术经济指标",{"key":28,"text":386,"correct":26},"组织措施",{"key":31,"text":388,"correct":26},"主要管理措施",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":33},1117907,"某公路改造项目计划投资1500万元，计划建设工期为5个月。则影响该项目目标实现的因素中，决定性的因素是()。",[393,395,397,399],{"key":20,"text":394,"correct":22},"组织",{"key":24,"text":396,"correct":26},"方法",{"key":28,"text":398,"correct":26},"工具",{"key":31,"text":400,"correct":26},"人力资源",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":24,"analysis":33},1117908,"在项目目标动态控制的纠偏措施中，调整设计、改进施工方法和改变施工机具等，属于()。",[405,407,408,409],{"key":20,"text":406,"correct":26},"经济措施",{"key":24,"text":382,"correct":22},{"key":28,"text":386,"correct":26},{"key":31,"text":410,"correct":26},"管理措施",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":28,"analysis":33},1117909,"项目目标动态控制的核心是()。",[415,417,419,421],{"key":20,"text":416,"correct":26},"针对影响目标的各种因素进行预控",{"key":24,"text":418,"correct":26},"确定目标控制的计划值",{"key":28,"text":420,"correct":22},"当发现目标偏离时采取纠偏措施",{"key":31,"text":422,"correct":26},"进行项目目标的调整",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":28,"analysis":33},1117910,"根据《国务院关于取消第二批行政审批项目和改变一批行政审项目管理方式的规定》（国发[200315号），取得建造师注册证书的人员是否担任工程项目施工的项目经理，由()决定。",[427,429,431,433],{"key":20,"text":428,"correct":26},"建设行政主管部门",{"key":24,"text":430,"correct":26},"项目业主",{"key":28,"text":432,"correct":22},"建筑施工企业",{"key":31,"text":434,"correct":26},"项目监理单位",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":31,"analysis":33},1117911,"在项目实施之前，由法定代表人或其授权人与项目经理协商制定项目管理目标责任书时，不应作为依据的是（）。",[439,441,443,445],{"key":20,"text":440,"correct":26},"项目合同文件",{"key":24,"text":442,"correct":26},"组织的经营方针和目标",{"key":28,"text":444,"correct":26},"项目管理规划大纲",{"key":31,"text":446,"correct":22},"项目管理实施规划",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":20,"analysis":33},1117912,"某施工企业项目经理在组织现场施工中，为了赶工期，违反了施工安全管理条例的有关规定，出现了安全事故，造成2人死亡，则政府主管部门主要追究该项目经理的()。",[451,453,455,457],{"key":20,"text":452,"correct":22},"法律责任",{"key":24,"text":454,"correct":26},"行政责任",{"key":28,"text":456,"correct":26},"经济责任",{"key":31,"text":458,"correct":26},"管理责任",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":31,"analysis":33},1117913,"建筑施工企业项目经理，是受企业()委托对工程项目施工过程全面负责的项目管理者。",[463,465,467,469],{"key":20,"text":464,"correct":26},"董事会",{"key":24,"text":466,"correct":26},"股东代表大会",{"key":28,"text":468,"correct":26},"总工程师",{"key":31,"text":470,"correct":22},"法定代表人",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":20,"analysis":33},1117914,"在工程项目施工中处于中心地位，对工程项目施工负有全面管理责任的是()。",[475,477,479,481],{"key":20,"text":476,"correct":22},"项目经理",{"key":24,"text":478,"correct":26},"项目总监理工程师",{"key":28,"text":480,"correct":26},"派驻施工现场的业主代表",{"key":31,"text":482,"correct":26},"施工现场技术负责人",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":20,"analysis":33},1117915,"项目经理以（）的身份处理与所承担的工程项目有关的外部关系.",[487,489,491,493],{"key":20,"text":488,"correct":22},"企业法定代表人的代表身份",{"key":24,"text":490,"correct":26},"企业总经理",{"key":28,"text":492,"correct":26},"分管生产经营的副经理",{"key":31,"text":494,"correct":26},"企业董事长",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":28,"analysis":33},1117916,"在一般的施工企业中工程计划、合同管理、工程管理、工程成本、技术管理、物资采购、设备管理、人事管理、财务管理等职能管理部门，项目经理可能在()管理部或项目管理部下的项目经理部主持工作。",[499,500,502,504],{"key":20,"text":234,"correct":26},{"key":24,"text":501,"correct":26},"财务",{"key":28,"text":503,"correct":22},"工程",{"key":31,"text":505,"correct":26},"技术",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":28,"analysis":33},1117917,"建设工程施工过程，可能会出现不利的地质条件（如地勘未探明的软弱层）而使施工进度延误、成本增加，这种风险属于()。",[510,512,514,516],{"key":20,"text":511,"correct":26},"经济与管理风险",{"key":24,"text":513,"correct":26},"组织风险",{"key":28,"text":515,"correct":22},"工程环境风险",{"key":31,"text":517,"correct":26},"技术风险",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":31,"analysis":33},1117918,"某城市轨道交通地下工程项目工风险管理中，建立了重大风险事件呈报制度，这一做法属于施工风险管理过程中的()",[522,524,526,528],{"key":20,"text":523,"correct":26},"风险识别",{"key":24,"text":525,"correct":26},"风险评估",{"key":28,"text":527,"correct":26},"风险响应",{"key":31,"text":529,"correct":22},"风险控制",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":28,"analysis":33},1117919,"建设工程项目的风险中，属于经济与管理风险的是（）。",[534,536,538,540],{"key":20,"text":535,"correct":26},"组织结构模式",{"key":24,"text":537,"correct":26},"工作流程组织",{"key":28,"text":539,"correct":22},"现场与公用防火设施的可用性及其数量",{"key":31,"text":541,"correct":26},"施工机械操作人员的能力和经验",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":31,"analysis":33},1117920,"某工程总承包企业与某建设单位签订了一个电站项目的EPC工程总承包合同，从风险角度分析，该项目实施风险包括()。",[546,548,550,552],{"key":20,"text":547,"correct":26},"项目评估风险",{"key":24,"text":549,"correct":26},"项目决策的风险",{"key":28,"text":551,"correct":26},"国家财政政策与货币政策变化的风险",{"key":31,"text":553,"correct":22},"设计风险、施工风险、设备和其他建设物资的风险",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":31,"analysis":33},1117921,"监理单位是建筑市场的主体之一，建设监理是一种高智能的()。",[558,560,562,564],{"key":20,"text":559,"correct":26},"委托代理服务",{"key":24,"text":561,"correct":26},"监督管理服务",{"key":28,"text":563,"correct":26},"中介代理服务",{"key":31,"text":565,"correct":22},"有偿技术服务",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":20,"analysis":33},1117922,"编制工程建设监理实施细则的依据不包括( )。",[570,572,574,576],{"key":20,"text":571,"correct":22},"可行性研究报告",{"key":24,"text":573,"correct":26},"施工组织设计",{"key":28,"text":575,"correct":26},"相关的专业工程的标准",{"key":31,"text":577,"correct":26},"已批准的工程建设监理规划",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":24,"analysis":33},1117923,"根据《建设工程监理规范》GB\u002FT 50319-2013，对中型及以上或专业性比较强的工程项目，项目监理机构应编制工程建设监理实施细则.并必须经()批准后执行。",[582,584,586,588],{"key":20,"text":583,"correct":26},"监理单位技术负责人",{"key":24,"text":585,"correct":22},"总监理工程师",{"key":28,"text":587,"correct":26},"专业监理工程师",{"key":31,"text":589,"correct":26},"业主代表",[591,594,597,600,603,606],{"id":15,"name":592,"category":7,"favorite":593},"领导干部任职前廉政法规知识测试题",92,{"id":595,"name":596,"category":7,"favorite":15},595,"建筑结构与设备",{"id":598,"name":599,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":601,"name":602,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":604,"name":605,"category":7,"favorite":8},534,"BIM工程师",{"id":607,"name":605,"category":7,"favorite":8},535]