[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":597},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,16,50,2973,[13,34,46,58,70,82,93,105,117,129,141,153,165,177,189,201,211,223,235,246,257,269,278,290,298,307,319,327,339,351,363,375,387,399,411,423,435,446,458,470,481,493,504,516,528,540,552,564,576,587],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1117823,1,"单选题","工程监理人员认为工程施工不符合工程设计要求、施工技术标准和合同约定的，()。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","由业主作出处理决定",false,{"key":24,"text":25,"correct":22},"B","由总监理工程师作出处理决定",{"key":27,"text":28,"correct":22},"C","由专业监理工程师作出处理决定",{"key":30,"text":31,"correct":32},"D","有权要求建筑施工企业改正",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1117824,"不属于材料和设备采购供应的建设监理工作的主要任务的是( )。",[38,40,42,44],{"key":20,"text":39,"correct":32},"监督检查施工单位质量保证体系及安全技术措施，完善质量管理程序与制度",{"key":24,"text":41,"correct":22},"制订(或参与制订)材料和设备供应计划和相应的资金需求计划",{"key":27,"text":43,"correct":22},"通过材料和设备的质量、价格、供货期和售后服务等条件的分析和比选，协助业主确定材料和设备等物资的供应单位",{"key":30,"text":45,"correct":22},"起草并参与材料和设备的订货合同",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},1117825,"工程建设监理计划完成后必须经()审核批准，并应在召开第一次工地会议前报送业主。",[50,52,54,56],{"key":20,"text":51,"correct":22},"建设单位负责人",{"key":24,"text":53,"correct":22},"施工单位负责人",{"key":27,"text":55,"correct":22},"注册建筑师",{"key":30,"text":57,"correct":32},"监理单位技术负责人",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1117826,"《建设工程安全生产管理条例》第十四条规定，工程监理单位和监理工程师对建设工程安全生产承担( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"领导责任",{"key":24,"text":65,"correct":22},"经济责任",{"key":27,"text":67,"correct":32},"监理责任",{"key":30,"text":69,"correct":22},"刑事责任",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1117827,"某监理公司在实施监理的过程中，发现施工单位在施工现场存在安全事故隐患且情况严重，则监理公司应当（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"要求施工单位整改",{"key":24,"text":77,"correct":22},"要求建设单位整改",{"key":27,"text":79,"correct":32},"要求施工单位暂时停止施工，并及时报告建设单位",{"key":30,"text":81,"correct":22},"向所在市区有关部门报告",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1117828,"工程监理单位依据法律、法规以及有关技术标准、设计文件和建设工程承包合同代表建设单位进行监理，并对实施安全承担()。",[86,88,89,91],{"key":20,"text":87,"correct":22},"法律责任",{"key":24,"text":67,"correct":32},{"key":27,"text":90,"correct":22},"行政责任",{"key":30,"text":92,"correct":22},"合同责任",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":30,"analysis":33},1117829,"在工程项目施工前，工程监理单位应当审查施工单位所提交的施工组织设计中的安全技术措施或者专项施工方案是否符合()。",[97,99,101,103],{"key":20,"text":98,"correct":22},"工程建设设计文件",{"key":24,"text":100,"correct":22},"工程建设设计规程",{"key":27,"text":102,"correct":22},"工程建设施工合同",{"key":30,"text":104,"correct":32},"工程建设强制性标准",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":27,"analysis":33},1117830,"对于采用新技术、新工艺、新材料、新设备以及专业性较强、危险性较大的工程项目，监理机构除了编制工程建设监理规划之外还应编制()。",[109,111,113,115],{"key":20,"text":110,"correct":22},"工程项目管理规划大纲",{"key":24,"text":112,"correct":22},"工程建设监理实施规划",{"key":27,"text":114,"correct":32},"工程建设监理实施细则",{"key":30,"text":116,"correct":22},"工程项目管理实施规划",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":24,"analysis":33},1117831,"实施旁站监理，从施工单位书面通知监理单位现场监理部的时间算起，到该工序开始施工之间的时间间隔至少应为()h。",[121,123,125,127],{"key":20,"text":122,"correct":22},"12",{"key":24,"text":124,"correct":32},"24",{"key":27,"text":126,"correct":22},"36",{"key":30,"text":128,"correct":22},"48",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":30,"analysis":33},1117832,"按《建设工程质量管理条例》的规定：未经总监理工程师签字，( )。",[133,135,137,139],{"key":20,"text":134,"correct":22},"建筑材料、建筑构配件不得在工程上使用",{"key":24,"text":136,"correct":22},"建筑设备不得在工程上安装",{"key":27,"text":138,"correct":22},"施工单位不得进行下一道工序的施工",{"key":30,"text":140,"correct":32},"建设单位不拨付工程款",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":24,"analysis":33},1117833,"根据建设工程质量管理条例，未经（）签字的建筑构配件和设备不得在工程上使用和安装。",[145,147,149,151],{"key":20,"text":146,"correct":22},"专业技术负责人",{"key":24,"text":148,"correct":32},"监理工程师",{"key":27,"text":150,"correct":22},"项目经理",{"key":30,"text":152,"correct":22},"总监理工程师",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":20,"analysis":33},1117834,"根据《建设工程质量管理条例》，监理工程师应当按照工程监理规范的要求，采取（）等形式对建设工程实施监理。",[157,159,161,163],{"key":20,"text":158,"correct":32},"旁站、巡视和平行检验",{"key":24,"text":160,"correct":22},"见证、巡视和抽样检验",{"key":27,"text":162,"correct":22},"旁站、巡视和抽样检验",{"key":30,"text":164,"correct":22},"见证、巡视和平行检验",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":27,"analysis":33},1117835,"监理人员实施旁站监理时，发现施工活动已经或者可能危及工程质量时，应当()。",[169,171,173,175],{"key":20,"text":170,"correct":22},"责令施工企业整改",{"key":24,"text":172,"correct":22},"向施工企业项目经理报告",{"key":27,"text":174,"correct":32},"向总监理工程师报告",{"key":30,"text":176,"correct":22},"向建设行政主管部门报告",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":24,"analysis":33},1117836,"根据《建设工程监理规范》(GB50319-2000)，属于施工阶段监理工作任务的是()。",[181,183,185,187],{"key":20,"text":182,"correct":22},"检查施工单位专职安全生产管理人员的资格",{"key":24,"text":184,"correct":32},"检查施工单位的测量、检测仪器设备定期检验的证明文件",{"key":27,"text":186,"correct":22},"审核分包单位资质条件",{"key":30,"text":188,"correct":22},"对重点工程部位的中线和水平控制进行复查",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":20,"analysis":33},1117837,"根据《建设工程委托监理合同（示范文本）》(GF-2000-0201)，监理人发现工程设计不符合国家规定的质量标准时，正确的做法是()。",[193,195,197,199],{"key":20,"text":194,"correct":32},"书面报告委托人并要求设计人改正",{"key":24,"text":196,"correct":22},"指令施工单位征求设计人的修改意见",{"key":27,"text":198,"correct":22},"及时向设计人报告问题的具体情况",{"key":30,"text":200,"correct":22},"口头联系设计人并书面报告委托人",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":27,"analysis":33},1117838,"工程建设监理规划编制完成后,必须经()审批批准。",[205,207,208,209],{"key":20,"text":206,"correct":22},"业主",{"key":24,"text":152,"correct":22},{"key":27,"text":57,"correct":32},{"key":30,"text":210,"correct":22},"专业监理工程师",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},1117839,"我国推行建设工程监理制度的目的，不包括()。",[215,217,219,221],{"key":20,"text":216,"correct":22},"确保工程建设质量",{"key":24,"text":218,"correct":32},"加快工程建设速度",{"key":27,"text":220,"correct":22},"提高工程建设水平",{"key":30,"text":222,"correct":22},"充分发挥投资效益",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},1117840,"旁站监理员发现施工单位在主体结构的施工中有违反工程建设强制性标准的行为,有权()。",[227,229,231,233],{"key":20,"text":228,"correct":22},"向施工企业下达局部停工令",{"key":24,"text":230,"correct":32},"责令施工企业立即整改",{"key":27,"text":232,"correct":22},"报告建设单位并采取应急措施",{"key":30,"text":234,"correct":22},"报告政府主管部门并采取措施",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":20,"analysis":33},1117841,"工程监理单位在实施监理过程中，发现存在安全事故隐患时，应当()。",[239,240,242,244],{"key":20,"text":75,"correct":32},{"key":24,"text":241,"correct":22},"要求施工单位暂时停止施工",{"key":27,"text":243,"correct":22},"由总监理工程师下达局部暂停施工指令",{"key":30,"text":245,"correct":22},"及时向有关主管部门报告",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":20,"analysis":33},1117842,"建设工程概况、监理工作范围、监理工作内容、监理工作目标、监理工作依据属于()的内容。",[250,252,254,256],{"key":20,"text":251,"correct":32},"工程建设监理规划",{"key":24,"text":253,"correct":22},"监理大纲",{"key":27,"text":255,"correct":22},"建设工程委托监理合同文件",{"key":30,"text":114,"correct":22},{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":30,"analysis":33},1117843,"建设工程监理的工作性质特点不包括()。",[261,263,265,267],{"key":20,"text":262,"correct":22},"服务性",{"key":24,"text":264,"correct":22},"独立性",{"key":27,"text":266,"correct":22},"科学性",{"key":30,"text":268,"correct":32},"合作性",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":30,"analysis":33},1117844,"根据《建设工程安全生产管理条例》第十四条的有关规定，工程监理单位应当审查施工组织设计中的安全技术措施或者专项施工方案是否符合()。",[273,274,276,277],{"key":20,"text":98,"correct":22},{"key":24,"text":275,"correct":22},"工程建设技术规程",{"key":27,"text":102,"correct":22},{"key":30,"text":104,"correct":32},{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":27,"analysis":33},1117845,"根据《中华人民共和国建筑法》的有关规定，工程监理人员认为工程施工不符合工程设计要求、施工技术标准和合同约定的，有权()。",[282,284,286,288],{"key":20,"text":283,"correct":22},"要求建设单位下达停工令",{"key":24,"text":285,"correct":22},"向有关主管部门报告",{"key":27,"text":287,"correct":32},"要求建筑施工企业改正",{"key":30,"text":289,"correct":22},"要求建筑施工企业整改",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":27,"analysis":33},1117846,"采用新材料，新工艺，新技术，新设备的工程，以及专业性较大的分项工程应编制( )。",[294,295,296,297],{"key":20,"text":110,"correct":22},{"key":24,"text":112,"correct":22},{"key":27,"text":114,"correct":32},{"key":30,"text":116,"correct":22},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},1117847,"工程监理机构应以事实为依据，以法律和有关合同为准绳，在维护业主的合法权益时不损害承包商的合法权益，这体现了建设工程监理的()。",[302,303,305,306],{"key":20,"text":262,"correct":22},{"key":24,"text":304,"correct":32},"公平性",{"key":27,"text":264,"correct":22},{"key":30,"text":266,"correct":22},{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":24,"analysis":33},1117849,"在建设工程项目招标阶段，不属于建设监理工作的主要任务是（）。",[311,313,315,317],{"key":20,"text":312,"correct":22},"拟订或参与拟订建设工程施工招标方案",{"key":24,"text":314,"correct":32},"组织建设工程设计方案竞赛或设计招标，协助业主选择勘测设计单位",{"key":27,"text":316,"correct":22},"参与建设工程施工招标的组织工作",{"key":30,"text":318,"correct":22},"准备建设工程施工招标文件",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":30,"analysis":33},1117850,"在工程项目施工前，工程监理应当审查施工单位所提交的施工组织设计中的安全技术措施或者专项施工方案是否符合()。",[323,324,325,326],{"key":20,"text":98,"correct":22},{"key":24,"text":275,"correct":22},{"key":27,"text":102,"correct":22},{"key":30,"text":104,"correct":32},{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":27,"analysis":33},1117851,"按照《建设工程施工合同（示范文本）》的条款，下列关于更换项目经理的表述中正确的是( )。",[331,333,335,337],{"key":20,"text":332,"correct":22},"承包人可根据工作需要自主更换项目经理",{"key":24,"text":334,"correct":22},"发包人有权更换无权履行职责或不称职的项目经理",{"key":27,"text":336,"correct":32},"承包人无正当理由拒绝发包人更换项目经理要求的，应承担违约责任",{"key":30,"text":338,"correct":22},"承包人需要更换项目经理时，提前7天告知发包人和监理人",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":20,"analysis":33},1117852,"下列各项需要编制分部（分项）工程施工组织设计内容的是（）",[343,345,347,349],{"key":20,"text":344,"correct":32},"定向爆破工程",{"key":24,"text":346,"correct":22},"土石方工程",{"key":27,"text":348,"correct":22},"基础工程",{"key":30,"text":350,"correct":22},"平整场地",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":30,"analysis":33},1117853,"若某事件经过风险评估，位于事件风险量区域图中的风险区 A，如下图所示则应采取适当措施降低其()。",[355,357,359,361],{"key":20,"text":356,"correct":22},"发生概率，使它移位至风险区D",{"key":24,"text":358,"correct":22},"发生概率，使它移位风险区C",{"key":27,"text":360,"correct":22},"损失量，使它移位至风险区B",{"key":30,"text":362,"correct":32},"发生概率，使它移位至风险区B",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":24,"analysis":33},1117854,"某工程项目发生风险的可能性为中等，造成的后果为重大损失，此类风险等级为()。",[367,369,371,373],{"key":20,"text":368,"correct":22},"2",{"key":24,"text":370,"correct":32},"3",{"key":27,"text":372,"correct":22},"4",{"key":30,"text":374,"correct":22},"5",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":24,"analysis":33},1117855,"系统的目标决定了系统的组织，而系统目标能否实现有多种因素，其中的决定性因素应当是（）",[379,381,383,385],{"key":20,"text":380,"correct":22},"生产工具",{"key":24,"text":382,"correct":32},"项目管理的组织",{"key":27,"text":384,"correct":22},"设计图纸",{"key":30,"text":386,"correct":22},"系统的目标",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":27,"analysis":33},1117856,"编制施工组织总设计时，资源需求量计划应在完成( )后确定。",[391,393,395,397],{"key":20,"text":392,"correct":22},"施工准备工作计划",{"key":24,"text":394,"correct":22},"施工总平面图",{"key":27,"text":396,"correct":32},"施工总进度计划",{"key":30,"text":398,"correct":22},"主要技术经济指标",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":20,"analysis":33},1117857,"按照《建设工程项目管理规范》(GB\u002FT50326-2006)，下列区域中风险等级最高的是( )。",[403,405,407,409],{"key":20,"text":404,"correct":32},"风险区A",{"key":24,"text":406,"correct":22},"风险区B",{"key":27,"text":408,"correct":22},"风险区C",{"key":30,"text":410,"correct":22},"风险区D",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":30,"analysis":33},1117858,"下列施工风险管理中，属于风险监控工作的是（）",[415,417,419,421],{"key":20,"text":416,"correct":22},"确定风险因素",{"key":24,"text":418,"correct":22},"分析风险发生的概率",{"key":27,"text":420,"correct":22},"分析风险损失量",{"key":30,"text":422,"correct":32},"提出风险预警",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":24,"analysis":33},1117859,"组织论是一门学科，是与项目管理学相关的一门非常重要的基础理论学科，下列不属于研究对象的是（）。",[427,429,431,433],{"key":20,"text":428,"correct":22},"技术流程组织",{"key":24,"text":430,"correct":32},"合同关系",{"key":27,"text":432,"correct":22},"组织结构模式",{"key":30,"text":434,"correct":22},"组织分工",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":30,"analysis":33},1117860,"分部（分项）工程施工组织设计的主要内容一般不包括()。",[439,441,443,445],{"key":20,"text":440,"correct":22},"施工方法的选择",{"key":24,"text":442,"correct":22},"施工机械的选择",{"key":27,"text":444,"correct":22},"劳动力需求量计划",{"key":30,"text":398,"correct":32},{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":30,"analysis":33},1117861,"根据目标动态控制原理，项目目标分解之后，在实施过程中进行动态跟踪和控制的首要工作是()。",[450,452,454,456],{"key":20,"text":451,"correct":22},"确定目标控制的计划值",{"key":24,"text":453,"correct":22},"定期比较目标计划值与实际值",{"key":27,"text":455,"correct":22},"分析比较结果，采取纠偏措施",{"key":30,"text":457,"correct":32},"收集目标的实际完成值",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":24,"analysis":33},1117862,"下列工作中,不属于施工项目目标动态控制程序中的工作是()。",[462,464,466,468],{"key":20,"text":463,"correct":22},"目标分解",{"key":24,"text":465,"correct":32},"目标计划值收集",{"key":27,"text":467,"correct":22},"目标计划值与实际值比较",{"key":30,"text":469,"correct":22},"采取措施纠偏",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":30,"analysis":33},1117863,"项目结构图、组织结构图和合同结构图的含义不同，其表达的方式也有所不同。右图反映了一个建设项目的业主与总承包商，以及总承包商与分包商之间的某种关系，这种关系是()。",[474,476,478,480],{"key":20,"text":475,"correct":22},"指令关系",{"key":24,"text":477,"correct":22},"项目结构关系",{"key":27,"text":479,"correct":22},"工作任务关系",{"key":30,"text":430,"correct":32},{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":27,"analysis":33},1117864,"项目经理李某在施工管理的中发现，由于某些工作部门之间的组织关系安排不当而导致协调不力，对此问题，李某适合利用()对工作部门之间的组织关系进行调整",[485,487,489,491],{"key":20,"text":486,"correct":22},"工作流程图",{"key":24,"text":488,"correct":22},"项目结构图",{"key":27,"text":490,"correct":32},"组织结构图",{"key":30,"text":492,"correct":22},"合同结构图",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":27,"analysis":33},1117865,"项目管理的目标能否实现的决定性因素是（）。",[497,499,501,502],{"key":20,"text":498,"correct":22},"项目管理的制度",{"key":24,"text":500,"correct":22},"项目管理的方法",{"key":27,"text":382,"correct":32},{"key":30,"text":503,"correct":22},"项目管理的实施",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":27,"analysis":33},1117866,"施工总承包管理方(M C)对所承包的建设工程承担()的总责任。",[508,510,512,514],{"key":20,"text":509,"correct":22},"施工任务分包",{"key":24,"text":511,"correct":22},"施工任务执行",{"key":27,"text":513,"correct":32},"施工任务组织",{"key":30,"text":515,"correct":22},"施工任务承包",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":30,"analysis":33},1117867,"某建设工程项目采用施工总承包模式，其中的土方开挖工程由建设单位发包给一家专业分包商。在施工中，该土方专业分包商应该直接接受()的工作指令。",[520,522,524,526],{"key":20,"text":521,"correct":22},"建设单位",{"key":24,"text":523,"correct":22},"设计单位",{"key":27,"text":525,"correct":22},"监理单位",{"key":30,"text":527,"correct":32},"施工总承包单位",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":24,"analysis":33},1117868,"施工组织总设计包括如下工作：1.编制资源需求量计划；2.编制施工总进度计划；3.施工总平面图设计；4.拟定施工方案。其正确的工作顺序是（）",[532,534,536,538],{"key":20,"text":533,"correct":22},"1-2-3-4",{"key":24,"text":535,"correct":32},"4-2-1-3",{"key":27,"text":537,"correct":22},"1-3-2-4",{"key":30,"text":539,"correct":22},"4-1-2-3",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":24,"analysis":33},1117869,"某施工企业在编制施工组织总设计时，已完成的工作有：收集和熟悉有关资料和图纸、调查项目特点和施工条件、计算主要工种的工程量、确定施工的总体部署和施工方案，则接下来应该进行的工作是( )。",[544,546,548,550],{"key":20,"text":545,"correct":22},"编制资源需用量计划",{"key":24,"text":547,"correct":32},"编制施工总进度计划",{"key":27,"text":549,"correct":22},"编制施工准备工作计划",{"key":30,"text":551,"correct":22},"施工总平面面设计",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":20,"analysis":33},1117870,"项目组织分工反映了一个组织系统中（）。",[556,558,560,562],{"key":20,"text":557,"correct":32},"各子系统的工作任务分工和管理职能分工",{"key":24,"text":559,"correct":22},"各项工作之间的逻辑关系",{"key":27,"text":561,"correct":22},"各子系统的工作任务",{"key":30,"text":563,"correct":22},"各组成部门之间的指令关系",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":20,"analysis":33},1117871,"项目结构图中的矩形框连接的表达是()。",[568,570,572,574],{"key":20,"text":569,"correct":32},"直线",{"key":24,"text":571,"correct":22},"双向箭线",{"key":27,"text":573,"correct":22},"波形线",{"key":30,"text":575,"correct":22},"单向箭线",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":20,"analysis":33},1117872,"项目风险管理过程包括：1项目风险应对；2项目风险评估；3项目风险识别；4项目风险控制，其正确的管理流程是()。",[580,582,584,586],{"key":20,"text":581,"correct":32},"3-2-1-4",{"key":24,"text":583,"correct":22},"3-2-4-1",{"key":27,"text":585,"correct":22},"2-3-4-1",{"key":30,"text":537,"correct":22},{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":24,"analysis":33},1117873,"风险识别的工作程序不包括()。",[591,593,594,596],{"key":20,"text":592,"correct":22},"编制施工风险识别报告",{"key":24,"text":420,"correct":32},{"key":27,"text":595,"correct":22},"收集与施工风险有关的信息",{"key":30,"text":416,"correct":22},[598,601,604,607,610,613],{"id":15,"name":599,"category":7,"favorite":600},"领导干部任职前廉政法规知识测试题",92,{"id":602,"name":603,"category":7,"favorite":15},595,"建筑结构与设备",{"id":605,"name":606,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":608,"name":609,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":611,"name":612,"category":7,"favorite":8},534,"BIM工程师",{"id":614,"name":612,"category":7,"favorite":8},535]