[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":586},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,15,50,2973,[13,34,43,55,67,79,91,103,115,127,139,151,162,174,186,198,210,222,234,246,257,269,281,291,303,315,327,339,351,363,375,386,397,407,416,424,436,448,460,471,482,492,500,508,517,529,541,553,563,574],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1117772,1,"单选题","某工程项目发生风险的可能性为1级，造成的后果为3级损失，此类风险等级为()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","1",false,{"key":24,"text":25,"correct":26},"B","2",true,{"key":28,"text":29,"correct":22},"C","3",{"key":31,"text":32,"correct":22},"D","4","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1117773,"按照《建设工程项目管理规范》GB\u002FT 50326-2006中风险评估等级，事件风险量区域中的风险区B为( )等风险。",[38,39,40,41],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":28,"text":29,"correct":22},{"key":31,"text":42,"correct":26},"5",{"id":44,"libraryId":5,"type":15,"typeLabel":16,"stem":45,"options":46,"answer":28,"analysis":33},1117774,"建筑工程监理应当依照法律、行政法规及有关的()文件和建筑工程承包合同，对承包单位在施工质量、建设工期和建设资金使用等方面，代表建设单位实施监督。",[47,49,51,53],{"key":20,"text":48,"correct":22},"施工组织设计",{"key":24,"text":50,"correct":22},"风险管理计划",{"key":28,"text":52,"correct":26},"技术标准设计",{"key":31,"text":54,"correct":22},"工程设计",{"id":56,"libraryId":5,"type":15,"typeLabel":16,"stem":57,"options":58,"answer":20,"analysis":33},1117775,"工程监理人员认为工程施工不符合工程设计要求时，其正确的做法是()。",[59,61,63,65],{"key":20,"text":60,"correct":26},"要求建筑施工企业改正",{"key":24,"text":62,"correct":22},"报告建设单位要求设计单位改正",{"key":28,"text":64,"correct":22},"下达设计整改通知单",{"key":31,"text":66,"correct":22},"报告设计单位要求建设单位改正",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":31,"analysis":33},1117776,"项目监理机构处理业主和承包方的利益冲突或矛盾时，应坚持的原则是()。",[71,73,75,77],{"key":20,"text":72,"correct":22},"无条件维护业主的权益",{"key":24,"text":74,"correct":22},"无条件维护承包方的权益",{"key":28,"text":76,"correct":22},"在不损害业主合法权益的前提下，维护承包方的权益",{"key":31,"text":78,"correct":26},"在维护业主的权益时，不损害承包方的合法权益",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":31,"analysis":33},1117777,"下列选项中，属于竣工验收阶段建设监理工作主要任务的是（）。",[83,85,87,89],{"key":20,"text":84,"correct":22},"及时整理竣工文件和验收资料",{"key":24,"text":86,"correct":22},"提交工程竣工验收申请，编写工程质量评估报告",{"key":28,"text":88,"correct":22},"组织工程竣工验收，并签署竣工验收意见",{"key":31,"text":90,"correct":26},"编制、整理工程监理归档文件并提交给业主",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":24,"analysis":33},1117778,"关于工程建设监理规划，下列说法正确的是（）。",[95,97,99,101],{"key":20,"text":96,"correct":22},"工程建设监理规划应在签订委托监理合同及收到施工合同后开始编制",{"key":24,"text":98,"correct":26},"工程建设监理规划应由总监理工程师组织专业监理工程师进行编制",{"key":28,"text":100,"correct":22},"工程建设监理规划应由总监理工程师签字后由建设单位项目负责人审批",{"key":31,"text":102,"correct":22},"工程建设监理规划在召开第一次工地会议后报送建设单位",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":20,"analysis":33},1117779,"工程监理企业是指取得企业法人营业执照，具有监理资质证书的依法从事建设业务活动的（）。",[107,109,111,113],{"key":20,"text":108,"correct":26},"经济组织",{"key":24,"text":110,"correct":22},"中介组织",{"key":28,"text":112,"correct":22},"政治组织",{"key":31,"text":114,"correct":22},"社会组织,",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":31,"analysis":33},1117780,"下列工程施工阶段的建设监理工作中，不属于进度控制监理工作的是()。",[119,121,123,125],{"key":20,"text":120,"correct":22},"监督施工单位严格按照施工合同规定的工期组织施工",{"key":24,"text":122,"correct":22},"审查施工单位提交的施工进度计划",{"key":28,"text":124,"correct":22},"核查施工单位对施工进度计划的调整",{"key":31,"text":126,"correct":26},"建立计量支付签证台账，核对工程形象进度",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":20,"analysis":33},1117781,"我国的建设工程监理属于国际上()的范畴。",[131,133,135,137],{"key":20,"text":132,"correct":26},"业主方项目管理",{"key":24,"text":134,"correct":22},"总承包方项目管理",{"key":28,"text":136,"correct":22},"承包方项目管理",{"key":31,"text":138,"correct":22},"咨询方项目管理",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":24,"analysis":33},1117782,"根据《建设工程质量管理条例》第三十六条的有关规定，工程监理单位代表建设单位对施工质量实施监理，并对施工质量承担()。",[143,145,147,149],{"key":20,"text":144,"correct":22},"监督责任",{"key":24,"text":146,"correct":26},"监理责任",{"key":28,"text":148,"correct":22},"法律责任",{"key":31,"text":150,"correct":22},"连带责任",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":31,"analysis":33},1117783,"不属于编制工程建设监理实施细则依据的是( )。",[155,157,159,160],{"key":20,"text":156,"correct":22},"已批准的工程建设监理规划",{"key":24,"text":158,"correct":22},"相关的专业工程的标准",{"key":28,"text":48,"correct":22},{"key":31,"text":161,"correct":26},"合同文件",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":28,"analysis":33},1117784,"编制工程建设监理规划的依据不包括( )。",[166,168,170,172],{"key":20,"text":167,"correct":22},"监理大纲",{"key":24,"text":169,"correct":22},"建设工程委托监理合同文件",{"key":28,"text":171,"correct":26},"项目建议书",{"key":31,"text":173,"correct":22},"与建设工程项目有关的技术资料",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":28,"analysis":33},1117785,"《建设工程质量管理条例》规定工程监理单位对施工质量承担监理责任。对此，下列选项中除( )以外，都是工程监理法定的职权。",[178,180,182,184],{"key":20,"text":179,"correct":22},"未经监理工程师签字，建筑材料、构配件和设备不得在工程上使用或安装",{"key":24,"text":181,"correct":22},"未经监理工程师签字，不得进入下道工序施工",{"key":28,"text":183,"correct":26},"施工单位更换技术负责人必须经总监理工程师同意",{"key":31,"text":185,"correct":22},"未经总监理工程师签字，不得进行竣工验收或付工程款",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":20,"analysis":33},1117786,"某工程监理单位在实施监理的过程中，发现施工单位存在安全事故隐患，则该工程监理单位应当()。",[190,192,194,196],{"key":20,"text":191,"correct":26},"要求施工单位整改",{"key":24,"text":193,"correct":22},"向有关主管部门报告",{"key":28,"text":195,"correct":22},"要求施工单位全面停工",{"key":31,"text":197,"correct":22},"向建设单位报告",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":28,"analysis":33},1117787,"某监理公司承担了当地某房地产开发项目的工程监理任务。则该工程监理单位所从事的建设监理活动在工作性质上属于()。",[202,204,206,208],{"key":20,"text":203,"correct":22},"承包",{"key":24,"text":205,"correct":22},"管理",{"key":28,"text":207,"correct":26},"服务",{"key":31,"text":209,"correct":22},"控制",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":28,"analysis":33},1117788,"某建设监理公司在监理过程中发现安全事故隐患未及时要求施工单位整改，政府主管部门发现后责令该建设监理公司限期改正，但该建设监理公司逾期未改正，则应对其()。",[214,216,218,220],{"key":20,"text":215,"correct":22},"依照刑法有关规定追究刑事责任",{"key":24,"text":217,"correct":22},"降低企业的资质等级，吊销企业的资质证书",{"key":28,"text":219,"correct":26},"责令停业整顿，并处10万元以上30万元以下的罚款",{"key":31,"text":221,"correct":22},"有关责任人进行经济和行政处罚",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":28,"analysis":33},1117789,"审查施工组织设计属于()建设监理工作的主要任务。",[226,228,230,232],{"key":20,"text":227,"correct":22},"设计阶段",{"key":24,"text":229,"correct":22},"施工招标阶段",{"key":28,"text":231,"correct":26},"施工准备阶段",{"key":31,"text":233,"correct":22},"工程施工阶段",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":24,"analysis":33},1117790,"施工中某工序需要实施旁站监理，施工单位从书面通知监理单位现场监理部的时间算起，到该工序开始施工之间的时间间隔至少应为()。",[238,240,242,244],{"key":20,"text":239,"correct":22},"12小时",{"key":24,"text":241,"correct":26},"24小时",{"key":28,"text":243,"correct":22},"36小时",{"key":31,"text":245,"correct":22},"48小时",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":28,"analysis":33},1117792,"工程监理单位与建设单位的关系属于（）关系。",[250,251,253,255],{"key":20,"text":203,"correct":22},{"key":24,"text":252,"correct":22},"中介服务",{"key":28,"text":254,"correct":26},"委托代理",{"key":31,"text":256,"correct":22},"合作",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":28,"analysis":33},1117793,"工程监理单位应当选派具备相应资格的总监理工程师和监理工程师进驻施工现场。未经（）签字，建筑材料、建筑构配件和设备不得在工程上使用或者安装，施工单位不得进行下一道工序的施工。未经（）签字，建设单位不拨付工程款，不进行竣工验收。",[261,263,265,267],{"key":20,"text":262,"correct":22},"项目经理，总监理工程师",{"key":24,"text":264,"correct":22},"总监理工程师，专业监理工程师",{"key":28,"text":266,"correct":26},"监理工程师，总监理工程师",{"key":31,"text":268,"correct":22},"总监理工程师，监理工程师",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":20,"analysis":33},1117794,"项目监理机构对工程的关键部位或关键工序的施工质量进行的监督活动，称为()。",[273,275,277,279],{"key":20,"text":274,"correct":26},"旁站监理",{"key":24,"text":276,"correct":22},"巡视",{"key":28,"text":278,"correct":22},"平行检查",{"key":31,"text":280,"correct":22},"抽检",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":31,"analysis":33},1117795,"根据《建设工程安全生产管理条例》的规定，工程监理单位和监理工程师对建设工程安全生产承担()。",[285,287,288,290],{"key":20,"text":286,"correct":22},"经济责任",{"key":24,"text":148,"correct":22},{"key":28,"text":289,"correct":22},"领导责任",{"key":31,"text":146,"correct":26},{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":28,"analysis":33},1117796,"建设工程监理是一种()。",[295,297,299,301],{"key":20,"text":296,"correct":22},"高智能的无偿技术服务",{"key":24,"text":298,"correct":22},"高智能管理",{"key":28,"text":300,"correct":26},"高智能的有偿技术服务",{"key":31,"text":302,"correct":22},"有偿技术服务",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":28,"analysis":33},1117797,"下列关于建设工程监理的说法正确的是（）。",[307,309,311,313],{"key":20,"text":308,"correct":22},"建设工程监理单位是建筑市场的主体之一，它是以一种高智能的无偿技术服务",{"key":24,"text":310,"correct":22},"未经监理工程师签字，建设单位不拨付工程款，不对建设工程实施监理",{"key":28,"text":312,"correct":26},"监理工程师应当按照工程监理规范的要求，采取旁站、巡视和平行检验等形式对建设工程实施监理",{"key":31,"text":314,"correct":22},"我国的工程监理属于施工方项目管理的范畴",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":24,"analysis":33},1117798,"工程监理单位是建筑市场的主体之一，在我国属于国际上()项目管理的范畴。",[319,321,323,325],{"key":20,"text":320,"correct":22},"项目总承包管理方",{"key":24,"text":322,"correct":26},"业主方",{"key":28,"text":324,"correct":22},"设计方",{"key":31,"text":326,"correct":22},"项目总承包方",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":20,"analysis":33},1117799,"监理人员进行平行检验时，发现施工过程存在安全事故隐患，应当（）",[331,333,335,337],{"key":20,"text":332,"correct":26},"责令施工企业整改",{"key":24,"text":334,"correct":22},"向施工企业项目经理报告",{"key":28,"text":336,"correct":22},"向建设单位驻工地代表报告",{"key":31,"text":338,"correct":22},"向建设行政主管部门报告",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":28,"analysis":33},1117800,"建设工程监理在组织上不属于承包商、供货商的任一方，在经济上也不依附于承包商、供货商的任一方，这体现了工程监理工作性质的()特点。",[343,345,347,349],{"key":20,"text":344,"correct":22},"服务性",{"key":24,"text":346,"correct":22},"科学性",{"key":28,"text":348,"correct":26},"独立性",{"key":31,"text":350,"correct":22},"公正性",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":20,"analysis":33},1117801,"房屋建筑工程的主体结构工程在混凝土浇筑时，需要旁站监理。根据《建设工程监理规范》(GB50319-2013)，施工企业至少应当在混凝土浇筑前()h，书面通知监理单位派驻工地的监理机构。",[355,357,359,361],{"key":20,"text":356,"correct":26},"24",{"key":24,"text":358,"correct":22},"36",{"key":28,"text":360,"correct":22},"48",{"key":31,"text":362,"correct":22},"60",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":24,"analysis":33},1117802,"根据《建设工程质量管理条例》，未经()签字的建筑材料不得在工程上使用。",[367,369,371,373],{"key":20,"text":368,"correct":22},"监理员",{"key":24,"text":370,"correct":26},"监理工程师",{"key":28,"text":372,"correct":22},"总监理工程师代表",{"key":31,"text":374,"correct":22},"总监理工程师",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":20,"analysis":33},1117803,"下列选项中，不属于监理实施细则编制依据的是（）。",[379,381,383,384],{"key":20,"text":380,"correct":26},"施工合同文件",{"key":24,"text":382,"correct":22},"工程设计文件",{"key":28,"text":48,"correct":22},{"key":31,"text":385,"correct":22},"监理规划",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":31,"analysis":33},1117804,"根据《建筑法》相关规定，工程监理人员发现工程设计不符合建筑工程质量标准或者合同约定的质量要求的，应当（）。",[390,392,394,396],{"key":20,"text":391,"correct":22},"要求设计单位改正",{"key":24,"text":393,"correct":22},"要求施工单位改正",{"key":28,"text":395,"correct":22},"报告施工单位要求设计单位改正",{"key":31,"text":62,"correct":26},{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":24,"analysis":33},1117805,"根据《建设工程质量管理条例》，未经（）签字，建筑材料、建筑构配件和设备不得在工程上使用或者安装，施工单位不得进行下一道工序的施工。",[401,403,404,405],{"key":20,"text":402,"correct":22},"业主代表",{"key":24,"text":370,"correct":26},{"key":28,"text":374,"correct":22},{"key":31,"text":406,"correct":22},"项目技术负责人",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":24,"analysis":33},1117806,"根据《建设工程监理规范》，建设工程在进行钢结构安装工程时，施工企业应在进行施工前（）h,书面通知项目监理机构安排旁站监理。",[411,413,414,415],{"key":20,"text":412,"correct":22},"12",{"key":24,"text":356,"correct":26},{"key":28,"text":358,"correct":22},{"key":31,"text":360,"correct":22},{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":28,"analysis":33},1117807,"工程监理机构将尽一切努力进行项目的目标控制，但他不可能保证项目目标一定实现，这是由建设工程监理工作性质的()决定的。",[420,421,422,423],{"key":20,"text":346,"correct":22},{"key":24,"text":348,"correct":22},{"key":28,"text":344,"correct":26},{"key":31,"text":350,"correct":22},{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":20,"analysis":33},1117808,"工程监理单位开展监理工作，应编制工程建设监理规划，下列表述正确的是()",[428,430,432,434],{"key":20,"text":429,"correct":26},"监理规划由工程监理单位技术负责人审批。",{"key":24,"text":431,"correct":22},"监理实施细则由总监理工程师编制",{"key":28,"text":433,"correct":22},"监理实施细则是监理规划的编制依据之一",{"key":31,"text":435,"correct":22},"监理实施细则应在签订了监理委托合同收到设计文件后开始编制",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":31,"analysis":33},1117809,"根据《建设工程安全生产管理条例》，工程监理单位应当审核施工组织设计中的安全技术措施或者专项施工方案是否符合（）。",[440,442,444,446],{"key":20,"text":441,"correct":22},"工程建设设计文件",{"key":24,"text":443,"correct":22},"工程建设施工合同",{"key":28,"text":445,"correct":22},"工程建设技术规程",{"key":31,"text":447,"correct":26},"工程建设强制性标准",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":28,"analysis":33},1117810,"工程监理代表建设单位对施工质量实施监理，下列选项中表述不正确的是()",[452,454,456,458],{"key":20,"text":453,"correct":22},"工程监理单位受业主委托，代表建设单位对施工质量实施监理，并对施工质量承担监理责任",{"key":24,"text":455,"correct":22},"实施监理活动中，当业主和承包商发生利益冲突或矛盾时，在维护业主合法权益时，不损害承包商的合法权益，这体现了监理公正性的工作特点",{"key":28,"text":457,"correct":26},"建筑材料、构配件和设备未经总监理工程师签字，不得在工程上使用或安装",{"key":31,"text":459,"correct":22},"审查施工单位选择的分包单位的资质是施工准备阶段的工作内容之一",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":28,"analysis":33},1117811,"旁站监理人员及()未在旁站监理记录上签字的，不得进行下一道工序",[464,465,467,469],{"key":20,"text":374,"correct":22},{"key":24,"text":466,"correct":22},"项目经理",{"key":28,"text":468,"correct":26},"施工企业的现场质检人员",{"key":31,"text":470,"correct":22},"建设单位技术负责人",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":24,"analysis":33},1117812,"监理单位编制的工程建设监理规划应经由()审核批准。",[475,476,478,480],{"key":20,"text":470,"correct":22},{"key":24,"text":477,"correct":26},"监理单位技术负责人",{"key":28,"text":479,"correct":22},"设计单位技术负责人",{"key":31,"text":481,"correct":22},"有关主管部门负责人",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":28,"analysis":33},1117813,"在监理过程中，监理工程师发现工程设计不符合建筑工程设计标准，应当()。",[486,487,489,490],{"key":20,"text":391,"correct":22},{"key":24,"text":488,"correct":22},"报告施工图审查机构",{"key":28,"text":62,"correct":26},{"key":31,"text":491,"correct":22},"报告总监理工程师下达停工令",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":20,"analysis":33},1117814,"对需要旁站监理的钢结构施工，施工企业至少应该在钢结构安装前()小时，书面通知监理单位派驻工地的项目监理机构。",[496,497,498,499],{"key":20,"text":356,"correct":26},{"key":24,"text":358,"correct":22},{"key":28,"text":360,"correct":22},{"key":31,"text":362,"correct":22},{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":24,"analysis":33},1117815,"对于需要实施旁站监理的施工关键部位与关键工序，施工企业应在进行施工前()小时，书面通知项目监理机构。",[504,505,506,507],{"key":20,"text":412,"correct":22},{"key":24,"text":356,"correct":26},{"key":28,"text":358,"correct":22},{"key":31,"text":360,"correct":22},{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":31,"analysis":33},1117816,"根据《建设工程质量管理条例》规定，未经()签字，建设单位不拨付工程款，不得进行竣工验收。",[512,513,515,516],{"key":20,"text":477,"correct":22},{"key":24,"text":514,"correct":22},"专业监理工程师",{"key":28,"text":372,"correct":22},{"key":31,"text":374,"correct":26},{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":31,"analysis":33},1117817,"工程监理人员发现工程设计不符合建筑工程质量标准或者合同约定的质量要求的，()。",[521,523,525,527],{"key":20,"text":522,"correct":22},"应当报告专业监理工程师要求设计单位改正",{"key":24,"text":524,"correct":22},"直接要求设计单位改正",{"key":28,"text":526,"correct":22},"应当报告总监理工程师要求设计单位改正",{"key":31,"text":528,"correct":26},"应当报告建设单位要求设计单位改正",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":28,"analysis":33},1117818,"对于大型工程项目，承担其监理业务的项目监理机构除了编制工程建设监理规划之外还应编制（）。",[533,535,537,539],{"key":20,"text":534,"correct":22},"工程项目管理规划大纲",{"key":24,"text":536,"correct":22},"工程建设监理实施规划",{"key":28,"text":538,"correct":26},"工程建设监理实施细则",{"key":31,"text":540,"correct":22},"工程项目管理实施规划",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":20,"analysis":33},1117819,"在国际上，把工程监理类服务归为（）服务。",[545,547,549,551],{"key":20,"text":546,"correct":26},"工程咨询",{"key":24,"text":548,"correct":22},"工程造价",{"key":28,"text":550,"correct":22},"工程建造",{"key":31,"text":552,"correct":22},"工程规划",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":24,"analysis":33},1117820,"我国的建设工程监理属于国际上()项目管理的范畴。",[557,558,559,561],{"key":20,"text":324,"correct":22},{"key":24,"text":322,"correct":26},{"key":28,"text":560,"correct":22},"施工方",{"key":31,"text":562,"correct":22},"分包方",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":28,"analysis":33},1117821,"(2005真题)国际上把建设( )单位所提供的服务归为工程咨询服务。",[567,569,571,573],{"key":20,"text":568,"correct":22},"设计",{"key":24,"text":570,"correct":22},"施工",{"key":28,"text":572,"correct":26},"监理",{"key":31,"text":203,"correct":22},{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":20,"analysis":33},1117822,"甲监理单位在实施监理的过程中，发现乙施工单位存在安全事故隐患，则甲监理 单位应当()。",[578,580,582,584],{"key":20,"text":579,"correct":26},"要求乙单位整改",{"key":24,"text":581,"correct":22},"及时向当地有关部门报告",{"key":28,"text":583,"correct":22},"要求乙单位停工",{"key":31,"text":585,"correct":22},"及时向建设单位报告",[587,590,593,596,599,602],{"id":15,"name":588,"category":7,"favorite":589},"领导干部任职前廉政法规知识测试题",92,{"id":591,"name":592,"category":7,"favorite":15},595,"建筑结构与设备",{"id":594,"name":595,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":597,"name":598,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":600,"name":601,"category":7,"favorite":8},534,"BIM工程师",{"id":603,"name":601,"category":7,"favorite":8},535]