[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":555},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,14,50,2973,[13,34,46,58,70,78,87,98,110,118,130,142,154,165,177,189,197,208,219,227,239,251,262,273,285,297,308,316,324,334,342,352,364,374,383,394,406,414,422,433,445,455,467,479,491,500,512,523,535,543],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1117722,1,"单选题","项目经理责任制的核心是项目经理承担实现项目管理目标责任书确定的责任，该目标责任书应在项目实施之前由()与项目经理协商确定。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","项目部",false,{"key":24,"text":25,"correct":22},"B","建设单位",{"key":27,"text":28,"correct":29},"C","施工企业法定代表人",true,{"key":31,"text":32,"correct":22},"D","监理工程师","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1117723,"根据《建设工程项目管理规范》，项目经理应履行的职责不包括()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"项目管理目标责任书中规定的职责",{"key":24,"text":41,"correct":22},"按规定完善工程资料",{"key":27,"text":43,"correct":29},"收集工程资料，准备结算资料，组织工程竣工验收",{"key":31,"text":45,"correct":22},"配合组织完善缺陷责任期的相关工作",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1117724,"某工程总承包企业与某建设单位签订了一个写字楼项目的施工总承包合同，该项目实施中，总承包企业要承担施工风险，包括下列选项中的（）。",[50,52,54,56],{"key":20,"text":51,"correct":29},"技术措施风险",{"key":24,"text":53,"correct":22},"项目立项决策的风险",{"key":27,"text":55,"correct":22},"国家财政政策与货币政策变化的风险",{"key":31,"text":57,"correct":22},"设计风险",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1117725,"编制施工组织设计时可能存在的、并有可能导致在施工过程发生安全事故的该种风险提出了事故防范措施和计划，属于风险类型中的( )风险。",[62,64,66,68],{"key":20,"text":63,"correct":22},"工程环境",{"key":24,"text":65,"correct":22},"组织",{"key":27,"text":67,"correct":22},"技术",{"key":31,"text":69,"correct":29},"经济与管理",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1117726,"由于设计错误导致的风险，属于风险分类中的()风险。",[74,75,76,77],{"key":20,"text":63,"correct":22},{"key":24,"text":65,"correct":22},{"key":27,"text":67,"correct":29},{"key":31,"text":69,"correct":22},{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":27,"analysis":33},1117727,"在项目实施中，由于材料价格上涨导致成本增加的风险，属于()风险。",[82,83,84,85],{"key":20,"text":65,"correct":22},{"key":24,"text":63,"correct":22},{"key":27,"text":69,"correct":29},{"key":31,"text":86,"correct":22},"技术风险",{"id":88,"libraryId":5,"type":15,"typeLabel":16,"stem":89,"options":90,"answer":24,"analysis":33},1117728,"承包商管理人员和一般技工的能力方面的风险属于( )类型。",[91,93,95,97],{"key":20,"text":92,"correct":22},"经济与管理风险",{"key":24,"text":94,"correct":29},"组织风险",{"key":27,"text":96,"correct":22},"工程环境风险",{"key":31,"text":86,"correct":22},{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":20,"analysis":33},1117729,"下列影响建设工程项目实施的风险因素中，属于技术风险的是()。",[102,104,106,108],{"key":20,"text":103,"correct":29},"工程勘察资料",{"key":24,"text":105,"correct":22},"气象条件",{"key":27,"text":107,"correct":22},"公用防火设施的数量",{"key":31,"text":109,"correct":22},"人身安全的控制计划",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":31,"analysis":33},1117730,"某建设工程项目在施工过程中，某电焊工从事电焊作业导致施工现场发生大火事件，经调查事故原因是使用了不合格的建筑材料导致的，则该事故属于施工项目的（）类型。",[114,115,116,117],{"key":20,"text":96,"correct":22},{"key":24,"text":94,"correct":22},{"key":27,"text":92,"correct":22},{"key":31,"text":86,"correct":29},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1117731,"风险管理的工作中，确定风险因素属于()。",[122,124,126,128],{"key":20,"text":123,"correct":22},"风险分析",{"key":24,"text":125,"correct":29},"风险识别",{"key":27,"text":127,"correct":22},"风险响应",{"key":31,"text":129,"correct":22},"风险控制",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1117732,"下列选项中。属于风险评估工作内容的是()",[134,136,138,140],{"key":20,"text":135,"correct":22},"编制施工风险识别报告",{"key":24,"text":137,"correct":22},"确定应对各种风险的对策",{"key":27,"text":139,"correct":29},"分析风险发生各种风险发生的概率和损失量",{"key":31,"text":141,"correct":22},"对风险进行监控并提出预警",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1117733,"城市轨道交通地下工程施工必须实施动态风险管理，利用( )实现施工风险的动态跟踪与控制",[146,148,150,152],{"key":20,"text":147,"correct":22},"事故应急预案与现场监测数据",{"key":24,"text":149,"correct":29},"现场监测数据与风险记录",{"key":27,"text":151,"correct":22},"事故应急预案与施工合同",{"key":31,"text":153,"correct":22},"事故应急预案与风险管理职责",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1117734,"某建筑公司与某建设单位通过工程量清单招标投标，签订了某写字楼的施工总承包合同，该项目的施工风险包括()。",[158,160,162,164],{"key":20,"text":159,"correct":29},"技术措施不当的风险",{"key":24,"text":161,"correct":22},"立项决策的风险",{"key":27,"text":163,"correct":22},"国家财政政策变化的风险",{"key":31,"text":57,"correct":22},{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":24,"analysis":33},1117735,"风险量指的是不确定的损失程度和损失发生的概率。下图中风险量最大的区域是()。",[169,171,173,175],{"key":20,"text":170,"correct":22},"风险区C",{"key":24,"text":172,"correct":29},"风险区A",{"key":27,"text":174,"correct":22},"风险区D",{"key":31,"text":176,"correct":22},"风险区B",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":20,"analysis":33},1117736,"风险量指的是（）和损失发生的概率",[181,183,185,187],{"key":20,"text":182,"correct":29},"不确定损失程度",{"key":24,"text":184,"correct":22},"错误决策",{"key":27,"text":186,"correct":22},"不合理指令",{"key":31,"text":188,"correct":22},"设计变更",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":27,"analysis":33},1117737,"某建设工程项目在基坑开挖阶段，遇到不利的软弱土层，需要进行地基处理，使施工进度延误，施工费用增加，该风险属于()。",[193,194,195,196],{"key":20,"text":94,"correct":22},{"key":24,"text":86,"correct":22},{"key":27,"text":96,"correct":29},{"key":31,"text":92,"correct":22},{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":24,"analysis":33},1117738,"下列建设工程施工风险因素中，属于组织风险的是（）。",[201,203,205,206],{"key":20,"text":202,"correct":22},"水文地质条件",{"key":24,"text":204,"correct":29},"安全管理人员的经验",{"key":27,"text":107,"correct":22},{"key":31,"text":207,"correct":22},"工程机械的稳定性",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":24,"analysis":33},1117739,"风险识别的任务是识别施工全过程存在的潜在风险，其工作程序不包括（）。",[212,214,216,218],{"key":20,"text":213,"correct":22},"确定风险因素",{"key":24,"text":215,"correct":29},"分析各种风险的损失量",{"key":27,"text":217,"correct":22},"收集与施工风险有关的信息",{"key":31,"text":135,"correct":22},{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":24,"analysis":33},1117740,"项目施工过程中，由于施工管理人员水平低，责任心差，使得安全隐患无法及时发现和有效控制而可能产生安全事故的风险，属于()风险。",[223,224,225,226],{"key":20,"text":63,"correct":22},{"key":24,"text":65,"correct":29},{"key":27,"text":67,"correct":22},{"key":31,"text":69,"correct":22},{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":24,"analysis":33},1117741,"风险指的是损失的()。",[231,233,235,237],{"key":20,"text":232,"correct":22},"可变更性",{"key":24,"text":234,"correct":29},"不确定性",{"key":27,"text":236,"correct":22},"危害性",{"key":31,"text":238,"correct":22},"不稳定性",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":31,"analysis":33},1117742,"进行工程项目建设时，技术风险可能来自于（）。",[243,245,247,249],{"key":20,"text":244,"correct":22},"损失控制和安全管理人员的知识、经验和能力",{"key":24,"text":246,"correct":22},"自然灾害工程",{"key":27,"text":248,"correct":22},"人身安全控制计划",{"key":31,"text":250,"correct":29},"施工方案",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":24,"analysis":33},1117743,"下列建设工程施工风险的因素中，属于技术风险因素的是()。",[255,257,259,260],{"key":20,"text":256,"correct":22},"承包商管理人员的能力",{"key":24,"text":258,"correct":29},"工程设计文件",{"key":27,"text":105,"correct":22},{"key":31,"text":261,"correct":22},"合同风险",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},1117744,"下列施工风险管理工作中，属于风险识别工作的是()。",[266,267,269,271],{"key":20,"text":213,"correct":29},{"key":24,"text":268,"correct":22},"分析风险发生的概率",{"key":27,"text":270,"correct":22},"分析风险损失量",{"key":31,"text":272,"correct":22},"提出风险预警",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":20,"analysis":33},1117745,"下列防范土方开挖过程中塌方风险而采取的措施，属于风险转移对策的是()。",[277,279,281,283],{"key":20,"text":278,"correct":29},"投保建筑工程一切险",{"key":24,"text":280,"correct":22},"设置警示牌",{"key":27,"text":282,"correct":22},"进行专题安全教育",{"key":31,"text":284,"correct":22},"设置边坡护壁",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":24,"analysis":33},1117746,"下列有关建设工程施工风险因素中，属于组织风险的是()",[289,291,293,295],{"key":20,"text":290,"correct":22},"工程所在地的水文地质条件",{"key":24,"text":292,"correct":29},"施工管理人员的经验和能力",{"key":27,"text":294,"correct":22},"事故的防范措施和计划",{"key":31,"text":296,"correct":22},"工程施工方案的可靠性",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":20,"analysis":33},1117747,"下列各项中属于施工中的技术风险的是（）",[301,303,304,306],{"key":20,"text":302,"correct":29},"工程物资",{"key":24,"text":105,"correct":22},{"key":27,"text":305,"correct":22},"地质水文",{"key":31,"text":307,"correct":22},"事故防范措施和计划",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":31,"analysis":33},1117748,"某建设工程项目在施工过程中，某电焊工由于没有上岗资格证书而从事电焊作业导致施工现场发生大火事件，该事故属于建设工程项目的（）类型。",[312,313,314,315],{"key":20,"text":96,"correct":22},{"key":24,"text":86,"correct":22},{"key":27,"text":92,"correct":22},{"key":31,"text":94,"correct":29},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":24,"analysis":33},1117749,"某建设工程项目由于采用的水准仪不准，导致楼面标高和层高错误，发现问题后推倒重做，使施工进度延误、施工费用增加，该风险属于()。",[320,321,322,323],{"key":20,"text":94,"correct":22},{"key":24,"text":86,"correct":29},{"key":27,"text":96,"correct":22},{"key":31,"text":92,"correct":22},{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":20,"analysis":33},1117750,"下列为防范脚手架搭设与拆卸过程中的倒塌风险而采取的措施中，属于风险转移对策的是（）。",[328,329,331,332],{"key":20,"text":278,"correct":29},{"key":24,"text":330,"correct":22},"编制脚手架搭设施工方案",{"key":27,"text":282,"correct":22},{"key":31,"text":333,"correct":22},"设置施工人员防护措施",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":27,"analysis":33},1117751,"建设工程施工过程，可能会出现暴雨、洪水，致使施工进度延误、成本增加，这种风险属于()。",[338,339,340,341],{"key":20,"text":92,"correct":22},{"key":24,"text":94,"correct":22},{"key":27,"text":96,"correct":29},{"key":31,"text":86,"correct":22},{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":27,"analysis":33},1117752,"下列工程项目风险管理工作中，属于风险识别阶段的工作是（）。",[346,347,349,350],{"key":20,"text":215,"correct":22},{"key":24,"text":348,"correct":22},"分析各种风险因素发生的概率",{"key":27,"text":213,"correct":29},{"key":31,"text":351,"correct":22},"对风险进行监控",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":31,"analysis":33},1117753,"正确进行项目的规划选址，避开容易发生地质灾害的区域，属于质量风险应对策略中的（）策略。",[356,358,360,362],{"key":20,"text":357,"correct":22},"减轻",{"key":24,"text":359,"correct":22},"自留",{"key":27,"text":361,"correct":22},"转移",{"key":31,"text":363,"correct":29},"规避",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":31,"analysis":33},1117754,"下列建设工程施工风险中，不属于经济与管理风险的是()。",[368,370,371,373],{"key":20,"text":369,"correct":22},"工程资金供应条件",{"key":24,"text":248,"correct":22},{"key":27,"text":372,"correct":22},"信息安全控制计划",{"key":31,"text":256,"correct":29},{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":20,"analysis":33},1117755,"施工风险管理过程中，风险因素的确定在()环节完成。",[378,379,381,382],{"key":20,"text":125,"correct":29},{"key":24,"text":380,"correct":22},"风险评估",{"key":27,"text":129,"correct":22},{"key":31,"text":127,"correct":22},{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":27,"analysis":33},1117756,"在施工风险管理过程中，属于风险识别工作的是（）。",[387,389,391,392],{"key":20,"text":388,"correct":22},"分析风险发生概率",{"key":24,"text":390,"correct":22},"制定风险管理目标",{"key":27,"text":213,"correct":29},{"key":31,"text":393,"correct":22},"预测风险成本",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":31,"analysis":33},1117757,"下列关于风险管理的叙述，错误的是()。",[398,400,402,404],{"key":20,"text":399,"correct":22},"风险管理是为了达到一个组织的既定目标，而对组织所承担的各种风险进行管理的系统过程",{"key":24,"text":401,"correct":22},"风险管理采取的方法应符合公众利益、人身安全、环境保护以及有关的法规的要求",{"key":27,"text":403,"correct":22},"风险管理包括策划、组织、领导、协调和控制等方面的工作",{"key":31,"text":405,"correct":29},"风险管理的工作流程为：风险分析→风险识别→风险控制→风险转移",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":27,"analysis":33},1117758,"编制施工方案时可能存在的、并由此可能导致施工延误和一些质量问题的该种风险，属于风险类型中的( )。",[410,411,412,413],{"key":20,"text":96,"correct":22},{"key":24,"text":94,"correct":22},{"key":27,"text":86,"correct":29},{"key":31,"text":92,"correct":22},{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":31,"analysis":33},1117759,"下图所示的事件风险量区域中，风险等级最低的区域是（）。",[418,419,420,421],{"key":20,"text":172,"correct":22},{"key":24,"text":170,"correct":22},{"key":27,"text":176,"correct":22},{"key":31,"text":174,"correct":29},{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":31,"analysis":33},1117760,"下列选项中，属于风险响应工作内容的是()。",[426,427,429,431],{"key":20,"text":268,"correct":22},{"key":24,"text":428,"correct":22},"分析风险的损失",{"key":27,"text":430,"correct":22},"确定各种风险的等级",{"key":31,"text":432,"correct":29},"确定风险应对措施",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":24,"analysis":33},1117761,"下列选项中，属于风险评估工作的是()。",[437,439,441,443],{"key":20,"text":438,"correct":22},"分析存在的风险因素",{"key":24,"text":440,"correct":29},"确定识别出的风险的等级",{"key":27,"text":442,"correct":22},"向保险公司投保",{"key":31,"text":444,"correct":22},"对识别出的风险进行监控",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":27,"analysis":33},1117762,"在施工进展过程中应收集和分析与风险相关的各种信息，预测可能发生的风险，对其进行监控并提出预警，属于施工风险管理中的()。",[449,450,451,453],{"key":20,"text":125,"correct":22},{"key":24,"text":380,"correct":22},{"key":27,"text":452,"correct":29},"风险监控",{"key":31,"text":454,"correct":22},"风险应对",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":24,"analysis":33},1117763,"某项目采用固定价格合同，对于施工单位来说，如果估计价格上涨的风险发生可能性1级，估计如果发生造成的损失属于4级损失，则此种风险等级应评为()级。",[459,461,463,465],{"key":20,"text":460,"correct":22},"Ⅰ",{"key":24,"text":462,"correct":29},"Ⅱ",{"key":27,"text":464,"correct":22},"Ⅲ",{"key":31,"text":466,"correct":22},"Ⅳ",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":27,"analysis":33},1117764,"工程所用的材料价格预计上涨的可能性属2级，且风险发生造成的损失属4级损失，则按《建设工程项目管理规范》(GB\u002FT50326-2006)规定，此种风险的等级应评为()等风险。",[471,473,475,477],{"key":20,"text":472,"correct":22},"1",{"key":24,"text":474,"correct":22},"2",{"key":27,"text":476,"correct":29},"3",{"key":31,"text":478,"correct":22},"4",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":24,"analysis":33},1117765,"以下关于风险量的说法正确的是（）。",[483,485,487,489],{"key":20,"text":484,"correct":22},"在风险量图中，不同区域的风险均不相同",{"key":24,"text":486,"correct":29},"在风险量图中，不同区域的风险有可能相同",{"key":27,"text":488,"correct":22},"风险量主要取决于风险发生的概率",{"key":31,"text":490,"correct":22},"风险量主要取决于风险的损失量",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":20,"analysis":33},1117766,"设计的风险、施工的风险以及材料、设备和其他建设物资的风险等属于建设工程项目的（）。",[495,496,497,498],{"key":20,"text":86,"correct":29},{"key":24,"text":94,"correct":22},{"key":27,"text":96,"correct":22},{"key":31,"text":499,"correct":22},"管理风险",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":24,"analysis":33},1117767,"某施工单位在对项目开展风险管理工作时，确定的主要管理环节包括：①风险识别；②风险响应；③风险控制；④风险评估。则下列流程排序正确的是()。",[504,506,508,510],{"key":20,"text":505,"correct":22},"①②③④",{"key":24,"text":507,"correct":29},"①④②③",{"key":27,"text":509,"correct":22},"④①②③",{"key":31,"text":511,"correct":22},"④①③②",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":31,"analysis":33},1117768,"某施工单位承揽市政园林工程，施工技术难度大且工期比较紧，在实施任务的过程中，除()外，均可作为施工单位选择的风险对策",[516,518,520,522],{"key":20,"text":517,"correct":22},"风险规避",{"key":24,"text":519,"correct":22},"风险转移",{"key":27,"text":521,"correct":22},"风险减轻",{"key":31,"text":129,"correct":29},{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":24,"analysis":33},1117769,"以下关于施工风险管理的工作流程顺序排列正确的是（）。",[527,529,531,533],{"key":20,"text":528,"correct":22},"风险分析、风险识别、风险控制、风险转移",{"key":24,"text":530,"correct":29},"风险识别、风险评估、风险应对、风险监控",{"key":27,"text":532,"correct":22},"风险控制、风险转移、风险分析、风险识别",{"key":31,"text":534,"correct":22},"风险分析、风险识别、风险转移、风险控制",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":20,"analysis":33},1117770,"项目施工过程中，可能发现在地质资料中未发现的软土层，而应进行软土地基处理等工作，使施工进度延误，这种风险属于风险类型中的()风险。",[539,540,541,542],{"key":20,"text":63,"correct":29},{"key":24,"text":65,"correct":22},{"key":27,"text":67,"correct":22},{"key":31,"text":69,"correct":22},{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":24,"analysis":33},1117771,"下列关于城市轨道交通地下工程风险管理的说法中，正确的是（）。",[547,549,551,553],{"key":20,"text":548,"correct":22},"城市轨道交通地下工程比较特殊，不必实施动态风险管理",{"key":24,"text":550,"correct":29},"风险管理应编制风险控制预案、建立重大风险事故呈报制度。",{"key":27,"text":552,"correct":22},"风险管理实施的主要阶段包括施工准备期、施工期和竣工验收。",{"key":31,"text":554,"correct":22},"因工程较特殊，风险管理可不编制风险控制预案",[556,559,562,565,568,571],{"id":15,"name":557,"category":7,"favorite":558},"领导干部任职前廉政法规知识测试题",92,{"id":560,"name":561,"category":7,"favorite":15},595,"建筑结构与设备",{"id":563,"name":564,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":566,"name":567,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":569,"name":570,"category":7,"favorite":8},534,"BIM工程师",{"id":572,"name":570,"category":7,"favorite":8},535]