[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":569},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,12,50,2973,[13,34,46,58,70,82,94,106,118,130,138,146,156,168,176,186,196,204,216,228,240,252,260,272,284,296,304,313,325,333,345,356,364,376,388,400,412,424,436,447,459,468,480,488,500,512,524,536,548,560],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1117621,1,"单选题","在项目实施过程中，为对工程进度目标进行动态跟踪和控制，在按照进度控制的要求，收集施工进度实际值之后应做的工作是()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","采取措施进行纠偏",false,{"key":24,"text":25,"correct":26},"B","比较工程进度的计划值和实际值",true,{"key":28,"text":29,"correct":22},"C","调整工程进度目标",{"key":31,"text":32,"correct":22},"D","逐层分解工程进度目标","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1117622,"下列选项中，属于项目目标动态控制中主动控制特点的是()。",[38,40,42,44],{"key":20,"text":39,"correct":26},"事前分析可能导致目标偏离的各种影响因素",{"key":24,"text":41,"correct":22},"目标出现偏离时采取纠偏措施",{"key":28,"text":43,"correct":22},"将目标的实际值与计划值比较",{"key":31,"text":45,"correct":22},"分析目标的实际值与计划值产生偏差的原因",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1117623,"在施工过程中对施工进度目标进行动态跟踪和控制的工作包括：①收集施工进度实际值；②定期对施工进度的计划值和实际值进行比较；③如有偏差，采取措施进行纠偏。正确的工作流程是()。",[50,52,54,56],{"key":20,"text":51,"correct":26},"①—②—③",{"key":24,"text":53,"correct":22},"②—①—③",{"key":28,"text":55,"correct":22},"②—③—①",{"key":31,"text":57,"correct":22},"③—①—②",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1117624,"某施工企业承担了某商务大厦写字楼的土建工程和安装工程施工任务，合同工期626天，在对该项目的施工成本目标进行动态跟踪和控制时，成本的控制周期一般为()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"年",{"key":24,"text":65,"correct":22},"旬",{"key":28,"text":67,"correct":26},"月",{"key":31,"text":69,"correct":22},"半年",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1117625,"尽管制定了成本目标，在进行施工成本控制的过程中，针对以下情况，有必要调整施工成本目标的是()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"在施工前没有进一步做更详细的成本策划",{"key":24,"text":77,"correct":26},"原定的成本目标不合理",{"key":28,"text":79,"correct":22},"施工实际成本和计划成本略有差异",{"key":31,"text":81,"correct":22},"工程款的支付与工程合同价产生偏差",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1117626,"在项目实施过程中，为了加强成本管理，对施工方法进行调整优化，改进施工工艺，属于成本控制措施的（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"经济措施",{"key":24,"text":89,"correct":22},"管理措施",{"key":28,"text":91,"correct":22},"组织措施",{"key":31,"text":93,"correct":26},"技术措施",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1117627,"施工成本的计划值和实际值也是相对的，相对于（）而言，施工成本规划的成本值是实际值。",[98,100,102,104],{"key":20,"text":99,"correct":22},"实际施工成本",{"key":24,"text":101,"correct":26},"工程合同价",{"key":28,"text":103,"correct":22},"竣工决算价",{"key":31,"text":105,"correct":22},"工程结算款",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},1117628,"( )是工程项目目标动态控制的核心。",[110,112,114,116],{"key":20,"text":111,"correct":22},"目标的逐层分解",{"key":24,"text":113,"correct":22},"目标实际数据的收集",{"key":28,"text":115,"correct":26},"目标的计划值和实际值的比较，当发现项目目标偏离时采取纠偏措施",{"key":31,"text":117,"correct":22},"调整项目目标",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},1117629,"调整设计、改进施工方法和改变施工机具等措施属于项目动态控制纠偏措施的( )措施。",[122,124,126,128],{"key":20,"text":123,"correct":22},"经济",{"key":24,"text":125,"correct":22},"管理",{"key":28,"text":127,"correct":26},"技术",{"key":31,"text":129,"correct":22},"组织",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1117630,"调整项目管理人员职责，明确各项管理工作流程，属于项目目标动态控制纠偏措施中的( )。",[134,135,136,137],{"key":20,"text":91,"correct":26},{"key":24,"text":89,"correct":22},{"key":28,"text":93,"correct":22},{"key":31,"text":87,"correct":22},{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":20,"analysis":33},1117631,"调整项目组织结构、进行管理职能分工，属于项目目标动态控制纠偏措施中的( )。",[142,143,144,145],{"key":20,"text":91,"correct":26},{"key":24,"text":89,"correct":22},{"key":28,"text":93,"correct":22},{"key":31,"text":87,"correct":22},{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":20,"analysis":33},1117632,"下列项目目标控制工作中，属于主动控制的是()。",[150,151,152,154],{"key":20,"text":39,"correct":26},{"key":24,"text":41,"correct":22},{"key":28,"text":153,"correct":22},"进行目标的实际值与计划值的比较",{"key":31,"text":155,"correct":22},"分析目标的实际值与计划值之间存在偏差的原因",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":28,"analysis":33},1117633,"在对施工成本目标进行动态跟踪和控制中，应定期对施工成本的()进行比较。",[160,162,164,166],{"key":20,"text":161,"correct":22},"预测值与计划值",{"key":24,"text":163,"correct":22},"预测值和实际值",{"key":28,"text":165,"correct":26},"计划值和实际值",{"key":31,"text":167,"correct":22},"计划值与定额标准值",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":28,"analysis":33},1117634,"在项目目标动态控制的纠偏措施中，加快工程施工进度所需的资金属于()。",[172,173,174,175],{"key":20,"text":91,"correct":22},{"key":24,"text":89,"correct":22},{"key":28,"text":87,"correct":26},{"key":31,"text":93,"correct":22},{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":28,"analysis":33},1117635,"为避免项目目标偏离的发生，在项目目标控制工作中采取的主动控制是（）。",[180,182,183,185],{"key":20,"text":181,"correct":22},"进行目标的实际值与计划值比较",{"key":24,"text":41,"correct":22},{"key":28,"text":184,"correct":26},"事前分析可能导致目标偏离的各种影响因素，并采取有效的预防措施",{"key":31,"text":155,"correct":22},{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":20,"analysis":33},1117636,"在施工成本动态控制过程中，当对工程合同价与实际施工成本进行比较时，成本的计划值是()。",[190,191,192,194],{"key":20,"text":101,"correct":26},{"key":24,"text":99,"correct":22},{"key":28,"text":193,"correct":22},"工程款支付额",{"key":31,"text":195,"correct":22},"施工图预算",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":20,"analysis":33},1117637,"进行项目目标控制过程中，属于主动控制的工作是()。",[200,201,202,203],{"key":20,"text":39,"correct":26},{"key":24,"text":153,"correct":22},{"key":28,"text":155,"correct":22},{"key":31,"text":41,"correct":22},{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":31,"analysis":33},1117638,"运用动态控制原理控制施工质量，要在施工活动开展前，对质量目标进行分解。目标不仅包括各分部分项工程的施工，还包括()。",[208,210,212,214],{"key":20,"text":209,"correct":22},"设计文件的质量",{"key":24,"text":211,"correct":22},"项目回访保修的质量",{"key":28,"text":213,"correct":22},"建设单位的决策质量",{"key":31,"text":215,"correct":26},"建筑材料和有关设备的质量",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":28,"analysis":33},1117639,"下列项目目标动态控制措施中，属于经济措施的是()。",[220,222,224,226],{"key":20,"text":221,"correct":22},"调整进度管理的方法",{"key":24,"text":223,"correct":22},"调整职能分工",{"key":28,"text":225,"correct":26},"落实加快工程施工进度所需的资金",{"key":31,"text":227,"correct":22},"改进施工工艺",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":20,"analysis":33},1117640,"某工程项目，在确定了工期目标后，为保证项目按期完成，项目经理进一步确定了每月的进度目标。这项工作在运用动态控制原理进行进度控制的工作步骤中，属于()。",[232,234,236,238],{"key":20,"text":233,"correct":26},"将工程进度目标逐层分解",{"key":24,"text":235,"correct":22},"定期比较工程进度的实际值与计划值",{"key":28,"text":237,"correct":22},"收集工程进度实际值",{"key":31,"text":239,"correct":22},"确定进度控制周期",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":24,"analysis":33},1117641,"项目管理最基本的方法论是()。",[244,246,248,250],{"key":20,"text":245,"correct":22},"项目目标的策划",{"key":24,"text":247,"correct":26},"项目目标的动态控制",{"key":28,"text":249,"correct":22},"项目管理的目标",{"key":31,"text":251,"correct":22},"项目管理的信息化",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":28,"analysis":33},1117642,"进行管理职能分工、调整项目管理班子人员，属于项目目标动态控制纠偏措施中的()。",[256,257,258,259],{"key":20,"text":87,"correct":22},{"key":24,"text":93,"correct":22},{"key":28,"text":91,"correct":26},{"key":31,"text":89,"correct":22},{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":31,"analysis":33},1117643,"分析和论证施工成本目标实现的可能性，并对施工成本目标进行分解是通过()进行的。",[264,266,268,270],{"key":20,"text":265,"correct":22},"比较施工成本的计划值和实际值",{"key":24,"text":267,"correct":22},"收集施工成本的实际值",{"key":28,"text":269,"correct":22},"编制月施工成本计划",{"key":31,"text":271,"correct":26},"编制施工成本规划",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":24,"analysis":33},1117644,"某施工企业承担了某项施工任务，在进行施工成本控制时，为及时了解该施工项目的盈亏情况，需要与实际施工成本进行比较的成本项是()。",[276,278,280,282],{"key":20,"text":277,"correct":22},"施工成本规划中的相应成本项",{"key":24,"text":279,"correct":26},"工程合同价中的相应成本项",{"key":28,"text":281,"correct":22},"工程投标价中的相应成本项",{"key":31,"text":283,"correct":22},"工程款支付中的相应成本项",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":24,"analysis":33},1117645,"运用动态控制原理控制施工质量时，质量目标不仅是各分部分项工程的施工质量，还包括()。",[288,290,292,294],{"key":20,"text":289,"correct":22},"设计图纸质量",{"key":24,"text":291,"correct":26},"建筑材料、设备质量",{"key":28,"text":293,"correct":22},"业主决策质量",{"key":31,"text":295,"correct":22},"监理规划质量",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":28,"analysis":33},1117646,"调整进度管理的方法和手段，属于项目目标动态控制纠偏措施中的( )。",[300,301,302,303],{"key":20,"text":91,"correct":22},{"key":24,"text":93,"correct":22},{"key":28,"text":89,"correct":26},{"key":31,"text":87,"correct":22},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":20,"analysis":33},1117647,"运用动态控制原理控制施工质量，则质量目标除各分部分项工程的施工外，还包括（）。",[308,309,310,312],{"key":20,"text":215,"correct":26},{"key":24,"text":209,"correct":22},{"key":28,"text":311,"correct":22},"施工环境的质量",{"key":31,"text":213,"correct":22},{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":20,"analysis":33},1117648,"下列项目目标动态控制的工作中，属于项目目标动态控制准备工作的是()。",[317,319,321,323],{"key":20,"text":318,"correct":26},"将项目的目标进行分解",{"key":24,"text":320,"correct":22},"收集项目目标的实际值",{"key":28,"text":322,"correct":22},"对项目目标进行动态跟踪",{"key":31,"text":324,"correct":22},"找出实际值与计划值的偏差",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":24,"analysis":33},1117649,"项目经理在实施施工管理中，调整项目组织结构、任务分工，属于项目目标动态控制纠偏措施中的()",[329,330,331,332],{"key":20,"text":89,"correct":22},{"key":24,"text":91,"correct":26},{"key":28,"text":93,"correct":22},{"key":31,"text":87,"correct":22},{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":24,"analysis":33},1117650,"在进行施工成本控制的过程中遇到以下情况，有必要调整施工成本目标的是()。",[337,339,341,343],{"key":20,"text":338,"correct":22},"在施工前没有进一步作更详细的成本策划",{"key":24,"text":340,"correct":26},"原定的施工成本目标不合理或原定的成本目标无法实现",{"key":28,"text":342,"correct":22},"成本计划中降低成本的措施不尽合理",{"key":31,"text":344,"correct":22},"工程中出现了可以索赔的情况",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":31,"analysis":33},1117651,"在施工成本动态控制过程中，相对于实际施工成本，计划值是()。",[349,351,353,354],{"key":20,"text":350,"correct":22},"投标价中的成本值",{"key":24,"text":352,"correct":22},"工程款支付中的成本值",{"key":28,"text":101,"correct":22},{"key":31,"text":355,"correct":26},"施工成本规划的成本值",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":20,"analysis":33},1117652,"在确定了区段工期目标后，为保证项目按期完成，项目经理进一步确定了每月的进度目标。这项工作在运用动态控制原理进行进度控制的工作步骤中，属于()。",[360,361,362,363],{"key":20,"text":233,"correct":26},{"key":24,"text":235,"correct":22},{"key":28,"text":237,"correct":22},{"key":31,"text":239,"correct":22},{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":24,"analysis":33},1117653,"施工项目技术负责人每天在施工日志上对当天的施工质量和进度情况进行详细记载，属于项目目标动态控制过程中（）的工作。",[368,370,372,374],{"key":20,"text":369,"correct":22},"准备阶段",{"key":24,"text":371,"correct":26},"收集项目实际值",{"key":28,"text":373,"correct":22},"进行目标计划值和实际值比较",{"key":31,"text":375,"correct":22},"纠偏环节",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":28,"analysis":33},1117654,"施工成本的计划值和实际值的比较不包括()。",[380,382,384,386],{"key":20,"text":381,"correct":22},"工程合同价与投标价中的相应成本项的比较",{"key":24,"text":383,"correct":22},"工程合同价与工程款支付中的相应成本项的比较",{"key":28,"text":385,"correct":26},"投标价中的相应成本与实际施工成本中的相应成本项的比较",{"key":31,"text":387,"correct":22},"施工成本规划与实际施工成本中的相应成本项的比较",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":24,"analysis":33},1117655,"关于项目目标动态控制的纠偏措施，表述不正确的是()。",[392,394,396,398],{"key":20,"text":393,"correct":22},"经济措施是分析由于经济的原因而影响项目目标实现的问题，并采取相应的措施，包括落实加快工程施工进度所需的资金",{"key":24,"text":395,"correct":26},"调整进度管理的方法和手段属于纠偏措施中的技术措施",{"key":28,"text":397,"correct":22},"改变施工管理和强化合同管理属于纠偏措施中的管理措施",{"key":31,"text":399,"correct":22},"组织措施是分析由于组织的原因而影响项目目标实现的问题，并采取相应的措施，包括管理职能分工、项目管理班子人员",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":28,"analysis":33},1117656,"在项目目标动态控制的工作程序中，第一步的工作是（）。",[404,406,408,410],{"key":20,"text":405,"correct":22},"项目决策策划",{"key":24,"text":407,"correct":22},"制定纠偏措施",{"key":28,"text":409,"correct":26},"分解项目目标",{"key":31,"text":411,"correct":22},"收集实际数据",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":20,"analysis":33},1117657,"项目目标动态控制的第一步工作，将项目的目标进行分解，以确定用于目标控制的()",[416,418,420,422],{"key":20,"text":417,"correct":26},"计划值",{"key":24,"text":419,"correct":22},"实际值",{"key":28,"text":421,"correct":22},"预算值",{"key":31,"text":423,"correct":22},"成本值",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":28,"analysis":33},1117658,"下列进度控制措施中，属于组织措施的是()。",[428,430,432,434],{"key":20,"text":429,"correct":22},"编制工程资源需求计划",{"key":24,"text":431,"correct":22},"应用互联网进行进度控制",{"key":28,"text":433,"correct":26},"制定进度控制工作流程",{"key":31,"text":435,"correct":22},"选择先进的施工技术",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":20,"analysis":33},1117659,"应用动态控制原理控制建设工程项目施工成本时，若将工程进度款作为实际值，则作为计划值的是()。",[440,441,443,445],{"key":20,"text":101,"correct":26},{"key":24,"text":442,"correct":22},"工程变更款",{"key":28,"text":444,"correct":22},"工程索赔款",{"key":31,"text":446,"correct":22},"工程结算价",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":28,"analysis":33},1117660,"在项目实施过程中，运用动态控制原理控制施工成本的步骤中，第一步应做的工作是（）。",[451,453,455,457],{"key":20,"text":452,"correct":22},"按照成本控制的要求收集施工成本的实际值",{"key":24,"text":454,"correct":22},"找出偏差，采取纠偏措施",{"key":28,"text":456,"correct":26},"施工成本目标的逐层分解",{"key":31,"text":458,"correct":22},"定期对施工成本的计划值和实际值进行比较",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":28,"analysis":33},1117661,"某施工企业签订了工程施工承包合同，在项目管理目标责任书中确定了成本目标，项目经理运用动态控制原理控制施工成本的步骤中，第一步应做的工作是（）。",[463,464,465,466],{"key":20,"text":452,"correct":22},{"key":24,"text":454,"correct":22},{"key":28,"text":456,"correct":26},{"key":31,"text":467,"correct":22},"定期对施工成本的计划值和实际值进行比较,",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":24,"analysis":33},1117662,"进度的控制周期应视项目的规模和特点而定，一般的项目控制周期为()。",[472,474,476,478],{"key":20,"text":473,"correct":22},"一周",{"key":24,"text":475,"correct":26},"一个月",{"key":28,"text":477,"correct":22},"一个季度",{"key":31,"text":479,"correct":22},"一旬",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":31,"analysis":33},1117663,"在项目实施过程过程动态控制工作的第一步的工作是（）。",[484,485,486,487],{"key":20,"text":405,"correct":22},{"key":24,"text":407,"correct":22},{"key":28,"text":409,"correct":22},{"key":31,"text":411,"correct":26},{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":20,"analysis":33},1117664,"按照我国的有关规定，下列关于项目经理岗位责任制的说法中，正确的是( )。",[492,494,496,498],{"key":20,"text":493,"correct":26},"项目经理是企业法定代表人在工程项目上的代表人",{"key":24,"text":495,"correct":22},"项目经理为合同当事人确认的人选，不得更换",{"key":28,"text":497,"correct":22},"建造师是一个工作岗位的名称",{"key":31,"text":499,"correct":22},"项目经理的职责权限由项目承包合同的当事人议定",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":28,"analysis":33},1117665,"承包人需要更换项目经理的，应提前( )天书面通知发包人和监理人，并征得发包人书面同意。",[504,506,508,510],{"key":20,"text":505,"correct":22},"5",{"key":24,"text":507,"correct":22},"7",{"key":28,"text":509,"correct":26},"14",{"key":31,"text":511,"correct":22},"28",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":20,"analysis":33},1117666,"以下对施工企业项目经理任务的说明，不正确的是()。",[516,518,520,522],{"key":20,"text":517,"correct":26},"施工企业项目经理和建设单位签订工程承包合同",{"key":24,"text":519,"correct":22},"施工企业项目经理与本企业法定代表人签订项目承包合同",{"key":28,"text":521,"correct":22},"项目经理的权力需要企业法定代表人授予",{"key":31,"text":523,"correct":22},"项目经理参与组建项目管理班子",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":31,"analysis":33},1117667,"在全面实施建造师执业资格制度后仍然要坚持落实项目经理岗位责任制，项目经理岗位不是保证工程项目建设()的重要岗位。",[528,530,532,534],{"key":20,"text":529,"correct":22},"安全",{"key":24,"text":531,"correct":22},"工期",{"key":28,"text":533,"correct":22},"质量",{"key":31,"text":535,"correct":26},"利润",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":28,"analysis":33},1117668,"下列不属于施工企业与项目经理签订项目管理目标责任书的主要依据是()",[540,542,544,546],{"key":20,"text":541,"correct":22},"项目合同文件",{"key":24,"text":543,"correct":22},"组织的经营方针和目标",{"key":28,"text":545,"correct":26},"建设工程项目管理实施规划",{"key":31,"text":547,"correct":22},"组织的管理制度",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":28,"analysis":33},1117669,"下列各项管理权力中，属于施工项目经理管理权力的是()。",[552,554,556,558],{"key":20,"text":553,"correct":22},"自行决定是否分包及选择分包企业",{"key":24,"text":555,"correct":22},"编制和确定需政府监管的招标方案，评选和确定投标、中标单位",{"key":28,"text":557,"correct":26},"指挥项目建设的生产经营活动，调配并管理进入工程项目的生产要素",{"key":31,"text":559,"correct":22},"代表企业法人参加民事活动，行使企业法人的一切权力",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":24,"analysis":33},1117670,"下列选项中，不是施工企业与项目经理签订项目管理目标责任书依据的是（）。",[564,565,567,568],{"key":20,"text":541,"correct":22},{"key":24,"text":566,"correct":26},"项目管理实施目标",{"key":28,"text":547,"correct":22},{"key":31,"text":543,"correct":22},[570,573,576,579,582,585],{"id":15,"name":571,"category":7,"favorite":572},"领导干部任职前廉政法规知识测试题",92,{"id":574,"name":575,"category":7,"favorite":15},595,"建筑结构与设备",{"id":577,"name":578,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":580,"name":581,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":583,"name":584,"category":7,"favorite":8},534,"BIM工程师",{"id":586,"name":584,"category":7,"favorite":8},535]