[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":561},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,11,50,2973,[13,34,46,57,67,79,91,101,112,122,134,142,150,158,170,180,192,202,210,219,227,239,251,262,270,282,294,306,318,330,342,353,365,377,389,397,409,421,429,440,452,463,472,483,495,507,515,527,538,550],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1117569,1,"单选题","编制施工组织总设计时，施工总进度计划必须在完成( )后确定。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","施工准备工作计划",false,{"key":24,"text":25,"correct":22},"B","施工总平面图",{"key":27,"text":28,"correct":29},"C","施工方案",true,{"key":31,"text":32,"correct":22},"D","资源需求量计划","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1117570,"某项目中的办公楼设计了地下二层停车场，并设有大型设备层，地下室底面标高-17.50m，地下情况复杂，施工困难。针对办公楼的深基坑施工，应当编制()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"施工规划",{"key":24,"text":41,"correct":22},"单位工程施工组织设计",{"key":27,"text":43,"correct":22},"施工组织总设计",{"key":31,"text":45,"correct":29},"分部分项工程施工组织设计",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1117572,"反映在空间上全面安排的施工组织设计内容是()。",[50,52,54,56],{"key":20,"text":51,"correct":29},"施工平面图",{"key":24,"text":53,"correct":22},"施工进度计划",{"key":27,"text":55,"correct":22},"主要技术经济指标",{"key":31,"text":28,"correct":22},{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":27,"analysis":33},1117573,"作业区施工平面布置图设计属于()的主要内容。",[61,62,63,65],{"key":20,"text":41,"correct":22},{"key":24,"text":43,"correct":22},{"key":27,"text":64,"correct":29},"分部（分项）工程施工组织设计",{"key":31,"text":66,"correct":22},"单项工程施工组织设计",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":20,"analysis":33},1117574,"施工组织总设计的编制程序中，计算主要工种工程的工程量之后紧接着的工作应是（）。",[71,73,75,77],{"key":20,"text":72,"correct":29},"确定施工的总体部署",{"key":24,"text":74,"correct":22},"编制施工总进度计划",{"key":27,"text":76,"correct":22},"计算主要技术经济指标",{"key":31,"text":78,"correct":22},"施工总平面图设计",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":20,"analysis":33},1117575,"单位工程施工组织设计的编制依据不包括( )。",[83,85,87,89],{"key":20,"text":84,"correct":29},"合同文件",{"key":24,"text":86,"correct":22},"资源配置情况",{"key":27,"text":88,"correct":22},"有关的标准、规范",{"key":31,"text":90,"correct":22},"建设单位的意图和要求",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":24,"analysis":33},1117576,"对整个建设工程项目的施工进行战略部署，并且是指导全局性施工的技术和经济纲要的文件是（）。",[95,96,97,99],{"key":20,"text":25,"correct":22},{"key":24,"text":43,"correct":29},{"key":27,"text":98,"correct":22},"施工部署及施工方案",{"key":31,"text":100,"correct":22},"施工图设计文件",{"id":102,"libraryId":5,"type":15,"typeLabel":16,"stem":103,"options":104,"answer":27,"analysis":33},1117577,"编制施工组织总设计时，在施工总进度计划确定之后，才可以进行的工作是( )。",[105,107,108,110],{"key":20,"text":106,"correct":22},"拟定施工方案",{"key":24,"text":72,"correct":22},{"key":27,"text":109,"correct":29},"编制资源需求量计划",{"key":31,"text":111,"correct":22},"计算主要工种工程的工程量",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":27,"analysis":33},1117578,"工程项目施工组织设计中，一般将施工顺序的安排写入()。",[116,117,118,120],{"key":20,"text":53,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":119,"correct":29},"施工部署和施工方案",{"key":31,"text":121,"correct":22},"工程概况",{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":31,"analysis":33},1117579,"下列施工组织总设计的各项工作中，先后顺序排列正确的是（）。①编制施工总进度计划②确定施工的总体部署③编制施工准备工作计划④编制资源需求量计划⑤计算主要工种的工程量",[126,128,130,132],{"key":20,"text":127,"correct":22},"②①④⑤③",{"key":24,"text":129,"correct":22},"②①④③⑤",{"key":27,"text":131,"correct":22},"③①④⑤②",{"key":31,"text":133,"correct":29},"⑤②①④③",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":31,"analysis":33},1117580,"工程项目施工组织设计中，全面部署施工任务，合理安排施工顺序属于()中的工作内容。",[138,139,140,141],{"key":20,"text":121,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":53,"correct":22},{"key":31,"text":98,"correct":29},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1117581,"编制施工组织总设计时，施工准备工作计划的编制应在完成( )后确定。",[146,147,148,149],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":32,"correct":29},{"key":31,"text":55,"correct":22},{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":20,"analysis":33},1117582,"作为对整个建设工程项目施工的战略部署，指导全局性施工的技术和经济纲要的文件是()。",[154,155,156,157],{"key":20,"text":43,"correct":29},{"key":24,"text":25,"correct":22},{"key":27,"text":98,"correct":22},{"key":31,"text":100,"correct":22},{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":31,"analysis":33},1117583,"施工组织总设计的编制程序是()。",[162,164,166,168],{"key":20,"text":163,"correct":22},"编制施工总进度计划一拟订施工总体部署、施工方案→计算主要技术经济指标→施工总平面图设计→编制资源需求量计划",{"key":24,"text":165,"correct":22},"施工总平面图设计→拟订施工总体部署、施工方案→编制资源需求量计划→编制施工总进度计划→计算主要技术经济指标",{"key":27,"text":167,"correct":22},"计算主要技术经济指标→编制施工总进度计划→拟订施工总体部署、施工方案→施工总平面图设计→编制资源需求量计划",{"key":31,"text":169,"correct":29},"拟订施工总体部署、施工方案→编制施工总进度计划→编制资源需求量计划→施工总平面图设计→计算主要技术经济指标",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":27,"analysis":33},1117584,"项目资源需求计划应当包括在施工组织设计的()内容中。",[174,176,177,178],{"key":20,"text":175,"correct":22},"施工部署",{"key":24,"text":28,"correct":22},{"key":27,"text":53,"correct":29},{"key":31,"text":179,"correct":22},"施工平面布置",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":24,"analysis":33},1117585,"施工组织总设计包括如下工作：（1）计算主要工种工程的工程量；（2）编制施工总进度计划；（3）编制资源需求量计划；（4）拟订施工方案。其正确的工作顺序是（）。（2012年真题）",[184,186,188,190],{"key":20,"text":185,"correct":22},"（1）（2）（3）（4）",{"key":24,"text":187,"correct":29},"（1）（4）（2）（3）",{"key":27,"text":189,"correct":22},"（1）（3）（2）（4）",{"key":31,"text":191,"correct":22},"（4）（1）（2）（3）",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":27,"analysis":33},1117586,"施工单位编制分部分项工程施工组织设计的依据是()。",[196,197,199,200],{"key":20,"text":43,"correct":22},{"key":24,"text":198,"correct":22},"全场性施工总平面图设计",{"key":27,"text":41,"correct":29},{"key":31,"text":201,"correct":22},"施工概况及施工特点分析",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},1117587,"某项目在进行施工组织设计，其中对于施工力量、劳动力、机具、材料、构件等资源供应情况的分析应当属于（）部分的内容",[206,207,208,209],{"key":20,"text":121,"correct":29},{"key":24,"text":98,"correct":22},{"key":27,"text":53,"correct":22},{"key":31,"text":55,"correct":22},{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":27,"analysis":33},1117588,"某施工企业承接了某住宅小区中10#楼的土建施工任务，项目经理部针对该10#楼编制的施工组织设计属于()。",[214,215,216,217],{"key":20,"text":43,"correct":22},{"key":24,"text":66,"correct":22},{"key":27,"text":41,"correct":29},{"key":31,"text":218,"correct":22},"分部工程施工组织设计",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":27,"analysis":33},1117589,"主要技术经济指标中包括工期、资源消耗的均衡性、机械设备的利用程度的施工组织设计类型是()。",[223,224,225,226],{"key":20,"text":43,"correct":22},{"key":24,"text":66,"correct":22},{"key":27,"text":41,"correct":29},{"key":31,"text":64,"correct":22},{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":31,"analysis":33},1117590,"在下列各项工程中，需要直接编制单位工程施工组织设计的是()。",[231,233,235,237],{"key":20,"text":232,"correct":22},"某市新建机场工程",{"key":24,"text":234,"correct":22},"某城际高速公路（含公路、桥梁和隧道）",{"key":27,"text":236,"correct":22},"某拆除工程定向爆破工程",{"key":31,"text":238,"correct":29},"某发电厂干灰库烟囱维修工程",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":31,"analysis":33},1117591,"某建筑工程总承包商，承接一高校工程项目的施工任务，其中包括2栋教学楼、1栋试验楼、3栋宿舍楼及其它附属设施，针对该项目施工组织设计的编制，下列选项中表述正确的是()",[243,245,247,249],{"key":20,"text":244,"correct":22},"针对教学楼应编制分部分项工程施工组织设计",{"key":24,"text":246,"correct":22},"针对该高校项目应编制单位工程施工组织设计作为指导全局性施工的技术和经济纲要",{"key":27,"text":248,"correct":22},"只有在确定了施工总进度计划后才能编制施工方案",{"key":31,"text":250,"correct":29},"如有深基础工程应编制分部分项工程施工组织设计",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":24,"analysis":33},1117592,"下列选项中，属于施工组织总设计编制依据的是()。",[255,257,259,261],{"key":20,"text":256,"correct":22},"建设工程监理合同",{"key":24,"text":258,"correct":29},"建设地区基础资料",{"key":27,"text":260,"correct":22},"各项资源需求量计划",{"key":31,"text":41,"correct":22},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},1117593,"施工单位编制分部（分项）工程施工组织设计和季、月、旬施工计划的依据是( )。",[266,267,268,269],{"key":20,"text":43,"correct":22},{"key":24,"text":41,"correct":29},{"key":27,"text":66,"correct":22},{"key":31,"text":64,"correct":22},{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":20,"analysis":33},1117594,"下列目标控制措施中属于经济措施的是（）",[274,276,278,280],{"key":20,"text":275,"correct":29},"落实加快工程施工进度所需的资金",{"key":24,"text":277,"correct":22},"调整设计",{"key":27,"text":279,"correct":22},"改变工作流程",{"key":31,"text":281,"correct":22},"改进施工管理",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":31,"analysis":33},1117595,"某建设工程项目经理部根据目标动态控制原理，将项目目标进行了分解，那么在项目目标实施过程中，首先应进行的工作是()。",[286,288,290,292],{"key":20,"text":287,"correct":22},"确定目标控制的计划值",{"key":24,"text":289,"correct":22},"定期比较目标计划值与实际值",{"key":27,"text":291,"correct":22},"分析比较结果，采取纠偏措施",{"key":31,"text":293,"correct":29},"收集目标的实际完成值",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":27,"analysis":33},1117597,"某施工企业在进行施工成本控制时，为了及时了解实施项目的成本情况，需要将计划成本与实际成本相比较，相对于工程合同价而言，属于计划值的是()",[298,300,302,304],{"key":20,"text":299,"correct":22},"实际施工成本",{"key":24,"text":301,"correct":22},"工程结算款",{"key":27,"text":303,"correct":29},"投标价",{"key":31,"text":305,"correct":22},"工程款支付",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":20,"analysis":33},1117598,"下列项目目标动态控制措施中，属于管理措施的是()。",[310,312,314,316],{"key":20,"text":311,"correct":29},"强化合同管理",{"key":24,"text":313,"correct":22},"调整职能分工",{"key":27,"text":315,"correct":22},"优化组织结构",{"key":31,"text":317,"correct":22},"改进施工工艺",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":31,"analysis":33},1117599,"“调整设计、改进施工方法和改变施工机具”属于项目目标动态控制纠偏措施中的( )。",[322,324,326,328],{"key":20,"text":323,"correct":22},"组织措施",{"key":24,"text":325,"correct":22},"管理措施",{"key":27,"text":327,"correct":22},"经济措施",{"key":31,"text":329,"correct":29},"技术措施",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":24,"analysis":33},1117600,"项目管理最基本的方法论是项目目标的（）。",[334,336,338,340],{"key":20,"text":335,"correct":22},"静态控制",{"key":24,"text":337,"correct":29},"动态控制",{"key":27,"text":339,"correct":22},"主动控制",{"key":31,"text":341,"correct":22},"被动控制",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":24,"analysis":33},1117601,"项目目标动态控制的组织措施是分析由于组织的原因而影响项目目标实现的问题，并采取相应的措施，包括()。",[346,348,350,352],{"key":20,"text":347,"correct":22},"调整进度管理的方法和手段",{"key":24,"text":349,"correct":29},"调整项目组织结构",{"key":27,"text":351,"correct":22},"改进施工方法",{"key":31,"text":275,"correct":22},{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":20,"analysis":33},1117602,"运用动态控制原理控制施工，质量目标除各分部分项工程的施工外，还包括()。",[357,359,361,363],{"key":20,"text":358,"correct":29},"建筑材料和有关设备的质量",{"key":24,"text":360,"correct":22},"设计文件的质量",{"key":27,"text":362,"correct":22},"施工环境的质量",{"key":31,"text":364,"correct":22},"建设单位的决策质量",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":27,"analysis":33},1117603,"某施工企业承揽了一个住宅施工项目，确定了项目目标的计划值，为了对项目进行动态跟踪和控制，在项目施工过程中，下列各项工作中首先应做的是（）。",[369,371,373,375],{"key":20,"text":370,"correct":22},"调整项目目标",{"key":24,"text":372,"correct":22},"比较项目目标的实际值与计划值",{"key":27,"text":374,"correct":29},"收集项目目标的实际值",{"key":31,"text":376,"correct":22},"采取纠偏措施进行纠偏",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":24,"analysis":33},1117604,"对施工进度的计划值和实际值进行比较时，如以里程碑事件的进度目标作为进度计划值，则进度的实际值应是（）。",[381,383,385,387],{"key":20,"text":382,"correct":22},"总进度规划的实际进度",{"key":24,"text":384,"correct":29},"里程碑事件的实际进度",{"key":27,"text":386,"correct":22},"各子系统的实际进度",{"key":31,"text":388,"correct":22},"各分项工作的实际进度",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":27,"analysis":33},1117605,"控制项目目标的主要措施中，（）是最重要的措施。",[393,394,395,396],{"key":20,"text":329,"correct":22},{"key":24,"text":325,"correct":22},{"key":27,"text":323,"correct":29},{"key":31,"text":327,"correct":22},{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":24,"analysis":33},1117606,"某施工企业承揽一住宅楼项目施工，在实施的过程中，对项目的进度目标进行动态跟踪和控制，收集施工进度实际值之后应做的工作是()",[401,403,405,407],{"key":20,"text":402,"correct":22},"采取措施进行纠偏",{"key":24,"text":404,"correct":29},"比较工程进度的计划值和实际值",{"key":27,"text":406,"correct":22},"调整工程进度目标",{"key":31,"text":408,"correct":22},"逐层分解工程进度目标",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":24,"analysis":33},1117607,"关于项目目标的动态控制，下列说法正确的是（）",[413,415,417,419],{"key":20,"text":414,"correct":22},"项目管理最基本的方法论是过程控制论",{"key":24,"text":416,"correct":29},"项目目标的动态控制的核心是计划值和实际值的定期比较和纠偏",{"key":27,"text":418,"correct":22},"定期进行目标的计划值和实际值得比较属于主动控制措施",{"key":31,"text":420,"correct":22},"事前分析可能导致目标偏离的各种影响因素属于动态控制措施",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":31,"analysis":33},1117608,"在某大型工程项目的施工过程中，由于“下情不能上传，上情不能下达”导致项目经理不能及时作出正确决策，拖延了工期，为了加快施工进度，项目经理修正了信息传递工作流程。这种纠偏措施属于动态控制的（）。",[425,426,427,428],{"key":20,"text":329,"correct":22},{"key":24,"text":325,"correct":22},{"key":27,"text":327,"correct":22},{"key":31,"text":323,"correct":29},{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":27,"analysis":33},1117609,"某施工企业承担了某项施工任务，为保证项目目标的实现，项目经理做了以下各项工作，其中属于项目目标事前控制的内容是（）。",[433,434,436,438],{"key":20,"text":374,"correct":22},{"key":24,"text":435,"correct":22},"定期进行项目目标的计划值与实际值比较",{"key":27,"text":437,"correct":29},"针对影响项目目标的各种因素采取预防措施",{"key":31,"text":439,"correct":22},"当发现目标偏离时，采取纠偏措施进行纠偏",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":20,"analysis":33},1117610,"下列选项中，属于项目目标控制中主动控制的是()。",[444,446,448,450],{"key":20,"text":445,"correct":29},"针对可能导致目标偏离的影响因素采取预防措施",{"key":24,"text":447,"correct":22},"当目标出现偏离时采取行之有效的纠偏措施",{"key":27,"text":449,"correct":22},"进行目标的实际值与计划值的比较",{"key":31,"text":451,"correct":22},"分析目标的实际值与计划值之间存在偏差的原因",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":20,"analysis":33},1117611,"过渡期满后，大、中型工程在施工成本动态控制过程中，当对工程合同价与实际施工成本、工程款支付进行比较时，成本的计划值是()。",[456,458,459,461],{"key":20,"text":457,"correct":29},"工程合同价",{"key":24,"text":299,"correct":22},{"key":27,"text":460,"correct":22},"工程款支付额",{"key":31,"text":462,"correct":22},"施工图预算",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":24,"analysis":33},1117612,"运用动态控制原理控制施工成本时，要定期对施工成本的计划值和实际值进行比较。相对于施工成本规划而言，实际值是指()。",[467,468,469,470],{"key":20,"text":457,"correct":22},{"key":24,"text":299,"correct":29},{"key":27,"text":303,"correct":22},{"key":31,"text":471,"correct":22},"实际支付的工程款",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":20,"analysis":33},1117613,"根据项目目标动态控制的工作程序，第一步工作是()。",[476,478,479,481],{"key":20,"text":477,"correct":29},"进行项目目标分解",{"key":24,"text":374,"correct":22},{"key":27,"text":480,"correct":22},"进行目标的计划值与实际值比较",{"key":31,"text":482,"correct":22},"确定各种资源投入量",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":31,"analysis":33},1117614,"在施工过程中收集组成工程质量的各元素质量的实际值，并定期地对施工质量的计划值和实际值进行跟踪和控制，编制质量控制的()报告。",[487,489,491,493],{"key":20,"text":488,"correct":22},"旬、月、季和年度",{"key":24,"text":490,"correct":22},"日、旬、月、季",{"key":27,"text":492,"correct":22},"日、旬、半年和年度",{"key":31,"text":494,"correct":29},"月、季、半年和年度",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":27,"analysis":33},1117615,"进度的计划值和实际值的比较应是定量的数据比较，比较的成果是()。",[499,501,503,505],{"key":20,"text":500,"correct":22},"里程碑事件进度报告",{"key":24,"text":502,"correct":22},"施工进度计划执行报告",{"key":27,"text":504,"correct":29},"进度跟踪和控制报告",{"key":31,"text":506,"correct":22},"工程进展报告",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":31,"analysis":33},1117616,"某项目专业性强且技术复杂，开工后，由于专业原因该项目的项目经理不能胜任该项目，为了保证项目目标的实现，企业更换了项目经理。企业的此项行为属于项目目标动态控制的()。",[511,512,513,514],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":22},{"key":27,"text":329,"correct":22},{"key":31,"text":323,"correct":29},{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":31,"analysis":33},1117617,"以下属于在项目实施过程中，对项目目标进行动态跟踪和控制的是（）。",[519,521,523,525],{"key":20,"text":520,"correct":22},"进行任务分工、规定工作流程",{"key":24,"text":522,"correct":22},"事前分析可能导致项目目标偏离的各种影响因素",{"key":27,"text":524,"correct":22},"针对可能导致项目目标偏离的各种影响因素采取预防措施",{"key":31,"text":526,"correct":29},"定期进行项目目标的计划值与实际值的比较",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":20,"analysis":33},1117618,"项目管理最基本的方法论是在项目实施过程中必须随着情况的变化进行项目目标的()。",[531,532,534,536],{"key":20,"text":337,"correct":29},{"key":24,"text":533,"correct":22},"风险预测",{"key":27,"text":535,"correct":22},"分解落实",{"key":31,"text":537,"correct":22},"系统分析",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":27,"analysis":33},1117619,"某施工企业承揽了一项住宅楼施工项目，确定了项目的计划开工日期和竣工日期，并进一步确定了主要分部分项工程的区段工期目标和每月的计划工期。其目的是确定用于目标控制的()。",[542,544,546,548],{"key":20,"text":543,"correct":22},"偏差值",{"key":24,"text":545,"correct":22},"调整值",{"key":27,"text":547,"correct":29},"计划值",{"key":31,"text":549,"correct":22},"实际值",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":20,"analysis":33},1117620,"目标动态控制中，属于项目目标控制准备工作的是()。",[554,556,557,559],{"key":20,"text":555,"correct":29},"将项目的目标进行分解",{"key":24,"text":374,"correct":22},{"key":27,"text":558,"correct":22},"对项目的目标进行动态跟踪",{"key":31,"text":560,"correct":22},"找出实际值与计划值的偏差",[562,565,568,571,574,577],{"id":15,"name":563,"category":7,"favorite":564},"领导干部任职前廉政法规知识测试题",92,{"id":566,"name":567,"category":7,"favorite":15},595,"建筑结构与设备",{"id":569,"name":570,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":572,"name":573,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":575,"name":576,"category":7,"favorite":8},534,"BIM工程师",{"id":578,"name":576,"category":7,"favorite":8},535]