[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-10":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":556},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,10,50,2973,[13,34,46,58,66,78,90,102,114,126,137,146,158,168,176,188,196,204,212,222,230,242,252,264,272,284,296,308,320,332,344,352,364,376,388,400,412,424,436,448,456,468,480,490,501,511,519,527,535,545],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1117519,1,"单选题","某工程进度发生延误，项目经理为加快进度，提出一班工作制改为两班工作制，增加夜班工作，增加施工设备和改变施工方法等方案，这属于管理职能中的（）",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","筹划",true,{"key":24,"text":25,"correct":26},"B","决策",false,{"key":28,"text":29,"correct":26},"C","执行",{"key":31,"text":32,"correct":26},"D","检查","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1117520,"关于组织工具，下列说法正确的是()。",[38,40,42,44],{"key":20,"text":39,"correct":26},"组织结构模式反映一个组织系统中各项工作之间指令关系",{"key":24,"text":41,"correct":26},"组织分工反映一个组织系统中各单位之间工作任务分工和管理职能分工",{"key":28,"text":43,"correct":26},"组织结构模式和组织分工都是一种相对动态的组织关系",{"key":31,"text":45,"correct":22},"工作流程组织则可反映一个组织系统中各项工作之间的逻辑关系",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1117521,"( )通过树状图的方式对一个项目的结构进行逐层分解，以反映组成该项目的所有工作任务。",[50,52,54,56],{"key":20,"text":51,"correct":26},"组织结构图",{"key":24,"text":53,"correct":22},"项目结构图",{"key":28,"text":55,"correct":26},"合同结构图",{"key":31,"text":57,"correct":26},"工作流程图",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1117522,"管理是由多个环节组成的过程，其中第二个环节是()。",[62,63,64,65],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":32,"correct":26},{"key":31,"text":29,"correct":26},{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":20,"analysis":33},1117523,"编制项目进度项编码、合同编码、工程档案编码等项目信息编码的基础是( )。",[70,72,74,76],{"key":20,"text":71,"correct":22},"项目结构图和项目结构编码",{"key":24,"text":73,"correct":26},"组织结构图和组织结构编码",{"key":28,"text":75,"correct":26},"工作流程图和项目结构编码",{"key":31,"text":77,"correct":26},"工作流程图和组织结构编码",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":31,"analysis":33},1117524,"建设工程施工管理中的工作流程图反映的是一个项目的()关系。",[82,84,86,88],{"key":20,"text":83,"correct":26},"管理班子中各组成部门之间的组织",{"key":24,"text":85,"correct":26},"各项工作之间的组织",{"key":28,"text":87,"correct":26},"管理班子中各组成部门之间的逻辑关系",{"key":31,"text":89,"correct":22},"各项工作之间的逻辑",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":20,"analysis":33},1117525,"工作流程图用图的形式反映一个组织系统中()之间的逻辑关系。",[94,96,98,100],{"key":20,"text":95,"correct":22},"各项工作",{"key":24,"text":97,"correct":26},"各个部门",{"key":28,"text":99,"correct":26},"各管理人员",{"key":31,"text":101,"correct":26},"各工作人员",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":31,"analysis":33},1117526,"采用项目结构图对建设工程项目进行分解时，项目结构的分解应与( )相结合，与将采用的合同结构相结合。",[106,108,110,112],{"key":20,"text":107,"correct":26},"项目的目标控制",{"key":24,"text":109,"correct":26},"将采用的组织结构",{"key":28,"text":111,"correct":26},"施工方案",{"key":31,"text":113,"correct":22},"整个工程施工的部署",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":28,"analysis":33},1117527,"安庆公司承揽了1栋住宅楼改造一小型工程，合同总价380万元，希望指令源唯一。该项目宜选用的组织结构模式为( )。",[118,120,122,124],{"key":20,"text":119,"correct":26},"矩阵组织结构",{"key":24,"text":121,"correct":26},"虚拟组织结构",{"key":28,"text":123,"correct":22},"线性组织结构",{"key":31,"text":125,"correct":26},"事业部结构",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":31,"analysis":33},1117528,"在某建设项目的组织设计文件编制过程中，为了区分业主方和代表业主利益的项目管理方以及工程建设监理公司等相关方的管理职能，可使用的组织工具是()。",[130,132,134,135],{"key":20,"text":131,"correct":26},"工作任务分工表",{"key":24,"text":133,"correct":26},"项目组织结构图",{"key":28,"text":53,"correct":26},{"key":31,"text":136,"correct":22},"管理职能分工表",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":28,"analysis":33},1117529,"管理是由多个环节组成的过程，其中首要的环节是()。",[141,142,143,145],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":26},{"key":28,"text":144,"correct":22},"提出问题",{"key":31,"text":29,"correct":26},{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":31,"analysis":33},1117530,"中原学院图书馆工程项目经理，在建立项目组织机构时采用了线性组织结构模式。该项目组织结构的特点是()。",[150,152,154,156],{"key":20,"text":151,"correct":26},"可能有多个矛盾的指令源",{"key":24,"text":153,"correct":26},"有横向和纵向两个指令源",{"key":28,"text":155,"correct":26},"能促进管理专业化分工",{"key":31,"text":157,"correct":22},"每个工作部门只接受一个上级的直接领导",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":28,"analysis":33},1117531,"反映项目管理班子内部项目经理、各工作部门和各工作岗位对各项工作任务的管理职能分工，所采用的组织工具是()。",[162,163,165,166],{"key":20,"text":131,"correct":26},{"key":24,"text":164,"correct":26},"管理任务表",{"key":28,"text":136,"correct":22},{"key":31,"text":167,"correct":26},"项目管理工作表",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":20,"analysis":33},1117532,"反映项目组织系统中各项工作之间的逻辑关系，所采用的组织工具是()。",[172,173,174,175],{"key":20,"text":57,"correct":22},{"key":24,"text":53,"correct":26},{"key":28,"text":55,"correct":26},{"key":31,"text":51,"correct":26},{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":24,"analysis":33},1117533,"某建设项目管理公司的项目部，根据该项目特点制定了投资控制、进度控制、质量控制、合同管理等工作流程。这些工作流程组织属于()。",[180,182,184,186],{"key":20,"text":181,"correct":26},"物质流程组织",{"key":24,"text":183,"correct":22},"管理工作流程组织",{"key":28,"text":185,"correct":26},"信息工作流程组织",{"key":31,"text":187,"correct":26},"一般作业流程组织",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":31,"analysis":33},1117534,"某建筑公司项目经理王某接受了一个新项目。为顺利实施这个项目，王经理设计了各工作部门之间的指令关系，所采用的组织工具应当是()。",[192,193,194,195],{"key":20,"text":57,"correct":26},{"key":24,"text":131,"correct":26},{"key":28,"text":53,"correct":26},{"key":31,"text":51,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":31,"analysis":33},1117535,"反映企业中各工作部门之间的指令关系的组织工具应当是（）。",[200,201,202,203],{"key":20,"text":57,"correct":26},{"key":24,"text":131,"correct":26},{"key":28,"text":53,"correct":26},{"key":31,"text":51,"correct":22},{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":28,"analysis":33},1117536,"通过树状图的方式对一个工程的结构层逐层分解以反映该工程的所有工作任务的组织工具应当是（）。",[208,209,210,211],{"key":20,"text":57,"correct":26},{"key":24,"text":131,"correct":26},{"key":28,"text":53,"correct":22},{"key":31,"text":51,"correct":26},{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":28,"analysis":33},1117537,"项目投资控制、进度控制和质量控制工作编码的基础是（）",[216,218,219,221],{"key":20,"text":217,"correct":26},"任务分工表",{"key":24,"text":55,"correct":26},{"key":28,"text":220,"correct":22},"项目结构图和项目结构的编码",{"key":31,"text":51,"correct":26},{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":28,"analysis":33},1117538,"在某产业园区建设工过程中，需要对项目结构、项目组织、参建单位、采购合同、实施过程、进度与费用项目、各类报表、函件、工程档案等进行编码。其中，对项目结构每一层的每一个组成部分进行编码的依据是（）",[226,227,228,229],{"key":20,"text":55,"correct":26},{"key":24,"text":51,"correct":26},{"key":28,"text":220,"correct":22},{"key":31,"text":217,"correct":26},{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":24,"analysis":33},1117539,"项目目标实现的决定性因素是（）。",[234,236,238,240],{"key":20,"text":235,"correct":26},"工具",{"key":24,"text":237,"correct":22},"组织",{"key":28,"text":239,"correct":26},"人",{"key":31,"text":241,"correct":26},"方法",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":20,"analysis":33},1117540,"我国多数的企业、事业单位目前还沿用()模式。",[246,248,249,250],{"key":20,"text":247,"correct":22},"职能组织结构",{"key":24,"text":123,"correct":26},{"key":28,"text":119,"correct":26},{"key":31,"text":251,"correct":26},"流水组织结构",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":20,"analysis":33},1117541,"关于管理环节中决策的说法，正确的是()。",[256,258,260,262],{"key":20,"text":257,"correct":22},"从备选方案中选择一个即将被执行的方案",{"key":24,"text":259,"correct":26},"制定多项备选方案",{"key":28,"text":261,"correct":26},"落实已选定方案",{"key":31,"text":263,"correct":26},"检查方案是否被执行",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":20,"analysis":33},1117542,"对一个建设工程的项目管理进行诊断，首先应分析其()方面存在的问题。",[268,269,270,271],{"key":20,"text":237,"correct":22},{"key":24,"text":239,"correct":26},{"key":28,"text":241,"correct":26},{"key":31,"text":235,"correct":26},{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":20,"analysis":33},1117543,"江南工业工程公司任命李某为华都芯片生产基地建设项目经理。李经理为此组建了项目团体，运用工作任务分工表进行了任务分工。这种分工表可以明确表示()。",[276,278,280,282],{"key":20,"text":277,"correct":22},"工作任务及其责任者",{"key":24,"text":279,"correct":26},"决策职能及其责任者",{"key":28,"text":281,"correct":26},"筹划职能及其责任者",{"key":31,"text":283,"correct":26},"监督职能及其责任者",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":31,"analysis":33},1117544,"下图所示的项目组织结构模式的特点不包括()。",[288,290,292,294],{"key":20,"text":289,"correct":26},"每一个工作部门可能得到其直接和非直接的上级工作部门下达的工作指令",{"key":24,"text":291,"correct":26},"每一个部门可能会有多个矛盾的指令源",{"key":28,"text":293,"correct":26},"矛盾的指令会影响项目管理机制的运行",{"key":31,"text":295,"correct":22},"上下级指令传递的路径较长",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":20,"analysis":33},1117545,"根据编制的广度、深度和作用的不同，施工组织设计可分为施工组织总设计、单位工程施工组织设计及()。",[300,302,304,306],{"key":20,"text":301,"correct":22},"分部、分项工程施工组织设计",{"key":24,"text":303,"correct":26},"施工详图设计",{"key":28,"text":305,"correct":26},"施工工艺及方案设计",{"key":31,"text":307,"correct":26},"施工总平面设计",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":24,"analysis":33},1117546,"某工程项目包括办公楼、住宅楼、综合楼各一栋以及室外工程。针对综合楼施工所作的施工组织设计属于()。",[312,314,316,318],{"key":20,"text":313,"correct":26},"施工规划",{"key":24,"text":315,"correct":22},"单位工程施工组织设计",{"key":28,"text":317,"correct":26},"施工组织总设计",{"key":31,"text":319,"correct":26},"分部分项工程施工组织设计",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":28,"analysis":33},1117547,"单位工程施工组织设计是以( )为对象编制的。",[324,326,328,330],{"key":20,"text":325,"correct":26},"整个建设工程项目",{"key":24,"text":327,"correct":26},"某些特别重要的工程",{"key":28,"text":329,"correct":22},"单位工程",{"key":31,"text":331,"correct":26},"分部分项工程",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":28,"analysis":33},1117548,"施工组织设计的基本内容要结合工程对象的()综合考虑。",[336,338,340,342],{"key":20,"text":337,"correct":26},"地质条件、施工条件和技术水平",{"key":24,"text":339,"correct":26},"实际特点、施工平面图和施工条件",{"key":28,"text":341,"correct":22},"实际特点、施工条件和技术水平",{"key":31,"text":343,"correct":26},"施工环境、施工部署和施工水平",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":24,"analysis":33},1117549,"施工组织总设计是以()为对象而编制的。",[348,349,350,351],{"key":20,"text":329,"correct":26},{"key":24,"text":325,"correct":22},{"key":28,"text":327,"correct":26},{"key":31,"text":331,"correct":26},{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":20,"analysis":33},1117550,"施工组织总设计的编制依据一般不包括()。",[356,358,360,362],{"key":20,"text":357,"correct":22},"工程的施工图纸和要求",{"key":24,"text":359,"correct":26},"计划文件",{"key":28,"text":361,"correct":26},"设计文件",{"key":31,"text":363,"correct":26},"合同文件",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":24,"analysis":33},1117551,"某施工企业编制某建设项目施工组织总设计，先后进行了相关资料的收集和调研、主要工种工程量的计算、施工总体部署的确定等工作，接下来应进行的工作是()。",[368,370,372,374],{"key":20,"text":369,"correct":26},"施工总进度计划的编制",{"key":24,"text":371,"correct":22},"施工方案的拟定",{"key":28,"text":373,"correct":26},"资源需求量计划的编制",{"key":31,"text":375,"correct":26},"施工总平面图的设计",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":20,"analysis":33},1117552,"单位工程施工组织设计的主要内容一般不包括( )。",[380,382,384,386],{"key":20,"text":381,"correct":22},"施工方法和施工机械的选择",{"key":24,"text":383,"correct":26},"工程概况及施工特点分析",{"key":28,"text":385,"correct":26},"各项资源需求量计划",{"key":31,"text":387,"correct":26},"技术组织措施、质量保证措施和安全施工措施",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":28,"analysis":33},1117553,"不属于单位工程施工组织设计的编制依据的是( )。",[392,394,396,398],{"key":20,"text":393,"correct":26},"建设单位的意图和要求，如工期、质量、预算要求等",{"key":24,"text":395,"correct":26},"施工组织总设计对本单位工程的工期、质量和成本的控制要求",{"key":28,"text":397,"correct":22},"计划、设计以及合同文件",{"key":31,"text":399,"correct":26},"建筑环境、场地条件及地质、气象资料，如工程地质勘测报告、地形图和测量控制等",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":31,"analysis":33},1117554,"施工组织总设计的编制程序中，编制施工总进度计划之后的下一步工作是()。",[404,406,408,410],{"key":20,"text":405,"correct":26},"拟订施工方案",{"key":24,"text":407,"correct":26},"确定施工的总体部署",{"key":28,"text":409,"correct":26},"编制施工准备工作计划",{"key":31,"text":411,"correct":22},"编制资源需求量计划",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":20,"analysis":33},1117555,"对施工活动实行科学管理的重要手段是()，它具有战略部署和战术安排的双重作用。",[416,418,420,422],{"key":20,"text":417,"correct":22},"施工组织设计",{"key":24,"text":419,"correct":26},"工作流程组织",{"key":28,"text":421,"correct":26},"项目目标控制",{"key":31,"text":423,"correct":26},"施工质量控制",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":31,"analysis":33},1117556,"下列各项工程中，需要直接编制单位工程施工组织设计的是（）。",[428,430,432,434],{"key":20,"text":429,"correct":26},"某市新建机场工程",{"key":24,"text":431,"correct":26},"某城际高速公路（含公路、桥梁和隧道）",{"key":28,"text":433,"correct":26},"某拆除工程定向爆破工程",{"key":31,"text":435,"correct":22},"某发电厂干灰库烟囱维修工程",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":31,"analysis":33},1117557,"下列分部（分项）工程中，需要编制分部（分项）工程施工组织设计的是（）。",[440,442,444,446],{"key":20,"text":441,"correct":26},"零星土石方工程",{"key":24,"text":443,"correct":26},"场地平整",{"key":28,"text":445,"correct":26},"混凝土垫层工程",{"key":31,"text":447,"correct":22},"定向爆破工程",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":28,"analysis":33},1117558,"某建筑企业作为总承包商承接了某单位迁建工程所有项目的施工任务，项目包括办公楼、住宅楼和综合楼各一栋，则该公司针对整个迁建工程项目制定的施工组织设计属于()。",[452,453,454,455],{"key":20,"text":313,"correct":26},{"key":24,"text":315,"correct":26},{"key":28,"text":317,"correct":22},{"key":31,"text":319,"correct":26},{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":24,"analysis":33},1117559,"施工组织总设计包括如下工作：①计算主要工种工程的工作量；②编制施工总进度计划；③编制资源需求量计划；④拟定施工方案，则其正确的工作顺序是()。",[460,462,464,466],{"key":20,"text":461,"correct":26},"①②③④",{"key":24,"text":463,"correct":22},"①④②③",{"key":28,"text":465,"correct":26},"①③②④",{"key":31,"text":467,"correct":26},"④①②③",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":24,"analysis":33},1117560,"施工组织总设计包括如下工作：①编制资源需求量计划；②编制施工总进度计划；③施工总平面图设计；④拟订施工方案。其正确的工作顺序是()。",[472,474,476,478],{"key":20,"text":473,"correct":26},"①一②一③一④",{"key":24,"text":475,"correct":22},"④一②一①一③",{"key":28,"text":477,"correct":26},"①一③一②一④",{"key":31,"text":479,"correct":26},"④一①一②一③",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":24,"analysis":33},1117561,"某住宅小区建设中,承包商针对其中一幢住宅楼施工所编制的施工组织设计,属于()。",[484,485,486,488],{"key":20,"text":317,"correct":26},{"key":24,"text":315,"correct":22},{"key":28,"text":487,"correct":26},"单项工程施工组织设计",{"key":31,"text":489,"correct":26},"分部工程施工组织设计",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":28,"analysis":33},1117562,"下列分部（分项）工程中，不需要编制分部（分项）工程施工组织设计的是()。",[494,496,498,499],{"key":20,"text":495,"correct":26},"大量土石方工程",{"key":24,"text":497,"correct":26},"特大构件的吊装",{"key":28,"text":445,"correct":22},{"key":31,"text":500,"correct":26},"无粘结预应力混凝土工程",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":31,"analysis":33},1117563,"根据编制的广度、深度和作用的不同进行分类，施工组织设计不包括（）。",[505,506,507,509],{"key":20,"text":317,"correct":26},{"key":24,"text":315,"correct":26},{"key":28,"text":508,"correct":26},"分部（分项）工程作业设计",{"key":31,"text":510,"correct":22},"专项施工组织设计",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":28,"analysis":33},1117564,"某建筑工程公司作为总承包商承接了某单位迁建工程所有项目的施工任务。项目包括办公楼、住宅楼和综合楼各一栋。该公司针对整个迁建工程项目制定的施工组织设计属于()。",[515,516,517,518],{"key":20,"text":313,"correct":26},{"key":24,"text":315,"correct":26},{"key":28,"text":317,"correct":22},{"key":31,"text":319,"correct":26},{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":24,"analysis":33},1117565,"某建筑工程公司作为总承包商承接了某高校新校区的全部工程项目，针对其中的综合楼建设所作的施工组织设计属于()。",[523,524,525,526],{"key":20,"text":313,"correct":26},{"key":24,"text":315,"correct":22},{"key":28,"text":317,"correct":26},{"key":31,"text":319,"correct":26},{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":31,"analysis":33},1117566,"某新建办公楼工程，地上28层，地下2层，并设有大型设备层，地下室标高-17. 5m，地下情况复杂，施工困难，针对该情况，施工单位应当编制()。",[531,532,533,534],{"key":20,"text":313,"correct":26},{"key":24,"text":315,"correct":26},{"key":28,"text":317,"correct":26},{"key":31,"text":319,"correct":22},{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":20,"analysis":33},1117567,"某公司计划编制施工组织设计，已收集和熟悉了相关资料，调查了项目特点和施工条件，计算了主要工种的工程量，确定了施工的总体部署，接下来应该进行的工作是()。",[539,541,543,544],{"key":20,"text":540,"correct":22},"拟定施工方案",{"key":24,"text":542,"correct":26},"编制施工总进度计划",{"key":28,"text":411,"correct":26},{"key":31,"text":409,"correct":26},{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":24,"analysis":33},1117568,"对整个建设项目的施工进行战略部署并且指导全局性施工的技术和经济纲领性文件是（）。",[549,551,552,554],{"key":20,"text":550,"correct":26},"施工部署及施工方案",{"key":24,"text":317,"correct":22},{"key":28,"text":553,"correct":26},"施工进度计划",{"key":31,"text":555,"correct":26},"施工平面布置",[557,560,563,566,569,572],{"id":15,"name":558,"category":7,"favorite":559},"领导干部任职前廉政法规知识测试题",92,{"id":561,"name":562,"category":7,"favorite":15},595,"建筑结构与设备",{"id":564,"name":565,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":567,"name":568,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":570,"name":571,"category":7,"favorite":8},534,"BIM工程师",{"id":573,"name":571,"category":7,"favorite":8},535]