[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-789-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":612},{"id":5,"name":6,"category":7,"favorite":8},789,"二建建设工程施工管理","建筑工程",0,1,50,2973,[13,33,45,57,69,81,93,104,116,128,139,151,163,175,187,199,211,223,235,244,253,265,277,289,301,313,325,337,349,360,372,384,396,408,420,432,444,456,468,480,492,504,516,528,540,552,564,576,588,600],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":26,"analysis":32},1117008,"单选题","关于建设工程项目管理的说法，正确的是（）。",[18,22,25,29],{"key":19,"text":20,"correct":21},"A","业主方是建设工程项目生产过程的总集成者，工程总承包方是建设工程项目生产过程的总组织者",false,{"key":23,"text":24,"correct":21},"B","建设项目工程总承包方的管理工作不涉及项目设计准备阶段",{"key":26,"text":27,"correct":28},"C","供货方项目管理的目标包括供货方的成本目标、供货的进度和质量目标",true,{"key":30,"text":31,"correct":21},"D","建设项目工程总承包方管理的目标只包括总承包方的成本目标、项目的进度和质量目标","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":30,"analysis":32},1117010,"某建设工程项目采取施工总承包管理模式，R 监理公司承担施工监理任务，G 施工企业承担主要的施工任务，业主将其中的二次装修发包给C 装饰公司，则C 装饰公司在施工中应接受（ ）的施工管理。",[37,39,41,43],{"key":19,"text":38,"correct":21},"业主",{"key":23,"text":40,"correct":21},"R 监理公司",{"key":26,"text":42,"correct":21},"G 施工企业",{"key":30,"text":44,"correct":28},"施工总承包管理方",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":26,"analysis":32},1117011,"关于施工总承包管理方责任的说法，正确的是（ ）。",[49,51,53,55],{"key":19,"text":50,"correct":21},"承担施工任务并对其质量负责",{"key":23,"text":52,"correct":21},"与分包方和供货方直接签订合同",{"key":26,"text":54,"correct":28},"承担对分包方的组织和管理责任",{"key":30,"text":56,"correct":21},"负责组织和指挥总承包单位的施工",{"id":58,"libraryId":5,"type":9,"typeLabel":15,"stem":59,"options":60,"answer":30,"analysis":32},1117012,"项目设计准备阶段的工作包括（）。",[61,63,65,67],{"key":19,"text":62,"correct":21},"编制项目建议书",{"key":23,"text":64,"correct":21},"编制项目可行性研究报告",{"key":26,"text":66,"correct":21},"编制项目初步设计",{"key":30,"text":68,"correct":28},"编制项目设计任务书",{"id":70,"libraryId":5,"type":9,"typeLabel":15,"stem":71,"options":72,"answer":23,"analysis":32},1117014,"项目管理的核心任务是项目的（ ）。",[73,75,77,79],{"key":19,"text":74,"correct":21},"组织协调",{"key":23,"text":76,"correct":28},"目标控制",{"key":26,"text":78,"correct":21},"合同管理",{"key":30,"text":80,"correct":21},"风险管理",{"id":82,"libraryId":5,"type":9,"typeLabel":15,"stem":83,"options":84,"answer":30,"analysis":32},1117016,"建设项目管理就是自项目开始至项目完成，通过（ ）使项目目标得以实现。",[85,87,89,91],{"key":19,"text":86,"correct":21},"项目策划和项目组织",{"key":23,"text":88,"correct":21},"项目控制和项目协调",{"key":26,"text":90,"correct":21},"项目组织和项目控制",{"key":30,"text":92,"correct":28},"项目策划和项目控制",{"id":94,"libraryId":5,"type":9,"typeLabel":15,"stem":95,"options":96,"answer":26,"analysis":32},1117017,"某工作项目施工采用施工总承包模式，其中电气设备由业主指定的分包单位采购和安装，则在施工中分包单位必须接受（ ）工作指令，服从其总体项目管理。",[97,98,100,102],{"key":19,"text":38,"correct":21},{"key":23,"text":99,"correct":21},"设计方",{"key":26,"text":101,"correct":28},"施工总承包方",{"key":30,"text":103,"correct":21},"项目监理方",{"id":105,"libraryId":5,"type":9,"typeLabel":15,"stem":106,"options":107,"answer":30,"analysis":32},1117019,"建设项目总承包的核心意义在于（ ）。",[108,110,112,114],{"key":19,"text":109,"correct":21},"合同总价包干降低成本",{"key":23,"text":111,"correct":21},"总承包方负责“交钥匙”",{"key":26,"text":113,"correct":21},"设计与施工的责任明确",{"key":30,"text":115,"correct":28},"为项目建设增值",{"id":117,"libraryId":5,"type":9,"typeLabel":15,"stem":118,"options":119,"answer":30,"analysis":32},1117020,"建设工程项目的全寿命周期包括项目的（ ）。",[120,122,124,126],{"key":19,"text":121,"correct":21},"可行性研究阶段、设计阶段、施工阶段",{"key":23,"text":123,"correct":21},"可行性研究阶段、施工阶段、使用阶段",{"key":26,"text":125,"correct":21},"决策阶段、实施阶段、保修阶段",{"key":30,"text":127,"correct":28},"决策阶段、实施阶段、使用阶段",{"id":129,"libraryId":5,"type":9,"typeLabel":15,"stem":130,"options":131,"answer":23,"analysis":32},1117022,"在建设工程施工总承包管理模式下，合同的主体是有分包方与（）签订。",[132,134,136,137],{"key":19,"text":133,"correct":21},"总承包管理方",{"key":23,"text":135,"correct":28},"业主方",{"key":26,"text":99,"correct":21},{"key":30,"text":138,"correct":21},"咨询机构",{"id":140,"libraryId":5,"type":9,"typeLabel":15,"stem":141,"options":142,"answer":19,"analysis":32},1117024,"某业主欲投资建造一座五星级宾馆，业主方项目管理的进度目标指的是（ ）。",[143,145,147,149],{"key":19,"text":144,"correct":28},"宾馆可以开业",{"key":23,"text":146,"correct":21},"项目竣工结算完成",{"key":26,"text":148,"correct":21},"宾馆开始盈利",{"key":30,"text":150,"correct":21},"项目通过竣工验收",{"id":152,"libraryId":5,"type":9,"typeLabel":15,"stem":153,"options":154,"answer":26,"analysis":32},1117025,"关于施工方项目管理目标和任务，下列说法中正确的是（ ）。",[155,157,159,161],{"key":19,"text":156,"correct":21},"施工总承包管理方对所承包的工程承担施工任务执行和组织的总的责任",{"key":23,"text":158,"correct":21},"施工方项目管理服务于施工方的利益，而不需要考虑其他方",{"key":26,"text":160,"correct":28},"由业主方选定的分包方应经过施工总承包管理方的认可",{"key":30,"text":162,"correct":21},"建设项目工程总承包的主要意义是总价包干和交钥匙",{"id":164,"libraryId":5,"type":9,"typeLabel":15,"stem":165,"options":166,"answer":26,"analysis":32},1117026,"甲单位拟新建一电教中心，经设计招标，由乙设计院承担该项目设计任务。下列目标中，不属于乙设计院项目管理目标的是（ ）。",[167,169,171,173],{"key":19,"text":168,"correct":21},"项目投资目标",{"key":23,"text":170,"correct":21},"设计进度目标",{"key":26,"text":172,"correct":28},"施工质量目标",{"key":30,"text":174,"correct":21},"设计成本目标",{"id":176,"libraryId":5,"type":9,"typeLabel":15,"stem":177,"options":178,"answer":30,"analysis":32},1117028,"下图反映的是某建设项目业主、项目总承包人、分包人之间的（ ）。",[179,181,183,185],{"key":19,"text":180,"correct":21},"协作关系",{"key":23,"text":182,"correct":21},"管理关系",{"key":26,"text":184,"correct":21},"指令关系",{"key":30,"text":186,"correct":28},"合同关系",{"id":188,"libraryId":5,"type":9,"typeLabel":15,"stem":189,"options":190,"answer":30,"analysis":32},1117029,"某施工企业采用矩阵组织结构模式，其横向工作部门可以是（ ）。",[191,193,195,197],{"key":19,"text":192,"correct":21},"合同管理部",{"key":23,"text":194,"correct":21},"计划管理部",{"key":26,"text":196,"correct":21},"财务管理部",{"key":30,"text":198,"correct":28},"项目管理部",{"id":200,"libraryId":5,"type":9,"typeLabel":15,"stem":201,"options":202,"answer":19,"analysis":32},1117031,"建设工程施工管理是多个环节组成的过程，第一个环节的工作是（ ）。",[203,205,207,209],{"key":19,"text":204,"correct":28},"提出问题",{"key":23,"text":206,"correct":21},"决策",{"key":26,"text":208,"correct":21},"执行",{"key":30,"text":210,"correct":21},"检查",{"id":212,"libraryId":5,"type":9,"typeLabel":15,"stem":213,"options":214,"answer":19,"analysis":32},1117032,"下列组织工具图，表示的是（ ）。",[215,217,219,221],{"key":19,"text":216,"correct":28},"项目结构图",{"key":23,"text":218,"correct":21},"工作流程图",{"key":26,"text":220,"correct":21},"组织结构图",{"key":30,"text":222,"correct":21},"合同结构图",{"id":224,"libraryId":5,"type":9,"typeLabel":15,"stem":225,"options":226,"answer":23,"analysis":32},1117034,"建设过程施工方进度目标能否实现的决定性因素是（ ）。",[227,229,231,233],{"key":19,"text":228,"correct":21},"项目经理",{"key":23,"text":230,"correct":28},"组织体系",{"key":26,"text":232,"correct":21},"施工方案",{"key":30,"text":234,"correct":21},"信息技术",{"id":236,"libraryId":5,"type":9,"typeLabel":15,"stem":237,"options":238,"answer":30,"analysis":32},1117035,"组织结构模式反映了一个组织系统中各子系统之间或各元素之间的（ ）。",[239,241,242,243],{"key":19,"text":240,"correct":21},"逻辑关系",{"key":23,"text":180,"correct":21},{"key":26,"text":186,"correct":21},{"key":30,"text":184,"correct":28},{"id":245,"libraryId":5,"type":9,"typeLabel":15,"stem":246,"options":247,"answer":19,"analysis":32},1117036,"对项目的结构进行逐层分解，反映项目所有工作任务的组织工具是（ ）。",[248,249,251,252],{"key":19,"text":216,"correct":28},{"key":23,"text":250,"correct":21},"组织结构",{"key":26,"text":222,"correct":21},{"key":30,"text":218,"correct":21},{"id":254,"libraryId":5,"type":9,"typeLabel":15,"stem":255,"options":256,"answer":19,"analysis":32},1117038,"建设工程项目结构图描述的是（ ）。",[257,259,261,263],{"key":19,"text":258,"correct":28},"工作对象之间的关系",{"key":23,"text":260,"correct":21},"组织系统中各部门的职责分工",{"key":26,"text":262,"correct":21},"项目各参与方之间的关系",{"key":30,"text":264,"correct":21},"组织系统中各子系统之间的关系",{"id":266,"libraryId":5,"type":9,"typeLabel":15,"stem":267,"options":268,"answer":26,"analysis":32},1117039,"施工项目管理机构编制项目管理任务分工表之前要完成的工作是（ ）。",[269,271,273,275],{"key":19,"text":270,"correct":21},"明确各项管理工作的工作流程",{"key":23,"text":272,"correct":21},"落实各工作部门的具体人员",{"key":26,"text":274,"correct":28},"对项目管理任务进行详细分解",{"key":30,"text":276,"correct":21},"对各项管理工作的执行情况进行检查",{"id":278,"libraryId":5,"type":9,"typeLabel":15,"stem":279,"options":280,"answer":23,"analysis":32},1117041,"编制施工管理任务分工表，涉及到的事项有：①确定工作部门或个人的工作任务；②项目管理任务分解；③编制任务分工表。正确的编制程序是（ ）。",[281,283,285,287],{"key":19,"text":282,"correct":21},"①②③",{"key":23,"text":284,"correct":28},"②①③",{"key":26,"text":286,"correct":21},"③②①",{"key":30,"text":288,"correct":21},"②③①",{"id":290,"libraryId":5,"type":9,"typeLabel":15,"stem":291,"options":292,"answer":26,"analysis":32},1117042,"编制项目管理工作任务分工表的目的是为了明确（ ）。",[293,295,297,299],{"key":19,"text":294,"correct":21},"项目的构成及项目之间的关系",{"key":23,"text":296,"correct":21},"各项工作任务的重要程度",{"key":26,"text":298,"correct":28},"各项任务的负责部门及配合或参与部门(或个人）",{"key":30,"text":300,"correct":21},"各项工作之间的先后关系",{"id":302,"libraryId":5,"type":9,"typeLabel":15,"stem":303,"options":304,"answer":23,"analysis":32},1117044,"某项目部根据项目特点制定了投资控制、进度控制、合同管理、付款和设计变更等工作流程，这些工作流程组织属于（ ）。",[305,307,309,311],{"key":19,"text":306,"correct":21},"物质流程组织",{"key":23,"text":308,"correct":28},"管理工作流程组织",{"key":26,"text":310,"correct":21},"信息处理工作流程组织",{"key":30,"text":312,"correct":21},"施工工作流程组织",{"id":314,"libraryId":5,"type":9,"typeLabel":15,"stem":315,"options":316,"answer":23,"analysis":32},1117045,"某建设工程项目施工前，业主方制定了工程款支付审批程序：施工方申报-监理方审批-业主现场代表审查-业主项目负责人审核-业主分管副经理审批支付。该程序属于（ ）。",[317,319,321,323],{"key":19,"text":318,"correct":21},"成本控制工作流程",{"key":23,"text":320,"correct":28},"投资控制工作流程",{"key":26,"text":322,"correct":21},"信息处理工作流程",{"key":30,"text":324,"correct":21},"物资采购工作流程",{"id":326,"libraryId":5,"type":9,"typeLabel":15,"stem":327,"options":328,"answer":30,"analysis":32},1117047,"下列关于项目管理工作任务分工表的说法，正确的是（ ）。",[329,331,333,335],{"key":19,"text":330,"correct":21},"工作任务分工表反映组织系统的动态关系",{"key":23,"text":332,"correct":21},"一个工程项目只能编制一张工作任务分工表",{"key":26,"text":334,"correct":21},"工作任务分工表中的具体任务不能改变",{"key":30,"text":336,"correct":28},"工作任务分工表是项目的组织设计文件之一",{"id":338,"libraryId":5,"type":9,"typeLabel":15,"stem":339,"options":340,"answer":26,"analysis":32},1117048,"建设工程施工管理中的组织结构图反映的是（ ）。",[341,343,345,347],{"key":19,"text":342,"correct":21},"一个项目中各工作之间的组织关系",{"key":23,"text":344,"correct":21},"一个项目中各组成部分之间的组织关系",{"key":26,"text":346,"correct":28},"一个项目管理班子中各组成部门之间的组织关系",{"key":30,"text":348,"correct":21},"一个项目中各组成部分之间的逻辑关系",{"id":350,"libraryId":5,"type":9,"typeLabel":15,"stem":351,"options":352,"answer":30,"analysis":32},1117049,"把施工所需的各种资源、生产、生活活动场地及各种临时设施合理地布置在施工现场，使整个现场能有组织地进行文明施工，属于施工组织设计中（ ）的内容。",[353,355,356,358],{"key":19,"text":354,"correct":21},"施工部署",{"key":23,"text":232,"correct":21},{"key":26,"text":357,"correct":21},"安全施工专项方案",{"key":30,"text":359,"correct":28},"施工平面图",{"id":361,"libraryId":5,"type":9,"typeLabel":15,"stem":362,"options":363,"answer":23,"analysis":32},1117051,"对整个建设工程项目的施工进行战略部署，并且是指导全局性施工的技术和经济纲要的文件是（ ）。",[364,366,368,370],{"key":19,"text":365,"correct":21},"施工总平面图",{"key":23,"text":367,"correct":28},"施工组织总设计",{"key":26,"text":369,"correct":21},"施工部署及施工方案",{"key":30,"text":371,"correct":21},"施工图设计文件",{"id":373,"libraryId":5,"type":9,"typeLabel":15,"stem":374,"options":375,"answer":30,"analysis":32},1117052,"下列分部（分项）工程中，需要编制分部（分项）工程施工组织设计的是（ ）。",[376,378,380,382],{"key":19,"text":377,"correct":21},"零星土方工程",{"key":23,"text":379,"correct":21},"场地平整",{"key":26,"text":381,"correct":21},"混凝土垫层工程",{"key":30,"text":383,"correct":28},"定向爆破工程",{"id":385,"libraryId":5,"type":9,"typeLabel":15,"stem":386,"options":387,"answer":30,"analysis":32},1117054,"编制施工组织总设计涉及下列工作：①施工总平面图②拟定施工方案③编制施工总进度计划④编制资源需求计划⑤计算主要工程的工程量，正确的编制程序是（ ）。",[388,390,392,394],{"key":19,"text":389,"correct":21},"⑤①②③④",{"key":23,"text":391,"correct":21},"①⑤②③④",{"key":26,"text":393,"correct":21},"①②③④⑤",{"key":30,"text":395,"correct":28},"⑤②③④①",{"id":397,"libraryId":5,"type":9,"typeLabel":15,"stem":398,"options":399,"answer":26,"analysis":32},1117055,"根据施工组织总设计编制程序，编制施工总进度计划前需收集相关资料和图纸、计算主要工程量、确定施工的总体部署和（ ）。",[400,402,404,406],{"key":19,"text":401,"correct":21},"编制资源需求计划",{"key":23,"text":403,"correct":21},"编制施工准备工作计划",{"key":26,"text":405,"correct":28},"拟定施工方案",{"key":30,"text":407,"correct":21},"计算主要技术经济指标",{"id":409,"libraryId":5,"type":9,"typeLabel":15,"stem":410,"options":411,"answer":23,"analysis":32},1117057,"需要编制单位工程施工组织设计的工程项目是（）。",[412,414,416,418],{"key":19,"text":413,"correct":21},"新建居民小区工程",{"key":23,"text":415,"correct":28},"发电厂干灰库烟囱工程",{"key":26,"text":417,"correct":21},"工厂整体搬迁工程",{"key":30,"text":419,"correct":21},"拆除工程定向爆破工程",{"id":421,"libraryId":5,"type":9,"typeLabel":15,"stem":422,"options":423,"answer":23,"analysis":32},1117058,"运用动态控制原理控制施工质量时，质量目标不仅包括各分部分项工程的施工质量，还包括（ ）。",[424,426,428,430],{"key":19,"text":425,"correct":21},"设计图纸的质量",{"key":23,"text":427,"correct":28},"材料及设备的质量",{"key":26,"text":429,"correct":21},"业主的决策质量",{"key":30,"text":431,"correct":21},"施工计划的质量",{"id":433,"libraryId":5,"type":9,"typeLabel":15,"stem":434,"options":435,"answer":30,"analysis":32},1117060,"关于项目目标动态控的说法，错误的是（ ）。",[436,438,440,442],{"key":19,"text":437,"correct":21},"动态控制首先应将目标分解，制定目标控制的计划值",{"key":23,"text":439,"correct":21},"当目标的计划值和实际值发生偏差时应进行纠偏",{"key":26,"text":441,"correct":21},"在项目实施过程中对项目进行动态跟踪和控制",{"key":30,"text":443,"correct":28},"目标的计划值在任何情况下都应保持不变",{"id":445,"libraryId":5,"type":9,"typeLabel":15,"stem":446,"options":447,"answer":30,"analysis":32},1117061,"建设工程项目目标动态控制的核心是( )。",[448,450,452,454],{"key":19,"text":449,"correct":21},"合理确定计划值",{"key":23,"text":451,"correct":21},"认真收集实际值",{"key":26,"text":453,"correct":21},"适当调整工程项目目标",{"key":30,"text":455,"correct":28},"比较分析,采取纠偏措施",{"id":457,"libraryId":5,"type":9,"typeLabel":15,"stem":458,"options":459,"answer":19,"analysis":32},1117063,"分析和论证施工成本目标实现的可能性，并对施工成本目标的分解通过（）进行的。",[460,462,464,466],{"key":19,"text":461,"correct":28},"编制施工成本规划",{"key":23,"text":463,"correct":21},"编制施工成本比较报表",{"key":26,"text":465,"correct":21},"编制工作任务分工表",{"key":30,"text":467,"correct":21},"编制施工组织设计",{"id":469,"libraryId":5,"type":9,"typeLabel":15,"stem":470,"options":471,"answer":26,"analysis":32},1117065,"项目部针对施工进度滞后问题，提出了落实管理人员责任，优化工作流程、改进施工方法、强化奖惩机制等措施，其中属于技术措施的是（ ）。",[472,474,476,478],{"key":19,"text":473,"correct":21},"落实管理人员责任",{"key":23,"text":475,"correct":21},"优化工作流程",{"key":26,"text":477,"correct":28},"改进施工方法",{"key":30,"text":479,"correct":21},"强化奖惩机制",{"id":481,"libraryId":5,"type":9,"typeLabel":15,"stem":482,"options":483,"answer":26,"analysis":32},1117066,"大型建设工程项目进度目标分解的工作有1.编制各子项目施工进度的计划；2.编制施工总进度计划；3.编制施工总进度规划；4.编制项目各子系统计划、正确的目标分解过程是（）。",[484,486,488,490],{"key":19,"text":485,"correct":21},"2-3-1-4",{"key":23,"text":487,"correct":21},"2-3-4-1",{"key":26,"text":489,"correct":28},"3-2-1-4",{"key":30,"text":491,"correct":21},"3-2-4-1",{"id":493,"libraryId":5,"type":9,"typeLabel":15,"stem":494,"options":495,"answer":23,"analysis":32},1117068,"下列建设工程项目目标动态控制的工作中，属于准备工作的是（ ）。",[496,498,500,502],{"key":19,"text":497,"correct":21},"收集项目目标的实际值",{"key":23,"text":499,"correct":28},"对项目目标进行分解",{"key":26,"text":501,"correct":21},"将项目目标的实际值和计划值相比较",{"key":30,"text":503,"correct":21},"对产生偏差采取纠偏措施",{"id":505,"libraryId":5,"type":9,"typeLabel":15,"stem":506,"options":507,"answer":23,"analysis":32},1117069,"根据《建设工程施工合同（示范文本）》，项目经理在紧急情况下有权采取必要措施保证与工程有关的人身，财产和工程安全，但应在48 小时内向（ ）提交书面报告。",[508,510,512,514],{"key":19,"text":509,"correct":21},"承包方法定代表人和总监理工程师",{"key":23,"text":511,"correct":28},"发包方代表和总监理工程师",{"key":26,"text":513,"correct":21},"监督只能部门和承包方法定代表人",{"key":30,"text":515,"correct":21},"政府只能监督部门和发包人代表",{"id":517,"libraryId":5,"type":9,"typeLabel":15,"stem":518,"options":519,"answer":23,"analysis":32},1117070,"根据《建设工程项目管理规范》，建设工程施工前由施工企业法定代表人或其授权人与项目经理协商制定的文件是（ ）",[520,522,524,526],{"key":19,"text":521,"correct":21},"施工组织设计",{"key":23,"text":523,"correct":28},"项目管理目标责任书",{"key":26,"text":525,"correct":21},"施工总体规划",{"key":30,"text":527,"correct":21},"工程总承包合同",{"id":529,"libraryId":5,"type":9,"typeLabel":15,"stem":530,"options":531,"answer":19,"analysis":32},1117072,"下列建设工程施工风险因素中，属于组织风险的是（ ）。",[532,534,536,538],{"key":19,"text":533,"correct":28},"承包人管理人员的能力",{"key":23,"text":535,"correct":21},"公用防火设施的可用性",{"key":26,"text":537,"correct":21},"岩土地质条件",{"key":30,"text":539,"correct":21},"工程机械的稳定性",{"id":541,"libraryId":5,"type":9,"typeLabel":15,"stem":542,"options":543,"answer":19,"analysis":32},1117074,"下列防范土方开挖过程中塌方风险而采取的措施，属于风险转移对策的是（ ）。",[544,546,548,550],{"key":19,"text":545,"correct":28},"投保建筑工程一切险",{"key":23,"text":547,"correct":21},"设置警示牌",{"key":26,"text":549,"correct":21},"进行专题安全教育",{"key":30,"text":551,"correct":21},"设置边坡护壁",{"id":553,"libraryId":5,"type":9,"typeLabel":15,"stem":554,"options":555,"answer":30,"analysis":32},1117075,"施工风险管理过程包括施工全过程的风险识别、风险评估、风险应对和（ ）。",[556,558,560,562],{"key":19,"text":557,"correct":21},"风险转移",{"key":23,"text":559,"correct":21},"风险跟踪",{"key":26,"text":561,"correct":21},"风险排序",{"key":30,"text":563,"correct":28},"风险监控",{"id":565,"libraryId":5,"type":9,"typeLabel":15,"stem":566,"options":567,"answer":19,"analysis":32},1117077,"根据构成风险的因素分类，建设工程施工现场因防火设施数量不足而产生的风险术语（ ）风险。",[568,570,572,574],{"key":19,"text":569,"correct":28},"经济与管理",{"key":23,"text":571,"correct":21},"组织",{"key":26,"text":573,"correct":21},"工程环境",{"key":30,"text":575,"correct":21},"技术",{"id":577,"libraryId":5,"type":9,"typeLabel":15,"stem":578,"options":579,"answer":30,"analysis":32},1117078,"根据《建设工程监理规范》，关于旁站监理的说法，正确的是（ ）",[580,582,584,586],{"key":19,"text":581,"correct":21},"施工企业对需要旁站的监理的关键部位进行施工之前，应至少提前48 小时通知项目监理机构",{"key":23,"text":583,"correct":21},"若施工企业现场质检人员未签字而旁站监理人员签字认可，即可进行下一道工序",{"key":26,"text":585,"correct":21},"旁站监理人员发现施工活动危及工程质量的，可直接下达停工指令",{"key":30,"text":587,"correct":28},"旁站监理人员对主体结构混凝土浇筑应进行旁站监理",{"id":589,"libraryId":5,"type":9,"typeLabel":15,"stem":590,"options":591,"answer":23,"analysis":32},1117079,"工程监理人员实施监理过程中，发现工程设计不符合工程质量标准或合同约定的质量要求时，应当采取的措施是（ ）",[592,594,596,598],{"key":19,"text":593,"correct":21},"要求施工单位报告设计单位改正",{"key":23,"text":595,"correct":28},"报告建设单位要求设计单位改正",{"key":26,"text":597,"correct":21},"直接与设计单位确认修改工程计划",{"key":30,"text":599,"correct":21},"要求施工单位改正并报告设计单位",{"id":601,"libraryId":5,"type":9,"typeLabel":15,"stem":602,"options":603,"answer":19,"analysis":32},1117081,"旁站监理人员实施旁站监理时,如发现施工单位存在违反工程建设强制性标准的行为,首先应（ ）。",[604,606,608,610],{"key":19,"text":605,"correct":28},"责令施工单位立即整改",{"key":23,"text":607,"correct":21},"立即下达工程暂停令",{"key":26,"text":609,"correct":21},"立即报告政府主管部门",{"key":30,"text":611,"correct":21},"立即报告业主代表和总监理工程师",[613,616,619,622,625,628],{"id":9,"name":614,"category":7,"favorite":615},"领导干部任职前廉政法规知识测试题",92,{"id":617,"name":618,"category":7,"favorite":9},595,"建筑结构与设备",{"id":620,"name":621,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":623,"name":624,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":626,"name":627,"category":7,"favorite":8},534,"BIM工程师",{"id":629,"name":627,"category":7,"favorite":8},535]