[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1120079":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1120079,789,1,"单选题","据国际有关文献资料介绍，建设工程项目10%～33%的费用增加与()存在的问题有关。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","信息交流",true,{"key":16,"text":17,"correct":18},"B","施工质量",false,{"key":20,"text":21,"correct":18},"C","施工进度",{"key":23,"text":24,"correct":18},"D","员工素质","2021\u002F2020教材P277页 据有关国际文献的资料统计中的第二条明确指出建设工程项目10%-33%的费用增加与信息交流存在的问题有关，依题意只有“信息交流”符合题意。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]