[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1120055":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1120055,789,1,"单选题","为了充分发挥信息资源的作用和提高信息管理的水平，施工单位和其项目管理部门都应设置专门的工作部门（或专门的人员）负责（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","信息收集",false,{"key":16,"text":17,"correct":14},"B","信息加工",{"key":19,"text":20,"correct":21},"C","信息管理",true,{"key":23,"text":24,"correct":14},"D","信息传输","2021\u002F2020教材P276页 “为充分发挥信息资源的作用和提高信息管理的水平，施工单位和其项目管理部门都应设置专门的工作部门（或专门的人员）负责信息管理。”",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]