[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1120043":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1120043,789,1,"单选题","为了充分利用和发挥信息资源的价值、提高信息管理效率以及实现有序的和科学的信息管理，各方都应该编制各自的（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目管理规划",false,{"key":16,"text":17,"correct":18},"B","信息管理手册",true,{"key":20,"text":21,"correct":14},"C","系统开发计划",{"key":23,"text":24,"correct":14},"D","信息编码表","2021\u002F2020教材P278页 三、信息管理手册的主要内容施工方、业主方和项目参与其他各方都有各自的信息管理任务，为充分利用和发挥信息资源的价值、提高信息管理效率以及实现有序的和科学的信息管理，各方都应该编制各自的信息管理手册。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]