[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1120033":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1120033,789,1,"单选题","建设工程项目利用信息技术手段进行信息管理，其核心手段是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","数据库技术",false,{"key":16,"text":17,"correct":14},"B","数据库的不断更新",{"key":19,"text":20,"correct":14},"C","信息处理的工作平台",{"key":22,"text":23,"correct":24},"D","基于互联网的信息处理平台",true,"2021\u002F2020教材P281页 其核心的技术是基于网络的信息处理平台。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]