[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119973":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1119973,789,1,"单选题","项目经理部收到工程图纸后，应组织有关人员进行审查，将设计疑问及图纸存在的问题，按专业整理、汇总后报（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","施工单位",false,{"key":16,"text":17,"correct":14},"B","设计单位",{"key":19,"text":20,"correct":14},"C","监理单位",{"key":22,"text":23,"correct":24},"D","建设单位",true,"2021\u002F2020教材P285页 1.图纸会审记录文件：项目经理部收到工程图纸后，应组织有关人员进行审查，将设计疑问及图纸存在的问题，按专业整理、汇总后报建设单位。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]