[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119907":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1119907,789,1,"单选题","某施工合同实施过程中出现了偏差，经过偏差分析后，承包人采取了夜间加班、增加劳动力投入等措施。这种调整措施属于()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","组织措施",true,{"key":16,"text":17,"correct":18},"B","技术措施",false,{"key":20,"text":21,"correct":18},"C","经济措施",{"key":23,"text":24,"correct":18},"D","合同措施","2021\u002F2020教材P259页 （1）组织措施，如增加人员投入、调整人员安排、调整工作流程和工作计划等，",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]