[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119776":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1119776,789,1,"单选题","采用( )合同，承包商不承担任何价格变化或工程量变化的风险，这些风险主要由业主承担，对业主的投资控制很不利。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","固定总价",false,{"key":16,"text":17,"correct":14},"B","可调单价",{"key":19,"text":20,"correct":14},"C","固定单价",{"key":22,"text":23,"correct":24},"D","成本加酬金",true,"2021\u002F2020教材P255页 采用这种合同（成本加酬金合同），承包商不承担任何价格变化或工程量变化的风险，这些风险主要由业主承担，对业主的投资控制很不利。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]