[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119774":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1119774,789,1,"单选题","根据《建设工程施工合同（示范文本）》(GF-1999-0201)规定，合同双方可约定，在()条件下不可以对合同价款进行调整。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","一周内非承包人原因停水、停电、停气造成的停工累计6h",true,{"key":16,"text":17,"correct":18},"B","工程造价管理部门公布的价格调整",false,{"key":20,"text":21,"correct":18},"C","国家有关政策变化影响合同价款",{"key":23,"text":24,"correct":18},"D","法律、行政法规变化影响合同价款","2021\u002F2020教材P254页 合同双方可约定，以下条件可对合同价款进行调整：（1）法律，行政法规和国家有关政策变化影响合同价款。（2）工程造价管理部门公布的价格调整。（3）一周内非承包人原因停水，停电，停气造成的停工累计超过8小时，（4）双方约定的其他因素。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]