[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119772":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1119772,789,1,"单选题","某建设工程项目承包合同的计价方式是单价合同,在评标过程中,发现某一个投标者其总价和单价的计算结果不一致,究其原因是投标者在计算时,将混凝土300元\u002Fm3误作为30元\u002Fm3的结果。为此,业主有权()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","以单价为准调整总价",true,{"key":16,"text":17,"correct":18},"B","以总价为准调整单价",false,{"key":20,"text":21,"correct":18},"C","要求投标者重新报混凝土単价",{"key":23,"text":24,"correct":18},"D","将该标做废标处理","2021\u002F2020教材P253页 当上述初步合同总价与各项单价乘以实际完成的工程量之和发生矛盾时，则肯定以后者为准，即单价优先。实际工程款的支付也将以实际完成工程量乘以合同单价进行计算。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]