[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119740":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1119740,789,1,"单选题","某建设工程采用单价合同，其投标报价单中，钢筋混凝土数量为1000m3，合同价应该是30万元，而实际只写了3万元。实际施工时，实际工程量为1500m3，则钢筋混凝土工程的价款金额应该是（）万元",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","30",false,{"key":16,"text":17,"correct":14},"B","3",{"key":19,"text":20,"correct":21},"C","45",true,{"key":23,"text":24,"correct":14},"D","4.5","2021\u002F2020教材P252页 人们常常注重总价格，但在工程款结算中单价优先。对于投标书中明显的数字计算错误，业主有权力先作修改再评标，当总价和单价的计算结果不一致时，以单价为准调整总价。业主给出的工程量清单表中的数字是参考数字，而实际工程款则按实际完成的工程量和承包商投标时所报的单价计算。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]