[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119734":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1119734,789,1,"单选题","合同价款的支付一般分三次，设备制造前，采购方支付设备价格的()作为预付款。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","5%",false,{"key":16,"text":17,"correct":18},"B","10%",true,{"key":20,"text":21,"correct":14},"C","15%",{"key":23,"text":24,"correct":14},"D","20%","2021\u002F2020教材P251页 合同价款的支付一般分三次：（1）设备制造前，采购方支付设备价格的10%作为预付款；（2）供货方按照交货顺序在规定的时间内将货物送达交货地点，采购方支付该批设备价的80%；（3）剩余的10%作为设备保证金，待保证期满，采购方签发最终验收证书后支付。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]