[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119733":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1119733,789,1,"单选题","设备采购合同规定，供货方按照交货顺序在规定的时间内将货物送达交货地点，采购方支付该批设备价的()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","20%",false,{"key":16,"text":17,"correct":14},"B","40%",{"key":19,"text":20,"correct":14},"C","60%",{"key":22,"text":23,"correct":24},"D","80%",true,"2021\u002F2020教材P251页 （2）供货方按照交货顺序在规定的时间内将货物送达交货地点，采购方支付该批设备价的80%；",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]