[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119706":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1119706,789,1,"单选题","建筑材料采购合同中约定委托运输单位代运的产品，交货日期一般以（）为准。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","供货方发货戳记的日期",false,{"key":16,"text":17,"correct":14},"B","采购方收货戳记的日期",{"key":19,"text":20,"correct":14},"C","合同约定的提货日期",{"key":22,"text":23,"correct":24},"D","承运单位签发的日期",true,"2021\u002F2020教材P250页 (3)凡委托运输部门或单位运输、送货或代运的产品，一般以供货方发运产品时承运单位签发的日期为准，不是以向承运单位提出申请的日期为准。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]