[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119696":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1119696,789,1,"单选题","某工程施工承包单位将其承包工程中的劳务作业发包给某劳务分包单位，双方约定劳务报酬采用固定劳务报酬。该劳务分包合同在履行过程中应()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","由工程师确认劳务分包人的工时和工程量",false,{"key":16,"text":17,"correct":14},"B","由劳务分包人每日提供劳务人数给工程承包人，由工程承包人确认",{"key":19,"text":20,"correct":14},"C","由劳务分包人按月将完成的工程量报工程承包人，由工程承包人确认",{"key":22,"text":23,"correct":24},"D","不计算劳务分包人的工时和工程量",true,"2021\u002F2020教材P248页 根据施工劳务分包合同示范文本的规定，采用固定劳务报酬方式的，施工过程中不计算工时和工程量。只有在劳务分包合同约定采用计时单价或计价单价计算劳务报酬的情况下，才需要劳务分包人向工程承包人报送有关劳务人数或工程量的报告，由工程承包人确认。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]