[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119687":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1119687,789,1,"单选题","根据《建设工程施工专业分包合同（示范文本）》GF-2003-0213，下列说法正确的是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","发包人向分包人提供具备施工条件的施工场地",false,{"key":16,"text":17,"correct":14},"B","分包人可直接致函发包人或工程师",{"key":19,"text":20,"correct":21},"C","就分包范围内的有关工作，承包人随时可以向分包人发出指令",true,{"key":23,"text":24,"correct":14},"D","分包合同价款与总承包合同相应部分的价款存在连带关系","2021\u002F2020教材P244页 承包人向分包人提供与分包工程相关的各种证件、批件和各种相关资料，向分包人提供具备施工条件的施工场地；未经承包人允许，分包人不得以任何理由与发包人或工程师发生直接工作联系，分包人不得直接致函发包人或工程师．也不得直接接受发包人或工程师指令；分包合同价款与总包合同相应部分价款无任何连带关系。 @##",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]