[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119670":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1119670,789,1,"单选题","根据《建设工程施工合同（示范文本）》（GF-1999-0201）规定，监理人审查后认为已具备竣工验收条件的，应在收到竣工验收申请报告后的()d内提请发包人进行工程验收。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","28",true,{"key":16,"text":17,"correct":18},"B","21",false,{"key":20,"text":21,"correct":18},"C","14",{"key":23,"text":24,"correct":18},"D","7","2021\u002F2020教材P242页 （2）监理人审查后认为已具备竣工验收条件的，应在收到竣工验收申请报告后的28d内提请发包人进行工程验收。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]