[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1119663":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1119663,789,1,"单选题","某工程监理人在审核当月承包人提交的进度付款申请单时，发现前二个月已签发的进度付款证书中存在错误，多支付了承包人约50万元的进度款，根据《标准施工招标文件》中“通用合同条款”的规定该笔款()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程师无权扣除",false,{"key":16,"text":17,"correct":18},"B","应在本次进度付款中扣除",true,{"key":20,"text":21,"correct":14},"C","应在本次进度付款中扣除一半",{"key":23,"text":24,"correct":14},"D","应在竣工付款中扣除","2021\u002F2020教材P240页 在对以往历次已签发的进度付款证书进行汇总和复核中发现错、漏或重复的，监理人有权予以修正，承包人也有权提出修正申请。经双方复核同意的修正，应在本次进度付款中支付或扣除。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]